ML17308A105: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/26/1988
| issue date = 08/26/1988
| title = Forwards Revised Emergency Plan Implementing Procedures & Revised Nuclear Emergency Info Plan,Per 10CFR50.54
| title = Forwards Revised Emergency Plan Implementing Procedures & Revised Nuclear Emergency Info Plan,Per 10CFR50.54
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = STAHLE C
| addressee name = Stahle C
| addressee affiliation = NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| addressee affiliation = NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
| docket = 05000244
| docket = 05000244

Revision as of 19:52, 18 June 2019

Forwards Revised Emergency Plan Implementing Procedures & Revised Nuclear Emergency Info Plan,Per 10CFR50.54
ML17308A105
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/26/1988
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Stahle C
NRC, NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17251A256 List:
References
NUDOCS 8809010236
Download: ML17308A105 (40)


Text

ACCESSION NBR:8809010236 DOC.DATE: 88/08/26 NOTARIZED:

NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH".NAME AUTHOR AFFILIATION

  • Rochester Gas a Electric Corp.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Revs to Emergency Plan Implementing Procedures;Rev 1,SC-321,"Mgt of Emergency Off-Site Radiation Survey Teams."/6/8~f DISTRIBOTION CODE: A045D COPIES RECEIVED:LTR

/ENCL 2 SIZE:+/TITLE: OR Submittal:

Emergency Preparedness Plans, Implement'g Procedures, C NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 8 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL: AEOD/DOA/IRB NUDOCS-ABSTRACT EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STAHLEiC RjjyClg PB 10 REG FILE 01 NRC PDR COPIES LTTR, ENCL 1 1 1 1 1'1 1 h S h TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9 pC,

/BIM'I j/I IIIIIIIIII u7rizz!//'zszzz i I/MKiP t/Illllllll(7I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K 14649-0001 TELEPHONE AREA CODE 7IE 546.2700 August 26, 1988 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Mr.Carl Stahle PWR Project Directorate No.1 Washington, D.C.20555

Subject:

Revisions to Emergency Plan Implementing Procedures and to the Nuclear Emergency Information Plan R.E.Ginna Nuclear Power Plant Docket No.50-244 Gentlemen:

In accordance with 10 CFR 50.54, enclosed are revisions to Ginna Station Emergency Plan Implementing Procedures and to the Nuclear Emergency Information Plan.Very truly yours, Enclosures Robert C.Me ed General Manager Nuclear Production xc: USNRC, Region I (2 copies)Resident Inspector, Ginna Station 8809 PDR,~P236 8808P6<DOCK P5Pppgy<I PNU 1',

Qg 0 PROCEDURE OS 8lNNA STATlON UNlT N$COMPLETED DATE:-TlMEŽSC-321 REV.NO.0 ROCHESTER GAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER MANAGEMENT OP EMERGENCY OFF-SITE RADIATION SURVEY TEAMS TECHNICAL REVIEW Y)'O PORC REVIEW D TE g-~-zG PLANT SUPERI TENDENT'.'t~<~~p N I EFFECTIVE DATE QA NON-QA CATEGORY 1~0 REVIEWED BY: THIS PROCEDURE CONTAINS 2 PAGES I

.t~.S SC-321:1 SC-321 MANAG OF EMERGENCY OFF-SITE RADIATION SURVEY TEAMS 1.0 PURPOSE: The ob)ective of the of f-site radiation survey team director is to obtain meaningful plume information in a timely manner, This procedure provides guidance for the survey team director to efficiently manage the survey teams in the collection of plume infor-mation.

2.0 REFERENCES

2.1 2'2'SC-323, Emergency Off-Site Radiation Survey Teams SC-420, Estimating Off-Site Doses SC-442, Monitoring Site Radiation Level by TLD 3.0 3.1 3.1.1 INSTRUCTIONS:

I Directing teams prior to release.Direct teams to complete primary survey routes.This will allow the teams to check out equipment.

and put out additional TLDs at locations as described in procedure SC-442, Table III, or other locations as desired.3.1.2 Position teams downwind at three different distances from the plant.This might be at one, three and five miles.Have teams survey back and forth across the area where the plume would be expected if a release occurred.3.1.3 3~1.4 3'3.2~1 Inform teams of the projected location of the center-line of the plume and the wind speed and direction.

