| issue date = 06/22/1981
| issue date = 06/22/1981
| title = Notifies That Intent of Interim Actions Specified in Encl 2 to NRC 801222 Ltr Re Control of Heavy Loads Have Been Implemented.Addl Three Months,Until 810922,requested in Order to Respond to Section 2.1 Re Deviations
| title = Notifies That Intent of Interim Actions Specified in Encl 2 to NRC 801222 Ltr Re Control of Heavy Loads Have Been Implemented.Addl Three Months,Until 810922,requested in Order to Respond to Section 2.1 Re Deviations
| author name = MAIER J E
| author name = Maier J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = CRUTCHFIELD D
| addressee name = Crutchfield D
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORYORMATIONDISTRIBUTIONSYSOM(RIBS)ACCESSIONNBR:8106300006DOC~DATE:81/06/22NOTARIZED:.YESDOCKETtlFACIL'50-244RobertEmmet'innaNuclearPlant~Unit1PRochester>>G05000244AUTH,NAMEiAUTHORAFFILIATIONMAIER<J,E~RochesterGas8ElectricCorp.RECIP~NAME',RECIPIENTAFFIIIATIONCRUTCHFIELD<D,OperatingReactorsBranch5
{{#Wiki_filter:REGULATORY      ORMATION          DISTRIBUTION SYSOM (RIBS)
ACCESSION NBR: 8106300006            DOC DATE: 81/06/22
                                            ~                      NOTARIZED:. YES            DOCKET tl FACIL'50-244 Robert Emmet'inna Nuclear Plant~ Unit 1P Rochester>>                       G    05000244 AUTH,NAMEi            AUTHOR    AFFILIATION MAIER< J,E ~         Rochester      Gas    8  Electr ic Corp.
RECIP ~ NAME',       RECIPIENT AFFII IATION CRUTCHFIELD<D,           Operating Reactors Branch            5


==SUBJECT:==
==SUBJECT:==
Notifiesthatintentofinterim'ctions"specifiedinEncl2'oNRC"'01222ltrrecontrolofheavyloadshavebeen:implemented.Addithreemonths~until810922irequestedIinordertorespondtoSection2'.1redeviations..DISTRIBUTIONCODE;:A033SCOPIESRECEIVED:LTR'NCLgSIZE:TITLE':ConrtolofHeavyLoadsNearSpent:Fue'I(USIA-36)Operat7ngReactorNOTES:1copy:SEPSectsLdr,05000240RECIPIENTIDCODE/NAMEYACTION:ORB05BCCOPIESLTTRENCLRECIPIENTIDCODE'/NAMECLEMENSONtF~00COPIESLTTRENCLINTERNAL:A/DCORE'CS11~NRC:PDR02RADASSESSBR10.REQUAPGB'91=.111IEEREG.F07BR12'1EXTERNAL:ACRSNSIC13-061611LPDR03JUL0S198l)y0TOTALNUMBEROFCOPIESREQUIRED:LTTRPfENCLPf PfII~~~IIt1CIUkgeJ~III fIIIIIIIIIIIIIIIIIIIIIII~'IIIIIIIIIIIIi!IIIIIIIII~!~raid(/E~IIIIIIIIIIIII~;-...(ROCHESTERGASANDELECTRICCORPORATIONo89EASTAVENUE,ROCHESTER,N.Y.14649JOHNE.MAIERVICEPRESIDENTTELEpHONCAREACODETIE546.2700June22,1981DirectorofNuclearReactorRegulationAttention:Mr.DennisM.Crutchfield,ChiefOperatingReactorsBranchNo.5DivisionofLicensingU.S.NuclearRegulatoryCommissionWashington,DC20555JUN291981~)2gDIIIIIIISSPSyENIICLEAIIQEQIILh
Notifies that intent of interim'ctions" specified in                      Encl NRC"'01222      ltr  re control of heavy loads have been:
2'o implemented.Addi three months~until 810922irequestedI in order to respond to Section 2'. 1 re deviations..
DISTRIBUTION CODE;: A033S COPIES RECEIVED:LTR                     'NCL      g  SIZE:
Reactor TITLE': Conrtol of Heavy Loads Near Spent: Fue'I (USI A-36) Operat7ng NOTES:1 copy:SEP      Sects    Ldr,                                                         05000240 RECIPIENT            COPIES                REC IP IENT            COPIES ID CODE/NAMEY          LTTR ENCL            ID CODE'/NAME          LTTR ENCL ACTION:    ORB  05 BC                                  CLEMENSONtF ~ 00 INTERNAL: A/D    CORE'   CS11   ~       1=              IEE              07 NRC: PDR          02      .1                            BR  12'1 RAD ASSESS    BR10.         1                REG. F REQUAPGB'9                  1 EXTERNAL: ACRS                13-     16      1        LPDR              03 NSIC              06        1 JUL 0  S 198l
                                                        )y              0 TOTAL NUMBER    OF COPIES REQUIRED: LTTR              Pf    ENCL    Pf
 
