ML18030A302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/08/1981
| issue date = 06/08/1981
| title = Comments on Des.Insufficient Info Provided Re Flood Plains & Hazards.Fes Should Provide Info Re 25,50 & 100-yr Flood Elevations
| title = Comments on Des.Insufficient Info Provided Re Flood Plains & Hazards.Fes Should Provide Info Re 25,50 & 100-yr Flood Elevations
| author name = TRIESCHMAN W E
| author name = Trieschman W
| author affiliation = ARMY, DEPT. OF
| author affiliation = ARMY, DEPT. OF
| addressee name = YOUNGBLOOD B J
| addressee name = Youngblood B
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, OTHER U.S. GOVERNMENT AGENCY/DEPARTMENT TO NRC
| page count = 2
| page count = 2
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:REGULATORY 1NFORMATION DISTRIBUTION SYSTK'H                (RIDS)
ACCESSION NBR: 8106090718            OOC  ~ DATE! 81/06/08      NOTARIZED:. NO      DOCKET    ¹ FACIL!50 387 Susquehanna        Steam      Electric StationE Unit      1E  Pennsylva 05 09938-50 388 Susquehanna        Steam      Electric Stationi Unit      2E  Pennsylva    000 AUTH INANE            AUTHuR AFFILIATION TRIKSCHHANiW ~ E. Ar my F Dept ~ of RECIP ~ NAME          RECIPIENT- AFFILIATION YOUNGBLOODEB ~ J ~        Licensing Branch        1 SUBJECTS  Comments    on OKS ~  Insufficient info provided          re flood olains 4  hazards,FES      shoula provide info re 25E50          8  100  yi'lood elements, DISTRIBUTION CODE: CODES          COPIES      RECEIVED:LTR      +ENCL        SIZE:
TITLE: Environ ~ Comments.
NOTES:Send ISE 3      conies    FSAR    8,  all amends,  1  cy.BWR-LRG PM(LIBRIS)    05000387 Send I8E 3    copies    FSAR    8    all amends,  1  cy:BWR LRG PH(L.RIB)      05000388 RECIPIENT            COP  IKS              RECIPIENT            COPIES IO COOK/NARK            I.TTR ENCL          ID COOK/NAME          LTTR ENCL ACTION!    LIC  BR  ¹2  BC  17                      STARKERS        05 INTERNAl.:  ACC IDNT KVAL BR                          KF TREAT SYS BR ENV KNG BR        09                      HYD/GEO BR HYDRO GKO BR                              ILE            07 NRC PDR          02                      0 RAD ASSESSHT BR                              KG  FI      01 SIT ANAL    BR    10                        'TTL  AI ANCE BR EXTERNAL; ACRS                                        LPOR            03 NATL LAB          20                      NSIC            04 pe  12%81 TOTAL NUABER OF COPIES        REQUIREDI LTTR      . W ENCL
DEPARTMENT OF THE ARMY BALTIMORE DISTRICT. CORPS OF ENOINEERS P.O. BOX I 715 BAI TIMORE. MARYLAND EIEO3 REPLY TO ATTKHTIOII OS<
NABPL-E Mr. B. J. Youngblood Chief Licensing Branch No. 1 Division of Licensing United States Nuclear Regulatory Commission Washington, D.C.            20555
==Dear Mr. Youngblood:==
This    letter is in        response  to your Draft Environmental Impact Statement (DEIS) related to the operation of the                Susquehanna      Steam  Electric Station Docket Nos. 50-387-50>>388.              Comments have been      provided in regards to the Corps'reas of concern        as they    relate to the proposed project.
This agency's areas of concern are flood control hazard potential, permit require-ments under Section 404 of the Clean Water Act, and other direct and                      indirect impacts on Corps of Engineers'xisting and/or proposed projects.
Insufficient information has been provided in order for comments to be made with regards to flood plain hazards. It is suggested that the Final Environmental Impact Statement provide information with regards to the 25, 50, and 100-year flood elevations. Any crossings of these flood plains should be extensively explained and mapped. The physical plant should have flood protection up to the probable maximum flood (PMF) level.
A  determination has been made that a Department of the Army Section 404 permit will not      be required for the proposed construction.
It  has also been determined that no impacts are anticipated to any existing and/or proposed Corps of EngineersI projects due to the proposed construction.
The    Baltimore        District appreciates      the opportunity to comment on your DEIS and    if we    can be    of further assistance,        please do not hesitate to contact us.
Sincerely, QQQQ WIL IAM      . ESC                      5 Chief, Planning Division Ilo s y0609          '"'3 i'L, Q}}

