* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************
* CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************
ITEM NUMBER : B2 .11 ITEM DESCRIPTION  
ITEM NUMBER : B2 .11 ITEM DESCRIPTION
: PRESSURIZER CIRCUMFERENTIAL SHELL-TO-HEAD  
: PRESSURIZER CIRCUMFERENTIAL SHELL-TO-HEAD  
~IELDS FLOW FLOW SYSTEM/ DIAGRAM ' DIAGRAM LINE EXAM COMPONENT C 11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86B G-6 1RCE2 VOL RELIEF REQUEST ======= SR-5 PROGRAM NOTES --------------  
~IELDS FLOW FLOW SYSTEM/ DIAGRAM ' DIAGRAM LINE EXAM COMPONENT C 11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86B G-6 1RCE2 VOL RELIEF REQUEST ======= SR-5 PROGRAM NOTES --------------  
Line 146: Line 146:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************
* CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************
ITEM NUMBER :s2.4o ITEM DESCRIPTION  
ITEM NUMBER :s2.4o ITEM DESCRIPTION
: STEAM GENERATORS(PRIMARY SIDE) TUBESHEET-TO-HEAD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86A C-1 2RCE1A VOL RC FM-86A C-6 2RCE1B VOL RC FM-86A J-1 2RCE1C VOL RELIEF REQUEST ======= PROGRAM NOTES --------------I . I 11 I I I I I I I   
: STEAM GENERATORS(PRIMARY SIDE) TUBESHEET-TO-HEAD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86A C-1 2RCE1A VOL RC FM-86A C-6 2RCE1B VOL RC FM-86A J-1 2RCE1C VOL RELIEF REQUEST ======= PROGRAM NOTES --------------I . I 11 I I I I I I I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 194: Line 194:
* SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
* CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************
* CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************
ITEM NUMBER :B4.12 ITEM DESCRIPTION  
ITEM NUMBER :B4.12 ITEM DESCRIPTION
: ALL VESSELS, FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 CRD NOZZLES LINE NUMBER --------------RPRV PARTIAL PENET. EXAM METHOD ------VIS ~IELDS RELIEF REQUEST --------------PROGRAM NOTES ======= --~~-1   
: ALL VESSELS, FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 CRD NOZZLES LINE NUMBER --------------RPRV PARTIAL PENET. EXAM METHOD ------VIS ~IELDS RELIEF REQUEST --------------PROGRAM NOTES ======= --~~-1   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 206: Line 206:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************
* CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************
ITEM NUMBER :B4.13 ITEM DESCRIPTION  
ITEM NUMBER :B4.13 ITEM DESCRIPTION
: ALL VESSELS, FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 INSTR. NOZZLES PART. LINE EXAM NUMBER METHOD ======= ------RPRV VIS PENET. WELDS RELIEF REQUEST --------------PROGRAM NOTES =======   
: ALL VESSELS, FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 INSTR. NOZZLES PART. LINE EXAM NUMBER METHOD ======= ------RPRV VIS PENET. WELDS RELIEF REQUEST --------------PROGRAM NOTES =======   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 218: Line 218:
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************
* CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************
ITEM NUMBER :B4.20 ITEM DESCRIPTION  
ITEM NUMBER :B4.20 ITEM DESCRIPTION
: PRESSURIZER FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86B G-6 HEATER PENETRATION WELDS LINE EXAM NUMBER METHOD ======= ------1RCE2 VIS RELIEF REQUEST --------------PROGRAM NOTES ======= I   
: PRESSURIZER FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86B G-6 HEATER PENETRATION WELDS LINE EXAM NUMBER METHOD ======= ------1RCE2 VIS RELIEF REQUEST --------------PROGRAM NOTES ======= I   
****************************************************************************************************  
****************************************************************************************************  
Line 243: Line 243:
* SURRY POWER STATION UNIT 2 CODE EDITION :sowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :sowao * ****************************************************************************************************
* CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************
* CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************
ITEM NUMBER :ss.20 ITEM DESCRIPTION  
ITEM NUMBER :ss.20 ITEM DESCRIPTION
: PRESSURIZER, NPS > 4" NOZZLE-SAFE END BUTT WE LOS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86B G-8 RC310-2501R SUR VOL RC FM-86B F-5 RC315-1502 SUR VOL RC FM-86B H-5 RC334-1502 SUR VOL RC FM-86B H-5 RC337-1502 SUR
: PRESSURIZER, NPS > 4" NOZZLE-SAFE END BUTT WE LOS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86B G-8 RC310-2501R SUR VOL RC FM-86B F-5 RC315-1502 SUR VOL RC FM-86B H-5 RC334-1502 SUR VOL RC FM-86B H-5 RC337-1502 SUR
* VOL RC FM-86B G-5 RC338-1502 SUR VOL RC FM-86B G-5 RC339-1502 SUR VOL *   
* VOL RC FM-86B G-5 RC338-1502 SUR VOL RC FM-86B G-5 RC339-1502 SUR VOL *   
Line 255: Line 255:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************
* CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************
ITEM NUMBER :B5.30 ITEM DESCRIPTION  
ITEM NUMBER :B5.30 ITEM DESCRIPTION
: STEAM GEN., NPS > 4" NOZZLE-SAFE END BUTT WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM . LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A B-2 RC302-2501R SUR VOL RC FM-86A E-5 RC304-2501R SUR VOL RC FM-86A B-6 RC305-2501R VOL RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A L-2 RC308-2501R SUR VOL l II I I 11 I I I ! I I I 11 I ,, I, \! 11 I' ,I I! I   
: STEAM GEN., NPS > 4" NOZZLE-SAFE END BUTT WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM . LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A B-2 RC302-2501R SUR VOL RC FM-86A E-5 RC304-2501R SUR VOL RC FM-86A B-6 RC305-2501R VOL RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A L-2 RC308-2501R SUR VOL l II I I 11 I I I ! I I I 11 I ,, I, \! 11 I' ,I I! I   
* * * ~---------------------1  
* * * ~---------------------1  
Line 267: Line 267:
* CODE EDITION :80W80 * ****************************************************************************************************
* CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.10 ITEM DESCRIPTION  
ITEM NUMBER :B6.10 ITEM DESCRIPTION
: REACTOR VESSEL CLOSURE HEAD NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------RC FM-86A F-5 RPRV SUR I ! I I I I I I I   
: REACTOR VESSEL CLOSURE HEAD NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------RC FM-86A F-5 RPRV SUR I ! I I I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 279: Line 279:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.l80 ITEM DESCRIPTION  
ITEM NUMBER :B6.l80 ITEM DESCRIPTION
: PUMPS BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD. NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------RC FM-86A A-1 RC-P-lA VOL RC FM-86A A-6 RC-P-lB VOL RC FM-86A L-1 RC-P-lC VOL *
: PUMPS BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD. NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------RC FM-86A A-1 RC-P-lA VOL RC FM-86A A-6 RC-P-lB VOL RC FM-86A L-1 RC-P-lC VOL *
* I I I I I I I I I 11 I I I I, I ., I I   
* I I I I I I I I I 11 I I I I, I ., I I   
Line 292: Line 292:
* SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.190 ITEM DESCRIPTION  
ITEM NUMBER :B6.190 ITEM DESCRIPTION
: PUMPS FLANGE SURFACE,WHEN CONNECTION DISASSEMBLE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-lB VIS RC FM-86A L-1 RC-P-lC VIS l I   
: PUMPS FLANGE SURFACE,WHEN CONNECTION DISASSEMBLE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-lB VIS RC FM-86A L-1 RC-P-lC VIS l I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 304: Line 304:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.20 ITEM DESCRIPTION  
ITEM NUMBER :B6.20 ITEM DESCRIPTION
: REACTOR VESSEL CLOSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT C 11715) COORD NUMBER ---------======== ======= ======= RC FM-86A F-5 RPRV STUDS, IN PLACE EXAM METHOD VOL RELIEF REQUEST --------------PROGRAM NOTES --------------  
: REACTOR VESSEL CLOSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT C 11715) COORD NUMBER ---------======== ======= ======= RC FM-86A F-5 RPRV STUDS, IN PLACE EXAM METHOD VOL RELIEF REQUEST --------------PROGRAM NOTES --------------  
****************************************************************************************************  
****************************************************************************************************  
Line 316: Line 316:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B&.200 ITEM DESCRIPTION  
ITEM NUMBER :B&.200 ITEM DESCRIPTION
: PUMPS NUTS,BUSHINGS,AND WASHERS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT I 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-lB VIS RC FM-86A L-1 RC-P-lC VIS * *   
: PUMPS NUTS,BUSHINGS,AND WASHERS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT I 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-lB VIS RC FM-86A L-1 RC-P-lC VIS * *   
****************************************************************************************************  
****************************************************************************************************  
Line 328: Line 328:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.210 ITEM DESCRIPTION  
ITEM NUMBER :B6.210 ITEM DESCRIPTION
: VALVES BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A D-2 RC301-2501R VOL RC FM-86A D-4 RC303-2501R VOL RC FM-86A D-6 RC304-2501R VOL RC FM-86A D-8 RC306-2501R VOL RC FM-86A I-2 RC307-2501R VOL
: VALVES BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A D-2 RC301-2501R VOL RC FM-86A D-4 RC303-2501R VOL RC FM-86A D-6 RC304-2501R VOL RC FM-86A D-8 RC306-2501R VOL RC FM-86A I-2 RC307-2501R VOL
* RC FM-86A I-4 RC309-2501R VOL *   
* RC FM-86A I-4 RC309-2501R VOL *   
Line 341: Line 341:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * **~*************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * **~*************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.220 ITEM DESCRIPTION  
ITEM NUMBER :B6.220 ITEM DESCRIPTION
: VALVES FLANGE SURFACE ,!~HEN CONNECTION DISASSEMBL FLOW FLOl4 SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= -------------------------------------RC FM-86A 0-2 RC301-2501R VIS RC FM-86A D-4 RC303-2501R VIS RC FM-86A 0-6 RC304-2501R VIS RC FM-86A D-8 RC306-2501R VIS RC FM-86A I-2 RC307-2501R VIS
: VALVES FLANGE SURFACE ,!~HEN CONNECTION DISASSEMBL FLOW FLOl4 SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= -------------------------------------RC FM-86A 0-2 RC301-2501R VIS RC FM-86A D-4 RC303-2501R VIS RC FM-86A 0-6 RC304-2501R VIS RC FM-86A D-8 RC306-2501R VIS RC FM-86A I-2 RC307-2501R VIS
* RC FM-86A I-4 RC309-2501R VIS *   
* RC FM-86A I-4 RC309-2501R VIS *   
Line 354: Line 354:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :86.230 ITEM DESCRIPTION  
ITEM NUMBER :86.230 ITEM DESCRIPTION
: VALVES NUTS,BUSHINGS,AND WASHERS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A D-2 RC30l-2501R VIS RC FM-86A D-4 RC303-2501R VIS RC FM-86A D-6 RC304-2501R VIS RC FM-86A D-8 RC306-2501R VIS RC FM-86A I-2 RC307-2501R VIS
: VALVES NUTS,BUSHINGS,AND WASHERS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A D-2 RC30l-2501R VIS RC FM-86A D-4 RC303-2501R VIS RC FM-86A D-6 RC304-2501R VIS RC FM-86A D-8 RC306-2501R VIS RC FM-86A I-2 RC307-2501R VIS
* RC FM-86A I-4 RC309-2501R VIS *   
* RC FM-86A I-4 RC309-2501R VIS *   
Line 379: Line 379:
* SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B6.40 ITEM DESCRIPTION  
ITEM NUMBER :B6.40 ITEM DESCRIPTION
: REACTOR VESSEL THREADS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT C 11715) COORD NUMBER ---------======== -------======= -------RC FM-86A F-5 RPRV IN FLANGE EXAM METHOD ------VOL RELIEF REQUEST ======= PROGRAM NOTES =======   
: REACTOR VESSEL THREADS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT C 11715) COORD NUMBER ---------======== -------======= -------RC FM-86A F-5 RPRV IN FLANGE EXAM METHOD ------VOL RELIEF REQUEST ======= PROGRAM NOTES =======   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 403: Line 403:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.10 ITEM DESCRIPTION  
ITEM NUMBER :B7.10 ITEM DESCRIPTION
: REACTOR VESSEL FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 BOLTS, STUDS, LINE NUMBER ======= RPRV AND NUTS EXAM METHOD ------VIS RELIEF REQUEST ======= PROGRAM NOTES ======= I, I ! I 11 I' I I I I ! I I I I I I   
: REACTOR VESSEL FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 BOLTS, STUDS, LINE NUMBER ======= RPRV AND NUTS EXAM METHOD ------VIS RELIEF REQUEST ======= PROGRAM NOTES ======= I, I ! I 11 I' I I I I ! I I I I I I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 412: Line 412:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * -****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * -****************************************************************************************************
ITEM NUMBER :B7.20 ITEM DESCRIPTION  
ITEM NUMBER :B7.20 ITEM DESCRIPTION
: PRESSURIZER BOLTS,STUDS, AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86B G-6 1RCE2 VIS 11 I, JI I !   
: PRESSURIZER BOLTS,STUDS, AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86B G-6 1RCE2 VIS 11 I, JI I !   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 425: Line 425:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :67.30 ITEM DESCRIPTION  
ITEM NUMBER :67.30 ITEM DESCRIPTION
: STEAM GENERATORS BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A C-1 2RCE1A VIS RC FM-86A C-6 2RCE1B VIS RC FM-86A J-1 2RCE1C VIS l ! I I 1, 11 I I ! I: 11 t'   
: STEAM GENERATORS BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A C-1 2RCE1A VIS RC FM-86A C-6 2RCE1B VIS RC FM-86A J-1 2RCE1C VIS l ! I I 1, 11 I I ! I: 11 t'   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 438: Line 438:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.50 ITEM DESCRIPTION  
ITEM NUMBER :B7.50 ITEM DESCRIPTION
: PIPING BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= -------------------------------CH FM-88C G-6 CH393-1502 VIS CH FM-88C D-6 CH395-1502 VIS CH FM-88C A-6 CH397-1502 VIS RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A C-7 RC416-1502 VIS RC FM-86A B-8 RC417-1502 VIS -1 I I   
: PIPING BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= -------------------------------CH FM-88C G-6 CH393-1502 VIS CH FM-88C D-6 CH395-1502 VIS CH FM-88C A-6 CH397-1502 VIS RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A C-7 RC416-1502 VIS RC FM-86A B-8 RC417-1502 VIS -1 I I   
* * * -----------------------------------------------------
* * * -----------------------------------------------------
Line 450: Line 450:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.50 ITEM DESCRIPTION  
ITEM NUMBER :B7.50 ITEM DESCRIPTION
: PIPING BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ------------------------------------------------RC FM-86A B-3 RC429-1502 VIS RC FM-86A B-3 RC431-1502 VIS RC FM-86A C-4 RC432-1502 VIS RC FM-86A K-3 RC446-1502 VIS RC FM-86A K-3 RC447-1502 VIS RC FM-86A J-3 RC451-250IR VIS RC FM-86B H-5 RC337-1502 VIS RC FM-86B G-5 RC338-1502 VIS RC FM-866 G-5 RC339-1502 VIS I I I I I I I I I I I I I I I I ! I I I I I I I I I I I I I I   
: PIPING BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ------------------------------------------------RC FM-86A B-3 RC429-1502 VIS RC FM-86A B-3 RC431-1502 VIS RC FM-86A C-4 RC432-1502 VIS RC FM-86A K-3 RC446-1502 VIS RC FM-86A K-3 RC447-1502 VIS RC FM-86A J-3 RC451-250IR VIS RC FM-86B H-5 RC337-1502 VIS RC FM-86B G-5 RC338-1502 VIS RC FM-866 G-5 RC339-1502 VIS I I I I I I I I I I I I I I I I ! I I I I I I I I I I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 463: Line 463:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.70 ITEM DESCRIPTION  
ITEM NUMBER :B7.70 ITEM DESCRIPTION
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------CH FM-88C D-2 CH305-1502 VIS CH FM-88C G-3 CH308-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1502 VIS CH FM-88C G-6 CH393-1502 VIS
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------CH FM-88C D-2 CH305-1502 VIS CH FM-88C G-3 CH308-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1502 VIS CH FM-88C G-6 CH393-1502 VIS
* CH FM-88C D-6 CH395-1502 VIS CH FM-88C B-7 CH397-1502 VIS RC FM-86A D-3 RC311-1502 VIS RC FM-86A D-7 RC312-1502 VIS *   
* CH FM-88C D-6 CH395-1502 VIS CH FM-88C B-7 CH397-1502 VIS RC FM-86A D-3 RC311-1502 VIS RC FM-86A D-7 RC312-1502 VIS *   
Line 476: Line 476:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.70 ITEM DESCRIPTION  
ITEM NUMBER :B7.70 ITEM DESCRIPTION
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A I-3 RC313-1502 VIS RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-1502 VIS RC FM-86A C-3 RC353,.-1502 VIS
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A I-3 RC313-1502 VIS RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-1502 VIS RC FM-86A C-3 RC353,.-1502 VIS
* RC FM-86A B-2 RC355-1502 VIS RC FM-86A B-6 RC356-l502 VIS RC FM-86A C-5 RC357-l502 VIS .RC FM-86A G-1 RC358-1502 VIS *   
* RC FM-86A B-2 RC355-1502 VIS RC FM-86A B-6 RC356-l502 VIS RC FM-86A C-5 RC357-l502 VIS .RC FM-86A G-1 RC358-1502 VIS *   
Line 490: Line 490:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.70 ITEM DESCRIPTION  
ITEM NUMBER :B7.70 ITEM DESCRIPTION
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A B-8 RC416-1502 VIS RC FM-86A C-8 RC417-1502 VIS
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A B-8 RC416-1502 VIS RC FM-86A C-8 RC417-1502 VIS
* RC FM-86A C-8 RC419-1502 VIS RC FM-86A C-7 RC421-1502 VIS RC FM-86A B-4 RC426-1502 VIS RC FM-86A B-3 RC429-1502 VIS *   
* RC FM-86A C-8 RC419-1502 VIS RC FM-86A C-7 RC421-1502 VIS RC FM-86A B-4 RC426-1502 VIS RC FM-86A B-3 RC429-1502 VIS *   
Line 504: Line 504:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :87.70 ITEM DESCRIPTION  
ITEM NUMBER :87.70 ITEM DESCRIPTION
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A B-2 RC43l-1502 VIS RC FM-86A C-3 RC432-1502 VIS RC FM-86A C-2 RC439-1502 VIS RC FM-86A K-3 RC442-1502 VIS RC FM-86A K-3 RC446-1502 VIS
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A B-2 RC43l-1502 VIS RC FM-86A C-3 RC432-1502 VIS RC FM-86A C-2 RC439-1502 VIS RC FM-86A K-3 RC442-1502 VIS RC FM-86A K-3 RC446-1502 VIS
* RC FM-86A K-2 RC447-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-2 RC453-1502 VIS RC FM-86A A-2 RC498-l502 VIS *   
* RC FM-86A K-2 RC447-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-2 RC453-1502 VIS RC FM-86A A-2 RC498-l502 VIS *   
Line 518: Line 518:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.70 <) ITEM DESCRIPTION  
ITEM NUMBER :B7.70 <) ITEM DESCRIPTION
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FM-86A A-6 RC499-1502 VIS RC FM-86A L-2 RC500-1502 VIS RC FM-86B E-8 RC314-1502 VIS RC FM-86B F-5 RC315-1502 VIS RC FM-86B I-4 RC335-1502 VIS RC FM-86B H-5 RC337-1502 VIS RC FM-86B G-5 RC338-l502 VIS RC FM-86B G-5 RC339-1502 VIS RC FM-86B I-5 RC361-1502 VIS ~l I I I I I   
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FM-86A A-6 RC499-1502 VIS RC FM-86A L-2 RC500-1502 VIS RC FM-86B E-8 RC314-1502 VIS RC FM-86B F-5 RC315-1502 VIS RC FM-86B I-4 RC335-1502 VIS RC FM-86B H-5 RC337-1502 VIS RC FM-86B G-5 RC338-l502 VIS RC FM-86B G-5 RC339-1502 VIS RC FM-86B I-5 RC361-1502 VIS ~l I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 531: Line 531:
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
* CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=
2" IN DIAMETER * ****************************************************************************************************
2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :B7.70 ITEM DESCRIPTION  
ITEM NUMBER :B7.70 ITEM DESCRIPTION
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-89B A-3 RC316-l502 VIS RC FM-89B A-1 RC317-l502 VIS RC FM-89B A-2 RC318-l502 VIS RC FM-89B A-1 RC319-l502 VIS RC FM-89B A-2 RC320-l502 VIS
: VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-89B A-3 RC316-l502 VIS RC FM-89B A-1 RC317-l502 VIS RC FM-89B A-2 RC318-l502 VIS RC FM-89B A-1 RC319-l502 VIS RC FM-89B A-2 RC320-l502 VIS
* RC FM-89B A-3 RC32l-l502 VIS RC FM-89B A-7 RC323-l502 VIS RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH116-l502 VIS * -1 ! I II I 11 I I I I I I I I I I I I I ! I I I i! I I I __ _J   
* RC FM-89B A-3 RC32l-l502 VIS RC FM-89B A-7 RC323-l502 VIS RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH116-l502 VIS * -1 ! I II I 11 I I I I I I I I I I I I I ! I I I i! I I I __ _J   
Line 569: Line 569:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-H INTEGRAL ATTACHMENTS FOR VESSELS * ****************************************************************************************************
* CATEGORY B-H INTEGRAL ATTACHMENTS FOR VESSELS * ****************************************************************************************************
ITEM NUMBER :B8.20 ITEM DESCRIPTION  
ITEM NUMBER :B8.20 ITEM DESCRIPTION
: PRESSURIZER INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------------------------------------------RC FM-86A F-5 RPRV VOL RC FM-86B G-6 1RCE2 VOL * *   
: PRESSURIZER INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------------------------------------------RC FM-86A F-5 RPRV VOL RC FM-86B G-6 1RCE2 VOL * *   
****************************************************************************************************  
****************************************************************************************************  
Line 581: Line 581:
* SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING 14ELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING 14ELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.ll ITEM DESCRIPTION  
ITEM NUMBER :B9.ll ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A B-2 RC302-2501R SUR VOL RC FM-86A A-4 RC303-2501R SUR VOL RC FM-86A E-5 RC304-2501R SUR
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A B-2 RC302-2501R SUR VOL RC FM-86A A-4 RC303-2501R SUR VOL RC FM-86A E-5 RC304-2501R SUR
* VOL RC FM-86A B-6 RC305-2501R SUR VOL I I RC FM-86A B-8 RC306-2501R SUR I VOL I **   
* VOL RC FM-86A B-6 RC305-2501R SUR VOL I I RC FM-86A B-8 RC306-2501R SUR I VOL I **   
Line 594: Line 594:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.ll ITEM DESCRIPTION  
ITEM NUMBER :B9.ll ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A L-2 RC308-2501R SUR VOL RC FM-86A K-4 RC309-2501R SUR VOL RC FM-86A D-2 RC3ll-2501R SUR
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A L-2 RC308-2501R SUR VOL RC FM-86A K-4 RC309-2501R SUR VOL RC FM-86A D-2 RC3ll-2501R SUR
* VOL RC FM-86A D-7 RC312-2501R SUR VOL RC FM-86A I-3 RC313-2501R SUR VOL *   
* VOL RC FM-86A D-7 RC312-2501R SUR VOL RC FM-86A I-3 RC313-2501R SUR VOL *   
Line 606: Line 606:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER !B9.ll ITEM DESCRIPTION  
ITEM NUMBER !B9.ll ITEM DESCRIPTION
: PIPING CIRC. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86B G-8 RC FM-86B E-8 RC FM-86B F-5 RC FM-86B H-5 RC FM-86B H-5 RC FM-86B G-5 WELDS, NPS >= 4 LINE NUMBER ======= RC310-2501R RC314-1502 RC315-1502 RC334-1502 RC337-1502 RC338-1502 IN. EXAM METHOD ------SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES =======
: PIPING CIRC. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86B G-8 RC FM-86B E-8 RC FM-86B F-5 RC FM-86B H-5 RC FM-86B H-5 RC FM-86B G-5 WELDS, NPS >= 4 LINE NUMBER ======= RC310-2501R RC314-1502 RC315-1502 RC334-1502 RC337-1502 RC338-1502 IN. EXAM METHOD ------SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES =======
l ******************************************************~*********************************************  
l ******************************************************~*********************************************  
Line 617: Line 617:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.ll ITEM DESCRIPTION  
ITEM NUMBER :B9.ll ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86B G-5 RC339-1502 SUR VOL RliR FM-87A H-7 RHlOl-1502 SUR VOL RHR FM-87A K-5 RH116-1502 SUR VOL I RHR FM-89B B-8 RH117-1502 SUR I ,. i VOL I SI FM-86A E-2 RC316-1502 SUR I VOL I SI FM-86A E-4 RC317-1502 SUR I VOL I 1, I 11 I I *   
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86B G-5 RC339-1502 SUR VOL RliR FM-87A H-7 RHlOl-1502 SUR VOL RHR FM-87A K-5 RH116-1502 SUR VOL I RHR FM-89B B-8 RH117-1502 SUR I ,. i VOL I SI FM-86A E-2 RC316-1502 SUR I VOL I SI FM-86A E-4 RC317-1502 SUR I VOL I 1, I 11 I I *   
*
*
Line 630: Line 630:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.ll ITEM DESCRIPTION  
ITEM NUMBER :B9.ll ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------SI FM-86A. E-6 RC318-1502 SUR VOL SI FM-86A E-7 RC319-l502 SUR VOL SI FM-86A H-4 RC320-1502 SUR VOL SI FM-86A H-2 RC321-1502 SUR VOL SI FM-86A E-7 RC344-1502 SUR VOL SI FH-86A E-4 SI245-1502 SUR VOL I ! I I I I I I I   
: PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------SI FM-86A. E-6 RC318-1502 SUR VOL SI FM-86A E-7 RC319-l502 SUR VOL SI FM-86A H-4 RC320-1502 SUR VOL SI FM-86A H-2 RC321-1502 SUR VOL SI FM-86A E-7 RC344-1502 SUR VOL SI FH-86A E-4 SI245-1502 SUR VOL I ! I I I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 666: Line 666:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :s9.12 ITEM DESCRIPTION  
ITEM NUMBER :s9.12 ITEM DESCRIPTION
: PIPING LONG. FLOW FLOW SYSJEM/ DIAGRAM DIAGRAM COMPONENT C 11715 l COORD ---------======== ======= RC FM-86A B-2 RC FM-86A B-6 RC FM-86A L-2 WELDS, NPS >= 4 LINE NUMBER ======= RC302-2501R RC305-2501R RC308-2501R IN. EXAM METHOD ------SUR VOL SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES ======= I I I i 11 I I I   
