ML18031A027: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/27/1978
| issue date = 10/27/1978
| title = Responds to 780920 NRC Request for Info & Forwards Sched for Kwu T-quencher Prog
| title = Responds to 780920 NRC Request for Info & Forwards Sched for Kwu T-quencher Prog
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = PARR O D
| addressee name = Parr O
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000387, 05000388
| docket = 05000387, 05000388
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
=Text=
{{#Wiki_filter:DOCKET NBR:                                      Sus uehanna        1/2DOC DATE:    781027 RECIPIENT:                          D                                  ACCESSION NBR: '7811170123
~
ORIGINATOR:                                                            COPIES RECEIVED=
COMPANY NAME-                PA Pwr    &    Li ht                    LTR 1          ENCL 1
==SUBJECT:==
SIZE:    2 Res onds    to      780920 NRC        request  for info 6 forwards sched for  KWU  T- encher                ro NOTARIZED DISTR7¹i~V?nN COnE>                    SOOt DISTR TRAIT      Ig'4      Tl TLE I pSA~/FSAR 4'~oTS ANO RELATED cARESpONOENCE NAIF                                    F NCL'P                        FOR ACTION ASST                                    LTR Pal Y                ~ VASSALLO
                                                                      ~ LNRO3 BC
            @7'R CH7FF                              LTR ONL pagd MrR                                            Y'A/FNCL s MINER LIC  A                                  I  7R (1N) Y            ~ LWR03  LA
                                            </E'4CL NRC  Pan                                'w/ENCL I 4 E                                    >/2 E>CL QFl D                                    LTR ONLY OPERATOR l JC HH                        w/ENCL E>ERGFNCY                                w/ENCL w/ENCL PLA'A8 nfRECTrlR >>RP                            LTR l>NL Y "TPC                                      LTR'NL Y Ao Fnp FNr,                              l. TR ONLY
    ~ECH VNG SR                              </ENCL STRUCTIIRAL ENG RR                        W/ENCL
    ~ATERTAL FNI HR                          </2    ENCL An FOR RE'AC SFTY                        LTR I'lNLY.
NOV Ro  19<~)
NOTES:
Send. ISE 3cys, FSAR 6        all  AMDTS
5                      'I f IMAGE'                REGULATO    ,INFORMATION DISTRIBUTION      YSTEM DOCKET NBR:                                      DOC DATE:
RECIPIENT:                                      ACCESSION NBR:
ORIGINATOR:                                      COPIES RECEIVED:
LTR            ENCL
==SUBJECT:==
SIZE:
FOR ACTION REACTna SVSTE~S      BR w/ENCL ANALYiTS    SR          w/ENCL CORE  CPAFnAt~ANCE HR  w/ENCL AD FUA PLANT    AYSTEwS LTR AUX?LTAAY SYS Sa ONLY'/ENCL CONTA th'~E~'T SYSTEMS I L C -SYSTEMS RA      w/ENCL POWER SYS HR            w/FNCL AD FOA SITF, TFC~      w/5  ENCL AD F'nA SiTE ANlvS      lTR  ONI.Y ACCIDPhIT ~NALYS'lS    I /ENCL EFFI.UENT TREA,T SYS    "/FNCL RAD ASSESSHFNT HP.      W/EHCL KTRKwnnD                w/ENCL GEOSCT  f NCES HR      w/ENCL I.PDR-                  w/ENCI.
TE'RA                  W/ENCt NSTC"                  w/ENCL ACRS                    w/16        ENCL TOTAL NUMBER OF COPIES    REQUIRED'TR EhiCL NOTES:
                                                          ~r ~) ~y;,I'I~~,'~  I,II I; P~Pg, PP [
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101  PHONE( (2)S) 821-SISI October 27, l978 Mr. Olan D. Parr Lightwater Reactors Branch No. 3 Division of Project Management U.S. Nuclear Regulatory Commission Washington>  D CD  20555 SUSQUEHANNA STEAM ELECTRIC STATION PPK-ISU T-QUENCHER PROGRAM STATUS ER 100t50      FILE 172, 840-2 PLA-297
==Dear Mr. Parr:==
Attached is- the status of PPK-KWU T-quencher program. Submittal of this information was requested by Dr. Mattson during the Staff's September 20, 1978 meeting with the members of the Mark      II Owners Group executive committee.
Very  truly yours, N. W. Curtis Vice President  - Engineering  Ee Construction DFR:GAF Attachment Copy  to: Dr. Rodger Mattson U.S. Nuclear Regulatory Commission Washington, D.C. 20555
~sgyy vD L3-T PENNSYLVANIA POWER      8  LIGHT COMPANY
0                      R N 1/78      SUBMITTAL OF THE TWENTY REPORTS WHICH FORM THE BASIS FOR THE 'KNU T-9UENCHER DESIGN 0/78        ICBNITTAL OF THE SUSQUEHANNA STEAN ELECTRIC STATION R WHICH INCLUDES THE BASIC DESIGN LOAD SPECIF I CA" TION FOR THE Kdo T-qUENCHER 5/78      KARLSTEIN VERIFICATION TESTS BEGIN 7/78      KARLSTEIN VERIFICATION TESTS COMPLETED 2/79      KARLSTEIN TEST REPORT  TO BE SUBMITTED NOTE: THIS  MAY BE NORE THAN ONE DOCUMENT I}}

