ML17304B221: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.AC CELE PATED Dl Bt'Tl 04.DEMON STRE O.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8906070197 DOC.DATE: 89/05/30 NOTARIZED:
{{#Wiki_filter:.
NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION HAYNES,J.G.
AC CELE PATED         Dl     Bt'Tl 04     . DEMON STRE           O.'i     SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
ACCESSION NBR:8906070197           DOC.DATE:     89/05/30     NOTARIZED: NO             DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station,           Unit 3, Arizona Publi 05000530 AUTH. NAME         AUTHOR AFFILIATION HAYNES,J.G.         Arizona Nuclear Power       Project (formerly Arizona Public Serv RECIP.NAME         RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Special Rept 3-SR-89-004:on 890512,inservice insp of steam generators completed.
Special Rept 3-SR-89-004:on 890512,inservice insp of steam generators completed.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE: TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.NOTES:Standardized plant.05000530 S RECIPIENT ID CODE/NAME PD5 LA DAVIS,M.J.
DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR                 ENCL         SIZE:
INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/TPAB DEDRO NRR/DEST/ADE 8H NRR/DEST/CEB 8H NRR/DEST/ICSB 7 NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB 10 NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RES/DSIR/EIB RGN5 FILE 01 EXTERNAL EGGG WI LLIAMS i S L ST LOBBY WARD NRC PDR NSIC MURPHY,G.A NOTES COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 4 4 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD DAVIS,M ACRS MOELLER AEOD/DOA AEOD/ROAB/DS P IRM/DCTS/DAB NRR/DEST/ADS 7E NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PS B 8 D NRR/DEST/SGB 8D NRR/DLPQ/PEB 10 R E PB 10 G 02 RES DSR/PRAB FORD BLDG HOY i A LPDR NSIC MAYS,G COPIES LTTR ENCL 1 1 1 1 2 2 1 1 2 2 1 1 1 0 1 1 1 1 1 1 1 1 1 1, 2 2 1 1 1 1 1 1 1 1 1 1 NOI<'IO AL"RIDS" RECIPIENIS:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
PLAZAS HELP US K)REDKZ~!CD>TACT'IHE DOCUMENT."Z CGhIROL DMK, ROOD P1-37 (EXP.20079)%0 ELIMINATE YOUR NAHE FRY DIS'ZRIBVTI(K LISTS FOR DOCUMENIS YOU DON'T NEED).TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 44 I 4 Arizona Public Service Company P.O, BOX 53999~PHOENIX, ARIZONA 85072 3999 192-00485-JGH/TDS/DAJ Hay 30, 1989 U.S.Nuclear Regulatory'ommission NRC Document Control Desk Washington, D.C.20555
NOTES:Standardized plant.                                                             05000530 S RECIPIENT           COPIES              RECIPIENT              COPIES ID CODE/NAME        LTTR ENCL          ID CODE/NAME           LTTR ENCL PD5 LA                 1      1      PD5 PD                      1    1 DAVIS,M.J.             1      1      DAVIS,M                    1    1 INTERNAL: ACRS MICHELSON             1      1      ACRS MOELLER                2    2 ACRS WYLIE             1      1      AEOD/DOA                    1    1 AEOD/DSP/TPAB           1      1      AEOD/ROAB/DS P              2    2 DEDRO                   1      1      IRM/DCTS/DAB                1    1 NRR/DEST/ADE 8H         1      1'      NRR/DEST/ADS    7E        1    0 NRR/DEST/CEB 8H                1      NRR/DEST/ESB    8D        1    1 NRR/DEST/ICSB    7      1      1      NRR/DEST/MEB    9H        1     1 NRR/DEST/MTB    9H      1      1      NRR/DEST/PS B    8D         1    1 NRR/DEST/RSB    8E      1      1      NRR/DEST/SGB    8D        1    1 NRR/DLPQ/HFB    10      1      1      NRR/DLPQ/PEB     10       1    1, NRR/DOEA/EAB    11      1      1        R     E   PB 10         2    2 NUDOCS-ABSTRACT        1      1'        G             02         1    1 RES/DSIR/EIB                  1      RES DSR/PRAB               1    1 RGN5    FILE 01        1      1 EXTERNAL    EGGG WI LLIAMSi S      4      4      FORD BLDG HOY i A           1     1 L ST LOBBY WARD        1     1       LPDR                        1     1 NRC PDR                1     1       NSIC MAYS,G                1     1 NSIC MURPHY,G.A        1     1 NOTES                                1     1 NOI< 'IO AL "RIDS" RECIPIENIS:
PLAZAS HELP US K) REDKZ ROOD P1-37 (EXP. 20079) %0
                                          ~!       CD>TACT 'IHE DOCUMENT."Z CGhIROL DMK, ELIMINATE YOUR NAHE FRY DIS'ZRIBVTI(K LISTS FOR DOCUMENIS YOU DON'T NEED).
TOTAL NUMBER OF COPIES REQUIRED: LTTR             45   ENCL     44