: PIPING LONG. FLOW FLOW SYSJEM/ DIAGRAM DIAGRAM COMPONENT C 11715 l COORD ---------======== ======= RC FM-86A B-2 RC FM-86A B-6 RC FM-86A L-2 WELDS, NPS >= 4 LINE NUMBER ======= RC302-2501R RC305-2501R RC308-2501R IN. EXAM METHOD ------SUR VOL SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES ======= I I I i 11 I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 678: Line 678:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER !89.21 ITEM DESCRIPTION  
ITEM NUMBER !89.21 ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS < 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ------------------------======= ------======= --------------------------------------CH FM-86A F-8 CH301-1502 SUR CH FM-88C H-3 CH379-1503 SUR RC FM-86A B-7 RC416-1502 SUR RC FM-86A C-8 RC417-l502 SUR RC FM-86A B-2 RC43l-l502 SUR
: PIPING CIRC. WELDS, NPS < 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ------------------------======= ------======= --------------------------------------CH FM-86A F-8 CH301-1502 SUR CH FM-88C H-3 CH379-1503 SUR RC FM-86A B-7 RC416-1502 SUR RC FM-86A C-8 RC417-l502 SUR RC FM-86A B-2 RC43l-l502 SUR
* RC FM-86A C-3 RC432-l502 SUR RC FM-86A K-2 RC447-l502 SUR RC FM-86A J-3 RC448-l502 SUR RC FM-86B I-4 RC335-l502 SUR *   
* RC FM-86A C-3 RC432-l502 SUR RC FM-86A K-2 RC447-l502 SUR RC FM-86A J-3 RC448-l502 SUR RC FM-86B I-4 RC335-l502 SUR *   
Line 691: Line 691:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.21 ITEM DESCRIPTION  
ITEM NUMBER :B9.21 ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS < 4 IN. I, FLOW FLOW 'I 11 SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM i' COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86B I-5 RC361-1502 SUR SI FM-86A H-4 SI275-1502 SUR SI FM-86A E-1 SI280-1502 SUR SI FM-86A E-5 SI281-1502 SUR SI FM-86A E-7 SI285-1502 SUR
: PIPING CIRC. WELDS, NPS < 4 IN. I, FLOW FLOW 'I 11 SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM i' COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86B I-5 RC361-1502 SUR SI FM-86A H-4 SI275-1502 SUR SI FM-86A E-1 SI280-1502 SUR SI FM-86A E-5 SI281-1502 SUR SI FM-86A E-7 SI285-1502 SUR
* SI FM-88B E-3 SI272-1503 SUR SI FM-89A I-3 SI272-1503 SUR SI FM-89B I-3 SI272-1503 SUR SI FM-89B E-2 SI273-1503 SUR
* SI FM-88B E-3 SI272-1503 SUR SI FM-89A I-3 SI272-1503 SUR SI FM-89B I-3 SI272-1503 SUR SI FM-89B E-2 SI273-1503 SUR
Line 705: Line 705:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.21 ITEM DESCRIPTION  
ITEM NUMBER :B9.21 ITEM DESCRIPTION
: PIPING CIRC. WELDS, NPS < 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ---------------------------------------------SI FM-89B B-1 SI274-1502 SUR SI FM-89B E-2 SI277-1503 SUR SI FM-89B C-3 SI279-1502 SUR SI FM-89B I-3 SI347-l503 SUR * *   
: PIPING CIRC. WELDS, NPS < 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ---------------------------------------------SI FM-89B B-1 SI274-1502 SUR SI FM-89B E-2 SI277-1503 SUR SI FM-89B C-3 SI279-1502 SUR SI FM-89B I-3 SI347-l503 SUR * *   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 717: Line 717:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.31 ITEM DESCRIPTION  
ITEM NUMBER :B9.31 ITEM DESCRIPTION
: PIPING, NPS >= FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD -----------------======= -----------------CH FM-86A . F-8 RC FM-86A C-2 RC FM-86A B-7 RC FM-86A B-2 RC FM-86A K-2 RC FM-866 G-8 4 IN. ,BRANCH LINE NUMBER --------------CH301-1502 RC353-l502 RC416-l502 RC431-1502 RC447-1502 RC310-2501R PIPE CONNECTION WELD EXAM METHOD ------SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL RELIEF REQUEST --------------SR-3 PROGRAM NOTES --------------l I I 1, I I I I I I I I ,' I I   
: PIPING, NPS >= FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD -----------------======= -----------------CH FM-86A . F-8 RC FM-86A C-2 RC FM-86A B-7 RC FM-86A B-2 RC FM-86A K-2 RC FM-866 G-8 4 IN. ,BRANCH LINE NUMBER --------------CH301-1502 RC353-l502 RC416-l502 RC431-1502 RC447-1502 RC310-2501R PIPE CONNECTION WELD EXAM METHOD ------SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL RELIEF REQUEST --------------SR-3 PROGRAM NOTES --------------l I I 1, I I I I I I I I ,' I I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 729: Line 729:
* SURRY POl~ER ST A TION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POl~ER ST A TION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.31 ITEM DESCRIPTION  
ITEM NUMBER :B9.31 ITEM DESCRIPTION
: PIPING, NPS >= 4 IN. ,BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86B E-8 RC314-1502 SUR SR-3 VOL RC FM-86B E-7 RC315-1502 SUR SR-3 VOL RHR FM-87A H-7 RHlOl-1502 SUR SR-3 VOL SI FM-86A E-2 RC316-1502 SUR SR-3 VOL SI FM-86A E-4 RC317-1502 SUR SR-3 VOL SI FM-86A E-6 RC318-1502 SUR SR-3 VOL I! II II I I I I   
: PIPING, NPS >= 4 IN. ,BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86B E-8 RC314-1502 SUR SR-3 VOL RC FM-86B E-7 RC315-1502 SUR SR-3 VOL RHR FM-87A H-7 RHlOl-1502 SUR SR-3 VOL SI FM-86A E-2 RC316-1502 SUR SR-3 VOL SI FM-86A E-4 RC317-1502 SUR SR-3 VOL SI FM-86A E-6 RC318-1502 SUR SR-3 VOL I! II II I I I I   
* * * .--* . -----, I I I ****************************************************************************************************
* * * .--* . -----, I I I ****************************************************************************************************
Line 742: Line 742:
* CODE EDITION :aowao * ****************************************************************************************************
* CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.31 ITEM DESCRIPTION  
ITEM NUMBER :B9.31 ITEM DESCRIPTION
: PIPING, NPS >= 4 IN. ,BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= -----------------------SI FM-86A E-7 RC319-1502 SUR SR-3 VOL SI FM-86A H-4 RC320-1502 SUR SR-3 VOL SI FM-86A H-2 RC321-1502 SUR SR-3 VOL SI FM-86A E-4 SI245-1502 SUR SR-3 VOL SI FM-86A H-3 SI247-1502 SUR VOL SI FM-89B A-7 RC323-1502 SUR SR-3 VOL I I I I 11 I I 11 I   
: PIPING, NPS >= 4 IN. ,BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= -----------------------SI FM-86A E-7 RC319-1502 SUR SR-3 VOL SI FM-86A H-4 RC320-1502 SUR SR-3 VOL SI FM-86A H-2 RC321-1502 SUR SR-3 VOL SI FM-86A E-4 SI245-1502 SUR SR-3 VOL SI FM-86A H-3 SI247-1502 SUR VOL SI FM-89B A-7 RC323-1502 SUR SR-3 VOL I I I I 11 I I 11 I   
****************************************************************************************************  
****************************************************************************************************  
Line 754: Line 754:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.32 ITEM DESCRIPTION  
ITEM NUMBER :B9.32 ITEM DESCRIPTION
: PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= --------------------------------------------------------CH FM-86A E-4 CH305-1502 SUR CH FM-86B E-5 CH368-1502 SUR RC FM-86A C-5 RC327-1502 SUR RC FM-86A H-2 RC344-1502 SUR RC FM-86A E-3 RC345-1502 SUR
: PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= --------------------------------------------------------CH FM-86A E-4 CH305-1502 SUR CH FM-86B E-5 CH368-1502 SUR RC FM-86A C-5 RC327-1502 SUR RC FM-86A H-2 RC344-1502 SUR RC FM-86A E-3 RC345-1502 SUR
* RC FM-86A E-7 RC346-1502 SUR I RC FH-86A C-2 RC353-1502 SUR I I' RC FM-86A A-7 RC356-1502 SUR I' RC FM-86A G-1 RC358-1502 SUR I I *   
* RC FM-86A E-7 RC346-1502 SUR I RC FH-86A C-2 RC353-1502 SUR I I' RC FM-86A A-7 RC356-1502 SUR I' RC FM-86A G-1 RC358-1502 SUR I I *   
Line 767: Line 767:
* SURRY POWER STATION UNIT 2 CODE EDITION :801480 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :801480 * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.32 ITEM DESCRIPTION  
ITEM NUMBER :B9.32 ITEM DESCRIPTION
: PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A K-2 RC359-1502 SUR RC FM-86A A-7 RC360-1502 SUR RC FM-86A I-4 RC405-1502 SUR RC FM-86A B-8 RC415-1502 SUR RC FM-86A A-2 RC425-1502 SUR
: PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A K-2 RC359-1502 SUR RC FM-86A A-7 RC360-1502 SUR RC FM-86A I-4 RC405-1502 SUR RC FM-86A B-8 RC415-1502 SUR RC FM-86A A-2 RC425-1502 SUR
* RC FM-86A L-2 RC441-1502 SUR RC FM-86A K-3 RC446-1502 SUR RC FM-86A A-2 RC498-1502 SUR RC FM-86A A-6 RC499-1502 SUR *   
* RC FM-86A L-2 RC441-1502 SUR RC FM-86A K-3 RC446-1502 SUR RC FM-86A A-2 RC498-1502 SUR RC FM-86A A-6 RC499-1502 SUR *   
Line 780: Line 780:
* CODE EDITION :aowao * ****************************************************************************************************
* CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.32 ITEM DESCRIPTION  
ITEM NUMBER :B9.32 ITEM DESCRIPTION
: PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAH RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A L-2 RC500-1502 SUR SI FM-86A E-1 SI280-1502 SUR SI FM-86A E-5 SI281-1502 SUR SI FM-89B C-3 SI279-1502 SUR -----I I I I I I I I I I I I I ______ I   
: PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAH RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A L-2 RC500-1502 SUR SI FM-86A E-1 SI280-1502 SUR SI FM-86A E-5 SI281-1502 SUR SI FM-89B C-3 SI279-1502 SUR -----I I I I I I I I I I I I I ______ I   
****************************************************************************************************  
****************************************************************************************************  
Line 792: Line 792:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.40 ITEM DESCRIPTION  
ITEM NUMBER :B9.40 ITEM DESCRIPTION
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------CH FM-86A F-8 CH301-1502 SUR CH FM-86A E-4 CH305-1502 SUR CH FM-86A A-2. CH308-1503 SUR CH FM-86A A-7 CH309-1503 SUR CH FM-86A L-2 CH310-1503 SUR
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------CH FM-86A F-8 CH301-1502 SUR CH FM-86A E-4 CH305-1502 SUR CH FM-86A A-2. CH308-1503 SUR CH FM-86A A-7 CH309-1503 SUR CH FM-86A L-2 CH310-1503 SUR
* CH FM-86B E-5 CH368-1502 SUR G-6 CH393-1502 CH FM-88C SUR CH FM-88C D-6 CH395-1502 SUR CH FM-88C B-6 CH397-1502 SUR
* CH FM-86B E-5 CH368-1502 SUR G-6 CH393-1502 CH FM-88C SUR CH FM-88C D-6 CH395-1502 SUR CH FM-88C B-6 CH397-1502 SUR
Line 809: Line 809:
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING
* I ****************************************************************************************************
* I ****************************************************************************************************
ITEM NUMBER :B9.40 ITEM DESCRIPTION  
ITEM NUMBER :B9.40 ITEM DESCRIPTION
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A . C-5 RC327-1502 SUR RC FM-86A H-2 RC344-1502 SUR RC FM-86A E-3 RC345-1502 SUR RC FM-86A E-7 RC346-1502 SUR RC FM-86A K-5 RC353-1502 SUR
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A . C-5 RC327-1502 SUR RC FM-86A H-2 RC344-1502 SUR RC FM-86A E-3 RC345-1502 SUR RC FM-86A E-7 RC346-1502 SUR RC FM-86A K-5 RC353-1502 SUR
* RC FM-86A B-2 RC355-1502 SUR RC FM-86A A-7 RC356-1502 SUR RC FM-86A G-1 RC358-1502 SUR RC FM-86A K-2 RC359-1502 SUR *   
* RC FM-86A B-2 RC355-1502 SUR RC FM-86A A-7 RC356-1502 SUR RC FM-86A G-1 RC358-1502 SUR RC FM-86A K-2 RC359-1502 SUR *   
Line 822: Line 822:
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.40 ITEM DESCRIPTION  
ITEM NUMBER :B9.40 ITEM DESCRIPTION
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= -----------------------------RC FM-86A A-7 RC360-l502 SUR RC FM-86A I-4 RC405-1502 SUR RC FM-86A A8 RC412-1502 SUR RC FM-86A B-8 RC415-1502 SUR RC F11-86A C-8 RC417-1502 SUR RC FM-86A C-8 RC417-2501R SUR RC FM-86A C-7 RC421-1502 SUR RC FM-86A A-2 RC425-1502 SUR RC FM-86A A-2 RC428-2501R SUR -1 I I I I I   
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= -----------------------------RC FM-86A A-7 RC360-l502 SUR RC FM-86A I-4 RC405-1502 SUR RC FM-86A A8 RC412-1502 SUR RC FM-86A B-8 RC415-1502 SUR RC F11-86A C-8 RC417-1502 SUR RC FM-86A C-8 RC417-2501R SUR RC FM-86A C-7 RC421-1502 SUR RC FM-86A A-2 RC425-1502 SUR RC FM-86A A-2 RC428-2501R SUR -1 I I I I I   
* * * --------------------1  
* * * --------------------1  
Line 836: Line 836:
* CODE EDITION :80W80 * ****************************************************************************************************
* CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :s9.40 ITEM DESCRIPTION  
ITEM NUMBER :s9.40 ITEM DESCRIPTION
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-3 RC429-1502 SUR RC FM-86A C-3 RC432-1502 SUR RC FM-86A C-2 RC439-1502 SUR RC FM-86A L-2 RC4_41-1502 SUR RC FM-86A L-3 RC442-1502 SUR RC FM-86A K-3 RC446-1502 SUR RC FM-86A J-3 RC448-1502 SUR RC FM-86A J-2 RC453-1502 SUR RC FM-86A A-2 RC498-1502 SUR I I I I I I I I I I I I: II I I 1* Ii I I 1, I Ii I   