P f
II
                    ~ ~
            ~ I I          t 1    CI U
kg e
J~
I II
 
~     f  IIIIIIIIIIIIII      IIIIIIIII
      'IIIIIIIIIIII i!IIIIIIIII                                                                           ~;-...
    ~!~raid(/E~       IIIIIIIIIIIII                                                                               (
ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER                                                                        TELEpHON C VICE PRESIDENT                                                              AREA CODE TIE  546.2700 June 22, 1981 Director of Nuclear Reactor Regulation Attention: Mr. Dennis M. Crutchfield, Chief                                        JUN 2 9 1981~              )2 Operating Reactors Branch No. 5              y    NIICLEAIIQEQIILh Division of Licensing                          E gDIIIIIIISSPS U.S. Nuclear Regulatory Commission Washington, DC 20555


==Subject:==
==Subject:==
ControlofHeavyLoadsR.E.GinnaNuclearPowerPlantDocketNo.50-244
Control of Heavy Loads R. E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr.                        Crutchfield:==


==DearMr.Crutchfield:==
This letter is in response to a letter dated December 22, 1980 from Darrell Eisenhut, USNRC, regarding control of heavy loads. Since receipt of the letter, the intent of interim actions specified in Enclosure 2 to Mr. Eisenhut's letter have been implemented.                             These have included definition of safe load paths, plant              procedure              development and implementation, crane operator training and qualification, and crane inspection testing and maintenance.                             In addition, special attention, as defined in Enclosure 2 was given to handling of heavy loads over the core during our recent, refueling.
ThisletterisinresponsetoaletterdatedDecember22,1980fromDarrellEisenhut,USNRC,regardingcontrolofheavyloads.Sincereceiptoftheletter,theintentofinterimactionsspecifiedinEnclosure2toMr.Eisenhut'sletterhavebeenimplemented.Thesehaveincludeddefinitionofsafeloadpaths,plantproceduredevelopmentandimplementation,craneoperatortrainingandqualification,andcraneinspectiontestingandmaintenance.Inaddition,specialattention,asdefinedinEnclosure2wasgiventohandlingofheavyloadsoverthecoreduringourrecent,refueling.Mr.Eisenhut'sletterrequiredsubmittalofasubstantialamountofinformationatthistime.Duetothemagnitudeoftheevaluationsrequiredandduetothesupportrequiredforourrecentrefuelingoutage,wehavebeenunabletocompletetheevaluations.Specifically,werequireanadditionalthreemonths,untilSeptember22,1981torespondtoSection2.1ofEnclosure3toMr.Eisenhut'sletter.Therequestedconfirmationofimplementa-tionofmodificationsandthejustificationofdeviations,whichwasrequested,isdirectlyrelatedtotheevaluationsrequiredbySections2.2,2.3and2.4ofEnclosure3.Sinceresponsetothesethreesectionsisnotdueforsometimeyet,wewilldeferassessmentofmodificationsandjustificationof'eviationsuntilthattime.  
Mr. Eisenhut's letter required submittal of a substantial amount of information at this time. Due to the magnitude of the evaluations required and due to the support required for our recent refueling outage, we have been unable to complete the evaluations. Specifically, we require an additional three months, until September 22, 1981 to respond to Section 2.1 of Enclosure 3 to Mr. Eisenhut's letter. The requested confirmation of implementa-tion of modifications and the justification of deviations, which was requested, is directly related to the evaluations required by Sections 2.2, 2.3 and 2.4 of Enclosure 3. Since response to these three sections is not due for some time yet, we will defer assessment of modifications and justification of'eviations until that time.
(hAb ROCHESTERGASANDELECTRICCORP.DATEJune22,1981To=-Mr.DennisM.CrutchfieldSHEETNO.Untilthecompletionofourevaluationsandimplementationofanycorrectiveactionswhichmayberequired,theimplementationoftheinterimactionsprovidescompensatorysafetyactions.Verytrulyyours,Subscribedandsworntomeonthis~4~dayofJune1981.SHARONG.CAVALER$NOTARYPUBLIC,StateofN.Y.,MonroeCountyMyCommissionExpiresMarch30le&
 
ke'  
(
}}
h A
b
 
ROCHESTER GAS AND ELECTRIC CORP.                                      SHEET NO.
DATE      June 22, 1981 To    =-
Mr . Dennis M.               Crutchf ield Until the completion of our evaluations and implementation of any corrective actions which may be required, the implementation of the interim actions provides compensatory safety actions.
Very truly yours, Subscribed and sworn to                        me on  this~4~             day      of    June 1981.
SHARON G. CAVALER$
NOTARY PUBLIC, State of N.Y., Monroe County My Commission Expires March  30le&
 
k e
'}}

Latest revision as of 19:11, 29 October 2019

Notifies That Intent of Interim Actions Specified in Encl 2 to NRC 801222 Ltr Re Control of Heavy Loads Have Been Implemented.Addl Three Months,Until 810922,requested in Order to Respond to Section 2.1 Re Deviations
ML17258B150
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/22/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8106300406
Download: ML17258B150 (6)


