ML18011B082: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P, ge pi'i P R.IC3R.I"PY'CCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSXON NBR:9512180220 DOC.DATE: 9~~NOTARIZED:
{{#Wiki_filter:P R.IC3R.I         RIDS PROCESSING "PY'CCELERATED P,    ge pi      'i REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION BOULWAARE,L.
ACCESSXON       NBR:9512180220             DOC.DATE:     9~~
Carolina Power&Light Co.DONAHUE,J.W.
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina NOTARIZED: NO        DOCKET 05000400 I
Carolina Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
AUTH. NAME                 AUTHOR AFFILIATION BOULWAARE,L.               Carolina Power         &   Light Co.
DONAHUE,J.W.               Carolina Power           &   Light Co.                                               P RECIP.NAME                 RECIPIENT AFFILIATION R


==SUBJECT:==
==SUBJECT:==
Monthly operating rept ov 1995 for Shearon Harris Nuclear Power Plant.W/51213 ltr.DISTRIBUTION CODE: IE24D COPXES RECEIVED:LTR ENCL SXZE: TXTLE: Monthly Operating Report (per Tech Specs)DOCKET I 05000400 P R NOTES:Application for permit renewal filed.o5ooo4oo R RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACR LE CENT Ol EXTERNAL LI TCO BRYCE g J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DRPM/PECB.
Monthly operating rept                     ov 1995             for Shearon Harris Nuclear Power Plant.W/ 51213                 ltr.
NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D C U N Y'OTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE24D COPXES RECEIVED:LTR                                       ENCL     SXZE:
PLEASE HELP US TO REDUCE 6'%STE!COYTACT I'HE DOCL'%!EYT CO4'TROL DESK.ROObl Pl-37 (EXT.5N-20S3)TO FLINII.'PATE YOUR X'Al!L FROXI DIS I'RIBUTIOY LISTS I'OR DOCL'NIEX'I'S YOl.'Oi"I YI.'I'.D!TOTAL NUMBER OF COPXES REQUIRED: LTTR 19 ENCL 19  
TXTLE: Monthly Operating Report (per Tech Specs)
~g I 4 C~IPSE Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 DEC 1 5 1995 United States Nuclear Regulatory Commission ATTENTION:
NOTES:Application             for permit       renewal   filed.                                     o5ooo4oo R RECIPIENT               COPIES                          RECIPIENT        COPIES ID CODE/NAME              LTTR ENCL            ID           CODE/NAME     LTTR ENCL PD2-1 PD                       1      1      LE,N                            1    1 INTERNAL: ACR                                 10      10        AEOD/SPD/RRAB                  1    1 LE CENT         Ol         1      1      NRR/DRPM/PECB.                  1    1 1      1 EXTERNAL       LITCO BRYCE g J H               1      1      NOAC                            1    1 NRC PDR                         1       1 D
Document Control Desk Washington, DC 20555 SERIAL: HNP-95-118 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT Gentlemen:
C U
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power&Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1995.Sincerely, J.W.Donahue General Manager Harris Nuclear Plant LDB Enclosure c: Mr.S.D.Ebneter Mr.N.B.Le Mr.D.J.Roberts 95i2i80220 rst5ii30 PDR ADOCK 05000400 PDR~l State Road 1134 New Hill NC Enclosure to SeriaL HNP-095-118 Page 1 of 4 CPBL CO.RUN DATE 12/05/95 RUN TIME 08:30:01 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36.000 OPERATING STATUS 1.UNIT NAME: HARRIS UNIT 1 DOCKET NO.050-400 COMPLETED BY LESLIE BOULWAARE TELEPHONE<919)362-2905 I NOTES 2.REPORTIHG PERIOD: NOVEMBER 95 I 3.LICENSED THERMAL POWER (MWT): 2775 4~NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 I 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920'J 7.MAX DEPENDABLE CAPACITY (NET MWE): 860~0-8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL AT IVE 11~HOURS IN REPORTING PERIOD 12~NUMBER OF HOURS REACTOR CRITICAL 13'EACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR OH LINE 15'NIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEH.(MWH)17.GROSS ELEC.FNFRGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 619.80 F 00 605.16 F 00 1609269.12 525735 F 00 488583.00 84'5 84.05 78.91 75.40 15.95 (TYPE, DATE, 75241.00 62236.65.00 61628.33 F 00 164555879.40 54774041.00 51042105.00 81.91 81.91 78.88 75.38 3.19 8016.00 6686.80~00 6654'6 F 00 17740588.32 5850515.00 5451451.00 83.01 83.01 79.08 75.56 5.38 AND DURATION OF EACH>: 25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
N Y'OTE TO ALL"RIDS" RECIPIENTS:
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 E
PLEASE HELP US TO REDUCE 6'%STE! COYTACT I'HE DOCL'%!EYT CO4'TROL DESK. ROObl Pl-37 (EXT. 5N-20S3 ) TO FLINII.'PATE YOUR X'Al!LFROXI DIS I'RIBUTIOYLISTS I'OR DOCL'NIEX'I'S YOl.'Oi "I YI.'I'.D!
Enclosure to Serial HNP-095-118 Page 2 of 4 CPRL CO.RUN DATE 12/05/95 RUN TIME 12:48:48 PLANT PERFORMANCE DATA SYSTEM APPENDIX B-AVERAGE DAILY POHER LEVEL HARRIS UNIT'1 PAGE 1 RPD39-000 DOCKET NO.050-400 COMPLETED BY LESLIE BOULWARE TELEPHONE (919)362-2905 NOVEMBER 1995 DAY AVG.DAILY PONER LEVEL (MNE-NET)DAY AVG.DAILY PONER LEVEL (MNE-NET)10 12 13 14 15 16-34-34 127, 257-35 39 749 766 802 856 854 854 855 855 17 20 21 22 23 24 25 26 27 28 29 30 856 853 851 851 851 855 852 854 855 851 852 856 UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH UNIT NAME: Hanis DATE: 12/06/95 COMPLETED BY: LD.Boulware TELEPHONE:
TOTAL NUMBER OF COPXES REQUIRED: LTTR                         19             ENCL   19
(919)362-2905 NUMBER 95407 DATE 951021 TYPE DURATION HOURS)59.82 REASON A METHOD OF SHUITING DOWN REACTOR LICENSEE EVENT REPORT/t N/A SYSTEM CODE4 CH COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Unit was shutdown manually to repair a leaking fcedwater isolation valve (IFW-217).
 
