IR 05000440/2015405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 21: Line 21:
-4352 July 20, 2015 Mr. Ernest Harkness Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, 10 Center Road, A
-4352 July 20, 2015 Mr. Ernest Harkness Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, 10 Center Road, A
-PY-A290 Perry, OH 44081
-PY-A290 Perry, OH 44081
-0097
-0097 SUBJECT: PERRY NUCLEAR POWER PLANT , UNIT 1 NRC SECURITY BASELINE INSPECTION REPORT 05000440/
 
SUBJECT: PERRY NUCLEAR POWER PLANT , UNIT 1 NRC SECURITY BASELINE INSPECTION REPORT 05000440/
201 5 40 5 Dear Mr. Harkness
201 5 40 5 Dear Mr. Harkness
: On June 18 , 201 5, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclos ed inspection report documents the inspection results, which were discussed on June 18, 201 5 , with Mr. J. Ellis and other members of your staf The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations
: On June 18 , 201 5, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclos ed inspection report documents the inspection results, which were discussed on June 18, 201 5 , with Mr. J. Ellis and other members of your staf The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations

Revision as of 01:07, 18 May 2019

IR 05000440/2015405; on 06/015/2015 - 06/18/2015; Perry Nuclear Power Plant, Unit 1; Routine Security Baseline Inspection. (Cover Letter Only)
ML15201A458
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 07/20/2015
From: Orth S K
Plant Support Branch II
To: Harkness E
FirstEnergy Nuclear Operating Co
References
IR 2015405
Download: ML15201A458 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532

-4352 July 20, 2015 Mr. Ernest Harkness Site Vice President, Nuclear FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P.O. Box 97, 10 Center Road, A

-PY-A290 Perry, OH 44081

-0097 SUBJECT: PERRY NUCLEAR POWER PLANT , UNIT 1 NRC SECURITY BASELINE INSPECTION REPORT 05000440/

201 5 40 5 Dear Mr. Harkness

On June 18 , 201 5, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Proces The enclos ed inspection report documents the inspection results, which were discussed on June 18, 201 5 , with Mr. J. Ellis and other members of your staf The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations

, and with the conditions of your licens The inspector reviewed selected procedures and records, observ ed activities, and interview ed personne No findings were identified during this inspectio In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy

of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security

-Related Information in accordance with 10 CFR 2.390(d)(1)

and its disclosure to unauthorized individuals could present a security vulnerabilit Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAM If you choose to provide a response and Security

-Related Information is necessary toEnclosure contains Sensitive Unclassified Non

-Safeguards Informatio When separated from enclosure, this transmittal document is decontrolle E. Harkness

-2- provide an acceptable response, please mark your entire response "Security

-Related Information

-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Should you have any questions concerning this inspection, we will be pleased to discuss them with yo

Sincerely,

/RA/ Steven K. Orth

, Chief Plant Support Branch Division of Reactor Safety

Docket No. 50

-440 License No. NPF

-58 Nonpublic Enclosure:

IR 05000440/

201540 5 w/Attachment: Supplemental Information cc w/encl: