ML16266A371: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 09/29/2016 | | issue date = 09/29/2016 | ||
| title = 09/22/2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station | | title = 09/22/2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station | ||
| author name = Klos | | author name = Klos J | ||
| author affiliation = NRC/NRR/DORL/LPLIV-1 | | author affiliation = NRC/NRR/DORL/LPLIV-1 | ||
| addressee name = | | addressee name = | ||
Line 9: | Line 9: | ||
| docket = 05000397 | | docket = 05000397 | ||
| license number = NPF-021 | | license number = NPF-021 | ||
| contact person = Klos L | | contact person = Klos L | ||
| case reference number = CAC MF8302 | | case reference number = CAC MF8302 | ||
| document type = Meeting Summary | | document type = Meeting Summary | ||
Line 26: | Line 26: | ||
==SUMMARY== | ==SUMMARY== | ||
OF SEPTEMBER 22, 2016, PUBLIC MEETING WITH ENERGY NORTHWEST TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP A REPAIR FOR COLUMBIA GENERATING STATION (CAC NO. MF8302) On September 22, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, the licensee for Columbia Generating Station, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | OF SEPTEMBER 22, 2016, PUBLIC MEETING WITH ENERGY NORTHWEST TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP A REPAIR FOR COLUMBIA GENERATING STATION (CAC NO. MF8302) On September 22, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, the licensee for Columbia Generating Station, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | ||
The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) regarding a change to the completion time for Residual Heat Removal (RHR) pump A repair. The meeting notice and agenda, dated September 7, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. | The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) regarding a change to the completion time for Residual Heat Removal (RHR) pump A repair. The meeting notice and agenda, dated September 7, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16251A014. | ||
A list of attendees is provided in the Enclosure to this meeting summary. The licensee provided handouts (ADAMS Accession No. | A list of attendees is provided in the Enclosure to this meeting summary. The licensee provided handouts (ADAMS Accession No. ML16264A036) and its presentation included an outline of the change, the reason and precedents for the LAR, a description of the system's operation, and the technical evaluation and the approach for the upcoming LAR. The NRC staff commented to the licensee that the following elements should be contained in the pending LAR that: | ||
* the proposed LAR Technical Specification text change should include a date and time that would bound the RHR pump A repair work, | * the proposed LAR Technical Specification text change should include a date and time that would bound the RHR pump A repair work, | ||
* a comparison of the work description that would be needed for this pending LAR's RHR pump A repair versus the previously approved RHR pump B repair amendment approved in February 2015 (ADAMS Accession No. | * a comparison of the work description that would be needed for this pending LAR's RHR pump A repair versus the previously approved RHR pump B repair amendment approved in February 2015 (ADAMS Accession No. ML15030A501 | ||
), | ), | ||
* a comprehensive discussion and presentation of the risk assessment and technical adequacy of the probabilistic risk analysis (PRA) based on the precedent of Clinton's exigent license amendment request for a one-time extension of the shutdown service water Division 2 subsystem completion time (ADAMS Accession No. | * a comprehensive discussion and presentation of the risk assessment and technical adequacy of the probabilistic risk analysis (PRA) based on the precedent of Clinton's exigent license amendment request for a one-time extension of the shutdown service water Division 2 subsystem completion time (ADAMS Accession No. ML15302A213), and | ||
* a discussion why the fire PRA is adequate for this pending LAR. The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received. | * a discussion why the fire PRA is adequate for this pending LAR. The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received. | ||
Docket No. 50-397 | Docket No. 50-397 | ||
Line 49: | Line 49: | ||
List of Attendees | List of Attendees | ||
/RA/ John Klos, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encls: Distribution via Listserv DISTRIBUTION: | /RA/ John Klos, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encls: Distribution via Listserv DISTRIBUTION: | ||
PUBLIC LPL4-1 r/f RidsACRS_MailCTR Resource RidsNrrDorllpl4 1 Resource RidsNrrDraApla Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource ASallman, NRR/DSS/SRXB EOesterle, NRR/DSS/SRXB PSynder, NRR/DSS/STSB THilsmeier, NRR/DRA/APLA SHerrick, NRR/DRA/APLA TWertz, NRR JBowen, EDO RIV ADAMS Accession No. Notice: | PUBLIC LPL4-1 r/f RidsACRS_MailCTR Resource RidsNrrDorllpl4 1 Resource RidsNrrDraApla Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource ASallman, NRR/DSS/SRXB EOesterle, NRR/DSS/SRXB PSynder, NRR/DSS/STSB THilsmeier, NRR/DRA/APLA SHerrick, NRR/DRA/APLA TWertz, NRR JBowen, EDO RIV ADAMS Accession No. Notice: ML16251A014 Summary: ML16266A371 Handouts: | ||
ML16264A036 OFFICE NRR/DORL/LPL4-1 | |||
/PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1 | /PM NRR/DORL/LPL4-1/LA NRR/DORL/LPL4-1 | ||
/BC NRR/DORL/LPL4-1 | /BC NRR/DORL/LPL4-1 | ||
/PM NAME JKlos JBurkhardt RPascarelli JKlos DATE 09/28/16 09/28/16 09/28/16 09/29/16 OFFICIAL RECORD COPY}} | /PM NAME JKlos JBurkhardt RPascarelli JKlos DATE 09/28/16 09/28/16 09/28/16 09/29/16 OFFICIAL RECORD COPY}} |
Revision as of 23:18, 19 June 2019
ML16266A371 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 09/29/2016 |
From: | John Klos Plant Licensing Branch IV |
To: | Energy Northwest |
Klos L | |
References | |
CAC MF8302 | |
Download: ML16266A371 (4) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 29, 2016 LICENSEE:
Energy Northwest FACILITY:
Columbia Generating Station
SUBJECT:
SUMMARY
OF SEPTEMBER 22, 2016, PUBLIC MEETING WITH ENERGY NORTHWEST TO DISCUSS UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP A REPAIR FOR COLUMBIA GENERATING STATION (CAC NO. MF8302) On September 22, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Energy Northwest, the licensee for Columbia Generating Station, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
The purpose of the meeting was to discuss the licensee's upcoming license amendment request (LAR) regarding a change to the completion time for Residual Heat Removal (RHR) pump A repair. The meeting notice and agenda, dated September 7, 2016, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16251A014.
A list of attendees is provided in the Enclosure to this meeting summary. The licensee provided handouts (ADAMS Accession No. ML16264A036) and its presentation included an outline of the change, the reason and precedents for the LAR, a description of the system's operation, and the technical evaluation and the approach for the upcoming LAR. The NRC staff commented to the licensee that the following elements should be contained in the pending LAR that:
- the proposed LAR Technical Specification text change should include a date and time that would bound the RHR pump A repair work,
- a comparison of the work description that would be needed for this pending LAR's RHR pump A repair versus the previously approved RHR pump B repair amendment approved in February 2015 (ADAMS Accession No. ML15030A501
),
- a comprehensive discussion and presentation of the risk assessment and technical adequacy of the probabilistic risk analysis (PRA) based on the precedent of Clinton's exigent license amendment request for a one-time extension of the shutdown service water Division 2 subsystem completion time (ADAMS Accession No. ML15302A213), and
- a discussion why the fire PRA is adequate for this pending LAR. The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received.
Docket No. 50-397
Enclosure:
List of Attendees cc w/encls: Distribution via Listserv Klos,
- ct Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES SEPTEMBER
- 22. 2016 MEETING WITH ENERGY NORTHWEST COLUMBIA GENERATING STATION UPCOMING LICENSE AMENDMENT REQUEST REGARDING CHANGE IN COMPLETION TIME FOR RESIDUAL HEAT REMOVAL PUMP "A" REPAIR DOCKET NO. 50-397 John Klos U.S. Nuclear ReQulatorv Commission (NRC) Ahsan Sallman NRC Pete Snyder NRC Todd Hilsmeier NRC Sandra Herrick NRC Eric Oesterle NRC Don Gregoire Enerav Northwest (EN) Rick Garcia* EN Blake Smith EN Habib Shtaih EN Sandra Christianson*
EN Brian Berglin* EN Mike 0. Kennedy* EN Don Gregoire*
EN Rick Garcia* EN Dehn Heath* Member of public (Engineering Planning and Management (EPM}, Inc.} *participated via phone Enclosure The licensee acknowledged the NRC staff's comments concerning the pending LAR content and thanked the staff for its discussion on the topic. One member of the public was in attendance, by phone. Public Meeting Feedback forms were not requested by the public, nor were any comments received.
Please direct any inquiries to me at 301-415-5136, or John.Klos@nrc.gov.
Docket No. 50-397
Enclosure:
List of Attendees
/RA/ John Klos, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation cc w/encls: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4-1 r/f RidsACRS_MailCTR Resource RidsNrrDorllpl4 1 Resource RidsNrrDraApla Resource RidsNrrDssSrxb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMColumbia Resource RidsRgn4MailCenter Resource ASallman, NRR/DSS/SRXB EOesterle, NRR/DSS/SRXB PSynder, NRR/DSS/STSB THilsmeier, NRR/DRA/APLA SHerrick, NRR/DRA/APLA TWertz, NRR JBowen, EDO RIV ADAMS Accession No. Notice: ML16251A014 Summary: ML16266A371 Handouts: