| issue date = 11/16/2018
| issue date = 11/16/2018
| title = Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024)
| title = Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024)
| author name = Oesterle E R
| author name = Oesterle E
| author affiliation = NRC/NRR/DMLR/MRPB
| author affiliation = NRC/NRR/DMLR/MRPB
| addressee name = Stoddard D G
| addressee name = Stoddard D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:November 16, 2018 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711
{{#Wiki_filter:November 16, 2018 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711


==SUBJECT:==
==SUBJECT:==
SURRY POWER STATION, UNIT NO S. 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL (EPID NOS. L
SURRY POWER STATION, UNIT NOS. 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL (EPID NOS. L-2018-RNW-0023 AND L-2018-RNW-0024)
-2018-RNW-0023 AND L
-2018-RNW-0024)


==Dear Mr. Stoddard,==
==Dear Mr. Stoddard,==
By letter dated October 15
 
, 2018 (Agencywide Documents Access and Management System (ADAMS) Package Accession No.
By letter dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), Virginia Electric and Power Company (Dominion Energy Virginia) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station (SPS), Unit Nos. 1 and 2.
ML18291A842), Virginia Electric and Power Company (Dominion Energy Virginia) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos.
The NRC staff continues to seek approaches to improve efficiency and support an effective review. One method to increase efficiency of the NRC staffs review of the subsequent license renewal application (SLRA) is the use of an online reference portal that will allow the NRC staff and associated contractors limited, read-only access to the documents and other reference materials cited in and in support of the SLRA. The online reference portal will allow the review of documents referenced in the SLRA. In cases where the NRC staff identifies documents as necessary to support its determination in the safety evaluation report, or its environmental impact statement, the NRC staff will request that those documents be submitted on the docket.
DPR-32 and DPR-37 for the Surry Power Station (SPS), Unit No s. 1 and 2. The NRC staff continues to seek approaches to improve efficiency and support an effective review. One method to increase efficiency of the NRC staff's review of the subsequent license renewal application (SLRA) is the use of an online reference portal that will allow the NRC staff and associated contractors limited, read
-only access to the documents and other reference materials cited in and in support of the SLRA. The online reference portal will allow the review of documents referenced in the SLRA. In cases where the NRC staff identifies documents as necessary to support its determination in the safety evaluation report, or its environmental impact statement, the NRC staff will request that those documents be submitted on the docket.
The use of the online reference portal will be in accordance with the following restrictions:
The use of the online reference portal will be in accordance with the following restrictions:
The online reference portal will be password
* The online reference portal will be password-protected, and passwords will be distributed only to NRC staff members and contractors directly involved in the SPS SLRA review on a need-to-know basis.
-protected, and passwords will be distributed only to NRC staff members and contractors directly involved in the SPS SLRA review on a need
* The online reference portal will not support any printing, saving, or downloading functions.
-to-know basis.
* The NRC staff members and contractors given password access to the online reference portal will be informed of the conditions related to the use of the online reference portal by NRC project managers.
The online reference portal will not support any printing, saving, or downloading functions.
* The conditions associated with the online reference portal will be maintained throughout its use during the SPS SLRA review process.
The NRC staff members and contractors given password access to the online reference portal will be informed of the conditions related to the use of the online reference portal by NRC project managers.
The conditions associated with the online reference portal will be maintained throughout its use during the SPS SLRA review process.


D. Stoddard Documents posted to the online reference portal will be limited to basis and other reference material cited in the SLRA, unless otherwise agreed upon by Dominion Energy Virginia and NRC management.
D. Stoddard
It is requested that the portal be fully populated with plant documents and well organized to facilitate efficient search capability and ease of use no later than 5 days after application acceptance for all NRC staff members and contractors directly involved in the SPS SLRA review , with the exception of Briana Grange , Tam Tran , and Michelle Moser who will need access to the portal no later than November 23, 2018.
* Documents posted to the online reference portal will be limited to basis and other reference material cited in the SLRA, unless otherwise agreed upon by Dominion Energy Virginia and NRC management.
If you have any questions on this matter, please contact Mr. Emmanuel Sayoc by telephone at 301-415-4084 or via e
* It is requested that the portal be fully populated with plant documents and well organized to facilitate efficient search capability and ease of use no later than 5 days after application acceptance for all NRC staff members and contractors directly involved in the SPS SLRA review, with the exception of Briana Grange, Tam Tran, and Michelle Moser who will need access to the portal no later than November 23, 2018.
-mail at Emmanuel.Sayoc@nrc.gov
If you have any questions on this matter, please contact Mr. Emmanuel Sayoc by telephone at 301-415-4084 or via e-mail at Emmanuel.Sayoc@nrc.gov.
. Sincerely,                     /RA/             Eric R. Oesterle, Chief License Renewal Projects Branch Division of Materials and License Renewal       Office of Nuclear Reactor Regulation Docket Nos. 50
Sincerely,
-280 and 50
                                                /RA/
-281 cc: Listserv
Eric R. Oesterle, Chief License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Listserv


