ML17296B105: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/01/1980
| issue date = 12/01/1980
| title = Interim Deficiency Rept Updating 801120 Telcon Re Sway Struts,Snubbers & Shock Suppressors Found to Contain Partially or Totally Disengaged self-aligning Rod End Bushings.Final Rept to Be Submitted by 810301
| title = Interim Deficiency Rept Updating 801120 Telcon Re Sway Struts,Snubbers & Shock Suppressors Found to Contain Partially or Totally Disengaged self-aligning Rod End Bushings.Final Rept to Be Submitted by 810301
| author name = VAN BRUNT E E
| author name = Van Brunt E
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name = SPENCER G S
| addressee name = Spencer G
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| docket = 05000528, 05000529, 05000530
| docket = 05000528, 05000529, 05000530
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGUL'4TORY QFORM4TION DISTRIBUTION BY+M (RIBS)ACCESSION NBRI 8012100384 DOC',DATE:
{{#Wiki_filter:REGUL'4TORY       QFORM4TION DISTRIBUTION                   BY+M (RIBS)
80/12/01, 40T'ARIZED:
ACCESSION NBRI 8012100384                 DOC',DATE: 80/12/01, 40T'ARIZED: NO                           DO FACIL:STN 50 528 Pal oi Verde Nucl ear Stat j oni Unj t 1R Ar i zona Publ i                             500 STN 50 529 Pail o Verde Nucl ear Stat i one Uni t Zr Ar i zonai Publ'j STN 50 530 Pal oi Ver de Nuclear Stations                       Unit 3r Arizona- Publi       05000530 AUTHBNAvlET             AUTHOR AFFC LiI ATION VAN BURNT<K,E,         Arizona PUblic Service         Co,.
NO DO FACIL:STN 50 528 Pal oi Verde Nucl ear Stat j oni Unj t 1R Ar i zona Publ i 500 STN 50 529 Pail o Verde Nucl ear Stat i one Uni t Zr Ar i zonai Publ'j STN 50 530 Pal oi Ver de Nuclear Stations Unit 3r Arizona-Publi 05000530 AUTHBNAvlET AUTHOR AFFC LiI ATION VAN BURNT<K,E, Arizona PUblic Service Co,.RECIP~NAIVE RECtIPIE4iTII AFF ILlIATION SPENCERRG~ST Region Sr San Francisco.i Reactor Construction L Engineer  
RECIP ~ NAIVE           RECtIPIE4iTII AFF ILlIATION SPENCERRG ~ ST             Region Sr San Francisco.i                   Reactor Construction       L Engineer


==SUBJECT:==
==SUBJECT:==
Interim def jciency rept updating 801120 telcon re s~ay str utsr snubber s 5 shock suppr essor s found to contain par ti'ailily or totallily disengaged sel f al i gning r od end bushings,Fiinal rept to, be submitted by 810301~DISTRIBUTION CODE': 8019S COPIES RECEIVED:LA'R J i ENCLl SIZE'.'Z TITlE: Construction Deficiency Report (10CFR50~55KB NOTES:Stahdardized Plant..Sta'ndardj zed Pl a'nt~Standardized Pilant~Hf 05000528 05000529 05000530 RECIPIENT ID CODE/NAME(ACTION: A/D LiICENSNG 00 LEKrJB 06 COPIES LITTR ENCL 1, 1 1 1 RECIPIENT'D CODE'/N A51Et'iIRAGLIAi F"B.05 KERRIGANg J07 COPIES LiTTR ENCl.l 1 1 1 1 KXTERNALt:
Interim def jciency rept updating 801120 telcon re s~ay str utsr snubber s 5 shock suppr essor s found to contain                                 Hf par ti'ailily or totallily disengaged sel f al i gning r od end bushings,Fiinal       rept to,   be submitted by 810301                 ~
ACRS NSICl 1 6'8 INTERNALS:
DISTRIBUTION CODE': 8019S               COPIES RECEIVED:LA'R             J i ENCLl       SIZE'.'Z TITlE: Construction Deficiency Report                 (10CFR50 ~ 55KB NOTES:Stahdardized Plant..                                                                             05000528 Sta'ndardj zed Pl a'nt     ~                                                                 05000529 Standardized Pilant         ~                                                                 05000530 RECIPIENT               COPIES            RECIPIENT'D COPIES ID CODE/ NAME(             LITTR ENCL                    CODE'/N A51Et      LiTTR ENCl.l ACTION:     A/D LiICENSNG 00               1,   1     'iIRAGLIAiF"B. 05                     1    1 LEKrJB            06          1   1     KERRIGANg            J07            1   1 INTERNALS:   AD/RCI-/IET'7                               AKOD                          18      1    1 ASLBP/J ~ HARD                 1          D/DIR HU9 FACiS                            1 EDO   8 STAFF<     19           1          EQUIP QUALI BR11                          1 HYD/GEOi BR       ZZ           1.          I L El                      09      1    1 I.IIC QUALI BR     12           1          MPA                        20        1    1 NRC
AD/RCI-/IET'7 ASLBP/J~HARD EDO 8 STAFF<19 HYD/GEOi BR ZZ I.IIC QUALI BR 12 NRC POR 02 PR'KV 13 EG FIILEr 01 DEV 21'1 1 1.1 1-l.1 116 1 16 1 AKOD 18 D/DIR HU9 FACiS EQUIP QUALI BR11 I L El 09 MPA 20 OELD 21 QA BR 14 RUTHERFORDrARIK" LPDR'3 1 1 1 1 1 1 1 1 1 1 1 1 DEC II tS80 TOTAl." NUMBER OFi COPiIKS REQUIRKD: LlTTR 39 ENCLI 39 4 pf'l k~0 F ()'I J I l4 J 1 I k g, II C f fl k~ii n C)I Lal~CD C3~Ial~)Ml Lc~Cl IC (QCSEQPREH'F I'll&Ha~CPM~P.O.BOX 2I666'HOENIX'RI2ONA 85036 O 0~~December 1, 1980 ANPP-16804-BSK/JAR CD UQS.Nu&3.ear Regulatory Commission Rkgion V Walnut Creek Plaza-Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention:
                  'KV POR         02           1-          OELD                        21       1   1
Mr.G.S.Spencer, Chief Reactor Construction and Engineering Support Branch  
                                                                            '3 PR                13          l.         QA BR                       14       1 EG  FIILEr      01          1          RUTHERFORDrARIK"                           1 DEV 21 '         1 KXTERNALt: ACRS                1 6'8      16    16      LPDR NSICl                          1   1 DEC II   tS80 TOTAl." NUMBER OFi COPiIKS REQUIRKD: LlTTR             39             ENCLI   39
 