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-3 RC429-1502 SUR RC FM-86A C-3 RC432-1502 SUR RC FM-86A C-2 RC439-1502 SUR RC FM-86A L-2 RC4_41-1502 SUR RC FM-86A L-3 RC442-1502 SUR RC FM-86A K-3 RC446-1502 SUR RC FM-86A J-3 RC448-1502 SUR RC FM-86A J-2 RC453-1502 SUR RC FM-86A A-2 RC498-1502 SUR I I I I I I I I I I I I: II I I 1* Ii I I 1, I Ii I   
****************************************************************************************************  
****************************************************************************************************  
Line 848: Line 848:
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :B9.40 ITEM DESCRIPTION  
ITEM NUMBER :B9.40 ITEM DESCRIPTION
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RC FM-86A A-6 RC499-l502 SUR RC FM-86A L-2 RC500-l502 SUR RC FM-86B I-4 RC335-l502 SUR RC FM-86B I-5 RC36l-l502 SUR SI FM-86A H-4 SI275-l502 SUR
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RC FM-86A A-6 RC499-l502 SUR RC FM-86A L-2 RC500-l502 SUR RC FM-86B I-4 RC335-l502 SUR RC FM-86B I-5 RC36l-l502 SUR SI FM-86A H-4 SI275-l502 SUR
* SI FM-86A El SI280-1502 SUR SI FM-86A E-5 SI28l-l502 SUR SI FM-86A E-7 SI285-l502 SUR SI FH-88B E-3 SI272-1503 SUR
* SI FM-86A El SI280-1502 SUR SI FM-86A E-5 SI28l-l502 SUR SI FM-86A E-7 SI285-l502 SUR SI FH-88B E-3 SI272-1503 SUR
Line 862: Line 862:
* SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :s9.40 ITEM DESCRIPTION  
ITEM NUMBER :s9.40 ITEM DESCRIPTION
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89A E-5 SI273-l503 SUR SI FM-89B C-3 SI272-l503 SUR SI FM-89B E-2 SI273-l503 SUR SI FM-89B B-1 SI274-l502 SUR SI FM-89B E-2 SI277-l503 SUR
: PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89A E-5 SI273-l503 SUR SI FM-89B C-3 SI272-l503 SUR SI FM-89B E-2 SI273-l503 SUR SI FM-89B B-1 SI274-l502 SUR SI FM-89B E-2 SI277-l503 SUR
* SI FM-89B C-3 SI279-l502 SUR *   
* SI FM-89B C-3 SI279-l502 SUR *   
Line 875: Line 875:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
* CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
ITEM NUMBER :Bl0.10 ITEM DESCRIPTION  
ITEM NUMBER :Bl0.10 ITEM DESCRIPTION
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-86A F-8 CH301-1502 SUR CH FM-86A L-2 CH310-1503 SUR CH FH-88C H-3 CH379-1503 SUR RC FM-86A K-5 RC353-1502 SUR RC FM-86A G-1 RC358-1502 SUR RC FM-86A B-7 RC416-1502 SUR RC FM-86A B-2 RC431-1502 SUR RC FH-86A K-2 RC447-1502 SUR RC FM-86A A-6 RC499-1502 SUR l I I I ---________________
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-86A F-8 CH301-1502 SUR CH FM-86A L-2 CH310-1503 SUR CH FH-88C H-3 CH379-1503 SUR RC FM-86A K-5 RC353-1502 SUR RC FM-86A G-1 RC358-1502 SUR RC FM-86A B-7 RC416-1502 SUR RC FM-86A B-2 RC431-1502 SUR RC FH-86A K-2 RC447-1502 SUR RC FM-86A A-6 RC499-1502 SUR l I I I ---________________
J   
J   
Line 888: Line 888:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ~***************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ~***************************************************************************************************
* CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
* CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
ITEM NUMBER :s10.10 ITEM DESCRIPTION  
ITEM NUMBER :s10.10 ITEM DESCRIPTION
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715 l COORO NUMBER METHOD REQUEST NOTES I ---------======== ======= -------------======= ------------------------------I I RC FM-86A E-1 SI280-1502 SUR I I RC FM-86B G-8 RC310-2501R SUR I RC. FM-86B E-8 RC314-1502 SUR RC FM-866 F-5 RC315-1502 SUR RC FM-86B H-5 RC334-1502 SUR
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715 l COORO NUMBER METHOD REQUEST NOTES I ---------======== ======= -------------======= ------------------------------I I RC FM-86A E-1 SI280-1502 SUR I I RC FM-86B G-8 RC310-2501R SUR I RC. FM-86B E-8 RC314-1502 SUR RC FM-866 F-5 RC315-1502 SUR RC FM-86B H-5 RC334-1502 SUR
* RC FM-86B I-4 RC335-1502 SUR RC FM-86B I-5 RC361-1502 SUR RC FM-89B E-2 SI277-1503 SUR RHR FM-87A H-7 RHlOl-1502 SUR *   
* RC FM-86B I-4 RC335-1502 SUR RC FM-86B I-5 RC361-1502 SUR RC FM-89B E-2 SI277-1503 SUR RHR FM-87A H-7 RHlOl-1502 SUR *   
Line 902: Line 902:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-K-l INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
* CATEGORY B-K-l INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
ITEM NUMBER :s10.10 ITEM DESCRIPTION  
ITEM NUMBER :s10.10 ITEM DESCRIPTION
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOl4 FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= ======= --------------RHR FM-89B . B-8 RHll7-1502 SUR SI FM-86A E-4 SI245-l502 SUR SI FM-86A H-3 SI247-l502 SUR SI FM-86A E-5 SI281-l502 SUR SI FM-89B A-7 RC323-l502 SUR
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOl4 FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= ======= --------------RHR FM-89B . B-8 RHll7-1502 SUR SI FM-86A E-4 SI245-l502 SUR SI FM-86A H-3 SI247-l502 SUR SI FM-86A E-5 SI281-l502 SUR SI FM-89B A-7 RC323-l502 SUR
* SI FM-89B C-7 SI246-l502 SUR SI FM-89B C-3 SI272-l503 SUR SI FM-89B E-2 SI273-l503 SUR SI FM-89B C-3 SI279-l502 SUR *   
* SI FM-89B C-7 SI246-l502 SUR SI FM-89B C-3 SI272-l503 SUR SI FM-89B E-2 SI273-l503 SUR SI FM-89B C-3 SI279-l502 SUR *   
Line 915: Line 915:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY B-K-1. INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
* CATEGORY B-K-1. INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************
ITEM NUMBER :s10.20 ITEM DESCRIPTION  
ITEM NUMBER :s10.20 ITEM DESCRIPTION
: PUMPS INTEGRALLY WELDED ATTACHMENTS FLO!~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RC.:.P-lA SUR RC FM-86A A-6 RC-P-1B SUR RC FM-86A L-1 RC-P-lC SUR I I   
: PUMPS INTEGRALLY WELDED ATTACHMENTS FLO!~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RC.:.P-lA SUR RC FM-86A A-6 RC-P-1B SUR RC FM-86A L-1 RC-P-lC SUR I I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 938: Line 938:
* SURRY POWER STATION UNIT 2, CODE EDITION :eowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2, CODE EDITION :eowao * ****************************************************************************************************
* CATEGORY B-L-2 PUMP CASINGS * ****************************************************************************************************
* CATEGORY B-L-2 PUMP CASINGS * ****************************************************************************************************
ITEM NUMBER :Bl2.10 ITEM DESCRIPTION  
ITEM NUMBER :Bl2.10 ITEM DESCRIPTION
: PUMP CASING WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RC FM-86A A-1 RCPlA VOL RC FM-86A A-6 RCPlB VOL RC FM-86A L-1 RCPlC VOL I I I I I I . I I I I I I _I   
: PUMP CASING WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RC FM-86A A-1 RCPlA VOL RC FM-86A A-6 RCPlB VOL RC FM-86A L-1 RCPlC VOL I I I I I I . I I I I I I _I   
****************************************************************************************************  
****************************************************************************************************  
Line 949: Line 949:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-L-2 PUMP CASINGS * ****************************************************************************************************
* CATEGORY B-L-2 PUMP CASINGS * ****************************************************************************************************
ITEM NUMBER :B12.20 ITEM DESCRIPTION  
ITEM NUMBER :B12.20 ITEM DESCRIPTION
: PUMP CASING FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ------------------------------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCP1B VIS RC FM-86A L-1 RCPlC VIS * * -------1 I I I I ! I I I I I I I I r' I I I I I I I I I I I I I I ! I I I   
: PUMP CASING FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ------------------------------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCP1B VIS RC FM-86A L-1 RCPlC VIS * * -------1 I I I I ! I I I I I I I I r' I I I I I I I I I I I I I I ! I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 962: Line 962:
* SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************
* CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************
ITEM NUMBER :Bl2.40 ITEM DESCRIPTION  
ITEM NUMBER :Bl2.40 ITEM DESCRIPTION
: VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A E-1 RC301-2501R VIS SR-1 RC FM-86A D-3 RC303-2501R VIS SR-1 RC FM-86A D-6 RC304-2501R VIS SR-1 RC FM-86A D-8 RC306-2501R VIS SR-1 RC FM-86A H-1 RC307-2501R VIS SR-1
: VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A E-1 RC301-2501R VIS SR-1 RC FM-86A D-3 RC303-2501R VIS SR-1 RC FM-86A D-6 RC304-2501R VIS SR-1 RC FM-86A D-8 RC306-2501R VIS SR-1 RC FM-86A H-1 RC307-2501R VIS SR-1
* RC FM-86A H-3 RC309-2501R VIS SR-1 RC FM-86A C-4 RC311-2501R VIS SR-1 RC FM-86A C-8 RC312-2501R VIS SR-1 RC FM-86A I-4 RC313-2501R VIS SR-1 *   
* RC FM-86A H-3 RC309-2501R VIS SR-1 RC FM-86A C-4 RC311-2501R VIS SR-1 RC FM-86A C-8 RC312-2501R VIS SR-1 RC FM-86A I-4 RC313-2501R VIS SR-1 *   
Line 975: Line 975:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************
* CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************
ITEM NUMBER :Bl2.40 ITEM DESCRIPTION  
ITEM NUMBER :Bl2.40 ITEM DESCRIPTION
: VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------RC FM-86B H-4 RC337-1502 VIS SR-1 RC FM-86B G-4 RC338-l502 VIS SR-1 RC. FM-86B F-4 RC339-l502 VIS SR-1 RC FM-89B A-2 RC316-1502 VIS SR-1 RC FM-89B A-1 RC317-1502 VIS SR-1
: VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------RC FM-86B H-4 RC337-1502 VIS SR-1 RC FM-86B G-4 RC338-l502 VIS SR-1 RC. FM-86B F-4 RC339-l502 VIS SR-1 RC FM-89B A-2 RC316-1502 VIS SR-1 RC FM-89B A-1 RC317-1502 VIS SR-1
* RC FM-89B A-2 RC318-1502 VIS SR-1 RC FM-89B A-1 RC319-1502 VIS SR-1 RC FM-89B A-1 RC320-1502 VIS SR-1 RC FM-89B A-3 RC321-1502 VIS SR-1 *   
* RC FM-89B A-2 RC318-1502 VIS SR-1 RC FM-89B A-1 RC319-1502 VIS SR-1 RC FM-89B A-1 RC320-1502 VIS SR-1 RC FM-89B A-3 RC321-1502 VIS SR-1 *   
Line 988: Line 988:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************
* CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************
ITEM NUMBER =Bl2.40 ITEM DESCRIPTION  
ITEM NUMBER =Bl2.40 ITEM DESCRIPTION
: VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== .;.. ______ --------------------======= ---------------------RHR FM-87A
: VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== .;.. ______ --------------------======= ---------------------RHR FM-87A
* H-7 RHlOl-1502 VIS SR-1 RHR FM-87A L-5 RH116-1502 VIS SR-1 RHR FM-87A K-5 RH117-1502 VIS SR-1 SI FM-89B C-5 SI245-1502 VIS SR-1 SI FM-89B F-7 SI246-1502 VIS SR-1
* H-7 RHlOl-1502 VIS SR-1 RHR FM-87A L-5 RH116-1502 VIS SR-1 RHR FM-87A K-5 RH117-1502 VIS SR-1 SI FM-89B C-5 SI245-1502 VIS SR-1 SI FM-89B F-7 SI246-1502 VIS SR-1
Line 1,003: Line 1,003:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL * ****************************************************************************************************
* CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL * ****************************************************************************************************
ITEM NUMBER :Bl3.10 ITEM DESCRIPTION  
ITEM NUMBER :Bl3.10 ITEM DESCRIPTION
: REACTOR VESSEL, VESSEL INTERIOR FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= ======= ---------------RPV FM-86A F-5 RPRV VIS I I J   
: REACTOR VESSEL, VESSEL INTERIOR FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= ======= ---------------RPV FM-86A F-5 RPRV VIS I I J   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,027: Line 1,027:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-0 PRESSURE RETAINING WELDS IN CONTROL ROD HOUSINGS * ****************************************************************************************************
* CATEGORY B-0 PRESSURE RETAINING WELDS IN CONTROL ROD HOUSINGS * ****************************************************************************************************
ITEM NUMBER :Bl4.10 ITEM DESCRIPTION  
ITEM NUMBER :Bl4.10 ITEM DESCRIPTION
: REACTOR VESSEL WELDS IN CRD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT (11715) COORD NUMBER ---------======== ======= -----------------------RC FM-86A F-5 RPRV HOUSING EXAM METHOD ------VOL RELIEF REQUEST --------------PROGRAM NOTES --------------I I . ' I I I 11 I I I !   
: REACTOR VESSEL WELDS IN CRD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT (11715) COORD NUMBER ---------======== ======= -----------------------RC FM-86A F-5 RPRV HOUSING EXAM METHOD ------VOL RELIEF REQUEST --------------PROGRAM NOTES --------------I I . ' I I I 11 I I I !   