Hant returned on-line 11-3-95 I 1149.I F: Forced S: Scheduled 2 Reason: A-Equipmcnt Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction EOperator Training 8t License Examination F-Adnunistrative
~g 4I
&Operational Error (Explain)H~er (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram%Continued 5-Reduced Load&Other 4 Extubit G-Instructions for Peeparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG4 161)5 Exhibit I-Same Source tn tn X WS 5 e rt n ro r-r rrtu 0 r to C 0 Rtu I w'Lo O UNIT SHUTDOWNS AND POWER REDUCTION REPORT MO~i UNIT NAME: Hams DATE: 12/06/95 COMPLETED BY: LD.Boulware TELEPHONE:
 
(919)362-2905 95408 DATE 951105 DURATION OURS 55.02 REASON METHOD OF SHUTTING DOWN REACTOR LICENSEE EVENT'YSTEM REPORT&#xb9;CODE 4 95411 COMPONENT CODES RELAYX CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Plant trip0737 duc to a failed circuit on a relay during ESFAS slave relay testing.Relay was replaced and testing completed.
C~
Plant returned on-linc 11-7-951438.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C Refueling D-Regulatory Restriction FA)pnator Training tb License Examination F-Administrative G~ionai Error (Explain)Hither (Explain)3 Mcthah I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load&Other 4 Exhbit G-Instructions for reparation of Data Entry Sheets for Lioensee Event Report (LER)File (NUREG4161) 5 Exhil>it I-Same Source Olol X WS P reit n 8 V rrQ 0 ta C 05$I rr wioO a4 o.}}
IPSE Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 1995 SERIAL: HNP-95-118 DEC  1 5 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Gentlemen:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power
    & Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1995.
Sincerely, J.W. Donahue General Manager Harris Nuclear Plant LDB Enclosure c:       Mr. S. D. Ebneter Mr. N. B. Le Mr. D. J. Roberts 95i2i80220 rst5ii30 PDR   ADOCK     05000400 PDR         ~lState Road 1134 New Hill NC
 
