| | issue date = 03/01/2017 | | | issue date = 03/01/2017 |
| | title = Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006) | | | title = Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006) |
| | author name = Pruett T W | | | author name = Pruett T |
| | author affiliation = NRC/RGN-IV/DRP | | | author affiliation = NRC/RGN-IV/DRP |
| | addressee name = Fallacara V | | | addressee name = Fallacara V |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:rch 1, 2017 |
| [[Issue date::March 1, 2017]]
| |
|
| |
|
| Mr. Vincent Fallacara Acting Site Vice President Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
| | ==SUBJECT:== |
| | ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006) |
|
| |
|
| SUBJECT: ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006)
| | ==Dear Mr. Fallacara:== |
| | On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. |
| | |
| | The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016. |
| | |
| | Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness. |
| | |
| | The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. |
|
| |
|
| ==Dear Mr. Fallacara:==
| | Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ |
| On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRC's Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, "Supplemental Inspection Response to Action Matrix Column 2 Inputs." The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness. The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, "Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans." This inspection will be conducted at Grand Gulf Nuclear Station to confirm the station's full implementation of Commission Orders EA-12-049 and EA-12-051. From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, "Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period," to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.
| | Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Grand Gulf Nuclear Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051. |
| | |
| | From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness. |
| | |
| | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter. |
| | |
| | Sincerely, |
| | /RA/ |
| | Troy Pruett, Director Division of Reactor Projects Docket No. 50-416 License No. NPF-29 Enclosure: |
| | Grand Gulf Nuclear Station Inspection Plan |
| | |
| | ML17059D517 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: |
| | By: GWarnick/dll Yes No Non-Publicly Available Sensitive NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D NAME GWarnick AVegel TPruett SIGNATURE /RA/ /RA JClark /RA/ |
| | for/ |
| | DATE 2/27/17 2/23/17 2/27/17 |
| | |
| | Page 1 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 2 1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing 1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RESTART - ENHANCED BASELINE FOR STAND DOWN RESTART 6 1 01/10/2017 03/25/2017 IP 7111104 Equipment Alignment (Quarterly) |
| | 1 01/10/2017 03/25/2017 IP 7111111Q Licensed Operator Requalification Program 1 01/10/2017 03/25/2017 IP 7111118 Plant Modifications 1 01/10/2017 03/25/2017 IP 7111119 Post Maintenance Testing 1 01/10/2017 03/25/2017 IP 7111120 Refueling and Other Outage Activities 1 01/10/2017 03/25/2017 IP 7111122 Surveillance Testing RS 13 PI - RADIATION SAFETY 2 1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial] |
| | 1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial] |
| | TI191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 03/06/2017 03/10/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation 1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EXAM - INITIAL EXAM 3 1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17) |
| | 1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17) |
| | ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1 1 06/01/2017 06/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EXAM - INITIAL EXAM (2ND ONE) 4 1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017) |
| | 1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017) |
| | This report does not include INPO and OUTAGE activities. |
|
| |
|
| Sincerely,/RA/ Troy Pruett, Director Division of Reactor Projects Docket No. 50-416 License No. NPF-29
| | This report shows only on-site and announced inspection procedures. |
|
| |
|
| ===Enclosure:===
| | Page 2 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RS TEAM 4 1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BRQ - BRQ INSPECTION 3 1 07/31/2017 08/04/2017 IP 7111111B Licensed Operator Requalification Program EB1-21M - GG DESIGN BASIS INSPECTION 6 1 09/11/2017 09/29/2017 IP 7111121M Component Design Bases Inspection (Teams) |
| Grand Gulf Nuclear Station Inspection Plan