~----------------------------------------------------
~----------------------------------------------------
Line 1,042: Line 1,042:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.10 ITEM DESCRIPTION  
ITEM NUMBER :B15.10 ITEM DESCRIPTION
: REACTOR VESSEL PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A F-5 RPRV VIS   
: REACTOR VESSEL PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A F-5 RPRV VIS   
****************************************************************************************************  
****************************************************************************************************  
Line 1,055: Line 1,055:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.ll ITEM DESCRIPTION  
ITEM NUMBER :B15.ll ITEM DESCRIPTION
: REACTOR VESSEL PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======== ------======= ======= ---------RC FM-86A F-5 RPRV VIS * *   
: REACTOR VESSEL PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======== ------======= ======= ---------RC FM-86A F-5 RPRV VIS * *   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,090: Line 1,090:


==SUMMARY==
==SUMMARY==
  .REVISION  
  .REVISION
: 0000 *
: 0000 *
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.50 ITEM DESCRIPTION  
ITEM NUMBER :B15.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C I-6 CHll-1502 VIS CH FM-88C D-2 CH301-1502 VIS CH FM-88C D-2 CH305-1502 VIS CH FM-88C I-3 CH308-1503 VIS CH FM-88C G-3 CH309-1503 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C I-6 CHll-1502 VIS CH FM-88C D-2 CH301-1502 VIS CH FM-88C D-2 CH305-1502 VIS CH FM-88C I-3 CH308-1503 VIS CH FM-88C G-3 CH309-1503 VIS
* CH FM-88C H-3 CH310-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1503 VIS CH FM-88C C-6 CH405-1502 VIS
* CH FM-88C H-3 CH310-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1503 VIS CH FM-88C C-6 CH405-1502 VIS
Line 1,110: Line 1,110:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :sis.so ITEM DESCRIPTION  
ITEM NUMBER :sis.so ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------CH FM-88C F-6 CH408-1502 VIS CH FM-88C C-3 CH423-1502 VIS CH FM-88C B-3 CH523-1502 VIS RC FM-86A E-2 RC301-2501R VIS RC FM-86A B-2 RC302-2501R VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------CH FM-88C F-6 CH408-1502 VIS CH FM-88C C-3 CH423-1502 VIS CH FM-88C B-3 CH523-1502 VIS RC FM-86A E-2 RC301-2501R VIS RC FM-86A B-2 RC302-2501R VIS
* RC FM-86A A-4 RC303-2501R VIS RC FM-86A E-5 RC304-2501R VIS RC FM-86A A-6 RC305-2501R VIS *RC FM-86A B-8 RC306-2501R VIS *   
* RC FM-86A A-4 RC303-2501R VIS RC FM-86A E-5 RC304-2501R VIS RC FM-86A A-6 RC305-2501R VIS *RC FM-86A B-8 RC306-2501R VIS *   
Line 1,124: Line 1,124:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER !Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER !Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86A H-2 RC307-2501R VIS RC FM-86A K-2 RC308-2501R VIS RC FM-86A K-4 RC309-2501R VIS. RC FM-86A H-I RC310-2501R VIS RC FM-86A D-2 RC311-2501R VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86A H-2 RC307-2501R VIS RC FM-86A K-2 RC308-2501R VIS RC FM-86A K-4 RC309-2501R VIS. RC FM-86A H-I RC310-2501R VIS RC FM-86A D-2 RC311-2501R VIS
* RC FM-86A D-7 RC312-2501R VIS RC FM-86A I-2 RC313-2501R VIS RC FM-86A E-4 RC314-1502 VIS RC FM-86A H-4 RC315-1502 VIS
* RC FM-86A D-7 RC312-2501R VIS RC FM-86A I-2 RC313-2501R VIS RC FM-86A E-4 RC314-1502 VIS RC FM-86A H-4 RC315-1502 VIS
Line 1,139: Line 1,139:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FM-86A E-2 RC316-1502 VIS RC FM-86A E-4 RC317-1502 VIS RC FM-86A E-6 RC318-1502 VIS RC FM-86A E-6 RC319-1502 VIS RC FM-86A .H-4 RC320-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FM-86A E-2 RC316-1502 VIS RC FM-86A E-4 RC317-1502 VIS RC FM-86A E-6 RC318-1502 VIS RC FM-86A E-6 RC319-1502 VIS RC FM-86A .H-4 RC320-1502 VIS
* RC FM-86A H-2 RC321-1502 VIS RC FM-86A E-5 RC322-1502 VIS RC FM-86A E-8 RC323-1502 VIS RC FM-86A H-3 RC324-1502 VIS *   
* RC FM-86A H-2 RC321-1502 VIS RC FM-86A E-5 RC322-1502 VIS RC FM-86A E-8 RC323-1502 VIS RC FM-86A H-3 RC324-1502 VIS *   
Line 1,153: Line 1,153:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER !BlS.50 ITEM DESCRIPTION  
ITEM NUMBER !BlS.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FH-86A H-3 RC344-l502 VIS RC FM-86A E-3 RC345-l502 VIS RC FH-86A E-7 RC346-l502 VIS RC FH-86A E-2 RC347-l502 VIS RC FM-86A E-7 RC348-l502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FH-86A H-3 RC344-l502 VIS RC FM-86A E-3 RC345-l502 VIS RC FH-86A E-7 RC346-l502 VIS RC FH-86A E-2 RC347-l502 VIS RC FM-86A E-7 RC348-l502 VIS
* RC FM-86A H-2 RC349-l502 VIS RC FH-86A C-3 RC353-l502 VIS RC FM-86A B-2 RC355-l502 VIS RC FM-86A A-7 RC356-l502 VIS *   
* RC FM-86A H-2 RC349-l502 VIS RC FH-86A C-3 RC353-l502 VIS RC FM-86A B-2 RC355-l502 VIS RC FM-86A A-7 RC356-l502 VIS *   
Line 1,167: Line 1,167:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER !815.50 ITEM DESCRIPTION  
ITEM NUMBER !815.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------RC FM-86A B-5 RC357-1502 VIS RC FM-86A I-1 RC358-1502 VIS RC-FM-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A D-3 RC363-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------RC FM-86A B-5 RC357-1502 VIS RC FM-86A I-1 RC358-1502 VIS RC-FM-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A D-3 RC363-1502 VIS
* RC FM-86A D-8 RC364-1502 VIS RC FM-86A I-3 RC365-1502 VIS RC FM-86A B-1 RC392-1502 VIS RC FM-86A B-1 RC393-1502 VIS *   
* RC FM-86A D-8 RC364-1502 VIS RC FM-86A I-3 RC365-1502 VIS RC FM-86A B-1 RC392-1502 VIS RC FM-86A B-1 RC393-1502 VIS *   
Line 1,182: Line 1,182:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A B-1 RC394-1502 VIS RC FM-86A C-2 RC395-1502 VIS RC FM-86A A-6 RC396-1502 VIS RC FM-86A A-6 RC397-1502 VIS RC FM-86A A-6 RC398-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A B-1 RC394-1502 VIS RC FM-86A C-2 RC395-1502 VIS RC FM-86A A-6 RC396-1502 VIS RC FM-86A A-6 RC397-1502 VIS RC FM-86A A-6 RC398-1502 VIS
* RC FM-86A C-6 RC399-1502 VIS RC FM-86A K-1 RC400-1502 VIS RC FM-86A K-1 RC401-1502 VIS RC FM-~6A K-1 RC402-1502 VIS *   
* RC FM-86A C-6 RC399-1502 VIS RC FM-86A K-1 RC400-1502 VIS RC FM-86A K-1 RC401-1502 VIS RC FM-~6A K-1 RC402-1502 VIS *   
Line 1,196: Line 1,196:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-86A J-2 RC403-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A I-5 RC406-1502 VIS RC FM-86A A-8 RC412-1502 VIS RC FM-86A A-8 RC413-2501R VIS RC FM-86A A-8 RC414-1502 VIS RC FM-86A C-8 RC415-1502 VIS RC FM-86A A-7 RC416-1502 VIS RC FM-86A B-8 RC417-1502 VIS I I! I I l I I ' I I   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-86A J-2 RC403-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A I-5 RC406-1502 VIS RC FM-86A A-8 RC412-1502 VIS RC FM-86A A-8 RC413-2501R VIS RC FM-86A A-8 RC414-1502 VIS RC FM-86A C-8 RC415-1502 VIS RC FM-86A A-7 RC416-1502 VIS RC FM-86A B-8 RC417-1502 VIS I I! I I l I I ' I I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,209: Line 1,209:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FH-86A B-7 RC418-1502 VIS RC FM-86A B-8 RC419-2501R VIS RC FM-86A B-8 RC420-1502 VIS RC FM-86A C-7 RC421-1502 VIS RC FM-86A C-7 RC422-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FH-86A B-7 RC418-1502 VIS RC FM-86A B-8 RC419-2501R VIS RC FM-86A B-8 RC420-1502 VIS RC FM-86A C-7 RC421-1502 VIS RC FM-86A C-7 RC422-1502 VIS
* RC FM-86A C-7 RC423-1502 VIS RC FM-86A C-6 RC424-1502 VIS RC FM-86A A-2 RC425-1502 VIS RC FM-86A B-3 RC426-1502 VIS *   
* RC FM-86A C-7 RC423-1502 VIS RC FM-86A C-6 RC424-1502 VIS RC FM-86A A-2 RC425-1502 VIS RC FM-86A B-3 RC426-1502 VIS *   
Line 1,223: Line 1,223:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-3 RC427-1502 VIS RC FM-86A B-3 RC428-2501R VIS RC FM-86A B-3 RC429-1502 VIS RC FM-86A B-4 RC430-l502 VIS RC FM-86A B-2 RC431-1502 VIS RC FM-86A C-3 RC432-1502 VIS RC FM-86A B-3 RC433-2501R VIS RC FM-86A C-3 RC434-1502 VIS RC FM-86A C-2 RC436-1502 VIS ---~-I I I I I I I I I I I   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-3 RC427-1502 VIS RC FM-86A B-3 RC428-2501R VIS RC FM-86A B-3 RC429-1502 VIS RC FM-86A B-4 RC430-l502 VIS RC FM-86A B-2 RC431-1502 VIS RC FM-86A C-3 RC432-1502 VIS RC FM-86A B-3 RC433-2501R VIS RC FM-86A C-3 RC434-1502 VIS RC FM-86A C-2 RC436-1502 VIS ---~-I I I I I I I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,236: Line 1,236:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.50 ITEM DESCRIPTION  
ITEM NUMBER :B15.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A C-2 RC437-1502 VIS RC FM-86A C-2 RC438-1502 VIS RC FM-86A C-2 RC439-l502 VIS RC FM-86A A-7 RC440-1502 VIS RC FM-86A L-2 RC441-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A C-2 RC437-1502 VIS RC FM-86A C-2 RC438-1502 VIS RC FM-86A C-2 RC439-l502 VIS RC FM-86A A-7 RC440-1502 VIS RC FM-86A L-2 RC441-1502 VIS
* RC FM-86A K-3 RC442-1502 VIS RC FM-86A L-3 RC443-1502 VIS RC FM-86A K-3 RC444-2501R VIS RC FM-86A K-4 RC445-1502 VIS * --_l   
* RC FM-86A K-3 RC442-1502 VIS RC FM-86A L-3 RC443-1502 VIS RC FM-86A K-3 RC444-2501R VIS RC FM-86A K-4 RC445-1502 VIS * --_l   
Line 1,250: Line 1,250:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.50 ITEM DESCRIPTION  
ITEM NUMBER :B15.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES. ----------========  
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES. ----------========  
======= -------------======= ======= -------RC FM-86A K-4 RC446-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-3 RC449-1502 VIS RC FM-86A J-3 RC451-2501R VIS RC FM-86A J-4 RC452-1502 VIS RC FM:-86A J-2
======= -------------======= ======= -------RC FM-86A K-4 RC446-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-3 RC449-1502 VIS RC FM-86A J-3 RC451-2501R VIS RC FM-86A J-4 RC452-1502 VIS RC FM:-86A J-2
Line 1,265: Line 1,265:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FH-86A J-4 RC461-1502 VIS RC FM-86A H-4 RC462-1502 VIS RC-FM-86A I-2 RC463-1502 VIS RC FM-86A D-2 RC465-1502 VIS RC FM-86A E-6 RC466-l502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FH-86A J-4 RC461-1502 VIS RC FM-86A H-4 RC462-1502 VIS RC-FM-86A I-2 RC463-1502 VIS RC FM-86A D-2 RC465-1502 VIS RC FM-86A E-6 RC466-l502 VIS
* RC FM-86A D-6 RC472-1502 VIS RC FM-86A G-5 RC473-1502 VIS RC FM-86A K-2 RC477-1502 VIS RC FM-86A G-5 RC492-1502 VIS *   
* RC FM-86A D-6 RC472-1502 VIS RC FM-86A G-5 RC473-1502 VIS RC FM-86A K-2 RC477-1502 VIS RC FM-86A G-5 RC492-1502 VIS *   
Line 1,280: Line 1,280:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :sis.so ITEM DESCRIPTION  
ITEM NUMBER :sis.so ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-2 RC498-1502 VIS RC FM-86A A-6 RC499-1502 VIS RC FM-86A L-2 RCS00-1502 VIS RC FM-86B F-4 RC325-602 VIS RC FM-86B G-4 RC326-602 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-2 RC498-1502 VIS RC FM-86A A-6 RC499-1502 VIS RC FM-86A L-2 RCS00-1502 VIS RC FM-86B F-4 RC325-602 VIS RC FM-86B G-4 RC326-602 VIS
* RC FM-86B H-4 RC327-602 VIS RC FM-86B G-5 RC334-1502 VIS RC FM-86B I-5 RC335-1502 VIS RC FM-86B H-4 RC337-1502 VIS *   
* RC FM-86B H-4 RC327-602 VIS RC FM-86B G-5 RC334-1502 VIS RC FM-86B I-5 RC335-1502 VIS RC FM-86B H-4 RC337-1502 VIS *   
Line 1,294: Line 1,294:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :sis.so ITEM DESCRIPTION  
ITEM NUMBER :sis.so ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RC FM-86B G-4 RC338-1502 VIS RC FM-86B G-4 RC339-1S02 VIS RC FM-868 H-7 RC3S0-1502 VIS RC FM-86B I-5 RC351-1502 VIS RC FM-86B 2-5 RC361-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RC FM-86B G-4 RC338-1502 VIS RC FM-86B G-4 RC339-1S02 VIS RC FM-868 H-7 RC3S0-1502 VIS RC FM-86B I-5 RC351-1502 VIS RC FM-86B 2-5 RC361-1502 VIS
* RC FM-86B D-5 RC366-1502 VIS RC FM-86B E-5 RC367-1502 VIS RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH117-1502 VIS *   
* RC FM-86B D-5 RC366-1502 VIS RC FM-86B E-5 RC367-1502 VIS RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH117-1502 VIS *   
Line 1,307: Line 1,307:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY I FLOW FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES I ,1 ---------====::===  
: PIPING PRESSURE RETAINING BOUNDARY I FLOW FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES I ,1 ---------====::===  
======= ======= ------======= ======= 11 SI FM-89B B-6 SI239-1502 VIS 11 II SI FM-89B F-7 SI240-1502 VIS 'I 11 SI FM-898 B-8 SI241-1502 VIS 1: SI FM-89B B-5 SI245-1502 VIS SI FM-89B C-7 SI246-1502 VIS
======= ======= ------======= ======= 11 SI FM-89B B-6 SI239-1502 VIS 11 II SI FM-89B F-7 SI240-1502 VIS 'I 11 SI FM-898 B-8 SI241-1502 VIS 1: SI FM-89B B-5 SI245-1502 VIS SI FM-89B C-7 SI246-1502 VIS