Enclosure to SeriaL HNP-095-118 Page 1 of   4 CPBL CO.                     PLANT PERFORMANCE DATA SYSTEM                    PAGE    1 RUN DATE  12/05/95               OPERATING DATA REPORT                        RPD36.000 RUN TIME 08:30:01                   HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY LESLIE BOULWAARE OPERATING STATUS                                            TELEPHONE <919)362-2905
: 1. UNIT  NAME:  HARRIS UNIT 1                      I  NOTES
: 2. REPORTIHG PERIOD: NOVEMBER     95               I
: 3. LICENSED THERMAL POWER (MWT):     2775 4 ~ NAMEPLATE RATING (GROSS MWE):     950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE):     900.0   I
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE):     920 '   J
: 7. MAX DEPENDABLE CAPACITY (NET MWE):       860 ~ 0-
: 8. IF CHANGES OCCUR   IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED   IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION   IF ANY:
THIS             YR TO               CUMUL MONTH                DATE               AT IVE 11 ~ HOURS IN REPORTING PERIOD                       720.00            8016.00            75241.00 12 ~ NUMBER OF HOURS REACTOR CRITICAL               619.80            6686.80            62236.65 13 'EACTOR RESERVE SHUTDOWN HRS                             00              ~ 00                .00
                                                                            '6 F
: 14. HOURS GENERATOR OH LINE                         605.16            6654              61628.33 15 'NIT   RESERVE SHUTDOWN HOURS                         F 00              F 00                F 00
: 16. GROSS THERMAL ENERGY GEH. (MWH)           1609269.12          17740588.32      164555879.40
: 17. GROSS ELEC. FNFRGY GEN (MWH)               525735 F 00          5850515.00        54774041.00
: 18. NET ELEC. ENERGY GENERATED (MWH)           488583.00            5451451.00        51042105.00
: 19. UNIT SERVICE FACTOR                               84  '5              83.01                81.91
: 20. UNIT AVAILABILITYFACTOR                          84.05              83.01                81.91
: 21. UNIT CAP. FACTOR (USING MDC NET)                 78.91              79.08                78.88
: 22. UNIT CAP. FACTOR (USING DER NET)                 75.40              75.56                75.38
: 23. UNIT FORCED OUTAGE RATE                           15.95                5.38                3.19
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE,          AND DURATION OF EACH>:
: 25. IF  SHUTDOWN AT END OF REPORT    PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR    TO COMMERCIAL OPERATION): FORECAST          ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
 
E Enclosure to Serial HNP-095-118 Page 2 of 4 CPRL CO.                   PLANT PERFORMANCE DATA SYSTEM                  PAGE    1 RUN DATE 12/05/95      APPENDIX B - AVERAGE DAILY POHER LEVEL            RPD39-000 RUN TIME 12:48:48                  HARRIS UNIT '1 DOCKET NO. 050-400 COMPLETED BY LESLIE BOULWARE TELEPHONE (919)362-2905 NOVEMBER        1995 DAY  AVG. DAILY PONER LEVEL              DAY    AVG. DAILY PONER LEVEL (MNE-NET)                                  (MNE-NET)
                  -34                    17                  856
                  -34                                        853 127,                                        851 20                  851 257                    21                  851
                  -35                    22                  855 39                    23                  852 24                  854 749                    25                  855 10                766                    26                  851 802                    27 12                856                    28 13                854                    29                  852 14                854                    30                  856 15                855 16                855
 
UNITSHUTDOWNS AND POWER REDUCTION UNITNAME:          Hanis DATE:             12/06/95 COMPLETED BY: LD. Boulware TELEPHONE:          (919) 362-2905 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF        LICENSEE                                          ACTION TO DURATION                    SHUITING DOWN        EVENT          SYSTEM COMPONENT        PREVENT RECURRENCE NUMBER    DATE TYPE            HOURS)        REASON        REACTOR          REPORT/t        CODE4    CODE 5 95407    951021                  59.82            A                              N/A            CH                    Unit was shutdown manually to repair a leaking fcedwater isolation valve (IFW-217).
I Hant returned 1149.
on-line 11-3-95 I                  2                                                            3                              4 F: Forced          Reason:                                                      Method:                        Extubit G-Instructions S: Scheduled        A-Equipmcnt Failure (Explain)                                I-Manual                      for Peeparation ofData B-Maintenance or Test                                        2-Manual Scram                  Entry Sheets for Licensee Event Report C-Refueling                                                  3-Automatic Scram              (LER) File D-Regulatory Restriction                                    %Continued                    (NUREG4 161)
EOperator Training 8t License Examination                    5-Reduced Load F-Adnunistrative                                            &Other                          5
                    &Operational Error (Explain)                                                                 Exhibit I - Same Source H~er    (Explain) tn tn X WS 5 r-r e rt n ro r
rrtu 0 to C
0 Rtu I
w'Lo O
 
UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME:             Hams DATE:                12/06/95 COMPLETED BY: LD. Boulware TELEPHONE:             (919) 362-2905 REPORT MO~i CAUSE AND CORRECTIVE METHOD OF        LICENSEE                                          ACTION TO DURATION                    SHUTTING DOWN        EVENT      'YSTEM    COMPONENT        PREVENT RECURRENCE DATE                    OURS        REASON        REACTOR          REPORT  &#xb9;      CODE 4  CODES 95408    951105                  55.02                                          95411                  RELAYX        Plant trip      0737 duc to a failed circuit on a relay during ESFAS slave relay testing.
Relay was replaced and testing completed.        Plant returned on-linc 11-7-95 1438.
I                  2                                                            3                              4 F: Forced          Reason:                                                      Mcthah                        Exhbit G-Instructions S: Scheduled        A-Equipment Failure (Explain)                                I-Manual                      for reparation of Data B-Maintenance or Test                                        2-Manual Scram                Entry Sheets for Lioensee Event Report C Refueling                                                  3-Automatic Scram              (LER) File D-Regulatory Restriction                                    4-Continued                    (NUREG4161)
FA)pnator Training tb License Examination                    5-Reduced Load F-Administrative                                            &Other                        5 G~ionai        Error (Explain)                                                              Exhil>it I - Same Source Hither (Explain)
Olol X WS P reit n 8 V rrQ 0 ta C
05$
I rr wioO
 
a4 o.}}

Latest revision as of 06:05, 22 October 2019

Monthly Operating Rept for Nov 1995 for Shearon Harris Nuclear Power Plant.W/951213 Ltr
ML18011B082
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1995
From: Boulwaare L, Donahue J
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-95-118, NUDOCS 9512180220
Download: ML18011B082 (9)


Text

P R.IC3R.I RIDS PROCESSING "PY'CCELERATED P, ge pi 'i REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSXON NBR:9512180220 DOC.DATE: 9~~

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina NOTARIZED: NO DOCKET 05000400 I

AUTH. NAME AUTHOR AFFILIATION BOULWAARE,L. Carolina Power & Light Co.

DONAHUE,J.W. Carolina Power & Light Co. P RECIP.NAME RECIPIENT AFFILIATION R

SUBJECT:

Monthly operating rept ov 1995 for Shearon Harris Nuclear Power Plant.W/ 51213 ltr.

DISTRIBUTION CODE: IE24D COPXES RECEIVED:LTR ENCL SXZE:

TXTLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. o5ooo4oo R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACR 10 10 AEOD/SPD/RRAB 1 1 LE CENT Ol 1 1 NRR/DRPM/PECB. 1 1 1 1 EXTERNAL LITCO BRYCE g J H 1 1 NOAC 1 1 NRC PDR 1 1 D

C U

N Y'OTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE 6'%STE! COYTACT I'HE DOCL'%!EYT CO4'TROL DESK. ROObl Pl-37 (EXT. 5N-20S3 ) TO FLINII.'PATE YOUR X'Al!LFROXI DIS I'RIBUTIOYLISTS I'OR DOCL'NIEX'I'S YOl.'Oi "I YI.'I'.D!

TOTAL NUMBER OF COPXES REQUIRED: LTTR 19 ENCL 19

~g 4I

C~

IPSE Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 1995 SERIAL: HNP-95-118 DEC 1 5 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLY OPERATING REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Plant, Carolina Power

& Light Company herewith submits the report of operating statistics and shutdown experience for the month of November 1995.

Sincerely, J.W. Donahue General Manager Harris Nuclear Plant LDB Enclosure c: Mr. S. D. Ebneter Mr. N. B. Le Mr. D. J. Roberts 95i2i80220 rst5ii30 PDR ADOCK 05000400 PDR ~lState Road 1134 New Hill NC

Enclosure to SeriaL HNP-095-118 Page 1 of 4 CPBL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/05/95 OPERATING DATA REPORT RPD36.000 RUN TIME 08:30:01 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY LESLIE BOULWAARE OPERATING STATUS TELEPHONE <919)362-2905