4 pf
                    'l F (
      )
        'I     J       I J 1 I l4 k
k g,
                                              ~ 0 II C
f fl k
          ~ ii                             n
 
C)
I
  ~CD C3~
Ial
  )Ml Lal
      ~
O CD CPM~
0 ~~
I'll&Ha P. O. BOX
                                                    ~              IC (QCSEQPREH'F 2I666 'HOENIX'RI2ONA 85036 December 1, 1980 ANPP-16804-BSK/JAR Lc ~
Cl UQS. Nu&3.ear Regulatory Commission Rkgion V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch


==Subject:==
==Subject:==
A 50.55(e)Potentially Reportable Deficiency Relating to Loose Bushings on ITT-Grinnell Sway Struts Interim Report File: 80-019-026
A 50.55(e) Potentially Reportable Deficiency Relating to Loose Bushings on   ITT-Grinnell   Sway Struts Interim Report File:   80-019-026


==Reference:==
==Reference:==
Telephone Conversation between R. Haynes and B. S. Kaplan on November 20, 1980 (DER 80-36)
==Dear  Sir:==
The  NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time,        it was estimated that a determination of reportability would be made within thirty (30) days.
Due  to the extensive investigation and evaluation required, an interim report is attached. It is now expected that 'this information will be finalized by March,1, 1981, at which time a complete report will be submitted.
Very  truly  ourI C~I E. E. Van Brunt,  Jr.
APS  Vice President Nuclear Projects ANPP  Project Director EEVBJr/BSK:skc Attachment Q 0/0
(/I
a I
f l
t I,'
U. S. Nuclear Regulatory Commission Attention: Mr. G. S. Spencer, Chief ANPP-16804-BSK/JAR November 26, 1980 Page 2 CC:  Victor Stello, Jr., Directo~r Offi'ce of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell  & Wilmer R. L. Robb D. B. Pasnacht W. E. Ide J. M. Allen A. C. Rogers J. A. Brand W. H. Wilson W. J. Bingham W. J. Stubblefield R. L. Patterson R. M. Grant R. W. Welcher D. R. Hawkinson
Vp l) t II' i((
f(
l


Telephone Conversation between R.Haynes and B.S.Kaplan on November 20, 1980 (DER 80-36)
INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 81  AND."82" I. Potential Problem Project receipt of Bechtel's Quality Assurance Bulletin 80-30 and Problem Alert TPM-P-80-6, October 13, 1980, indicated that ITT-Grinnell manufactured sway struts, snubbers and shock sup-pressors have been found to contain''artially or totally dis-engaged  self-aligning rod    end bushings.
The  condition of total disengagement    may  create a safety hazard of overstress in piping systems.
Surveillance activity was initiated to evaluate the ITT-Grinnell product received at the jobsite. The results of the review re-vealed that two sway struts (3-ED-401-H-004) and (3-ED-176-H-013) were found with bushings disengaging.        The bushings were not staked.
II. A    roach To and Status Of Pro osed Resolution
: 1. Bechtel Engineering    will obtain a written statement from ITT-Grinnell as to the implemented effective date of a formal staking program.
: 2. Bechtel Construction    will identify all struts which have been received    prior to the formal staking by ITT-Grinnell.
: 3. ITT-Grinnell will develop and submit for Bechtel Engi-neering approval, an inspection and repair procedure.
: 4. Bechtel Construction and ITT-Grinnell to establish how the inspection and repair procedure will be implemented.
: 5. Repair and/or replace defected sway struts as established
                                            ~4 by the approved procedure.
III. Pro ected    Com  letion of Corrective Action    and Submittal Date of the Final Re ort It is  forecast to have the resolution and completion plan implemented by February 1, 1981.
The  final report will be    submitted by March 1, 1981.


==Dear Sir:==
~ ~
The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation.
Iy f'4@+}}
At that time, it was estimated that a determination of reportability would be made within thirty (30)days.Due to the extensive investigation and evaluation required, an interim report is attached.It is now expected that'this information will be finalized by March,1, 1981, at which time a complete report will be submitted.
Very truly our I C~I E.E.Van Brunt, Jr.APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment Q 0/0 (/I a I f l t I,'
U.S.Nuclear Regulatory Commission Attention:
Mr.G.S.Spencer, Chief ANPP-16804-BSK/JAR November 26, 1980 Page 2 CC: Victor Stello, Jr., Directo~r Offi'ce of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 A.C.Gehr Snell&Wilmer R.L.D.B.W.E.J.M.A.C.J.A.W.H.W.J.W.J.R.L.R.M.R.W.D.R.Robb Pasnacht Ide Allen Rogers Brand Wilson Bingham Stubblefield Patterson Grant Welcher Hawkinson Vp l)t II'i((f(l INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)PVNGS UNITS 81 AND."82" I.Potential Problem Project receipt of Bechtel's Quality Assurance Bulletin 80-30 and Problem Alert TPM-P-80-6, October 13, 1980, indicated that ITT-Grinnell manufactured sway struts, snubbers and shock sup-pressors have been found to contain''artially or totally dis-engaged self-aligning rod end bushings.The condition of total disengagement may create a safety hazard of overstress in piping systems.Surveillance activity was initiated to evaluate the ITT-Grinnell product received at the jobsite.The results of the review re-vealed that two sway struts (3-ED-401-H-004) and (3-ED-176-H-013) were found with bushings disengaging.
The bushings were not staked.II.A roach To and Status Of Pro osed Resolution 1.Bechtel Engineering will obtain a written statement from ITT-Grinnell as to the implemented effective date of a formal staking program.2.Bechtel Construction will identify all struts which have been received prior to the formal staking by ITT-Grinnell.
3.ITT-Grinnell will develop and submit for Bechtel Engi-neering approval, an inspection and repair procedure.
4.Bechtel Construction and ITT-Grinnell to establish how the inspection and repair procedure will be implemented.
5.Repair and/or replace defected sway struts as established
~4 by the approved procedure.
III.Pro ected Com letion of Corrective Action and Submittal Date of the Final Re ort It is forecast to have the resolution and completion plan implemented by February 1, 1981.The final report will be submitted by March 1, 1981.
~~I y f'4@+}}

Latest revision as of 12:44, 29 October 2019

Interim Deficiency Rept Updating 801120 Telcon Re Sway Struts,Snubbers & Shock Suppressors Found to Contain Partially or Totally Disengaged self-aligning Rod End Bushings.Final Rept to Be Submitted by 810301
ML17296B105
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/01/1980
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-16804-BSK, NUDOCS 8012100384
Download: ML17296B105 (8)


Text

REGUL'4TORY QFORM4TION DISTRIBUTION BY+M (RIBS)

ACCESSION NBRI 8012100384 DOC',DATE: 80/12/01, 40T'ARIZED: NO DO FACIL:STN 50 528 Pal oi Verde Nucl ear Stat j oni Unj t 1R Ar i zona Publ i 500 STN 50 529 Pail o Verde Nucl ear Stat i one Uni t Zr Ar i zonai Publ'j STN 50 530 Pal oi Ver de Nuclear Stations Unit 3r Arizona- Publi 05000530 AUTHBNAvlET AUTHOR AFFC LiI ATION VAN BURNT<K,E, Arizona PUblic Service Co,.