Line 1,320: Line 1,320:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.50 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== -------======= -------------SI FM-89B B-3 SI279-1502 VIS SI FM-89B B-3 SI280-1502 VIS SI FM-89B B-2 SI281-1502 VIS SI FM-89B I-2 SI347-1503 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= 11 II I' ti I ii I Ii ii II II I I I i !' I I I   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== -------======= -------------SI FM-89B B-3 SI279-1502 VIS SI FM-89B B-3 SI280-1502 VIS SI FM-89B B-2 SI281-1502 VIS SI FM-89B I-2 SI347-1503 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= 11 II I' ti I ii I Ii ii II II I I I i !' I I I   
*'~**************************************************************************************************  
*'~**************************************************************************************************  
Line 1,333: Line 1,333:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.51 ITEM DESCRIPTION  
ITEM NUMBER :B15.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C I-6 CHll-1502 VIS CH FM-88C 0-2 CH301-1502 VIS CH FM-88C D-2 CH305-1502 VIS CH FM-88C I-3 CH308-1503 VIS CH FM-88C G-3 CH309-1503 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C I-6 CHll-1502 VIS CH FM-88C 0-2 CH301-1502 VIS CH FM-88C D-2 CH305-1502 VIS CH FM-88C I-3 CH308-1503 VIS CH FM-88C G-3 CH309-1503 VIS
* CH FM-88C H-3 CH310-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1503 VIS CH FM-88C C-6 CH405-1502 VIS *   
* CH FM-88C H-3 CH310-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1503 VIS CH FM-88C C-6 CH405-1502 VIS *   
Line 1,347: Line 1,347:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.51 ITEM DESCRIPTION  
ITEM NUMBER :B15.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88C F-6 CH408-1502 VIS CH FM-88C C-3 CH423-l502 VIS CH FM-88C B-3 CH523-1502 VIS RC FM-86A E-2 RC301-2501R VIS RC FM-86A B-2 RC302-2501R VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88C F-6 CH408-1502 VIS CH FM-88C C-3 CH423-l502 VIS CH FM-88C B-3 CH523-1502 VIS RC FM-86A E-2 RC301-2501R VIS RC FM-86A B-2 RC302-2501R VIS
* RC FM-86A A-4 RC303-2501R VIS RC FM-86A E-5 RC304-2501R VIS RC FM-86A A-6 RC305-2501R VIS RC FM-86A B-8 RC306-2501R VIS *   
* RC FM-86A A-4 RC303-2501R VIS RC FM-86A E-5 RC304-2501R VIS RC FM-86A A-6 RC305-2501R VIS RC FM-86A B-8 RC306-2501R VIS *   
Line 1,361: Line 1,361:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A H-2 RC307-2501R VIS RC FM-86A K-2 RC308-2501R VIS RC* FM-86A K-4 RC309-2501R VIS RC FM-86A H-I RC310-2501R VIS RC FM-86A D-2 RC3il-2501R VIS RC FM-86A D-7 RC312-2501R VIS RC FM-86A I-2 RC313-2501R VIS RC F11-86A E-4 RC314-1502 VIS RC FM-86A H-4 RC315-1502 VIS ----1 I I I   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A H-2 RC307-2501R VIS RC FM-86A K-2 RC308-2501R VIS RC* FM-86A K-4 RC309-2501R VIS RC FM-86A H-I RC310-2501R VIS RC FM-86A D-2 RC3il-2501R VIS RC FM-86A D-7 RC312-2501R VIS RC FM-86A I-2 RC313-2501R VIS RC F11-86A E-4 RC314-1502 VIS RC FM-86A H-4 RC315-1502 VIS ----1 I I I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,373: Line 1,373:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ----------------------RC FN-86A
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ----------------------RC FN-86A
* E-2 RC316-1502 VIS RC FM-86A E-4 RC317-1502 VIS RC FM-86A E-6 RC318-1502 VIS RC FM-86A E-6 RC319-l502 VIS RC FM-86A H-4 RC320-1502 VIS RC FM-86A H-2 RC321-1502 VIS RC FM-86A E-5 RC322-1502 VIS RC FM-86A E-8 RC323-1502 VIS RC FM-86A H-3 RC324-1502 VIS l I Ii 11 ! ! I I I: I' ' I I I I I I I I I' i' i II II ii 'I I II ------------------------
* E-2 RC316-1502 VIS RC FM-86A E-4 RC317-1502 VIS RC FM-86A E-6 RC318-1502 VIS RC FM-86A E-6 RC319-l502 VIS RC FM-86A H-4 RC320-1502 VIS RC FM-86A H-2 RC321-1502 VIS RC FM-86A E-5 RC322-1502 VIS RC FM-86A E-8 RC323-1502 VIS RC FM-86A H-3 RC324-1502 VIS l I Ii 11 ! ! I I I: I' ' I I I I I I I I I' i' i II II ii 'I I II ------------------------
Line 1,388: Line 1,388:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.51 ITEM DESCRIPTION  
ITEM NUMBER :B15.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-l502 VIS RC FM-86A E-2 RC347-1502 VIS RC FM-86A -E-7 RC348-1502 VIS RC FM-86A H-2 RC349-1502 VIS RC FM-86A C-3 RC353-1502 VIS RC FM-86A B-2 RC355-1502 VIS RC FM-86A A-7 RC356-1502 VIS i II   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-l502 VIS RC FM-86A E-2 RC347-1502 VIS RC FM-86A -E-7 RC348-1502 VIS RC FM-86A H-2 RC349-1502 VIS RC FM-86A C-3 RC353-1502 VIS RC FM-86A B-2 RC355-1502 VIS RC FM-86A A-7 RC356-1502 VIS i II   
****************************************************************************************************  
****************************************************************************************************  
Line 1,401: Line 1,401:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD RELIEF PROGRAM I, ,! REQUEST NOTES I ---------======== ======= ======= -------------======= -------RC FM-86A B-5 RC357-1502 VIS RC FM-86A I-1 RC358-1502 VIS RC FH-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A D-3 RC363-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD RELIEF PROGRAM I, ,! REQUEST NOTES I ---------======== ======= ======= -------------======= -------RC FM-86A B-5 RC357-1502 VIS RC FM-86A I-1 RC358-1502 VIS RC FH-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A D-3 RC363-1502 VIS
* RC FM-86A D-8 RC364-1502 VIS RC FM-86A I-3 RC365-1502 VIS RC FM-86A B-1 RC392-1502 VIS RC FM-86A B-1 RC393-1502 VIS *   
* RC FM-86A D-8 RC364-1502 VIS RC FM-86A I-3 RC365-1502 VIS RC FM-86A B-1 RC392-1502 VIS RC FM-86A B-1 RC393-1502 VIS *   
Line 1,414: Line 1,414:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :BI5,51 ITEM DESCRIPTION  
ITEM NUMBER :BI5,51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A B-1 RC394-1502 VIS RC FM-86A C-2 RC395-1502 VIS RC FM-86A A-6 RC396-1502 VIS RC FM-86A A-6 RC397-1502 VIS RC FM-86A A-6 RC398-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A B-1 RC394-1502 VIS RC FM-86A C-2 RC395-1502 VIS RC FM-86A A-6 RC396-1502 VIS RC FM-86A A-6 RC397-1502 VIS RC FM-86A A-6 RC398-1502 VIS
* RC FM-86A C-6 RC399-1502 VIS RC FM-86A K-1 RC400-1502 VIS RC FM-86A K-1 RC401-1502 VIS I . I I RC FM-86A K-1 RC402-1502 VIS I I I I I I' *   
* RC FM-86A C-6 RC399-1502 VIS RC FM-86A K-1 RC400-1502 VIS RC FM-86A K-1 RC401-1502 VIS I . I I RC FM-86A K-1 RC402-1502 VIS I I I I I I' *   
Line 1,428: Line 1,428:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :815.51 ITEM DESCRIPTION  
ITEM NUMBER :815.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= I -------I I RC FM-86A J-2 RC403-1502 VIS I I RC FM-86A I-5 RC405-1502 VIS [, RC FH-86A I-5 RC406-1502 VIS I I RC FM-86A A-8 RC412-1502 VIS I I RC FM-86A A-8 RC413-2501R VIS [, I
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= I -------I I RC FM-86A J-2 RC403-1502 VIS I I RC FM-86A I-5 RC405-1502 VIS [, RC FH-86A I-5 RC406-1502 VIS I I RC FM-86A A-8 RC412-1502 VIS I I RC FM-86A A-8 RC413-2501R VIS [, I
* RC FH-86A A-8 RC414-1502 VIS ;i ! RC FM-86A C-8 RC415-1502 VIS ii RC FM-86A A-7 RC416-1502 VIS II RC FM-86A B-8 RC417-1502 VIS *   
* RC FH-86A A-8 RC414-1502 VIS ;i ! RC FM-86A C-8 RC415-1502 VIS ii RC FM-86A A-7 RC416-1502 VIS II RC FM-86A B-8 RC417-1502 VIS *   
Line 1,442: Line 1,442:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A B-7 RC418-1502 VIS I RC FM-86A B-8 RC419-2501R VIS I RC FM-86A B-8 RC420-l502 VIS ! I RC FM-86A C-7 RC421-1502 VIS I RC FM-86A C-7 RC422-1502 VIS I I
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A B-7 RC418-1502 VIS I RC FM-86A B-8 RC419-2501R VIS I RC FM-86A B-8 RC420-l502 VIS ! I RC FM-86A C-7 RC421-1502 VIS I RC FM-86A C-7 RC422-1502 VIS I I
* RC FM-86A C-7 RC423-1502 VIS I I RC FM-86A C-6 RC424-1502 VIS I 1, RC FM-86A A-2 RC425-1502 VIS rl I RC FM-86A B-3 RC426-1502 VIS *   
* RC FM-86A C-7 RC423-1502 VIS I I RC FM-86A C-6 RC424-1502 VIS I 1, RC FM-86A A-2 RC425-1502 VIS rl I RC FM-86A B-3 RC426-1502 VIS *   
Line 1,458: Line 1,458:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.51 ITEM DESCRIPTION  
ITEM NUMBER :B15.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-3 RC427-1502 VIS RC FM-86A B-3 RC428-2501R VIS RC* FM-86A B-3 RC429-1502 VIS RC FM-86A B-4 RC430-1502 VIS RC FM-86A B-2 RC431-1502 VIS RC FM-86A C-3 RC432-l502 VIS RC FM-86A B-3 RC433-2501R VIS RC FM-86A C-3 RC434-1502 VIS RC FM-86A C-2 RC436-1502 VIS I I I   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-3 RC427-1502 VIS RC FM-86A B-3 RC428-2501R VIS RC* FM-86A B-3 RC429-1502 VIS RC FM-86A B-4 RC430-1502 VIS RC FM-86A B-2 RC431-1502 VIS RC FM-86A C-3 RC432-l502 VIS RC FM-86A B-3 RC433-2501R VIS RC FM-86A C-3 RC434-1502 VIS RC FM-86A C-2 RC436-1502 VIS I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,472: Line 1,472:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :615.51 ITEM DESCRIPTION  
ITEM NUMBER :615.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST .NOTES I ---------======== ======= -------------======= ======= I -------11 RC FM-86A
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST .NOTES I ---------======== ======= -------------======= ======= I -------11 RC FM-86A
* C-2 RC437-1502 VIS 1; RC FM-86A C-2 RC438-1502 VIS !' RC FM-86A C-2 RC439-1502 VIS I RC FM-86A A-7 RC440-1502 VIS RC FM-86A L-2 RC441-1502 VIS ** RC FM-86A K-3 RC442-1502 VIS RC FM-86A L-3 RC443-l502 VIS RC FM-86A K-3 RC444-2501R VIS RC FM-86A K-4 RC445-1502 VIS *   
* C-2 RC437-1502 VIS 1; RC FM-86A C-2 RC438-1502 VIS !' RC FM-86A C-2 RC439-1502 VIS I RC FM-86A A-7 RC440-1502 VIS RC FM-86A L-2 RC441-1502 VIS ** RC FM-86A K-3 RC442-1502 VIS RC FM-86A L-3 RC443-l502 VIS RC FM-86A K-3 RC444-2501R VIS RC FM-86A K-4 RC445-1502 VIS *   
Line 1,481: Line 1,481:


==SUMMARY==
==SUMMARY==
  -REVISION  
  -REVISION
: 0000 *
: 0000 *
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A K-4 RC446-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-3 RC449-1502 VIS RC FM-86A J-3 RC451-2501R VIS RC FM-86A J-4 RC452-1502 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A K-4 RC446-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-3 RC449-1502 VIS RC FM-86A J-3 RC451-2501R VIS RC FM-86A J-4 RC452-1502 VIS
* RC FM-86A J-2 RC453-1502 VIS RC FM-86A J-2 RC454-1502 VIS RC FM-86A J-2, RC455-1502 VIS RC FM-86A J-2 RC456-1502 VIS
* RC FM-86A J-2 RC453-1502 VIS RC FM-86A J-2 RC454-1502 VIS RC FM-86A J-2, RC455-1502 VIS RC FM-86A J-2 RC456-1502 VIS
Line 1,501: Line 1,501:
* CATEGORY B-P All PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P All PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B1s.s1 ITEM DESCRIPTION  
ITEM NUMBER :B1s.s1 ITEM DESCRIPTION
: PIPING PRESSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A J-4 RC FM-86A H-4 RC FM-86A I-2 RC FM-86A D-2 RC FM-86A E-6 RC FM-86A D-6 RC FM-86A G-5 RC FM-86A K-2 RC FM-86A G-5 RETAINING BOUNDARY LINE EXAM NUMBER METHOD ======= ------RC461-1502 VIS RC462-1502 VIS RC463-1502 VIS RC465-l502 VIS RC466-l502 VIS RC472-1502 VIS RC473-l502 VIS RC477-1502 VIS RC492-1502 VIS RELIEF REQUEST ======= PROGRAM NOTES =======   
: PIPING PRESSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A J-4 RC FM-86A H-4 RC FM-86A I-2 RC FM-86A D-2 RC FM-86A E-6 RC FM-86A D-6 RC FM-86A G-5 RC FM-86A K-2 RC FM-86A G-5 RETAINING BOUNDARY LINE EXAM NUMBER METHOD ======= ------RC461-1502 VIS RC462-1502 VIS RC463-1502 VIS RC465-l502 VIS RC466-l502 VIS RC472-1502 VIS RC473-l502 VIS RC477-1502 VIS RC492-1502 VIS RELIEF REQUEST ======= PROGRAM NOTES =======   
****************************************************************************************************  
****************************************************************************************************  
Line 1,514: Line 1,514:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION  
ITEM NUMBER :Bl5.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A A-2 RC498-1502 VIS RC FM-86A A-6 RC499-l502 VIS RC FM-86A L-2 RCS00-1502 VIS RC FM-86B F-4 RC325-602 VIS RC FM-86B G-4 RC326-602 VIS
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A A-2 RC498-1502 VIS RC FM-86A A-6 RC499-l502 VIS RC FM-86A L-2 RCS00-1502 VIS RC FM-86B F-4 RC325-602 VIS RC FM-86B G-4 RC326-602 VIS
* RC FM-86B H-4 RC327-602 VIS RC FM-86B G-5 RC334-1502 VIS RC FM-86B I-5 RC335-1502 VIS RC FM-868 H-4 RC337-1502 VIS *   
* RC FM-86B H-4 RC327-602 VIS RC FM-86B G-5 RC334-1502 VIS RC FM-86B I-5 RC335-1502 VIS RC FM-868 H-4 RC337-1502 VIS *   
Line 1,528: Line 1,528:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.51 ITEM DESCRIPTION  
ITEM NUMBER :B15.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-86B G-4 RC338-1502 VIS RC FM-86B G-4 RC339-1502 VIS RC FM-86B H-7 RC350-1502 VIS RC FM-86B I-5 RC351-1502 VIS RC FM-86B 2-5 RC361-1502 VIS I