| | TSB 52B - BIENNIAL PI&R 4 1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution 1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION R21 1 1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR RS 12PI - RAD SAFETY 2 1 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/05/2018 03/09/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness EB1-17T - GG 50.59 CHANGES, TESTS, EXPERIMENTS 3 1 10/22/2018 10/26/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP-1 - EP PROGRAM INSPECTION 1 1 11/05/2018 11/09/2018 IP 7111402 Alert and Notification System Testing 1 11/05/2018 11/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/05/2018 11/09/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/05/2018 11/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/05/2018 11/09/2018 IP 71151-EP01 Drill/Exercise Performance 1 11/05/2018 11/09/2018 IP 71151-EP02 ERO Readiness 1 11/05/2018 11/09/2018 IP 71151-EP03 Alert & Notification System Reliability RS 5678 - RAD SAFETY 4 1 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 11/26/2018 11/30/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/26/2018 11/30/2018 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities. |
|
| |
|
| SUNSI Review By: GWarnick/dll ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D NAME GWarnick AVegel TPruett SIGNATURE /RA/ /RA JClark for/ /RA/ DATE 2/27/17 2/23/17 2/27/17 Grand GulfInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 1 of 302/23/2017 11:46:342EP3-EP PROGRAM INSPECTION (POSTPONE 2016)1 01/09/201701/13/2017IP7111402Alert and Notification System Testing1 01/09/201701/13/2017IP7111403Emergency Preparedness Organization Staffing and Augmentation System1 01/09/201701/13/2017IP7111404Emergency Action Level and Emergency Plan Changes1 01/09/201701/13/2017IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies6RESTART-ENHANCED BASELINE FOR STAND DOWN RESTART1 01/10/201703/25/2017IP7111104Equipment Alignment (Quarterly)1 01/10/201703/25/2017IP7111111QLicensed Operator Requalification Program1 01/10/201703/25/2017IP7111118Plant Modifications1 01/10/201703/25/2017IP7111119Post Maintenance Testing1 01/10/201703/25/2017IP7111120Refueling and Other Outage Activities1 01/10/201703/25/2017IP7111122Surveillance Testing2RS 13 PI-RADIATION SAFETY1 02/13/201702/17/2017IP71124.01Radiological Hazard Assessment and Exposure Controls1 02/13/201702/17/2017IP71124.03In-Plant Airborne Radioactivity Control and Mitigation1 02/13/201702/17/2017IP71151-OR01Occupational Exposure Control Effectiveness1 02/13/201702/17/2017IP71151-PR01RETS/ODCM Radiological Effluent Occurrences4EB2-05T-TRIENNIAL FIRE PROTECTION INSPECTION1 04/03/201704/07/2017IP7111105TFire Protection [Triennial]1 04/17/201704/28/2017IP7111105TFire Protection [Triennial]4TI191-MITIGATING STRATEGIES/SFP INST FOR BDBEE1 03/06/201703/10/2017IP2515/191Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 20124EP-2-BIENNIAL EP EXERCISE INSPECTION1 03/27/201703/31/2017IP7111401Exercise Evaluation1 03/27/201703/31/2017IP7111404Emergency Action Level and Emergency Plan Changes3EXAM-INITIAL EXAM1 04/10/201704/14/2017X02613INITIAL EXAM GG( 4/17)1 05/08/201705/12/2017X02613INITIAL EXAM GG( 4/17)1ISFSI-LOADING INSPECTION (ONE WEEK IN MONTH)1 06/01/201706/30/2017IP60855.1Operation of an Independent Spent Fuel Storage Installation at Operating Plants4EXAM-INITIAL EXAM (2ND ONE)1 10/30/201711/03/2017X02598INITIAL EXAM GRAND GULF (12/2017)1 12/04/201712/08/2017X02598INITIAL EXAM GRAND GULF (12/2017)This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | This report shows only on-site and announced inspection procedures. |
|
| |
|
| Grand GulfInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 2 of 302/23/2017 11:46:344RS 5678-RS TEAM1 07/10/201707/14/2017IP71124.05Radiation Monitoring Instrumentation1 07/10/201707/14/2017IP71124.06Radioactive Gaseous and Liquid Effluent Treatment1 07/10/201707/14/2017IP71124.07Radiological Environmental Monitoring Program1 07/10/201707/14/2017IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation3BRQ-BRQ INSPECTION1 07/31/201708/04/2017IP7111111BLicensed Operator Requalification Program6EB1-21M-GG DESIGN BASIS INSPECTION1 09/11/201709/29/2017IP7111121MComponent Design Bases Inspection (Teams)4TSB 52B-BIENNIAL PI&R1 10/30/201711/03/2017IP71152BProblem Identification and Resolution1 11/13/201711/17/2017IP71152BProblem Identification and Resolution171111.08-INSERVICE INSPECTION R211 03/05/201803/09/2018IP7111108GInservice Inspection Activities - BWR2RS 12PI-RAD SAFETY1 03/05/201803/09/2018IP71124.01Radiological Hazard Assessment and Exposure Controls1 03/05/201803/09/2018IP71124.02Occupational ALARA Planning and Controls1 03/05/201803/09/2018IP71151-OR01Occupational Exposure Control Effectiveness1 03/05/201803/09/2018IP71151-OR01Occupational Exposure Control Effectiveness3EB1-17T-GG 50.59 CHANGES, TESTS, EXPERIMENTS1 10/22/201810/26/2018IP7111117TEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications1EP-1-EP PROGRAM INSPECTION1 