IR 05000285/2016401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/31/2016
| issue date = 08/31/2016
| title = Non-Public Security Inspection Plan for Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2016401)
| title = Non-Public Security Inspection Plan for Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2016401)
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS
| author affiliation = NRC/RGN-IV/DRS
| addressee name = Marik S M
| addressee name = Marik S
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:SECURITY-RELATED INFORMATIO " " August 31, 2016  
{{#Wiki_filter:SECURITY-RELATED INFORMATIO UNITED STATES ust 31, 2016


Mr. Shane M. Marik, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station P.O. Box 550 Fort Calhoun, NE 68023-0550
==SUBJECT:==
 
NON-PUBLIC SECURITY INSPECTION PLAN FOR FORT CALHOUN STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000285/2016401)
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR FORT CALHOUN STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000285/2016401)


==Dear Mr. Marik:==
==Dear Mr. Marik:==
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Fort Calhoun Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility. The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Fort Calhoun Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.


While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


Please contact me at (817) 200-1527 with any questions you have regarding this letter.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.


Sincerely,/RA/
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40


===Enclosure:===
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Inspection Plan


cc w/encl:
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Enclosure:
Inspection Plan cc w/encl:
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl:
Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl:
Electronic Distribution for Fort Calhoun Station
Electronic Distribution for Fort Calhoun Station
}}
}}

Latest revision as of 15:43, 30 October 2019

Non-Public Security Inspection Plan for Calhoun Station (NRC Physical Security Inspection Report Number 05000285/2016401)
ML16242A110
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 08/31/2016
From: Mark Haire
Division of Reactor Safety IV
To: Marik S
Omaha Public Power District
References
IR 2016401
Download: ML16242A110 (4)


Text

SECURITY-RELATED INFORMATIO UNITED STATES ust 31, 2016

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR FORT CALHOUN STATION (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000285/2016401)

Dear Mr. Marik:

On August 11, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Fort Calhoun Station. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2018. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-285 License No. DPR-40 Enclosure:

Inspection Plan cc w/encl:

Mr. Dennis A. Bakalar Manager, Site Security Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-1 9610 Power Lane Blair, NE 68008 cc w/o encl:

Electronic Distribution for Fort Calhoun Station