ML18017A836: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ORY 1 REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina RUTH.NAME AUTHOR AFFILIATION ROGER,S.Carolina Power&.Light Co.ALEXANDER,D.B.
{{#Wiki_filter:ORY 1 REGULAT     Y INFORMATION DISTRIBUTIO           YSTEM (RIDS)
Carolina Power 8 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET I 05000400 9 for Shearon Harris NOTES:Application for permit renewal filed.
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET 05000400 I
RUTH.NAME             AUTHOR AFFILIATION ROGER,S.             Carolina Power     &. Light Co.
ALEXANDER,D.B.       Carolina Power     8   Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating re Ju Nuclear Power Pla.With 9'908 t DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL X SIZE: TITLE: Monthly Operating Report (per Tech Specs)osooo4oo E RECIPIENT ID CODE/NAME LAUFER,R.COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: ACRS OC/DBA/PAD RGN2 1 1 1 1 1 1 FILE Cgggg~KS DRAA/OERAB 1 1 1 1 EXTERNAL: LMITCO MARSHALL NRC PDR 1 1 1 1 NOAC 1 1 D'E N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating re                 Ju       9 for Shearon    Harris Nuclear Power Pla .With           9'908     t DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 9 ENCL 9  
I ENCL  X    SIZE:
'c Carolina Power&Light Company Harris Nuclear Plant P.O.8ox 165 New Hill NC 27562 Serial: HNP-99-126 United States Nuclear Regulatory Commission ATTENTION:
NOTES:Application      for permit renewal filed.                                        osooo4oo     E RECIPIENT           COPIES              RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL         ID CODE/NAME         LTTR ENCL LAUFER,R.                1      1 INTERNAL: ACRS                       1      1      FILE  Cgggg~            1      1 OC/DBA/PAD               1       1       KS DRAA/OERAB         1     1 RGN2                      1       1 EXTERNAL: LMITCO MARSHALL             1       1       NOAC                    1     1 NRC PDR                  1     1 D
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT  
                                                                                                    'E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR                 9   ENCL     9
 
'c Carolina Power & Light Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 Serial: HNP-99-126 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power&Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of July 1999 is provided.Sincerely, D.B.Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure~Q'Mr.J.B.Brady-NRC Senior Resident Inspector Mr.R.J.Laufer-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'st'st08'l70166 st90731 PDR'ADOCK 05000400 R'''","'PDR'  
 
*e f e e~
In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of July 1999 is provided.
Enclosure to Serial HNP-99-126 Sheet 1 of 2 CPEcL CO.RUN DATE 08/06/99 RUN TIME 12:23:04 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: JULY 99 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATXNG (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.ZF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRXCTED ZF ANY (NET MWE): 10.REASONS FOR RESTRlCTION ZF ANY: THIS MONTH YR TO DATE CUMUL ATIVE r 11.HOURS IN REPORTXNG PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LlNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USXNG MDC NET)22.UNXT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 744.00 744.00.00 744.00.00 2060091.18 673755.00 632165.00 100.00 100.00 98.80 94.41.00 5087.00 4925.60.00 4851.11.00 13252993.74 4402034.00 4126640.00 95.36 95.36 94.33 90.13 4.64 107376.00 91151.21.00 90236.72.00 242672717.70 80746071.00 75363512.00 84.04 84.04 81.61 77.99 3.18 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): 25.I'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS 1N TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure                                                                                     ~Q' Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road   New Hill NC
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: HNP-99-126 Sheet 2 of 2 CPEcL CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 08/06/99 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 12:23:03 HARRIS UNIT 1 PAGE 1 RPD39-000 JULY 1999 DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 14 15 16 852 853 850 847 843 843 850 850 847 860 866 865 861 858 854 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 850 848 847 847 847 845 842 845 849 846 848 846 849 846}}
  'st'st08'l70166       st90731 PDR R         '' '","'05000400
              'ADOCK PDR'
* e e
f e   ~
 