11/05/201811/09/2018IP7111402Alert and Notification System Testing1 11/05/201811/09/2018IP7111403Emergency Preparedness Organization Staffing and Augmentation System1 11/05/201811/09/2018IP7111404Emergency Action Level and Emergency Plan Changes1 11/05/201811/09/2018IP7111405Correction of Emergency Preparedness Weaknesses and Deficiencies1 11/05/201811/09/2018IP71151-EP01Drill/Exercise Performance1 11/05/201811/09/2018IP71151-EP02ERO Readiness1 11/05/201811/09/2018IP71151-EP03Alert & Notification System Reliability4RS 5678-RAD SAFETY1 11/26/201811/30/2018IP71124.05Radiation Monitoring Instrumentation1 11/26/201811/30/2018IP71124.06Radioactive Gaseous and Liquid Effluent Treatment1 11/26/201811/30/2018IP71124.07Radiological Environmental Monitoring ProgramThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | Page 3 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RAD SAFETY 4 1 11/26/2018 11/30/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Comments: |
| | This report does not include INPO and OUTAGE activities. |
|
| |
|
| Grand GulfInspection / Activity Plan01/01/2017-12/31/2018UnitNumberReport 22No. of Staffon SitePlanned DatesStart EndInspection ActivityTitlePage 3 of 302/23/2017 11:46:344RS 5678-RAD SAFETY1 11/26/201811/30/2018IP71124.08Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and TransportationComments:This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
| | This report shows only on-site and announced inspection procedures. |
| }} | | }} |
|
---|
Category:Inspection Plan
MONTHYEARIR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24108A1142024-04-17017 April 2024 June 2024 Emergency Preparedness Program Inspection - Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24023A3242024-01-23023 January 2024 Inservice Inspection Request for Information ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) IR 05000416/20220062023-03-0101 March 2023 Annual Assessment Letter for Grand Gulf Nuclear Station Report 05000416/2022006 ML22312A5832022-11-0808 November 2022 Notification of Cyber Security Baseline Inspection and Request for Information 05000416/2023401 IR 05000416/20220052022-08-18018 August 2022 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2022005) ML22110A1172022-04-19019 April 2022 (GG) 2022 Emergency Preparedness (EP) Program Inspection RFI Sdh 041922 IR 05000416/20210062022-03-0202 March 2022 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2021006) ML22075A3682022-02-14014 February 2022 2022 PIR Request for Information.Pdf ML21327A0842021-11-22022 November 2021 ISI RFI IR 05000416/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Grand Gulf Nuclear Station (Report 05000416/2021005) ML21179A1202021-06-28028 June 2021 Notification of NRC Supplemental Inspection of Action Matrix Column 3 (Degraded Performance) Inputs and Request for Information ML21158A0822021-06-0707 June 2021 Notification of Inspection (NRC Inspection Report 05000416/2021003) and Request for Information ML21106A2232021-04-16016 April 2021 IR 2021402 Document Request List ML21074A0822021-03-15015 March 2021 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000416/2021002) and Request for Information ML21061A3352021-02-25025 February 2021 Request for Information: Grand Gulf Nuclear Station, Dated December 4, 2020; Inspection Report 05000416-2021001, Occupational Radiation Safety Inspection-2, 4 ML20363A1462020-12-22022 December 2020 Request for Information: Grand Gulf EP Exercise Inspection - March 2021 ML20258A0202020-09-0909 September 2020 EP Program Inspection RFI, Request for Information to Support and Prepare for Emergency Preparedness (EP) Program Inspection Scheduled to Occur the Week of November 16, 2020 ML20199M2352020-07-17017 July 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000416/2020012) and Initial Request for Information ML20155K7172020-06-0303 June 2020 Notification of NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2020013) and Request for Information ML20125A3802020-05-0404 May 2020 Request for Information, Inspection Date: July 20-24, 2020 ML20055E1562020-03-0303 March 2020 GG2019006 Annual Assessment Letter ML19346E2892019-12-11011 December 2019 ISI Request for Information ML19302E1082019-10-29029 October 2019 Document Request - GG 95001 - August 2 2019 ML19302E1102019-10-29029 October 2019 Document Request - GG 95001 - July 15 2019 IR 05000416/20190052019-08-30030 August 2019 Updated Inspection Plan for Grand Gulf Nuclear Station, Report 05000416/2019005 ML19148A5252019-05-28028 May 2019 Notification of Nrc Design Bases Assurance Inspection (Programs) ((05000416/2019010) and Initial Request for Information IR 05000416/20180062019-03-0404 March 2019 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2018006) ML19063B4882019-03-0404 March 2019 Notification of NRC Triennial Heat Sink Performance Inspection (05000416/2019002) and