ML16362A449: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16362A449
| number = ML16362A449
| issue date = 12/22/2016
| issue date = 12/22/2016
| title = Waterford Steam Electric Station Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01
| title = Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Chisum M R
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000382/2016406]]
See also: [[see also::IR 05000382/2016406]]


=Text=
=Text=
{{#Wiki_filter:December 22, 2016   EA-16-276  
{{#Wiki_filter:UNITED STATES
                          NUCLEAR REGULATORY COMMISSION
                                              REGION IV
Mr. Michael R. Chisum  
                                        1600 E. LAMAR BLVD
Site Vice President Entergy Operations, Inc. 17265 River Road  
                                      ARLINGTON, TX 76011-4511
Killona, LA 70057-0751  
                                      December 22, 2016
EA-16-276
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL OF NON-CITED VIOLATION 05000382/2016406-01
Mr. Michael R. Chisum
Dear Mr. Chisum:  
Site Vice President
Entergy Operations, Inc.
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2, 2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a  
17265 River Road
non-cited violation, NCV 05000382/2016406-01 "Failure to Analyze and Identify Site-Specific  
Killona, LA 70057-0751
Conditions.The non-cited violation enclosed with Inspection Report 05000382/2016406  
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
required you to respond in writing within 30 days if you contest the violation.   On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance  
              RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation.   The NRC is  
              OF NON-CITED VIOLATION 05000382/2016406-01
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8  
Dear Mr. Chisum:
of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written response within 90 days of the receipt of your letter.  
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2,
made available electronically for public inspection in the NRC Public Document Room and in the UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a
M. Chisum  - 2 - 
non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific
NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html.  Sincerely,
Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406
  /RA/ 
required you to respond in writing within 30 days if you contest the violation.
  Mark S. Haire, Chief
On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance
Plant Support Branch 1
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is
Division of Reactor Safety
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8
Docket No. 50-382 License No. NPF-38
of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written
response within 90 days of the receipt of your letter.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
 
made available electronically for public inspection in the NRC Public Document Room and in the


   ML16362A449  SUNSI Review By: ADM ADAMS Yes    No Publicly Available  Non-Publicly Available Non-Sensitive  Sensitive Keyword: NRC-002 OFFICE PSI:PSB1 C:PSB1 ACES C:PBD C:PSB1   NAME AMeyen MHaire CAlldredge GMiller MHaire   SIGNATURE E-mail E-mail /RA/ /RA/ /RA/   DATE 12/20/16 12/20/16 12/22/16 12/22/16 12/22/16  
M. Chisum                                  -2-
  Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016 SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL  
NRCs Agencywide Documents Access and Management System (ADAMS), accessible from
OF NON-CITED VIOLATION 05000382/2016406-01
the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
Electronic distribution by RIV: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)  
                                            Sincerely,
DRP Deputy Director (Ryan.Lantz@nrc.gov)  
                                            /RA/
DRS Director (Anton.Vegel@nrc.gov)  
                                            Mark S. Haire, Chief
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Frances.Ramirez@nrc.gov) Resident Inspector (Chris.Speer@nrc.gov)  
                                            Plant Support Branch 1
Site Administrative Assistant (Amy.Elam@nrc.gov)  
                                            Division of Reactor Safety
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)  
Docket No. 50-382
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov)  
License No. NPF-38
Public Affairs Officer (Victor.Dricks@nrc.gov)  
 
Project Manager (April.Pulvirenti@nrc.gov)  
 
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)  
ML16362A449
RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
   SUNSI Review         ADAMS          Publicly Available        Non-Sensitive Keyword:
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
By: ADM                 Yes No     Non-Publicly Available   Sensitive     NRC-002
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)  
OFFICE       PSI:PSB1   C:PSB1     ACES           C:PBD       C:PSB1
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov)
NAME         AMeyen     MHaire     CAlldredge     GMiller     MHaire
SIGNATURE E-mail       E-mail     /RA/           /RA/       /RA/
DATE         12/20/16   12/20/16   12/22/16       12/22/16   12/22/16
                                 
Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
              RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
              OF NON-CITED VIOLATION 05000382/2016406-01
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Site Administrative Assistant (Amy.Elam@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (April.Pulvirenti@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)
}}
}}

Latest revision as of 09:52, 30 October 2019

Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01
ML16362A449
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/22/2016
From: Mark Haire
Plant Support Branch-1
To: Chisum M
Entergy Operations
References
EA-16-276 IR 2016406
Download: ML16362A449 (4)


See also: IR 05000382/2016406

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

December 22, 2016

EA-16-276

Mr. Michael R. Chisum

Site Vice President

Entergy Operations, Inc.

17265 River Road

Killona, LA 70057-0751

SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF

RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL

OF NON-CITED VIOLATION 05000382/2016406-01

Dear Mr. Chisum:

This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in

response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2,

2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a

non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific

Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406

required you to respond in writing within 30 days if you contest the violation.

On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance

Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is

currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8

of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written

response within 90 days of the receipt of your letter.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room and in the

M. Chisum -2-

NRCs Agencywide Documents Access and Management System (ADAMS), accessible from

the NRC Website at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Mark S. Haire, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No. 50-382

License No. NPF-38

ML16362A449

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: ADM Yes No Non-Publicly Available Sensitive NRC-002

OFFICE PSI:PSB1 C:PSB1 ACES C:PBD C:PSB1

NAME AMeyen MHaire CAlldredge GMiller MHaire

SIGNATURE E-mail E-mail /RA/ /RA/ /RA/

DATE 12/20/16 12/20/16 12/22/16 12/22/16 12/22/16

Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016

SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF

RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL

OF NON-CITED VIOLATION 05000382/2016406-01

Electronic distribution by RIV:

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

Site Administrative Assistant (Amy.Elam@nrc.gov)

Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)

Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (April.Pulvirenti@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

RIV RSLO (Bill.Maier@nrc.gov)