Enclosure to Serial HNP-99-126 Sheet 1 of 2 CPEcL CO.                   PLANT PERFORMANCE DATA SYSTEM                PAGE      1 RUN DATE 08/06/99               OPERATING DATA REPORT                    RPD36-000 RUN TIME 12:23:04                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                      TELEPHONE (919)362-2573
: 1. UNIT NAME: HARRIS UNIT 1
: 2. REPORTING PERIOD: JULY         99
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9
: 5. DESIGN ELECTRICAL RATXNG (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):     860.0
: 8. ZF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS 3 THRU     7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRXCTED ZF ANY (NET MWE):
: 10. REASONS FOR RESTRlCTION ZF ANY:
THIS             YR TO                 CUMUL MONTH              DATE                 ATIVE r
: 11. HOURS IN REPORTXNG PERIOD                   744.00          5087.00            107376.00
: 12. NUMBER OF HOURS REACTOR CRITICAL             744.00          4925.60              91151. 21
: 13. REACTOR RESERVE SHUTDOWN HRS                     .00              .00                  .00
: 14. HOURS GENERATOR ON LlNE                     744.00          4851.11              90236.72
: 15. UNIT RESERVE SHUTDOWN HOURS                     .00              .00                  .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)         2060091.18        13252993.74        242672717.70
: 17. GROSS ELEC. ENERGY GEN (MWH)             673755.00        4402034.00          80746071.00
: 18. NET ELEC. ENERGY GENERATED (MWH)         632165.00        4126640.00          75363512.00
: 19. UNIT SERVICE FACTOR                         100.00            95.36                84.04
: 20. UNIT AVAILABILITYFACTOR                      100.00            95.36                84.04
: 21. UNIT CAP. FACTOR (USXNG MDC NET)             98.80            94.33                81.61
: 22. UNXT CAP. FACTOR (USING DER NET)             94.41            90.13                77.99
: 23. UNIT FORCED OUTAGE RATE                         .00             4.64                 3.18
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 25. I'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS 1N TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
 
Enclosure to Serial: HNP-99-126 Sheet 2 of 2 CPEcL CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE 08/06/99     APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 12:23:03                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 JULY            1999 DAY   AVG. DAILY POWER LEVEL             DAY   AVG. DAILY POWER LEVEL (MWE-NET)                                 (MWE-NET) 852                   17                850 853                   18                848 850                   19                847 847                   20                 847 843                    21                 847 843                    22                 845 850                    23                 842 850                    24                 845 25                 849 10                  847                    26                 846 860                    27                 848 12                  866                    28                 846 13                  865                    29                 849 14                  861                    30                 846 15                  858                    31 16                  854}}

Latest revision as of 05:12, 22 October 2019

Monthly Operating Rept for July 1999 for Shearon Harris Nuclear Power Plant.With 990811 Ltr
ML18017A836
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/31/1999
From: Alexander D, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-99-126, NUDOCS 9908170166
Download: ML18017A836 (5)


Text

ORY 1 REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina DOCKET 05000400 I

RUTH.NAME AUTHOR AFFILIATION ROGER,S. Carolina Power &. Light Co.

ALEXANDER,D.B. Carolina Power 8 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re Ju 9 for Shearon Harris Nuclear Power Pla .With 9'908 t DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL X SIZE:

NOTES:Application for permit renewal filed. osooo4oo E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LAUFER,R. 1 1 INTERNAL: ACRS 1 1 FILE Cgggg~ 1 1 OC/DBA/PAD 1 1 KS DRAA/OERAB 1 1 RGN2 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

'E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, LISTS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OP COPIES REQUIRED: LTTR 9 ENCL 9

'c Carolina Power & Light Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 Serial: HNP-99-126 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of July 1999 is provided.

Sincerely, D. B. Alexander Manager, Regulatory Affairs Harris Plant SGR Enclosure ~Q' Mr. J. B. Brady - NRC Senior Resident Inspector Mr. R. J. Laufer - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC

'st'st08'l70166 st90731 PDR R '","'05000400

'ADOCK PDR'

  • e e

f e ~

Enclosure to Serial HNP-99-126 Sheet 1 of 2 CPEcL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 08/06/99 OPERATING DATA REPORT RPD36-000 RUN TIME 12:23:04 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: JULY 99
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATXNG (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. ZF CHANGES OCCUR XN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRXCTED ZF ANY (NET MWE):
10. REASONS FOR RESTRlCTION ZF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE r

11. HOURS IN REPORTXNG PERIOD 744.00 5087.00 107376.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 4925.60 91151. 21
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LlNE 744.00 4851.11 90236.72
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2060091.18 13252993.74 242672717.70
17. GROSS ELEC. ENERGY GEN (MWH) 673755.00 4402034.00 80746071.00
18. NET ELEC. ENERGY GENERATED (MWH) 632165.00 4126640.00 75363512.00
19. UNIT SERVICE FACTOR 100.00 95.36 84.04
20. UNIT AVAILABILITYFACTOR 100.00 95.36 84.04
21. UNIT CAP. FACTOR (USXNG MDC NET) 98.80 94.33 81.61
22. UNXT CAP. FACTOR (USING DER NET) 94.41 90.13 77.99
23. UNIT FORCED OUTAGE RATE .00 4.64 3.18
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. I'F SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS 1N TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: HNP-99-126 Sheet 2 of 2 CPEcL CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 08/06/99 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 12:23:03 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 JULY 1999 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 852 17 850 853 18 848 850 19 847 847 20 847 843 21 847 843 22 845 850 23 842 850 24 845 25 849 10 847 26 846 860 27 848 12 866 28 846 13 865 29 849 14 861 30 846 15 858 31 16 854