RECIP ~ NAIVE RECtIPIE4iTII AFF ILlIATION SPENCERRG ~ ST Region Sr San Francisco.i Reactor Construction L Engineer

SUBJECT:

Interim def jciency rept updating 801120 telcon re s~ay str utsr snubber s 5 shock suppr essor s found to contain Hf par ti'ailily or totallily disengaged sel f al i gning r od end bushings,Fiinal rept to, be submitted by 810301 ~

DISTRIBUTION CODE': 8019S COPIES RECEIVED:LA'R J i ENCLl SIZE'.'Z TITlE: Construction Deficiency Report (10CFR50 ~ 55KB NOTES:Stahdardized Plant.. 05000528 Sta'ndardj zed Pl a'nt ~ 05000529 Standardized Pilant ~ 05000530 RECIPIENT COPIES RECIPIENT'D COPIES ID CODE/ NAME( LITTR ENCL CODE'/N A51Et LiTTR ENCl.l ACTION: A/D LiICENSNG 00 1, 1 'iIRAGLIAiF"B. 05 1 1 LEKrJB 06 1 1 KERRIGANg J07 1 1 INTERNALS: AD/RCI-/IET'7 AKOD 18 1 1 ASLBP/J ~ HARD 1 D/DIR HU9 FACiS 1 EDO 8 STAFF< 19 1 EQUIP QUALI BR11 1 HYD/GEOi BR ZZ 1. I L El 09 1 1 I.IIC QUALI BR 12 1 MPA 20 1 1 NRC

'KV POR 02 1- OELD 21 1 1

'3 PR 13 l. QA BR 14 1 EG FIILEr 01 1 RUTHERFORDrARIK" 1 DEV 21 ' 1 KXTERNALt: ACRS 1 6'8 16 16 LPDR NSICl 1 1 DEC II tS80 TOTAl." NUMBER OFi COPiIKS REQUIRKD: LlTTR 39 ENCLI 39

4 pf

'l F (

)

'I J I J 1 I l4 k

k g,

~ 0 II C

f fl k

~ ii n

C)

I

~CD C3~

Ial

)Ml Lal

~

O CD CPM~

0 ~~

I'll&Ha P. O. BOX

~ IC (QCSEQPREH'F 2I666 'HOENIX'RI2ONA 85036 December 1, 1980 ANPP-16804-BSK/JAR Lc ~

Cl UQS. Nu&3.ear Regulatory Commission Rkgion V Walnut Creek Plaza Suite 202 1990 North California Boulevard Walnut Creek, California 94596 Attention: Mr. G. S. Spencer, Chief Reactor Construction and Engineering Support Branch

Subject:

A 50.55(e) Potentially Reportable Deficiency Relating to Loose Bushings on ITT-Grinnell Sway Struts Interim Report File: 80-019-026

Reference:

Telephone Conversation between R. Haynes and B. S. Kaplan on November 20, 1980 (DER 80-36)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an interim report is attached. It is now expected that 'this information will be finalized by March,1, 1981, at which time a complete report will be submitted.

Very truly ourI C~I E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/BSK:skc Attachment Q 0/0

(/I

a I

f l

t I,'

U. S. Nuclear Regulatory Commission Attention: Mr. G. S. Spencer, Chief ANPP-16804-BSK/JAR November 26, 1980 Page 2 CC: Victor Stello, Jr., Directo~r Offi'ce of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 A. C. Gehr Snell & Wilmer R. L. Robb D. B. Pasnacht W. E. Ide J. M. Allen A. C. Rogers J. A. Brand W. H. Wilson W. J. Bingham W. J. Stubblefield R. L. Patterson R. M. Grant R. W. Welcher D. R. Hawkinson

Vp l) t II' i((

f(

l

INTERIM REPORT POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNITS 81 AND."82" I. Potential Problem Project receipt of Bechtel's Quality Assurance Bulletin 80-30 and Problem Alert TPM-P-80-6, October 13, 1980, indicated that ITT-Grinnell manufactured sway struts, snubbers and shock sup-pressors have been found to containartially or totally dis-engaged self-aligning rod end bushings.

The condition of total disengagement may create a safety hazard of overstress in piping systems.

Surveillance activity was initiated to evaluate the ITT-Grinnell product received at the jobsite. The results of the review re-vealed that two sway struts (3-ED-401-H-004) and (3-ED-176-H-013) were found with bushings disengaging. The bushings were not staked.

II. A roach To and Status Of Pro osed Resolution

1. Bechtel Engineering will obtain a written statement from ITT-Grinnell as to the implemented effective date of a formal staking program.
2. Bechtel Construction will identify all struts which have been received prior to the formal staking by ITT-Grinnell.
3. ITT-Grinnell will develop and submit for Bechtel Engi-neering approval, an inspection and repair procedure.
4. Bechtel Construction and ITT-Grinnell to establish how the inspection and repair procedure will be implemented.
5. Repair and/or replace defected sway struts as established

~4 by the approved procedure.

III. Pro ected Com letion of Corrective Action and Submittal Date of the Final Re ort It is forecast to have the resolution and completion plan implemented by February 1, 1981.

The final report will be submitted by March 1, 1981.

~ ~

Iy f'4@+