Latest revision as of 01:43, 22 October 2019

Comments on Des.Insufficient Info Provided Re Flood Plains & Hazards.Fes Should Provide Info Re 25,50 & 100-yr Flood Elevations
ML18030A302
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/08/1981
From: Trieschman W
ARMY, DEPT. OF
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NABPL-E, NUDOCS 8106090718
Download: ML18030A302 (2)


Text

REGULATORY 1NFORMATION DISTRIBUTION SYSTK'H (RIDS)

ACCESSION NBR: 8106090718 OOC ~ DATE! 81/06/08 NOTARIZED:. NO DOCKET ¹ FACIL!50 387 Susquehanna Steam Electric StationE Unit 1E Pennsylva 05 09938-50 388 Susquehanna Steam Electric Stationi Unit 2E Pennsylva 000 AUTH INANE AUTHuR AFFILIATION TRIKSCHHANiW ~ E. Ar my F Dept ~ of RECIP ~ NAME RECIPIENT- AFFILIATION YOUNGBLOODEB ~ J ~ Licensing Branch 1 SUBJECTS Comments on OKS ~ Insufficient info provided re flood olains 4 hazards,FES shoula provide info re 25E50 8 100 yi'lood elements, DISTRIBUTION CODE: CODES COPIES RECEIVED:LTR +ENCL SIZE:

TITLE: Environ ~ Comments.

NOTES:Send ISE 3 conies FSAR 8, all amends, 1 cy.BWR-LRG PM(LIBRIS) 05000387 Send I8E 3 copies FSAR 8 all amends, 1 cy:BWR LRG PH(L.RIB) 05000388 RECIPIENT COP IKS RECIPIENT COPIES IO COOK/NARK I.TTR ENCL ID COOK/NAME LTTR ENCL ACTION! LIC BR ¹2 BC 17 STARKERS 05 INTERNAl.: ACC IDNT KVAL BR KF TREAT SYS BR ENV KNG BR 09 HYD/GEO BR HYDRO GKO BR ILE 07 NRC PDR 02 0 RAD ASSESSHT BR KG FI 01 SIT ANAL BR 10 'TTL AI ANCE BR EXTERNAL; ACRS LPOR 03 NATL LAB 20 NSIC 04 pe 12%81 TOTAL NUABER OF COPIES REQUIREDI LTTR . W ENCL

DEPARTMENT OF THE ARMY BALTIMORE DISTRICT. CORPS OF ENOINEERS P.O. BOX I 715 BAI TIMORE. MARYLAND EIEO3 REPLY TO ATTKHTIOII OS<

NABPL-E Mr. B. J. Youngblood Chief Licensing Branch No. 1 Division of Licensing United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Youngblood:

This letter is in response to your Draft Environmental Impact Statement (DEIS) related to the operation of the Susquehanna Steam Electric Station Docket Nos. 50-387-50>>388. Comments have been provided in regards to the Corps'reas of concern as they relate to the proposed project.

This agency's areas of concern are flood control hazard potential, permit require-ments under Section 404 of the Clean Water Act, and other direct and indirect impacts on Corps of Engineers'xisting and/or proposed projects.

Insufficient information has been provided in order for comments to be made with regards to flood plain hazards. It is suggested that the Final Environmental Impact Statement provide information with regards to the 25, 50, and 100-year flood elevations. Any crossings of these flood plains should be extensively explained and mapped. The physical plant should have flood protection up to the probable maximum flood (PMF) level.

A determination has been made that a Department of the Army Section 404 permit will not be required for the proposed construction.

It has also been determined that no impacts are anticipated to any existing and/or proposed Corps of EngineersI projects due to the proposed construction.

The Baltimore District appreciates the opportunity to comment on your DEIS and if we can be of further assistance, please do not hesitate to contact us.

Sincerely, QQQQ WIL IAM . ESC 5 Chief, Planning Division Ilo s y0609 '"'3 i'L, Q