1. UNIT NAME: HARRIS UNIT 1 I NOTES
2. REPORTIHG PERIOD: NOVEMBER 95 I
3. LICENSED THERMAL POWER (MWT): 2775 4 ~ NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920 ' J
7. MAX DEPENDABLE CAPACITY (NET MWE): 860 ~ 0-
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE AT IVE 11 ~ HOURS IN REPORTING PERIOD 720.00 8016.00 75241.00 12 ~ NUMBER OF HOURS REACTOR CRITICAL 619.80 6686.80 62236.65 13 'EACTOR RESERVE SHUTDOWN HRS 00 ~ 00 .00

'6 F

14. HOURS GENERATOR OH LINE 605.16 6654 61628.33 15 'NIT RESERVE SHUTDOWN HOURS F 00 F 00 F 00
16. GROSS THERMAL ENERGY GEH. (MWH) 1609269.12 17740588.32 164555879.40
17. GROSS ELEC. FNFRGY GEN (MWH) 525735 F 00 5850515.00 54774041.00
18. NET ELEC. ENERGY GENERATED (MWH) 488583.00 5451451.00 51042105.00
19. UNIT SERVICE FACTOR 84 '5 83.01 81.91
20. UNIT AVAILABILITYFACTOR 84.05 83.01 81.91
21. UNIT CAP. FACTOR (USING MDC NET) 78.91 79.08 78.88
22. UNIT CAP. FACTOR (USING DER NET) 75.40 75.56 75.38
23. UNIT FORCED OUTAGE RATE 15.95 5.38 3.19
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH>:
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

E Enclosure to Serial HNP-095-118 Page 2 of 4 CPRL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/05/95 APPENDIX B - AVERAGE DAILY POHER LEVEL RPD39-000 RUN TIME 12:48:48 HARRIS UNIT '1 DOCKET NO. 050-400 COMPLETED BY LESLIE BOULWARE TELEPHONE (919)362-2905 NOVEMBER 1995 DAY AVG. DAILY PONER LEVEL DAY AVG. DAILY PONER LEVEL (MNE-NET) (MNE-NET)

-34 17 856

-34 853 127, 851 20 851 257 21 851

-35 22 855 39 23 852 24 854 749 25 855 10 766 26 851 802 27 12 856 28 13 854 29 852 14 854 30 856 15 855 16 855

UNITSHUTDOWNS AND POWER REDUCTION UNITNAME: Hanis DATE: 12/06/95 COMPLETED BY: LD. Boulware TELEPHONE: (919) 362-2905 REPORT MONTH CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUITING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE HOURS) REASON REACTOR REPORT/t CODE4 CODE 5 95407 951021 59.82 A N/A CH Unit was shutdown manually to repair a leaking fcedwater isolation valve (IFW-217).

I Hant returned 1149.

on-line 11-3-95 I 2 3 4 F: Forced Reason: Method: Extubit G-Instructions S: Scheduled A-Equipmcnt Failure (Explain) I-Manual for Peeparation ofData B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event Report C-Refueling 3-Automatic Scram (LER) File D-Regulatory Restriction %Continued (NUREG4 161)

EOperator Training 8t License Examination 5-Reduced Load F-Adnunistrative &Other 5

&Operational Error (Explain) Exhibit I - Same Source H~er (Explain) tn tn X WS 5 r-r e rt n ro r

rrtu 0 to C

0 Rtu I

w'Lo O

UNIT SHUTDOWNS AND POWER REDUCTION UNITNAME: Hams DATE: 12/06/95 COMPLETED BY: LD. Boulware TELEPHONE: (919) 362-2905 REPORT MO~i CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT 'YSTEM COMPONENT PREVENT RECURRENCE DATE OURS REASON REACTOR REPORT ¹ CODE 4 CODES 95408 951105 55.02 95411 RELAYX Plant trip 0737 duc to a failed circuit on a relay during ESFAS slave relay testing.

Relay was replaced and testing completed. Plant returned on-linc 11-7-95 1438.

I 2 3 4 F: Forced Reason: Mcthah Exhbit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for reparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Lioensee Event Report C Refueling 3-Automatic Scram (LER) File D-Regulatory Restriction 4-Continued (NUREG4161)

FA)pnator Training tb License Examination 5-Reduced Load F-Administrative &Other 5 G~ionai Error (Explain) Exhil>it I - Same Source Hither (Explain)

Olol X WS P reit n 8 V rrQ 0 ta C

05$

I rr wioO

a4 o.