December 22, 2016
Mr. Michael R. Chisum
Site Vice President
Entergy Operations, Inc.
17265 River Road
Killona, LA 70057-0751
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
OF NON-CITED VIOLATION 05000382/2016406-01
Dear Mr. Chisum:
This letter acknowledges your December 15, 2016, (ML16350A400) correspondence in
response to NRC Inspection Report 05000382/2016406, (ML16307A236) dated November 2,
2016. On November 2, 2016, the US Nuclear Regulatory Commission (NRC) documented a
non-cited violation, NCV 05000382/2016406-01 Failure to Analyze and Identify Site-Specific
Conditions. The non-cited violation enclosed with Inspection Report 05000382/2016406
required you to respond in writing within 30 days if you contest the violation.
On December 15, 2016, the NRC received a letter from Mr. John Jarrell, Regulatory Assurance
Manager, at Waterford Steam Electric Station, Unit 3, contesting the violation. The NRC is
currently reviewing you basis for contesting the violation in accordance with Part I, Section 2.2.8
of the Enforcement Manual. Accordingly, we will provide the results of our evaluation by written
response within 90 days of the receipt of your letter.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room and in the
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD
ARLINGTON, TX 76011-4511
M. Chisum
- 2 -
NRCs Agencywide Documents Access and Management System (ADAMS), accessible from
the NRC Website at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Mark S. Haire, Chief
Plant Support Branch 1
Division of Reactor Safety
Docket No. 50-382
License No. NPF-38
SUNSI Review
By: ADM
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
OFFICE
PSI:PSB1
C:PSB1
ACES
C:PBD
C:PSB1
NAME
AMeyen
MHaire
CAlldredge
GMiller
MHaire
SIGNATURE
/RA/
/RA/
/RA/
DATE
12/20/16
12/20/16
12/22/16
12/22/16
12/22/16
Letter to Michael R. Chisum from Mark S. Haire, dated December 22, 2016
SUBJECT: WATERFORD STEAM ELECTRIC STATION ACKNOWLEDGEMENT OF
RESPONSE TO NRC INSPECTION REPORT 05000382/2016406 AND DENIAL
OF NON-CITED VIOLATION 05000382/2016406-01
Electronic distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
Site Administrative Assistant (Amy.Elam@nrc.gov)
Branch Chief, DRP/D (Geoffrey.Miller@nrc.gov)
Senior Project Engineer, DRP/D (John.Dixon@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (April.Pulvirenti@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)