Request for Information ML19003A3812018-12-31031 December 2018 Notification of Cyber Security Inspection Report 05000416/2019410, and Request for Information ML18283A0622018-10-10010 October 2018 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000416/2018004) and Request for Information IR 05000416/20180052018-08-31031 August 2018 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2018005) IR 05000416/20170062018-03-0101 March 2018 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2017006) IR 05000416/20170052017-08-28028 August 2017 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2017005) ML17243A3062017-08-28028 August 2017 Updated Non-Public Security Inspection Plan for Grand Gulf Nuclear Station, Unit 1 IR 05000416/20160062017-03-0101 March 2017 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016006) ML16320A2082016-11-14014 November 2016 Notification of an NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000416/2017008) and Request for Information IR 05000416/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) ML16242A3352016-08-31031 August 2016 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2016005) IR 05000416/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2016401) IR 05000416/20150062016-03-0202 March 2016 Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2015006) IR 05000416/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2015005) ML15132A7112015-05-11011 May 2015 Notification of NRC Component Design Bases Inspection (05000416/2015007) and Initial Request for Information IR 05000416/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2014006) IR 05000416/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Grand Gulf Nuclear Station (NRC Physical Security Inspection Report Number 05000416/2014402) IR 05000416/20130012014-03-0404 March 2014 IR 05000416-13-001, 02/11/2014, Grand Gulf, Annual Assessment Letter 2024-08-21
[Table view] Category:Letter
MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24149A1592024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24087A1962024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close IR 05000416/20220042024-03-19019 March 2024 – Amended Integrated Inspection Report 05000416/2022004 and Exercise of Enforcement Discretion ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 2024-09-09
[Table view] |
Text
rch 1, 2017
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR GRAND GULF NUCLEAR STATION (REPORT 05000416/2016006)
Dear Mr. Fallacara:
On February 15, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance assessment of Grand Gulf Nuclear Station, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2016, through December 31, 2016. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Grand Gulf Nuclear Station during the most recent quarter was within the Regulatory Response Column, the second highest performance column of the NRCs Reactor Oversight Process (ROP) Action Matrix. This conclusion was based on the PI for Unplanned Scrams per 7,000 Critical Hours (Initiating Events Cornerstone) crossing the White threshold in the third quarter of 2016.
Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. The objectives of the supplemental inspection are: (1) to assure that the root causes and contributing causes of significant performance issues are understood, (2) to independently assess and assure that the extent of condition and extent of cause of significant performance issues are identified, (3) to assure that corrective actions taken to address and preclude repetition of significant performance issues are prompt and effective, and (4) to assure that corrective plans direct prompt actions to effectively address and preclude repetition of significant performance issues. This inspection will be scheduled after you notify the NRC of your readiness.
The enclosed inspection plan lists the inspections scheduled through December 31, 2018. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
Additionally, as reflected in the enclosure, during this period the NRC staff will complete Temporary Instruction 2515/191, Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/
Staffing/Multi-Unit Dose Assessment Plans. This inspection will be conducted at Grand Gulf Nuclear Station to confirm the stations full implementation of Commission Orders EA-12-049 and EA-12-051.
From January 1 to December 31, 2016, the NRC issued three Severity Level IV traditional enforcement violations associated with impeding the regulatory process. Therefore, the NRC plans to conduct Inspection Procedure 92723, Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period, to follow-up on these violations. This inspection will be scheduled after you notify the NRC of your readiness.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Greg Warnick at 817-200-1144 with any questions you have regarding this letter.
Sincerely,
/RA/
Troy Pruett, Director Division of Reactor Projects Docket No. 50-416 License No. NPF-29 Enclosure:
Grand Gulf Nuclear Station Inspection Plan
ML17059D517 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: GWarnick/dll Yes No Non-Publicly Available Sensitive NRC-002 OFFICE RIV/C RIV/DRS:D RIV/DRP:D NAME GWarnick AVegel TPruett SIGNATURE /RA/ /RA JClark /RA/
for/
DATE 2/27/17 2/23/17 2/27/17
Page 1 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EP3 - EP PROGRAM INSPECTION (POSTPONE 2016) 2 1 01/09/2017 01/13/2017 IP 7111402 Alert and Notification System Testing 1 01/09/2017 01/13/2017 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 01/09/2017 01/13/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 01/09/2017 01/13/2017 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies RESTART - ENHANCED BASELINE FOR STAND DOWN RESTART 6 1 01/10/2017 03/25/2017 IP 7111104 Equipment Alignment (Quarterly)
1 01/10/2017 03/25/2017 IP 7111111Q Licensed Operator Requalification Program 1 01/10/2017 03/25/2017 IP 7111118 Plant Modifications 1 01/10/2017 03/25/2017 IP 7111119 Post Maintenance Testing 1 01/10/2017 03/25/2017 IP 7111120 Refueling and Other Outage Activities 1 01/10/2017 03/25/2017 IP 7111122 Surveillance Testing RS 13 PI - RADIATION SAFETY 2 1 02/13/2017 02/17/2017 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 02/13/2017 02/17/2017 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 02/13/2017 02/17/2017 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 02/13/2017 02/17/2017 IP 71151-PR01 RETS/ODCM Radiological Effluent Occurrences EB2-05T - TRIENNIAL FIRE PROTECTION INSPECTION 4 1 04/03/2017 04/07/2017 IP 7111105T Fire Protection [Triennial]
1 04/17/2017 04/28/2017 IP 7111105T Fire Protection [Triennial]
TI191 - MITIGATING STRATEGIES/SFP INST FOR BDBEE 4 1 03/06/2017 03/10/2017 IP 2515/191 Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 EP-2 - BIENNIAL EP EXERCISE INSPECTION 4 1 03/27/2017 03/31/2017 IP 7111401 Exercise Evaluation 1 03/27/2017 03/31/2017 IP 7111404 Emergency Action Level and Emergency Plan Changes EXAM - INITIAL EXAM 3 1 04/10/2017 04/14/2017 X02613 INITIAL EXAM GG( 4/17)
1 05/08/2017 05/12/2017 X02613 INITIAL EXAM GG( 4/17)
ISFSI - LOADING INSPECTION (ONE WEEK IN MONTH) 1 1 06/01/2017 06/30/2017 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EXAM - INITIAL EXAM (2ND ONE) 4 1 10/30/2017 11/03/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
1 12/04/2017 12/08/2017 X02598 INITIAL EXAM GRAND GULF (12/2017)
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RS TEAM 4 1 07/10/2017 07/14/2017 IP 71124.05 Radiation Monitoring Instrumentation 1 07/10/2017 07/14/2017 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 07/10/2017 07/14/2017 IP 71124.07 Radiological Environmental Monitoring Program 1 07/10/2017 07/14/2017 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation BRQ - BRQ INSPECTION 3 1 07/31/2017 08/04/2017 IP 7111111B Licensed Operator Requalification Program EB1-21M - GG DESIGN BASIS INSPECTION 6 1 09/11/2017 09/29/2017 IP 7111121M Component Design Bases Inspection (Teams)
TSB 52B - BIENNIAL PI&R 4 1 10/30/2017 11/03/2017 IP 71152B Problem Identification and Resolution 1 11/13/2017 11/17/2017 IP 71152B Problem Identification and Resolution 71111.08 - INSERVICE INSPECTION R21 1 1 03/05/2018 03/09/2018 IP 7111108G Inservice Inspection Activities - BWR RS 12PI - RAD SAFETY 2 1 03/05/2018 03/09/2018 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/05/2018 03/09/2018 IP 71124.02 Occupational ALARA Planning and Controls 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 03/05/2018 03/09/2018 IP 71151-OR01 Occupational Exposure Control Effectiveness EB1-17T - GG 50.59 CHANGES, TESTS, EXPERIMENTS 3 1 10/22/2018 10/26/2018 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications EP-1 - EP PROGRAM INSPECTION 1 1 11/05/2018 11/09/2018 IP 7111402 Alert and Notification System Testing 1 11/05/2018 11/09/2018 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 11/05/2018 11/09/2018 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 11/05/2018 11/09/2018 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 11/05/2018 11/09/2018 IP 71151-EP01 Drill/Exercise Performance 1 11/05/2018 11/09/2018 IP 71151-EP02 ERO Readiness 1 11/05/2018 11/09/2018 IP 71151-EP03 Alert & Notification System Reliability RS 5678 - RAD SAFETY 4 1 11/26/2018 11/30/2018 IP 71124.05 Radiation Monitoring Instrumentation 1 11/26/2018 11/30/2018 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/26/2018 11/30/2018 IP 71124.07 Radiological Environmental Monitoring Program This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 3 of 3 Grand Gulf 02/23/2017 11:46:34 Inspection / Activity Plan Report 22 01/01/2017 - 12/31/2018 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site RS 5678 - RAD SAFETY 4 1 11/26/2018 11/30/2018 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation Comments:
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.