ML18016A285: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/31/1997
| issue date = 12/31/1997
| title = Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr
| title = Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr
| author name = DONAHUE J W, ROGERS S
| author name = Donahue J, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  

Revision as of 05:50, 18 June 2019

Monthly Operating Rept for Dec 1997 for Shearon Harris Nuclear Plant,Unit 1.W/980114 Ltr
ML18016A285
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1997
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-004, HNP-98-4, NUDOCS 9801210266
Download: ML18016A285 (7)


Text

CATEGORY 1 lIEGULATORY INPORI'1ATION DISTRIEUTIONCYSTEN

<RIDS)ACCESSION NBR: 9801210266 DOC.DATE: NOTARIZED:

NO FAG IL: 50-400 Shearon Harris Nuclear Power Planti Unit ii Carolina AUTH.N*M'E o AUTHOR AFFILIATION ROGERSI S.Carolina Power 5 Light Co.DONAHUEI J.N.Carolina Power ltj: Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 0 05000400 l SUB JECT: Month 1 g op crating r ep t 97 for Shearon Harris Nuclear Planti Unit.W 8012%ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED: LTR~ENCL l SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: Application for permit renewal filed.05000eoOE RECIPIENT ID CODE/NAME PD2-1 PD COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1 1 FLANDERS.S COPIES LTTR ENCL 1 1 INTERNAL: LE ENTE RGN2 EXTERNAL: LITCO BRYCEI J H NRC PDR 1.1 1 1 1 1 1 1 1 1*EQD/SPD/RRAB QC/DBA/PAD NOAC 1 1 1 1 1 U N NOTE TO ALL"RIDS" RECZPIENTSI PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF CQP I ES REQUIRED: LTTR 20 ENCL 20 e sc 4 ,p Carolina Power 8 Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 JAN 14 1998 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 Serial: HNP-98-004 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power 0 Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of December 1997 is provided.Sincerely, J.W.Donahue Director of Site Operations Harris Plant MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.L.A.Reyes-NRC Regional Administrator Mr.V.Rooney-NRC Project Manager 980i2i02bb 97i23i PDR ADOCK 05000400 R"'PDR II!IIIIIIIII!IIII!IIIIIIIIIIIIIIIIIIIIII State Road H3d New Hill NC

  • n 4 I Enclosure to Serial HNP-93-004 Sheet l of 2 CP&L CO.RUN DATE 01/07/98 RUN TIME 09:55:48 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: DECEMBER 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 S.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION XF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS XN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNZT SERVICE FACTOR 20.UNIT AVAXLABILXTY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 744.00 744.00.00 744.00.00 2057886.72 695296.00 653406.00 100.00 100.00 102.12 97.58.00 8760.00 7043.60.00 6935.88.00 18950443.92 6314552.00 5900566.00 79.18 79.18 78.32 74.84 4.11 93529.00 78309.71.00 77493.54.00 207834777.18 69181804.00 64525305.00 82.86 82.86 80.22 76.66 3.40 24~SHUTDOWNS SCHED~OVER NEXT 6 MONTHS (TYPEi DATEi AND DURATION OF EACH)25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 S I,'

~~Enclosure to Serial: HNP-98-004 Sheet 2 of2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE Ol/07/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 09:55:47 HARRIS UNIT 1 PAGE 1 RPD39-000 DECEMBER 1997 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHE1LA ROGERS TELEPHONE (919)362"2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 16 876 881 878 874 880 849 880 880 881 879 879 881 881 882 880 880 17 18 19 20 21 22 23 25 26 27 28 29 30 31 879 880 878 877 879 879 879 877 877 880 880 882 882 878 878