Text

REGULATORY ORMATION DISTRIBUTION SYSOM (RIBS)

ACCESSION NBR: 8106300006 DOC DATE: 81/06/22

~ NOTARIZED:. YES DOCKET tl FACIL'50-244 Robert Emmet'inna Nuclear Plant~ Unit 1P Rochester>> G 05000244 AUTH,NAMEi AUTHOR AFFILIATION MAIER< J,E ~ Rochester Gas 8 Electr ic Corp.

RECIP ~ NAME', RECIPIENT AFFII IATION CRUTCHFIELD<D, Operating Reactors Branch 5

SUBJECT:

Notifies that intent of interim'ctions" specified in Encl NRC"'01222 ltr re control of heavy loads have been:

2'o implemented.Addi three months~until 810922irequestedI in order to respond to Section 2'. 1 re deviations..

DISTRIBUTION CODE;: A033S COPIES RECEIVED:LTR 'NCL g SIZE:

Reactor TITLE': Conrtol of Heavy Loads Near Spent: Fue'I (USI A-36) Operat7ng NOTES:1 copy:SEP Sects Ldr, 05000240 RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAMEY LTTR ENCL ID CODE'/NAME LTTR ENCL ACTION: ORB 05 BC CLEMENSONtF ~ 00 INTERNAL: A/D CORE' CS11 ~ 1= IEE 07 NRC: PDR 02 .1 BR 12'1 RAD ASSESS BR10. 1 REG. F REQUAPGB'9 1 EXTERNAL: ACRS 13- 16 1 LPDR 03 NSIC 06 1 JUL 0 S 198l

)y 0 TOTAL NUMBER OF COPIES REQUIRED: LTTR Pf ENCL Pf

P f

II

~ ~

~ I I t 1 CI U

kg e

J~

I II

~ f IIIIIIIIIIIIII IIIIIIIII

'IIIIIIIIIIII i!IIIIIIIII ~;-...

~!~raid(/E~ IIIIIIIIIIIII (

ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E. MAIER TELEpHON C VICE PRESIDENT AREA CODE TIE 546.2700 June 22, 1981 Director of Nuclear Reactor Regulation Attention: Mr. Dennis M. Crutchfield, Chief JUN 2 9 1981~ )2 Operating Reactors Branch No. 5 y NIICLEAIIQEQIILh Division of Licensing E gDIIIIIIISSPS U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Control of Heavy Loads R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

This letter is in response to a letter dated December 22, 1980 from Darrell Eisenhut, USNRC, regarding control of heavy loads. Since receipt of the letter, the intent of interim actions specified in Enclosure 2 to Mr. Eisenhut's letter have been implemented. These have included definition of safe load paths, plant procedure development and implementation, crane operator training and qualification, and crane inspection testing and maintenance. In addition, special attention, as defined in Enclosure 2 was given to handling of heavy loads over the core during our recent, refueling.

Mr. Eisenhut's letter required submittal of a substantial amount of information at this time. Due to the magnitude of the evaluations required and due to the support required for our recent refueling outage, we have been unable to complete the evaluations. Specifically, we require an additional three months, until September 22, 1981 to respond to Section 2.1 of Enclosure 3 to Mr. Eisenhut's letter. The requested confirmation of implementa-tion of modifications and the justification of deviations, which was requested, is directly related to the evaluations required by Sections 2.2, 2.3 and 2.4 of Enclosure 3. Since response to these three sections is not due for some time yet, we will defer assessment of modifications and justification of'eviations until that time.

(

h A

b

ROCHESTER GAS AND ELECTRIC CORP. SHEET NO.

DATE June 22, 1981 To =-

Mr . Dennis M. Crutchf ield Until the completion of our evaluations and implementation of any corrective actions which may be required, the implementation of the interim actions provides compensatory safety actions.

Very truly yours, Subscribed and sworn to me on this~4~ day of June 1981.

SHARON G. CAVALER$

NOTARY PUBLIC, State of N.Y., Monroe County My Commission Expires March 30le&

k e

'