==Dear Sirs:==
I 4
 
Arizona Public Service Company P.O, BOX 53999 ~ PHOENIX, ARIZONA 85072 3999 192-00485-JGH/TDS/DAJ Hay 30,      1989 U. S. Nuclear Regulatory'ommission NRC Document Control Desk Washington, D.C. 20555
 
==Dear Sirs:==


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)Unit 3 Docket.No.STN 50-530 (License No.NPF-74)Special Report 3-SR-89-004 File: 89-020-404 Attached please find Special Report 3-SR-89-004 prepared and submitted pursuant to Technical Specifications 4.4.4.5 and 6.9'.This report discusses steam generator tube plugging in Unit 3.If you have any questions, please contact T.D.Shriver, Compliance Hanager, at (602)393-2521,'ery truly yours, J.G.Haynes Vice President Nuclear Production JGH/TDS/DAJ/kj Attachment cc: D.B.Karner E.E.Van Brunt, Jr.J.B.Hartin T.J.Polich H.J.Davis A.C.Gehr INPO Records Center (all w/attachments)
Palo Verde Nuclear Generating Station (PVNGS)
PALO VERDE NUCLEAR GENERATING STATION Steam Generator Tube Plugging License No.NPF-74 Docket No.STN 50-530 Special Report 3-SR-89-004 This special report is provided pursuant to Palo Verde Unit 3 Technical Specifications 4.4.4.5(a) and 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities.
Unit 3 Docket .No. STN 50-530 (License No. NPF-74)
On May 12, 1989, Unit 3 was in a refueling outage with the core off-loaded to the Spent Fuel Pool when an inservice inspection of both steam generators was completed.
Special Report 3-SR-89-004 File: 89-020-404 Attached please find Special Report 3-SR-89-004 prepared and submitted
The inspection resulted in the plugging of seven (7)tubes in Steam Generator No.1 and ten (10)tubes in Steam Generator No.2.Pursuant to Technical Specification 4.4.4.5(b), the complete results of the steam generator tube inservice inspection will be submitted by May 12, 1990.
                                                                      '.
                    'ery pursuant to Technical Specifications 4.4.4.5 and 6.9                       This report discusses steam generator tube plugging in Unit 3.
If you have any questions,     please contact T. D. Shriver, Compliance Hanager, at (602) 393-2521, truly yours, J. G. Haynes Vice President Nuclear Production JGH/TDS/DAJ/kj Attachment cc:   D. B. Karner                   (all    w/attachments)
E. E. Van Brunt, Jr.
J. B. Hartin T. J. Polich H. J. Davis A. C. Gehr INPO Records Center
 
PALO VERDE NUCLEAR GENERATING STATION Steam Generator Tube Plugging License No. NPF-74 Docket No. STN 50-530 Special Report 3-SR-89-004 This special report is provided pursuant to Palo Verde Unit 3 Technical Specifications 4.4.4.5(a) and 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities. On May 12, 1989, Unit 3 was in a refueling outage with the core off-loaded to the Spent Fuel Pool when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of seven (7) tubes in Steam Generator No. 1 and ten (10) tubes in Steam Generator No. 2.
Pursuant to Technical Specification 4.4.4.5(b), the complete results of the steam generator tube inservice inspection will be submitted by May 12, 1990.
 
l}}
l}}

Revision as of 10:44, 29 October 2019

Special Rept 3-SR-89-004:on 890512,while Unit in Refueling Outage W/Core Offloaded to Spent Fuel Pool,Inservice Insp of Steam Generators Completed.Complete Results of Insp Will Be Submitted by 900512
ML17304B221
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 05/30/1989
From: Haynes J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
192-00485-JGH, 192-485-JGH, 3-SR-89-004, 3-SR-89-4, NUDOCS 8906070197
Download: ML17304B221 (5)


Text

.