Obtain names o f team members and obtain exposure history for the current calendar quarter.Directing teams during a release.Inform teams when release begins and their location in relation of the plume centerline.

Tell what the pro)ected dose rates are at the plume centerline.

1, SC-321:2 3.2.2 3.2.3 Inform teams as to need for respiratory

'protection and use of KI.Position teams downwind at three different distances from the plant.This might be at one, two and five miles.3.2'3.2'3.2.6 33.2'Direct teams to do a profile of the plume after it arrives.They should be directed to drive across the plume to determine the width and the maximum reading (centerline), recording dose rates every 1/10 miles.More profiles of the plume are made as necessary to put the plume location on the map.Direct teams to take an air sample (10 minutes)at the plume centerline.

Maintain record of dose to survey team members.I f teams need relic f f or meals, etc., relieve one team at a time on a rotating basis.Teams on standby should be located in low background areas.

ROCHESTER GAS AND ELECTRIC CORPORATIO GINNA STATION CONTROLLED COPY NUMBER GINNA STATION UNIT¹'OMPLETED DATa:-TIME:-PROCEDURE NO.SC-410 REV.NO.26 INSPECTION OF EMERGENCY E UIPMENT TECHNIC L VI W PORC REVIEW DATE PLANT PERINTENDENT EFFECTIVE DATE QA NON-QA CATEGORY 1.0 REVIEWED BY: THXS PROCEDURE CONTAINS~5 PAGES

<L't K 0 80-410 INSPECTION OP EMERGENCY E UIPMENT SC-410'1 1.0%ROOSE: The equipment required by the emergency plan and the means.of assuring it is available is outlined in this procedure.

Inspection will be made-monthly as required by Technical Specifications and after each drill or use by the Health Physics Section.2.0 F 1 212 Nuclear Emergency Response Plan Tech.Specs, Table 4.1-1 3'INSTRUCTIONS:

3.1 3.1~1 3.1~2 3.1~3 3.1~4 3.1~5 3'3.2.1 3.3 3'Inspect each location using attached appendices.

Indicate number of items present in blank space on appendix.Emergency Survey Center-Appendix A Control Room-Appendix B Health Physics Office, Auxiliary Building, Operational Support Center, Butler Building Warehouse-Appendix C Technical Support Center-Appendix D Monthly Inspection Log,-Appendix E If any discrepancies are found make note on the Monthly Inspection Log (Appendix E).If there are no discre-pancies, enter NONE on Log Sheet.Discrepancies are to be corrected (or a trouble card submitted) as soon as possible and so noted on the log sheet and filed per A-1701.Notify Control Room and Dave Burke (71-8022)prior to initiating Survey Center and TSC Communication checks.Send a copy of.completed Appendix<<E<<Emergency Equipment Monthly Inspection Log to Dave Burke at 49 East Ave., 5th floor.

>v, S!h E f SC-410:2 APPENDIX<A<EMERGENCY E UIPMENT IN SURVEY CENTER 2~3~Assignment tag board-all tags in place Survey team maps-Red, Green, Orange, Blue, Yellow Survey team boxes-Red, Green, Orange, Blue, Yellow, White-If seal is unbroken assume equipment is intact.Inventory boxes and change batteries in January and July.NOTE: Each January update Source Check Data Card 15 4~5~Low range survey instruments, RM-14 with HP-190 probe battery check.Source check per HP-7.31, and log on Attachment III.Mid range survey instruments RO2 (1 mR/hr to 5 R/hr)battery check, source check per HP-7.31, and check calibration date.Log on Attachment, I HP-7.31'~High level dose rate meters-battery check, calibration check, source check per HP-7.31.Xetex 305 series instruments (0.1 mR/hr to 99.9 R/hr)Xetex 302 series instruments may be substituted.

(24)spare AA batteries for replacement.

Log on Attachment I HP-7.31.24 7~Extendable high level survey meter-battery check, source check, calibration check.Xetex 302 series instruments (0.01 R/hr to 999 R/hr)or equivalent.

Log on Attachment I HP-7.31.8~9~BC-4 sealer or equivalent, source check, efficiency calibration annually.Radiation monitor RM-3C or equivalent, with HP-260 probe or equivalent, source check, calibration check.10'rea radiation monitor, stationary

-change chart paper, operational check.Mark date on chart and submit to Central Records.Dosimeter charger battery charger.~line operated.

t)'J ai<

SC-410:3 APPENDIX<A<(con't)12.Dosimeter (High Range)-check calibration 0-5R 0-10R 13.Dosimeter (0-500mr)-check calibration Dosimeter (0-1500mr)

-check calibration 14.Thermal luminescent dosimeters (TLD)15.Packages of (6)environmental TLD badges (off-site only)16.Battery operated, low volume air samplers-calibration check.Run air sampler several minutes to check operation.

17.Battery charger-operation check, disconnect 18.RADECO H 809 B2 air sampler-run 90 minutes.Check that AG ZEO cartridge is in place.Replace particulate filter at end of run.19.RADECO H 809 C aix sampler-run 1 minute 20.Filters for air samplers-particulate 21.Filters for air samplers-silver zeolite 12 75 100 100 50 22.Envelopes for air samples-particulate 100 23.Envelopes for air samples-iodine 24.Envelopes for smear papers 25.Smear papers 26.Decontamination kit (NMC-3 piece)100 100 1000 NOTE PRECEDE ALL COMMUNICATION HZTH"THIS IS A TEST" 27.Radios, Handi-Talkie

-radio check with security.Check that charge status lights are illuminated

-these are part of circuitry.

5 28.Radios, Porta-mobile ZZ-radio check with Security f l yo-\'I~Ar A g1 SC-410:4 APPENDIX<<A<<(con't)29.Magnetic car mount antenna 30.Radio, stationary

-radio check with security 31.Full face respirator inspect mask, mark bag with inspection date and initials.22 32.Charcoal Respirator Filters-check expiration date 22 33.Voice emitters for respirators

-operational check 13 34.Contaminated clothing&waste containers) 55 gal drum 35.Anti-contamination clothing, sets 36.Step off pads 37.Masking tape rolls (replace January)38.Plastic Bags, poultry 39.Plastic bags, clean, large 40.Radioactive material bags, yellow, large 41.=Radiation rope 10 1 box 1 box 20 1 roll 1 roll 42'3'4'adiation hazard signs with inserts, 10 each.(high radiation area)(radiation area)(surface contamination area){radioactive material)Thyroid block tablets, bottles-check expiration date Pens and pencils 10 10 45.Batteries, D size 46.Batteries, 9V 47.Extension cord 10 10 48.NMC CAM-Check flow CAM test (60),&check switch positions.

A 1 4 49.50'1'2'3.54.55, 56.57.58.59.60'1.62'C-4104 5 APPENDIX<A<(con't)NOTE: PRECEDE ALL COMMUNICATION CHECKS WITH"THIS IS A TEST" Intercom"A"-communication check with Control Room.Call Control Room on GAI page, have them plug in Intercom A and contact survey center.NRC Red telephone-lift receiver, tell party"This is a Ginna Station Survey Center Communications Check." New York State Red telephone-Push button, lift receiver, wait 10 seconds, state"This is Ginna Station Emergency Survey Center Communications Check, this is a test.>>Then say"All Stations Standby for Roll Call"p then ask one at a time if New York State, Monroe County, Wayne County and the Control Room are, listening.

Telephone Books-Rochester 1, Wayne County 1 Wayne County (946-5663}

Monroe County (9-716-473-0710)

New York State (9-518-457-2200}

or (9-518-457-6&1)

National Weather Service, Rochester (9-716-328-7633)

National Weather Service, Buffalo (9-716-632-2223)

From Health Physics Network phone-call Control Room at 524-4984 and request they call you back at 524-0040 From 524-6711 call Control Room at 524-4984 and TSC at 524-4973 From extension 331 call TSC at 474 From extension 207 call TSC at 507 Scissors Disposable shaving razors 0

64.Shaving cream Initials Date pl, SC-410:7 APPENDIX<A" (con't)EMERGENCY E UIPMENT PER SURVEY BOX If box is sealed inventory not required.Boxes shall be opened in January and July for battery change and inventory.

1.Coveralls, disposable 2.Hoods, disposable 3.Gloves, pair 4.Booties, pair 5.Hats, Surgeon 6.Hoods, Rain 7.Coats, Rain 8.Boots, Rain, pair 9.Flashlight with Batteries 10.Plastic Bags 11.Masking Tape, rolls (replace January)12.Pencils 13.Pencil Sharpener 14.Tablet, writing 15.Survey Route Maps 16.Air Sampler Filters-Particulate 17.Air Sampler Filters-Silver Zeolite GY-130 18.Air Sample Envelopes (Iodine)19.Air Sample Envelopes (Environmental) 20.Clipboard 21.Appropriate procedure for team (Remove survey route instructions in Appendix III that do not apply to that survey team)10 10 I 1'V@

SC-410: 8 APPENDIX"A>>(con't)22.Procedure SC-452, Sampling Snow, Grass, Soil and Vegetation.

23.Thyroid Block Tablets (bottle)24.Suits, cold weather (earhart)(on-site team only)25.Equipment Belts with Bags (on-site team only)1 26, First Aid Room key (onsite team only)27.Backpacks-2 (on-site teams only)28.Respirator hip pouches (on-site only)29.Quarters for Telephones (Off-site team only)30.Hammer and 10 nails (off-site only)31.HP-190 window clamp (off-site'teams only)32.Garden Trowel 33.Tags with wire tie 34.Ruler, Scale inches 35.Scissors 36.Packet of screwdrivers 10 10 Initials Date I.1y J ll, 0 SC-410:9 APPENDIX<B" EMERGENCY E UIPMENT IN CONTROL ROOM 1.Scott Air Pack (SCBA)-monthly inspection 2.Dosimeters 0-5R or 0-10R-check calibration 3.Dosimeters 0-500 mRem-check calibration 10 15 4.Dosimeter charger with battery-operability check 5.High range dose rate meter-battery check, source check per HP-7.31 and calibration check (RO2A)6.Plant radiation survey maps (sets)7.Smear papers 8.Envelopes for smear papers 9.Thyroid block tablets (bottle)-check expiration date 10.Air sampler, low volume-operability check, calibration check 100 10 10 11.Air sampler filters-particulate 12.Air sampler filters-silver zeolite 13.Radiation monitor RM-14 or equivalent with HP-190 probe, battery check, source check, calibration check 14.Masking tape, roll (replace January)15.Anti-contamination clothing (sets)16.Continuous Air Monitor Eberline AMS-3 check operation of unit and pump.Check calibration' due annually.17.Head set, control box and minimum 15 feet of cord (for continuous communication with TSC)1 18.AA Batteries Initial Date 4

SC-410'10 APPENDIX"C" EMERGENCY E UIPMENT OPERATIONAL SUPPORT CENTER 1.Full face respirators

-inspect mask and then seal in a bag with inspection date and initials 6 2.Respirator charcoal filters-expiration date 3.Anti-contamination clothing (sets)4.Flood lights, portable-operational check 5.Thyroid block tablets (bottles)-check expiration date 6.Dosimeters 0-500 mRem-check calibration 7.Dosimeters 0-10R-check calibration 15 20 10 8.Dosimeter charger with battery-operational check 9.Daily exposure record sheets 10.Pens ll.Rolls masking tape (replace January)12.Battery operated low volume air samplers-calibration check.Run air sampler several minutes to check operation.

'13.Filters for air samplers-particulate 14.Filters for air samplers-silver zeolite 15.Envelopes for air samples-iodine 16.Envelopes for air samples-particulate 17.Clipboards with pens 4 50 10 50 50 4 INTERMEDIATE BUILDING ,1.Scott'air pack (SCBA)-monthly inspection i P SC-410: 11 APPENDIX"C" (con't)HEALTH PHYSICS OFFICE 1.Scott, air pack (SCBA)-monthly inspection 2.High range dosimeter-calibration check 20 3;Anti-contamination clothing (sets)20 4.High range dose rate meter-battery check, source check per HP-7.31 and check calibration (RO2A, Radector III, Xetec 305 series or Eberline Teletector) 5 BUTLER BUILDING WAREHOUSE l.As per SC-3.16.15 and SC>>3.16.15.1, the moisture detector (located in the rear of the breathing air compressor in-line with the filter cartridges) is normally a light blue color.If color is found to be pink, DO NOT OPERATE THE COMPRESSOR.

Turn in a Trouble Card and notify the Health Physicist responsible for respiratory protection.

1 2.For the three-300 cubic foot breathing air bottles as part of the cascade system, at least one should have a pressure of at least 2200 psi.If none of the three have this minimum pressure reading, turn in Trouble Card and notify Health Physicist responsible for respiratory protection.

1 Initials Date e I SC-410:12 APPZNDI<<D>>EMERGENCY E UIP&"NT IN TECHNICAL SUPPORT C 1.Radiation monitor RM-14 or equivalent with HP-190 probe battery check, source check, check calibration 2.Area radiation monitor-battery check, source check, check calibration 3.Full face respirator

-inspect mask mark bag with inspection date and initials 4.Respirator charcoal filter-check expiration date 10 10 5.Thyroid block tablets (bottles)check expiration date 6.Dosimeter, 500mr-check calibration 7.Dosimeter, high range-check calibration 8.Dosimeter charger with battery-operability check 9.RADECO H-809 B2 air sampler-run 120 minutes 10.Air sample filters-particulate ll.Air sample filters-silver zeolite 12.Anti-contamination clothing (sets)13.Step Off Pads 14.Daily exposure records sheets 15.Radioactive materials bags (yellow)16.Masking tape, rolls (replace January)17.Smear papers 18.Envelopes for smears 19.Envelopes for particulate air sample 20.Envelopes for iodine air samples 25 40 20 10 100 10 10 10 E gA (Ae tl 4l SC-410: 13 APPENDIX<D<(con't)21.Pens and pencils NOTE: PRECEDE ALL COMMUNICATION CHECKS WITH n THIS IS A TESTir 22.Radio, Portable-radio check with security 5 ea.23.24.25'6~Radio, Stationary

-radio check with security book entry 1 4.NRC Red telephone-lift receiver, tell party"This is a Ginna Station TSC Communication Check." Request the return call to Ginna Station 1 Answer NRC Red telephone on call back to verify check New York State Red Telephone-push button, lift receiver, wait 10 seconds, ask if New York State, Wayne County, Monroe County, Control are listening'P Tell them"This is Ginna Station TSC Communication Check." 1 27.EOF Direct line (63PL5187)

Telephone 28.From Health Physic Network phone-call Control Room at 524-4984 and request they call you back at 524-0040 29.Battery operated, low volume air sampler check calibration run for several minutes to check operation.

30.NMC CAM-check flow, CAM test (60), and check switch positions.

31.Head set, control box, and minimum 15 feet of'.cord (for continuous communication with Control Room)'2.AA Batteries 33.Extension Cords Initials Date

)ef SC-410: 14 APPENDIX"E" GENCY E UIPMENT MONTHLY INSPECTION LOG DISCREPANCIES NOTED DISCREPANCIES CORRECTED Surve Center Date Xnitials Date Xnitials Control Room Date Znitiaas Date initials HP Office Date Initials Date Initials Auxilia B d Date Initials Date Initials

Butler.Bldg.Warehouse APPENDIX"E" (con't)Date Initials SC-410'5 Data Initials Technical Su ort Center Date Initials Date Znitials Operational Su ort Center Date Initials Date Znitials REVIEWED BX: One copy af the completed Appendix"E" Emergency Equipment Monthly Inspection Log provided to Dave Burke (49/5)Copy sent