| issue date = 03/01/2017
| issue date = 03/01/2017
| title = Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006)
| title = Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006)
| author name = Pruett T W
| author name = Pruett T
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
| addressee name = Fallacara V
| addressee name = Fallacara V
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:rch 1, 2017
[[Issue date::March 1, 2017]]


Mr. Vincent Fallacara Acting Site Vice President Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006)


SUBJECT: ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006)
==Dear Mr. Fallacara:==
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
 
The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016.
 
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness.
 
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.


==Dear Mr. Fallacara:==
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRC's Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs." The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans." This inspection will be conducted at Grand Gulf Nuclear Station to confirm the station's full implementation of Commission Orders EA-12-049 and EA-12-051. From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.
Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Grand Gulf Nuclear Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.
 
From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.
 
Sincerely,
/RA/
Troy Pruett, Director Division of Reactor Projects Docket No. 50-416 License No. NPF-29 Enclosure:
Grand Gulf Nuclear Station Inspection Plan
 
ML17059D517 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: GWarnick/dll Yes No Non-Publicly Available Sensitive NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D NAME GWarnick AVegel TPruett SIGNATURE /RA/ /RA JClark /RA/
for/
DATE 2/27/17 2/23/17 2/27/17
 
Page 1 of 3      Grand Gulf 02/23/2017 11:46:34    Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EP3 - EP PROGRAM INSPECTION (POSTPONE 2016)      2 1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing 1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RESTART - ENHANCED BASELINE FOR STAND DOWN RESTART    6 1 01/10/2017 03/25/2017 IP 7111104 Equipment Alignment (Quarterly)
1 01/10/2017 03/25/2017 IP 7111111Q Licensed Operator Requalification Program 1 01/10/2017 03/25/2017 IP 7111118 Plant Modifications 1 01/10/2017 03/25/2017 IP 7111119 Post Maintenance Testing 1 01/10/2017 03/25/2017 IP 7111120 Refueling and Other Outage Activities 1 01/10/2017 03/25/2017 IP 7111122 Surveillance Testing RS 13 PI - RADIATION SAFETY      2 1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION      4 1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]
1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]
TI191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE    4 1 03/06/2017 03/10/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 EP-2 - BIENNIAL EP EXERCISE INSPECTION      4 1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation 1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EXAM - INITIAL EXAM      3 1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)
1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)
ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH)      1 1 06/01/2017 06/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EXAM - INITIAL EXAM (2ND ONE)      4 1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
This report does not include INPO and OUTAGE activities.


Sincerely,/RA/ Troy Pruett, Director Division of Reactor Projects Docket No. 50-416 License No. NPF-29
This report shows only on-site and announced inspection procedures.


===Enclosure:===
Page 2 of 3      Grand Gulf 02/23/2017 11:46:34    Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RS TEAM        4 1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BRQ - BRQ INSPECTION      3 1 07/31/2017 08/04/2017 IP 7111111B Licensed Operator Requalification Program EB1-21M - GG DESIGN BASIS INSPECTION      6 1 09/11/2017 09/29/2017 IP 7111121M Component Design Bases Inspection (Teams)
Grand Gulf Nuclear Station Inspection Plan  
TSB 52B - BIENNIAL PI&R      4 1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution 1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION R21      1 1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR RS 12PI - RAD SAFETY      2 1 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/05/2018 03/09/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness EB1-17T - GG 50.59 CHANGES, TESTS, EXPERIMENTS      3 1 10/22/2018 10/26/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP-1 - EP PROGRAM INSPECTION      1 1 11/05/2018 11/09/2018 IP 7111402 Alert and Notification System Testing 1 11/05/2018 11/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/05/2018 11/09/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/05/2018 11/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/05/2018 11/09/2018 IP 71151-EP01 Drill/Exercise Performance 1 11/05/2018 11/09/2018 IP 71151-EP02 ERO Readiness 1 11/05/2018 11/09/2018 IP 71151-EP03 Alert & Notification System Reliability RS 5678 - RAD SAFETY      4 1 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 11/26/2018 11/30/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/26/2018 11/30/2018 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.


SUNSI Review By: GWarnick/dll ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D NAME GWarnick AVegel TPruett SIGNATURE /RA/ /RA JClark for/ /RA/ DATE 2/27/17 2/23/17 2/27/17 Grand GulfInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 1 of 302/23/2017 11:46:342EP3-EP PROGRAM INSPECTION (POSTPONE 2016)1 01/09/201701/13/2017IP7111402Alert and Notification System Testing1 01/09/201701/13/2017IP7111403Emergency Preparedness Organization Staffing and Augmentation System1 01/09/201701/13/2017IP7111404Emergency Action Level and Emergency Plan Changes1 01/09/201701/13/2017IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies6RESTART-ENHANCED BASELINE FOR STAND DOWN RESTART1 01/10/201703/25/2017IP7111104Equipment Alignment (Quarterly)1 01/10/201703/25/2017IP7111111QLicensed Operator Requalification Program1 01/10/201703/25/2017IP7111118Plant Modifications1 01/10/201703/25/2017IP7111119Post Maintenance Testing1 01/10/201703/25/2017IP7111120Refueling and Other Outage Activities1 01/10/201703/25/2017IP7111122Surveillance Testing2RS 13 PI-RADIATION SAFETY1 02/13/201702/17/2017IP71124.01Radiological Hazard Assessment and Exposure Controls1 02/13/201702/17/2017IP71124.03In-Plant Airborne Radioactivity Control and Mitigation1 02/13/201702/17/2017IP71151-OR01Occupational Exposure Control Effectiveness1 02/13/201702/17/2017IP71151-PR01RETS/ODCM Radiological Effluent Occurrences4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION1 04/03/201704/07/2017IP7111105TFire Protection [Triennial]1 04/17/201704/28/2017IP7111105TFire Protection [Triennial]4TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE1 03/06/201703/10/2017IP2515/191Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20124EP-2-BIENNIAL EP EXERCISE INSPECTION1 03/27/201703/31/2017IP7111401Exercise Evaluation1 03/27/201703/31/2017IP7111404Emergency Action Level and Emergency Plan Changes3EXAM-INITIAL EXAM1 04/10/201704/14/2017X02613INITIAL EXAM GG( 4/17)1 05/08/201705/12/2017X02613INITIAL EXAM GG( 4/17)1ISFSI-LOADING INSPECTION (ONE WEEK IN MONTH)1 06/01/201706/30/2017IP60855.1Operation of an Independent Spent Fuel Storage Installation at Operating Plants4EXAM-INITIAL EXAM (2ND ONE)1 10/30/201711/03/2017X02598INITIAL EXAM GRAND GULF (12/2017)1 12/04/201712/08/2017X02598INITIAL EXAM GRAND GULF (12/2017)This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Grand GulfInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 2 of 302/23/2017 11:46:344RS 5678-RS TEAM1 07/10/201707/14/2017IP71124.05Radiation Monitoring Instrumentation1 07/10/201707/14/2017IP71124.06Radioactive Gaseous and Liquid Effluent Treatment1 07/10/201707/14/2017IP71124.07Radiological Environmental Monitoring Program1 07/10/201707/14/2017IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation3BRQ-BRQ INSPECTION1 07/31/201708/04/2017IP7111111BLicensed Operator Requalification Program6EB1-21M-GG DESIGN BASIS INSPECTION1 09/11/201709/29/2017IP7111121MComponent Design Bases Inspection (Teams)4TSB 52B-BIENNIAL PI&R1 10/30/201711/03/2017IP71152BProblem Identification and Resolution1 11/13/201711/17/2017IP71152BProblem Identification and Resolution171111.08-INSERVICE INSPECTION R211 03/05/201803/09/2018IP7111108GInservice Inspection Activities - BWR2RS 12PI-RAD SAFETY1 03/05/201803/09/2018IP71124.01Radiological Hazard Assessment and Exposure Controls1 03/05/201803/09/2018IP71124.02Occupational ALARA Planning and Controls1 03/05/201803/09/2018IP71151-OR01Occupational Exposure Control Effectiveness1 03/05/201803/09/2018IP71151-OR01Occupational Exposure Control Effectiveness3EB1-17T-GG 50.59 CHANGES, TESTS, EXPERIMENTS1 10/22/201810/26/2018IP7111117TEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications1EP-1-EP PROGRAM INSPECTION1 11/05/201811/09/2018IP7111402Alert and Notification System Testing1 11/05/201811/09/2018IP7111403Emergency Preparedness Organization Staffing and Augmentation System1 11/05/201811/09/2018IP7111404Emergency Action Level and Emergency Plan Changes1 11/05/201811/09/2018IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies1 11/05/201811/09/2018IP71151-EP01Drill/Exercise Performance1 11/05/201811/09/2018IP71151-EP02ERO Readiness1 11/05/201811/09/2018IP71151-EP03Alert & Notification System Reliability4RS 5678-RAD SAFETY1 11/26/201811/30/2018IP71124.05Radiation Monitoring Instrumentation1 11/26/201811/30/2018IP71124.06Radioactive Gaseous and Liquid Effluent Treatment1 11/26/201811/30/2018IP71124.07Radiological Environmental Monitoring ProgramThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 3 of 3      Grand Gulf 02/23/2017 11:46:34    Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site RS 5678 - RAD SAFETY      4 1 11/26/2018 11/30/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Comments:
This report does not include INPO and OUTAGE activities.


Grand GulfInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 3 of 302/23/2017 11:46:344RS 5678-RAD SAFETY1 11/26/201811/30/2018IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and TransportationComments:This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 06:15, 30 October 2019

Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006)
ML17059D517
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 03/01/2017
From: Troy Pruett
NRC/RGN-IV/DRP
To: Fallacara V
Entergy Operations
GREG WARNICK
References
IR 2016006
Download: ML17059D517 (6)


Text

rch 1, 2017

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006)

Dear Mr. Fallacara:

On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016.

Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness.

The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/

Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Grand Gulf Nuclear Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.

From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Troy Pruett, Director Division of Reactor Projects Docket No. 50-416 License No. NPF-29 Enclosure:

Grand Gulf Nuclear Station Inspection Plan

ML17059D517 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: GWarnick/dll Yes No Non-Publicly Available Sensitive NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D NAME GWarnick AVegel TPruett SIGNATURE /RA/ /RA JClark /RA/

for/

DATE 2/27/17 2/23/17 2/27/17

Page 1 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 2 1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing 1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RESTART - ENHANCED BASELINE FOR STAND DOWN RESTART 6 1 01/10/2017 03/25/2017 IP 7111104 Equipment Alignment (Quarterly)

1 01/10/2017 03/25/2017 IP 7111111Q Licensed Operator Requalification Program 1 01/10/2017 03/25/2017 IP 7111118 Plant Modifications 1 01/10/2017 03/25/2017 IP 7111119 Post Maintenance Testing 1 01/10/2017 03/25/2017 IP 7111120 Refueling and Other Outage Activities 1 01/10/2017 03/25/2017 IP 7111122 Surveillance Testing RS 13 PI - RADIATION SAFETY 2 1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]

1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]

TI191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 03/06/2017 03/10/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation 1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EXAM - INITIAL EXAM 3 1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)

1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)

ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1 1 06/01/2017 06/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EXAM - INITIAL EXAM (2ND ONE) 4 1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)

1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RS TEAM 4 1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BRQ - BRQ INSPECTION 3 1 07/31/2017 08/04/2017 IP 7111111B Licensed Operator Requalification Program EB1-21M - GG DESIGN BASIS INSPECTION 6 1 09/11/2017 09/29/2017 IP 7111121M Component Design Bases Inspection (Teams)

TSB 52B - BIENNIAL PI&R 4 1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution 1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION R21 1 1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR RS 12PI - RAD SAFETY 2 1 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/05/2018 03/09/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness EB1-17T - GG 50.59 CHANGES, TESTS, EXPERIMENTS 3 1 10/22/2018 10/26/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP-1 - EP PROGRAM INSPECTION 1 1 11/05/2018 11/09/2018 IP 7111402 Alert and Notification System Testing 1 11/05/2018 11/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/05/2018 11/09/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/05/2018 11/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/05/2018 11/09/2018 IP 71151-EP01 Drill/Exercise Performance 1 11/05/2018 11/09/2018 IP 71151-EP02 ERO Readiness 1 11/05/2018 11/09/2018 IP 71151-EP03 Alert & Notification System Reliability RS 5678 - RAD SAFETY 4 1 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 11/26/2018 11/30/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/26/2018 11/30/2018 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RAD SAFETY 4 1 11/26/2018 11/30/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.