AC CELE PATED Dl Bt'Tl 04 . DEMON STRE O.'i SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8906070197 DOC.DATE: 89/05/30 NOTARIZED: NO DOCKET FACIL:STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH. NAME AUTHOR AFFILIATION HAYNES,J.G. Arizona Nuclear Power Project (formerly Arizona Public Serv RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Special Rept 3-SR-89-004:on 890512,inservice insp of steam generators completed.

DISTRIBUTION CODE: IE22D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:Standardized plant. 05000530 S RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 1 1 PD5 PD 1 1 DAVIS,M.J. 1 1 DAVIS,M 1 1 INTERNAL: ACRS MICHELSON 1 1 ACRS MOELLER 2 2 ACRS WYLIE 1 1 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 AEOD/ROAB/DS P 2 2 DEDRO 1 1 IRM/DCTS/DAB 1 1 NRR/DEST/ADE 8H 1 1' NRR/DEST/ADS 7E 1 0 NRR/DEST/CEB 8H 1 NRR/DEST/ESB 8D 1 1 NRR/DEST/ICSB 7 1 1 NRR/DEST/MEB 9H 1 1 NRR/DEST/MTB 9H 1 1 NRR/DEST/PS B 8D 1 1 NRR/DEST/RSB 8E 1 1 NRR/DEST/SGB 8D 1 1 NRR/DLPQ/HFB 10 1 1 NRR/DLPQ/PEB 10 1 1, NRR/DOEA/EAB 11 1 1 R E PB 10 2 2 NUDOCS-ABSTRACT 1 1' G 02 1 1 RES/DSIR/EIB 1 RES DSR/PRAB 1 1 RGN5 FILE 01 1 1 EXTERNAL EGGG WI LLIAMSi S 4 4 FORD BLDG HOY i A 1 1 L ST LOBBY WARD 1 1 LPDR 1 1 NRC PDR 1 1 NSIC MAYS,G 1 1 NSIC MURPHY,G.A 1 1 NOTES 1 1 NOI< 'IO AL "RIDS" RECIPIENIS:

PLAZAS HELP US K) REDKZ ROOD P1-37 (EXP. 20079) %0

~! CD>TACT 'IHE DOCUMENT."Z CGhIROL DMK, ELIMINATE YOUR NAHE FRY DIS'ZRIBVTI(K LISTS FOR DOCUMENIS YOU DON'T NEED).

TOTAL NUMBER OF COPIES REQUIRED: LTTR 45 ENCL 44

I 4

Arizona Public Service Company P.O, BOX 53999 ~ PHOENIX, ARIZONA 85072 3999 192-00485-JGH/TDS/DAJ Hay 30, 1989 U. S. Nuclear Regulatory'ommission NRC Document Control Desk Washington, D.C. 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 3 Docket .No. STN 50-530 (License No. NPF-74)

Special Report 3-SR-89-004 File: 89-020-404 Attached please find Special Report 3-SR-89-004 prepared and submitted

'.

'ery pursuant to Technical Specifications 4.4.4.5 and 6.9 This report discusses steam generator tube plugging in Unit 3.

If you have any questions, please contact T. D. Shriver, Compliance Hanager, at (602) 393-2521, truly yours, J. G. Haynes Vice President Nuclear Production JGH/TDS/DAJ/kj Attachment cc: D. B. Karner (all w/attachments)

E. E. Van Brunt, Jr.

J. B. Hartin T. J. Polich H. J. Davis A. C. Gehr INPO Records Center

PALO VERDE NUCLEAR GENERATING STATION Steam Generator Tube Plugging License No. NPF-74 Docket No. STN 50-530 Special Report 3-SR-89-004 This special report is provided pursuant to Palo Verde Unit 3 Technical Specifications 4.4.4.5(a) and 6.9.2 to report the number of steam generator tubes plugged as a result of inservice inspection activities. On May 12, 1989, Unit 3 was in a refueling outage with the core off-loaded to the Spent Fuel Pool when an inservice inspection of both steam generators was completed. The inspection resulted in the plugging of seven (7) tubes in Steam Generator No. 1 and ten (10) tubes in Steam Generator No. 2.

Pursuant to Technical Specification 4.4.4.5(b), the complete results of the steam generator tube inservice inspection will be submitted by May 12, 1990.