Latest revision as of 01:30, 22 October 2019

Responds to 780920 NRC Request for Info & Forwards Sched for Kwu T-quencher Prog
ML18031A027
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/27/1978
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
NUDOCS 7811170123
Download: ML18031A027 (7)


Text

DOCKET NBR: Sus uehanna 1/2DOC DATE: 781027 RECIPIENT: D ACCESSION NBR: '7811170123

~

ORIGINATOR: COPIES RECEIVED=

COMPANY NAME- PA Pwr & Li ht LTR 1 ENCL 1

SUBJECT:

SIZE: 2 Res onds to 780920 NRC request for info 6 forwards sched for KWU T- encher ro NOTARIZED DISTR7¹i~V?nN COnE> SOOt DISTR TRAIT Ig'4 Tl TLE I pSA~/FSAR 4'~oTS ANO RELATED cARESpONOENCE NAIF F NCL'P FOR ACTION ASST LTR Pal Y ~ VASSALLO

~ LNRO3 BC

@7'R CH7FF LTR ONL pagd MrR Y'A/FNCL s MINER LIC A I 7R (1N) Y ~ LWR03 LA

</E'4CL NRC Pan 'w/ENCL I 4 E >/2 E>CL QFl D LTR ONLY OPERATOR l JC HH w/ENCL E>ERGFNCY w/ENCL w/ENCL PLA'A8 nfRECTrlR >>RP LTR l>NL Y "TPC LTR'NL Y Ao Fnp FNr, l. TR ONLY

~ECH VNG SR </ENCL STRUCTIIRAL ENG RR W/ENCL

~ATERTAL FNI HR </2 ENCL An FOR RE'AC SFTY LTR I'lNLY.

NOV Ro 19<~)

NOTES:

Send. ISE 3cys, FSAR 6 all AMDTS

5 'I f IMAGE' REGULATO ,INFORMATION DISTRIBUTION YSTEM DOCKET NBR: DOC DATE:

RECIPIENT: ACCESSION NBR:

ORIGINATOR: COPIES RECEIVED:

LTR ENCL

SUBJECT:

SIZE:

FOR ACTION REACTna SVSTE~S BR w/ENCL ANALYiTS SR w/ENCL CORE CPAFnAt~ANCE HR w/ENCL AD FUA PLANT AYSTEwS LTR AUX?LTAAY SYS Sa ONLY'/ENCL CONTA th'~E~'T SYSTEMS I L C -SYSTEMS RA w/ENCL POWER SYS HR w/FNCL AD FOA SITF, TFC~ w/5 ENCL AD F'nA SiTE ANlvS lTR ONI.Y ACCIDPhIT ~NALYS'lS I /ENCL EFFI.UENT TREA,T SYS "/FNCL RAD ASSESSHFNT HP. W/EHCL KTRKwnnD w/ENCL GEOSCT f NCES HR w/ENCL I.PDR- w/ENCI.

TE'RA W/ENCt NSTC" w/ENCL ACRS w/16 ENCL TOTAL NUMBER OF COPIES REQUIRED'TR EhiCL NOTES:

~r ~) ~y;,I'I~~,'~ I,II I; P~Pg, PP [

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE( (2)S) 821-SISI October 27, l978 Mr. Olan D. Parr Lightwater Reactors Branch No. 3 Division of Project Management U.S. Nuclear Regulatory Commission Washington> D CD 20555 SUSQUEHANNA STEAM ELECTRIC STATION PPK-ISU T-QUENCHER PROGRAM STATUS ER 100t50 FILE 172, 840-2 PLA-297

Dear Mr. Parr:

Attached is- the status of PPK-KWU T-quencher program. Submittal of this information was requested by Dr. Mattson during the Staff's September 20, 1978 meeting with the members of the Mark II Owners Group executive committee.

Very truly yours, N. W. Curtis Vice President - Engineering Ee Construction DFR:GAF Attachment Copy to: Dr. Rodger Mattson U.S. Nuclear Regulatory Commission Washington, D.C. 20555

~sgyy vD L3-T PENNSYLVANIA POWER 8 LIGHT COMPANY

0 R N 1/78 SUBMITTAL OF THE TWENTY REPORTS WHICH FORM THE BASIS FOR THE 'KNU T-9UENCHER DESIGN 0/78 ICBNITTAL OF THE SUSQUEHANNA STEAN ELECTRIC STATION R WHICH INCLUDES THE BASIC DESIGN LOAD SPECIF I CA" TION FOR THE Kdo T-qUENCHER 5/78 KARLSTEIN VERIFICATION TESTS BEGIN 7/78 KARLSTEIN VERIFICATION TESTS COMPLETED 2/79 KARLSTEIN TEST REPORT TO BE SUBMITTED NOTE: THIS MAY BE NORE THAN ONE DOCUMENT I