ML18319A252
ML18319A252                                 *concurred via email OFFICE         PM:MRPB:DMLR PM:MRPB:DMLR PM:MRPB:DMLR               PM:MRPB:DMLR NAME           AWu                 SLent           ESayoc*         TTran DATE           11/15/2018           11/15/2018       11/16/2018     11/15/2018 OFFICE         OGC (NLO)           BC:MENB:DMLR BC:MRPB:DMLR NAME           BHarris*             BBeasley*       EOesterle DATE           11/16/2018           11/15/18         11/16/2018}}
    *concurred via email OFFICE PM:MRPB:DMLR PM:MRPB:DMLR PM:MRPB:DMLR PM:MRPB:DMLR NAME AWu SLent ESayoc* TTran DATE 11/15/2018 11/15/2018 11/16/2018 11/15/2018 OFFICE OGC (NLO) BC:MENB:DMLR BC:MRPB:DMLR NAME BHarris* BBeasley* EOesterle DATE 11/16/2018 11/15/18 11/16/2018}}

Latest revision as of 11:33, 20 October 2019

Subsequent License Renewal Application Online Reference Portal (EPID Nos. L-2018-RNW-0023 and L-2018-RNW-0024)
ML18319A252
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/16/2018
From: Eric Oesterle
NRC/NRR/DMLR/MRPB
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
Wu A, NRR-DMLR 415-2995
References
EPID L-2018-RNW-0023, EPID L-2018-RNW-0024
Download: ML18319A252 (3)


Text

November 16, 2018 Mr. Daniel G. Stoddard Senior Vice President and Chief Nuclear Officer Innsbrook Technical Center 5000 Dominion Blvd Glen Allen, VA 23060-6711

SUBJECT:

SURRY POWER STATION, UNIT NOS. 1 AND 2, SUBSEQUENT LICENSE RENEWAL APPLICATION ONLINE REFERENCE PORTAL (EPID NOS. L-2018-RNW-0023 AND L-2018-RNW-0024)

Dear Mr. Stoddard,

By letter dated October 15, 2018 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML18291A842), Virginia Electric and Power Company (Dominion Energy Virginia) submitted to the U.S. Nuclear Regulatory Commission (NRC or staff) an application to renew the Renewed Facility Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station (SPS), Unit Nos. 1 and 2.

The NRC staff continues to seek approaches to improve efficiency and support an effective review. One method to increase efficiency of the NRC staffs review of the subsequent license renewal application (SLRA) is the use of an online reference portal that will allow the NRC staff and associated contractors limited, read-only access to the documents and other reference materials cited in and in support of the SLRA. The online reference portal will allow the review of documents referenced in the SLRA. In cases where the NRC staff identifies documents as necessary to support its determination in the safety evaluation report, or its environmental impact statement, the NRC staff will request that those documents be submitted on the docket.

The use of the online reference portal will be in accordance with the following restrictions:

  • The online reference portal will be password-protected, and passwords will be distributed only to NRC staff members and contractors directly involved in the SPS SLRA review on a need-to-know basis.
  • The online reference portal will not support any printing, saving, or downloading functions.
  • The NRC staff members and contractors given password access to the online reference portal will be informed of the conditions related to the use of the online reference portal by NRC project managers.
  • The conditions associated with the online reference portal will be maintained throughout its use during the SPS SLRA review process.

D. Stoddard

  • Documents posted to the online reference portal will be limited to basis and other reference material cited in the SLRA, unless otherwise agreed upon by Dominion Energy Virginia and NRC management.
  • It is requested that the portal be fully populated with plant documents and well organized to facilitate efficient search capability and ease of use no later than 5 days after application acceptance for all NRC staff members and contractors directly involved in the SPS SLRA review, with the exception of Briana Grange, Tam Tran, and Michelle Moser who will need access to the portal no later than November 23, 2018.

If you have any questions on this matter, please contact Mr. Emmanuel Sayoc by telephone at 301-415-4084 or via e-mail at Emmanuel.Sayoc@nrc.gov.

Sincerely,

/RA/

Eric R. Oesterle, Chief License Renewal Projects Branch Division of Materials and License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-280 and 50-281 cc: Listserv