ML16362A449: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16362A449 | | number = ML16362A449 | ||
| issue date = 12/22/2016 | | issue date = 12/22/2016 | ||
| title = | | title = Acknowledgement of Response to NRC Inspection Report 05000382/2016406 and Denial of Non-Cited Violation 05000382/2016406-01 | ||
| author name = Haire M | | author name = Haire M | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 | ||
| addressee name = Chisum M | | addressee name = Chisum M | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000382 | | docket = 05000382 | ||
Line 15: | Line 15: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000382/2016406]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:December 22, 2016 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
Mr. Michael R. Chisum | 1600 E. LAMAR BLVD | ||
Site Vice President Entergy Operations, Inc. 17265 River Road | ARLINGTON, TX 76011-4511 | ||
Killona, LA | December 22, 2016 | ||
EA-16-276 | |||
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL OF NON-CITED VIOLATION 05000382/2016406-01 | Mr. Michael R. Chisum | ||
Dear Mr. Chisum: | Site Vice President | ||
Entergy Operations, Inc. | |||
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2, 2016. | 17265 River Road | ||
non-cited violation, NCV 05000382/2016406-01 | Killona, LA 70057-0751 | ||
Conditions. | SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF | ||
required you to respond in writing within 30 days if you contest the violation. | RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL | ||
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. | OF NON-CITED VIOLATION 05000382/2016406-01 | ||
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8 | Dear Mr. Chisum: | ||
of the Enforcement Manual. | This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in | ||
In accordance with 10 CFR 2.390 of the | response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2, | ||
made available electronically for public inspection in the NRC Public Document Room and in the | 2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a | ||
non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific | |||
Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406 | |||
required you to respond in writing within 30 days if you contest the violation. | |||
On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance | |||
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is | |||
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8 | |||
of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written | |||
response within 90 days of the receipt of your letter. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
made available electronically for public inspection in the NRC Public Document Room and in the | |||
M. Chisum -2- | |||
NRCs Agencywide Documents Access and Management System (ADAMS), accessible from | |||
OF NON-CITED VIOLATION 05000382/2016406-01 | the NRC Website at http://www.nrc.gov/reading-rm/adams.html. | ||
Electronic distribution by RIV: Regional Administrator (Kriss.Kennedy@nrc.gov) Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) | Sincerely, | ||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | /RA/ | ||
DRS Director (Anton.Vegel@nrc.gov) | Mark S. Haire, Chief | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | Plant Support Branch 1 | ||
Site Administrative Assistant (Amy.Elam@nrc.gov) | Division of Reactor Safety | ||
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) | Docket No. 50-382 | ||
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov) Project Engineer, DRP/D (Jan.Tice@nrc.gov) Project Engineer, DRP/D (Brian.Parks@nrc.gov) | License No. NPF-38 | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (April.Pulvirenti@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | ML16362A449 | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) | SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | ||
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | By: ADM Yes No Non-Publicly Available Sensitive NRC-002 | ||
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | OFFICE PSI:PSB1 C:PSB1 ACES C:PBD C:PSB1 | ||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) RIV RSLO (Bill.Maier@nrc.gov) | NAME AMeyen MHaire CAlldredge GMiller MHaire | ||
SIGNATURE E-mail E-mail /RA/ /RA/ /RA/ | |||
DATE 12/20/16 12/20/16 12/22/16 12/22/16 12/22/16 | |||
Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016 | |||
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF | |||
RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL | |||
OF NON-CITED VIOLATION 05000382/2016406-01 | |||
Electronic distribution by RIV: | |||
Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | |||
DRP Director (Troy.Pruett@nrc.gov) | |||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (Frances.Ramirez@nrc.gov) | |||
Resident Inspector (Chris.Speer@nrc.gov) | |||
Site Administrative Assistant (Amy.Elam@nrc.gov) | |||
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov) | |||
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov) | |||
Project Engineer, DRP/D (Jan.Tice@nrc.gov) | |||
Project Engineer, DRP/D (Brian.Parks@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Project Manager (April.Pulvirenti@nrc.gov) | |||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | |||
RIV RSLO (Bill.Maier@nrc.gov) | |||
}} | }} |
Latest revision as of 09:52, 30 October 2019
ML16362A449 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 12/22/2016 |
From: | Mark Haire Plant Support Branch-1 |
To: | Chisum M Entergy Operations |
References | |
EA-16-276 IR 2016406 | |
Download: ML16362A449 (4) | |
See also: IR 05000382/2016406
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
December 22, 2016
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
OF NON-CITED VIOLATION 05000382/2016406-01
Dear Mr. Chisum:
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in
response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2,
2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a
non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific
Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406
required you to respond in writing within 30 days if you contest the violation.
On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8
of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written
response within 90 days of the receipt of your letter.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room and in the
M. Chisum -2-
NRCs Agencywide Documents Access and Management System (ADAMS), accessible from
the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: ADM Yes No Non-Publicly Available Sensitive NRC-002
OFFICE PSI:PSB1 C:PSB1 ACES C:PBD C:PSB1
NAME AMeyen MHaire CAlldredge GMiller MHaire
SIGNATURE E-mail E-mail /RA/ /RA/ /RA/
DATE 12/20/16 12/20/16 12/22/16 12/22/16 12/22/16
Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
OF NON-CITED VIOLATION 05000382/2016406-01
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Site Administrative Assistant (Amy.Elam@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (April.Pulvirenti@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)