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-86B G-4 RC338-1502 VIS RC FM-86B G-4 RC339-1502 VIS RC FM-86B H-7 RC350-1502 VIS RC FM-86B I-5 RC351-1502 VIS RC FM-86B 2-5 RC361-1502 VIS I
* RC FM-86B D-5 RC366-1502 VIS I, I, RC FM-86B E-5 RC367-1502 VIS I RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH117-1502 VIS *   
* RC FM-86B D-5 RC366-1502 VIS I, I, RC FM-86B E-5 RC367-1502 VIS I RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH117-1502 VIS *   
Line 1,542: Line 1,542:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B,15.51 ITEM DESCRIPTION  
ITEM NUMBER :B,15.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ---------------------------------------------SI FM-89B B-6 SI239-1502 VIS SI FM-89B F-7 SI240-l502 VIS SI FM-89B B-8 SI241-1502 VIS I I SI FM-89B B-5 SI245-1502 VIS I I SI FM-89B .C-7 SI246-1502 VIS 11
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ---------------------------------------------SI FM-89B B-6 SI239-1502 VIS SI FM-89B F-7 SI240-l502 VIS SI FM-89B B-8 SI241-1502 VIS I I SI FM-89B B-5 SI245-1502 VIS I I SI FM-89B .C-7 SI246-1502 VIS 11
* SI FM-89B B-8 SI247-1502 VIS Ii II SI FM-89B I-3 SI272-1503 VIS I SI FM-89B E-2 SI273-1503 VIS SI FM-89B E-3 SI277-1503 VIS *   
* SI FM-89B B-8 SI247-1502 VIS Ii II SI FM-89B I-3 SI272-1503 VIS I SI FM-89B E-2 SI273-1503 VIS SI FM-89B E-3 SI277-1503 VIS *   
Line 1,556: Line 1,556:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER !615.51 ITEM DESCRIPTION  
ITEM NUMBER !615.51 ITEM DESCRIPTION
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------SI FM-896 B-3 SI279-1502 VIS SI FM-896 B-3 SI280-l502 VIS SI* FM-898 B-2 SI281-1502 VIS SI FM-89B I-2 SI347-1503 VIS *   
: PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------SI FM-896 B-3 SI279-1502 VIS SI FM-896 B-3 SI280-l502 VIS SI* FM-898 B-2 SI281-1502 VIS SI FM-89B I-2 SI347-1503 VIS *   
* * * ---~--------------------
* * * ---~--------------------
Line 1,571: Line 1,571:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :015.60 ITEM DESCRIPTION  
ITEM NUMBER :015.60 ITEM DESCRIPTION
: PUMPS PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A A-1 RC-P.-lA VIS RC FM-86A A-6 RC-P-18 VIS RC FM-86A L-1 RC-P-lC VIS I I I 1, 11 I   
: PUMPS PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A A-1 RC-P.-lA VIS RC FM-86A A-6 RC-P-18 VIS RC FM-86A L-1 RC-P-lC VIS I I I 1, 11 I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,584: Line 1,584:
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :B15.61 ITEM DESCRIPTION  
ITEM NUMBER :B15.61 ITEM DESCRIPTION
: PUMPS PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-1B VIS RC FM-86A L-1 RC-P-lC VIS * *   
: PUMPS PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-1B VIS RC FM-86A L-1 RC-P-lC VIS * *   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,596: Line 1,596:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
ITEM NUMBER :c1.10 ITEM DESCRIPTION  
ITEM NUMBER :c1.10 ITEM DESCRIPTION
: PRESSURE VESSELS SHELL CIRCUMFERENTIAL WELDS FLOI~ FLOI~ SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ----------------------------------CH F11-72A F-4 CHE4 VOL CH FH-88B G-3 CHEl VOL CH FM-88B C-2 CHE2 VOL CH FM-88B J-1 CHFL2 VOL CH FM-88B E-3 CHFL3 VOL CH FH-88B E-3 CHFL4A VOL CH FM-88B E-3 CHFL4B VOL CH FM-88B H-2 CHTK2 VOL CH FM-88C F-2 CHE3 VOL RELIEF REQUEST ======= SR-4 PROGRAM NOTES =======   
: PRESSURE VESSELS SHELL CIRCUMFERENTIAL WELDS FLOI~ FLOI~ SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ----------------------------------CH F11-72A F-4 CHE4 VOL CH FH-88B G-3 CHEl VOL CH FM-88B C-2 CHE2 VOL CH FM-88B J-1 CHFL2 VOL CH FM-88B E-3 CHFL3 VOL CH FH-88B E-3 CHFL4A VOL CH FM-88B E-3 CHFL4B VOL CH FM-88B H-2 CHTK2 VOL CH FM-88C F-2 CHE3 VOL RELIEF REQUEST ======= SR-4 PROGRAM NOTES =======   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,608: Line 1,608:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
ITEM NUMBER :c1.10 ITEM DESCRIPTION  
ITEM NUMBER :c1.10 ITEM DESCRIPTION
: PRESSURE VESSELS SHELL CIRCUMFERENTIAL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT ( 11715) COORD NUMBER METHOD ---------======== ======= ======= ------MS FM-64A A-2 2RCE1A VOL MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL RHR FM-87A K-2 RHElA VOL RHR FM-87A K-2 RHE1B VOL RELIEF REQUEST ======= PROGRAM NOTES =======   
: PRESSURE VESSELS SHELL CIRCUMFERENTIAL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT ( 11715) COORD NUMBER METHOD ---------======== ======= ======= ------MS FM-64A A-2 2RCE1A VOL MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL RHR FM-87A K-2 RHElA VOL RHR FM-87A K-2 RHE1B VOL RELIEF REQUEST ======= PROGRAM NOTES =======   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,620: Line 1,620:
* SURRY POWER STATION UNIT 2 ~ODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 ~ODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PRESSURE VESSELS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT C 11715) COORD ---------======== --------------CH FM-72A F-4 CH FM-88B G-3 CH FM-88B C-2 CH FM-88B J-1 CH FM-88B E-3 CH FM-88B E-3 CH FM-88B E-3 CH FM-888 H-2 MS Fl1-64A A-2 HEAD CIRCUMFERENTIAL LINE EXAM NUMBER METHOD ======= ------CHE4 VOL CHEl VOL CHE2 VOL CHFL2 VOL CHFL3 VOL CHFL4A VOL CHFL4B VOL CHTK2 VOL 2RCE1A VOL WELDS RELIEF REQUEST ======= SR-4 PROGRAM NOTES ======= J.   
: PRESSURE VESSELS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT C 11715) COORD ---------======== --------------CH FM-72A F-4 CH FM-88B G-3 CH FM-88B C-2 CH FM-88B J-1 CH FM-88B E-3 CH FM-88B E-3 CH FM-88B E-3 CH FM-888 H-2 MS Fl1-64A A-2 HEAD CIRCUMFERENTIAL LINE EXAM NUMBER METHOD ======= ------CHE4 VOL CHEl VOL CHE2 VOL CHFL2 VOL CHFL3 VOL CHFL4A VOL CHFL4B VOL CHTK2 VOL 2RCE1A VOL WELDS RELIEF REQUEST ======= SR-4 PROGRAM NOTES ======= J.   
****************************************************************************************************  
****************************************************************************************************  
Line 1,632: Line 1,632:
* SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PRESSURE VESSELS HEAD CIRCUMFERENTIAL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL RHR FM-87A K-2 RHElA VOL RHR FM-87A K-2 RHElB VOL *
: PRESSURE VESSELS HEAD CIRCUMFERENTIAL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL RHR FM-87A K-2 RHElA VOL RHR FM-87A K-2 RHElB VOL *
* JI I * * * ****************************************************************************************************  
* JI I * * * ****************************************************************************************************  
Line 1,646: Line 1,646:
* CODE EDITION :aowao * ****************************************************************************************************
* CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
* CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************
ITEM NUMBER :c1.30 ITEM DESCRIPTION  
ITEM NUMBER :c1.30 ITEM DESCRIPTION
: PRESSURE VESSELS TUBESHEET-TO-SHELL WELD FLOI~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------CH FM-88C F-2 CHE3 VOL MS FM-64A A-2 2RCE1A VOL MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL I I I I ______ J   
: PRESSURE VESSELS TUBESHEET-TO-SHELL WELD FLOI~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------CH FM-88C F-2 CHE3 VOL MS FM-64A A-2 2RCE1A VOL MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL I I I I ______ J   
****************************************************************************************************  
****************************************************************************************************  
Line 1,659: Line 1,659:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowso * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowso * ****************************************************************************************************
* CATEGORY C-B PRESSURE RETAINING WELDS IN NOZZLE VESSELS * ****************************************************************************************************
* CATEGORY C-B PRESSURE RETAINING WELDS IN NOZZLE VESSELS * ****************************************************************************************************
I ITEM NUMBER :c2.10 ITEM DESCRIPTION  
I ITEM NUMBER :c2.10 ITEM DESCRIPTION
: PRESS. VESSELS,NOZ.
: PRESS. VESSELS,NOZ.
IN VESSELS<=
IN VESSELS<=
Line 1,674: Line 1,674:
* SURRY POl4ER STATION UNIT 2 COD!;. EDITION :eoweo * ****************************************************************************************************
* SURRY POl4ER STATION UNIT 2 COD!;. EDITION :eoweo * ****************************************************************************************************
* CATEGORY C-B PRESSURE RETAINING WELDS IN NOZZLE VESSELS * ****************~***********************************************************************************
* CATEGORY C-B PRESSURE RETAINING WELDS IN NOZZLE VESSELS * ****************~***********************************************************************************
ITEM NUMBER :c2.20 ITEM DESCRIPTION  
ITEM NUMBER :c2.20 ITEM DESCRIPTION
: PRESS. VESSELS,NOZ.
: PRESS. VESSELS,NOZ.
IN VESSELS> 1/2" NOM. THICK FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------FW FM-64A A-2 2RCE1A SUR VOL FW FH-64A A-4 2RCE1B SUR VOL FW FM-64A A-6 2RCE1C SUR VOL MS FM-64A A-2 2RCE1A SUR
IN VESSELS> 1/2" NOM. THICK FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------FW FM-64A A-2 2RCE1A SUR VOL FW FH-64A A-4 2RCE1B SUR VOL FW FM-64A A-6 2RCE1C SUR VOL MS FM-64A A-2 2RCE1A SUR
Line 1,688: Line 1,688:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************
* CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************
ITEM NUMBER :c3.10 ITEM DESCRIPTION  
ITEM NUMBER :c3.10 ITEM DESCRIPTION
: PRESSURE VESSELS INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------------------------------------------------------------------------------CH FM-88B G-3 CHEl SUR CH FM-88B C-2 CHE2 SUR CH FM-88B J-1 CHFL2 SUR CH FM-88B E-3 CHFL3 SUR CH FM-88B E-3 CHFL4A SUR ., CH FM-88B E-3 CHFL4B SUR CH FM-88B H-2 CHTK2 SUR RHR FM-87A K-2 RHElA SUR RHR FM-87A K-2 RHE1B SUR *   
: PRESSURE VESSELS INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------------------------------------------------------------------------------CH FM-88B G-3 CHEl SUR CH FM-88B C-2 CHE2 SUR CH FM-88B J-1 CHFL2 SUR CH FM-88B E-3 CHFL3 SUR CH FM-88B E-3 CHFL4A SUR ., CH FM-88B E-3 CHFL4B SUR CH FM-88B H-2 CHTK2 SUR RHR FM-87A K-2 RHElA SUR RHR FM-87A K-2 RHE1B SUR *   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,700: Line 1,700:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************
* CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************
ITEM NUMBER :c3.40 ITEM DESCRIPTION  
ITEM NUMBER :c3.40 ITEM DESCRIPTION
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------I FW FM-68A B-5 WFPD109-601 SUR FW FM-68A B-3 WFPD113-601 SUR FW FH-68A B-2 WFPDll 7-601 SUR HS FH-64A A-2 SHPlOl-601 SUR MS FH-64A A-4 SHP102-601 SUR HS FH-64A A-6 SHP103-601 SUR MS FM-64A 0-3 SHP145-601 SUR HS FH-64A 0-5 SHP146-601 SUR MS FM-64A 0-6 SHP147-601 SUR -------, I I I I I   
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------I FW FM-68A B-5 WFPD109-601 SUR FW FM-68A B-3 WFPD113-601 SUR FW FH-68A B-2 WFPDll 7-601 SUR HS FH-64A A-2 SHPlOl-601 SUR MS FH-64A A-4 SHP102-601 SUR HS FH-64A A-6 SHP103-601 SUR MS FM-64A 0-3 SHP145-601 SUR HS FH-64A 0-5 SHP146-601 SUR MS FM-64A 0-6 SHP147-601 SUR -------, I I I I I   
* * * -------------------------------------1 I I ****************************************************************************************************
* * * -------------------------------------1 I I ****************************************************************************************************
Line 1,712: Line 1,712:
* SURRY POWER STATION UNIT 2 *:oDE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 *:oDE EDITION :80W80 * ****************************************************************************************************
* CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************
* CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************
ITEM NUMBER :c3.4o ITEM DESCRIPTION  
ITEM NUMBER :c3.4o ITEM DESCRIPTION
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RHR FM-87A D-3 RHll0-602 SUR RHR FM-87A J-5 RH112-602 SUR RHR FM-87A L-5 RH116-1502 SUR RHR FM-87A D-7 RH118-602 SUR SI FM-89B C-2 SI248-l502 SUR SI FM-89B C-2 SI249-l502 SUR SI FM-89B B-2 5!344-1502 SUR SI FM-89B B-1 5!345-1502 SUR SI FM-89B B-2 5!353-1502 SUR 11 I I I I I   
: PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RHR FM-87A D-3 RHll0-602 SUR RHR FM-87A J-5 RH112-602 SUR RHR FM-87A L-5 RH116-1502 SUR RHR FM-87A D-7 RH118-602 SUR SI FM-89B C-2 SI248-l502 SUR SI FM-89B C-2 SI249-l502 SUR SI FM-89B B-2 5!344-1502 SUR SI FM-89B B-1 5!345-1502 SUR SI FM-89B B-2 5!353-1502 SUR 11 I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,724: Line 1,724:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-D PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
* CATEGORY C-D PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************
ITEM NUMBER :c4.30 ITEM DESCRIPTION  
ITEM NUMBER :c4.30 ITEM DESCRIPTION
: PUMPS BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= -----------------------------CH FM-88B D-7 CHPlA VOL CH FM-888 E-7 CHP1B VOL CH FM-88B G-7 CHPlC VOL * *   
: PUMPS BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= -----------------------------CH FM-88B D-7 CHPlA VOL CH FM-888 E-7 CHP1B VOL CH FM-88B G-7 CHPlC VOL * *   
,* ----------------*--
,* ----------------*--
Line 1,738: Line 1,738:
* SURRY PQl,lER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY PQl,lER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cs.11 ITEM DESCRIPTION  
ITEM NUMBER :cs.11 ITEM DESCRIPTION
: PIPING CIRC. WELDS<= l/2 IN. NOM. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= ======= -----------------------cs FM-84A C-2 CS103-153 SUR cs FM-84A D-1 CS104-153 SUR cs FM-84A D-1 CS123-l53 SUR cs FM-84A F-4 CS133-153
: PIPING CIRC. WELDS<= l/2 IN. NOM. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= ======= -----------------------cs FM-84A C-2 CS103-153 SUR cs FM-84A D-1 CS104-153 SUR cs FM-84A D-1 CS123-l53 SUR cs FM-84A F-4 CS133-153
* SUR cs FM-84A G-4 CS134-153 SUR
* SUR cs FM-84A G-4 CS134-153 SUR
Line 1,754: Line 1,754:
* SURRY POl~ER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POl~ER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cs.11 ITEM DESCRIPTION  
ITEM NUMBER :cs.11 ITEM DESCRIPTION
: PIPING CIRC. WELDS<= 1/2 IN. NOH. WALL THICKNES FLOI~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------MS FH-64A A-6 SHP124-601 SUR MS FH-64A C-3 SHP137-601 SUR MS FH-64A B-4 SHP138-601 SUR MS FH-64A C-6 SHP139-60l SUR HS FM-64A D-3 SHP145-601 SUR .;, MS FM-64A D-5 SHP146-601 SUR MS FM-64A D-6 SHP147-601 SUR RC FH-84A G-6 RS109-153 SUR RHR FM,-87A D-7 RH102-602 SUR *   
: PIPING CIRC. WELDS<= 1/2 IN. NOH. WALL THICKNES FLOI~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------MS FH-64A A-6 SHP124-601 SUR MS FH-64A C-3 SHP137-601 SUR MS FH-64A B-4 SHP138-601 SUR MS FH-64A C-6 SHP139-60l SUR HS FM-64A D-3 SHP145-601 SUR .;, MS FM-64A D-5 SHP146-601 SUR MS FM-64A D-6 SHP147-601 SUR RC FH-84A G-6 RS109-153 SUR RHR FM,-87A D-7 RH102-602 SUR *   
****************************************************************************************************  
****************************************************************************************************  
Line 1,766: Line 1,766:
* SURRY POWER STATION UNIT 2 CODE. EDITION :aowso * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE. EDITION :aowso * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************f***********************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************f***********************************************************************************
ITEM NUMBER :c5.ll ITEM DESCRIPTION  
ITEM NUMBER :c5.ll ITEM DESCRIPTION
: PIPING CIRC. WELDS<= 1/2 IN. NOM. ~lALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT  
: PIPING CIRC. WELDS<= 1/2 IN. NOM. ~lALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT  
<11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RHR FM-87A B-6 RH104-602 SUR RHR FM-87A D-6 RH105-602 SUR RHR FM-87A D-3 RH107-602 SUR RHR FM-87A B-3 RH108-602 SUR RHR FM-87A B-3 RH109-602 SUR
<11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RHR FM-87A B-6 RH104-602 SUR RHR FM-87A D-6 RH105-602 SUR RHR FM-87A D-3 RH107-602 SUR RHR FM-87A B-3 RH108-602 SUR RHR FM-87A B-3 RH109-602 SUR
Line 1,781: Line 1,781:
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cs.11 ITEM DESCRIPTION  
ITEM NUMBER :cs.11 ITEM DESCRIPTION
: PIPING CIRC. WELDS <= 1/2 IN. NON. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT , C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RHR FH-87A E-4 RH119-602 SUR RHR FH-87A K-5 RH137-602 SUR RS FM-84A B-6 RSlOl-153 SUR RS FM-84A C-5 RS102-153 SUR RS FM-84A C-2 RS103-153 SUR RS FM-84A C-2 RS104-153 SUR RS FM-84A C-2 RS109-153 SUR RS FM-84A G-6 RSll0-153 SUR RS FM-84A C-2 RSlll-153 SUR I I I I I ! 1! I I I ii II 11 I   
: PIPING CIRC. WELDS <= 1/2 IN. NON. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT , C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RHR FH-87A E-4 RH119-602 SUR RHR FH-87A K-5 RH137-602 SUR RS FM-84A B-6 RSlOl-153 SUR RS FM-84A C-5 RS102-153 SUR RS FM-84A C-2 RS103-153 SUR RS FM-84A C-2 RS104-153 SUR RS FM-84A C-2 RS109-153 SUR RS FM-84A G-6 RSll0-153 SUR RS FM-84A C-2 RSlll-153 SUR I I I I I ! 1! I I I ii II 11 I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,793: Line 1,793:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cs.11 ITEM DESCRIPTION  
ITEM NUMBER :cs.11 ITEM DESCRIPTION
: PIPING CIRC. WELDS <= 1/2 IN. NOM. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RS FM-84A C-6 RS112-153 SUR RS FM-84A C-2 RS120-153 SUR RS FM-84A C-2 RS121-153 SUR I I RS FM-84A C-2 RS122-153 SUR I RS FM-84A C-A RS123-153 SUR I
: PIPING CIRC. WELDS <= 1/2 IN. NOM. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RS FM-84A C-6 RS112-153 SUR RS FM-84A C-2 RS120-153 SUR RS FM-84A C-2 RS121-153 SUR I I RS FM-84A C-2 RS122-153 SUR I RS FM-84A C-A RS123-153 SUR I
* RS FM-89A C-2 RSll0-153 SUR I I .SI FM-89A D-6 SI216-153 SUR 11 :I SI FM-89A D-6 SI292-153 SUR IJ I SI FM-89A D-6 SI351-153 SUR " ii 1: 11 I I I *   
* RS FM-89A C-2 RSll0-153 SUR I I .SI FM-89A D-6 SI216-153 SUR 11 :I SI FM-89A D-6 SI292-153 SUR IJ I SI FM-89A D-6 SI351-153 SUR " ii 1: 11 I I I *   
Line 1,807: Line 1,807:
0000 * :ODE EDITION :aowao * ****************************************************************************************************
0000 * :ODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :c5.ll ITEM DESCRIPTION  
ITEM NUMBER :c5.ll ITEM DESCRIPTION
: PIPING CIRC. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= SI FM-89B C-3 SI FM-89B C-3 WELDS <= 1/2 IN. NOM. LINE EXAM NUMBER METHOD ======= ------SI248-1502 SUR SI249-l502 SUR WALL THICKNES RELIEF REQUEST ======= PROGRAM NOTES ======= I I I I I I I I   
: PIPING CIRC. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= SI FM-89B C-3 SI FM-89B C-3 WELDS <= 1/2 IN. NOM. LINE EXAM NUMBER METHOD ======= ------SI248-1502 SUR SI249-l502 SUR WALL THICKNES RELIEF REQUEST ======= PROGRAM NOTES ======= I I I I I I I I   
-I ****************************************************************************************************  
-I ****************************************************************************************************  
Line 1,819: Line 1,819:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING l~ELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING l~ELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :c5.2l ITEM DESCRIPTION  
ITEM NUMBER :c5.2l ITEM DESCRIPTION
: PIPING CIRC. WELDS > l/2" NON. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= FW FM-68A B-5 WFPD109-60l SUR VOL FW FM-68A B-3 WFPD113-60l SUR VOL FW FM-68A B-2 WFPDll 7-6 01 SUR VOL MS FM-64A A-2 SHPlOl-601 SUR
: PIPING CIRC. WELDS > l/2" NON. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= FW FM-68A B-5 WFPD109-60l SUR VOL FW FM-68A B-3 WFPD113-60l SUR VOL FW FM-68A B-2 WFPDll 7-6 01 SUR VOL MS FM-64A A-2 SHPlOl-601 SUR
* VOL MS FM-64A A-4 SHP102-60l SUR VOL MS FM-64A A-6 SHP103-60l SUR VOL *   
* VOL MS FM-64A A-4 SHP102-60l SUR VOL MS FM-64A A-6 SHP103-60l SUR VOL *   
Line 1,832: Line 1,832:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cs.21 ITEM DESCRIPTION  
ITEM NUMBER :cs.21 ITEM DESCRIPTION
: PIPING CIRC. WELDS > 1/2" NOH. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------MS FM-64A A-2 SHP122-601 SUR VOL MS FM-64A A-4 SHP123-601 SUR VOL I, MS FM-64A A-6 SHP124-601
: PIPING CIRC. WELDS > 1/2" NOH. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------MS FM-64A A-2 SHP122-601 SUR VOL MS FM-64A A-4 SHP123-601 SUR VOL I, MS FM-64A A-6 SHP124-601
* SUR ! VOL I RHR FM-87A L-5 RH116-1502 SUR
* SUR ! VOL I RHR FM-87A L-5 RH116-1502 SUR
Line 1,847: Line 1,847:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :c5.21 ITEM DESCRIPTION  
ITEM NUMBER :c5.21 ITEM DESCRIPTION
: PIPING CIRC. WELDS > 1/2" NOH. WALL THICKNESS FLOW FLO~l SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------SI FM-89A A-3 SI345-1502 SUR VOL SI FM-89A A-4 5!352-1502 SUR VOL SI FM-89B C-3 SI248-1502 SUR VOL SI FM-89B C-3 SI249-1502 SUR * , VOL SI FM-89B C-2 SI250-1502 SUR VOL SI FM-89B B-2 SI344-1502 SUR VOL *   
: PIPING CIRC. WELDS > 1/2" NOH. WALL THICKNESS FLOW FLO~l SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------SI FM-89A A-3 SI345-1502 SUR VOL SI FM-89A A-4 5!352-1502 SUR VOL SI FM-89B C-3 SI248-1502 SUR VOL SI FM-89B C-3 SI249-1502 SUR * , VOL SI FM-89B C-2 SI250-1502 SUR VOL SI FM-89B B-2 SI344-1502 SUR VOL *   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 1,871: Line 1,871:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cs.22 ITEM DESCRIPTION  
ITEM NUMBER :cs.22 ITEM DESCRIPTION
: PIPING LONG. WELDS > 1/2" NDM. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715 l CDDRD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= ----------------------MS FM-64A A-2 SHPlOl-601 SUR VOL MS FM-64A A-4 SHP102-601 SUR VOL MS FM-64A A-6 SHP103-601 SUR VOL MS FM-64A A-2 SHP122-601 SUR
: PIPING LONG. WELDS > 1/2" NDM. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715 l CDDRD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= ----------------------MS FM-64A A-2 SHPlOl-601 SUR VOL MS FM-64A A-4 SHP102-601 SUR VOL MS FM-64A A-6 SHP103-601 SUR VOL MS FM-64A A-2 SHP122-601 SUR
* VOL MS FM-64A A-4 SHP123-601 SUR VOL MS FM-64A A-6 SHP124-60l SUR VOL * ------1 I I I l1 II I   
* VOL MS FM-64A A-4 SHP123-601 SUR VOL MS FM-64A A-6 SHP124-60l SUR VOL * ------1 I I I l1 II I   
Line 1,884: Line 1,884:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
* CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************
ITEM NUMBER :cS.31 ITEM DESCRIPTION  
ITEM NUMBER :cS.31 ITEM DESCRIPTION
: PIPING CIRCUMFERENTIAL WELD,PIPE BRANCH CONNECT! FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------MS FM-64A A-2 SHP122-601 SUR MS FM-64A A-4 SHP123-601 SUR MS FH-64A A-6 SHP124-601 SUR HS FH-64A C-2 SHP137-601 SUR MS FM-64A B-4 SHP138-601 SUR
: PIPING CIRCUMFERENTIAL WELD,PIPE BRANCH CONNECT! FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------MS FM-64A A-2 SHP122-601 SUR MS FM-64A A-4 SHP123-601 SUR MS FH-64A A-6 SHP124-601 SUR HS FH-64A C-2 SHP137-601 SUR MS FM-64A B-4 SHP138-601 SUR
* MS FM-64A C-6 SHP139-601 SUR MS FM-64A D-3 SHP145-60l SUR MS FM-64A D-5 SHP146-601 SUR MS FM-64A D-6 SHP147-601 SUR * -1 i I I I I i1 I I !' I I I I ! I I I I ---__ __J   
* MS FM-64A C-6 SHP139-601 SUR MS FM-64A D-3 SHP145-60l SUR MS FM-64A D-5 SHP146-601 SUR MS FM-64A D-6 SHP147-601 SUR * -1 i I I I I i1 I I !' I I I I ! I I I I ---__ __J   
Line 1,898: Line 1,898:
* CATEGORY C-H All PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H All PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.10 ITEM DESCRIPTION  
ITEM NUMBER :c1.10 ITEM DESCRIPTION
: PRESSURE VESSELS,PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------CH FM-72A F-4 CHE4 VIS CH FM-888 G-3 CHEl VIS CH FM-888 C-2 CHE2 VIS CH FM-88B H-2 CHTK2 VIS I MS FM-64A A-2 2RCE1A VIS I
: PRESSURE VESSELS,PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------CH FM-72A F-4 CHE4 VIS CH FM-888 G-3 CHEl VIS CH FM-888 C-2 CHE2 VIS CH FM-88B H-2 CHTK2 VIS I MS FM-64A A-2 2RCE1A VIS I
* MS FM-64A A-4 2RCE1B VIS I I MS FM-64A A-6 2RCE1C VIS I I RHR FM-87A K-2 RHElA VIS I RHR FM-87A K-2 RHElB VIS I I 1, I I I I *   
* MS FM-64A A-4 2RCE1B VIS I I MS FM-64A A-6 2RCE1C VIS I I RHR FM-87A K-2 RHElA VIS I RHR FM-87A K-2 RHElB VIS I I 1, I I I I *   
Line 1,912: Line 1,912:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.u ITEM DESCRIPTION  
ITEM NUMBER :c1.u ITEM DESCRIPTION
: PRESSURE VESSELS,PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-72A F-4 CHE4 VIS CH FM-88B G-3 CHEl VIS CH FM-888 C-2 CHE2 VIS CH FM-888 H-2 CHTK2 VIS MS FM-64A A-2 2RCE1A VIS
: PRESSURE VESSELS,PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-72A F-4 CHE4 VIS CH FM-88B G-3 CHEl VIS CH FM-888 C-2 CHE2 VIS CH FM-888 H-2 CHTK2 VIS MS FM-64A A-2 2RCE1A VIS
* MS FM-64A A-4 2RCE1B VIS MS FM-64A A-6 2RCE1C VIS RHR FM-87A K-2 RHElA VIS RHR FM-87A K-2 RHE1B VIS *   
* MS FM-64A A-4 2RCE1B VIS MS FM-64A A-6 2RCE1C VIS RHR FM-87A K-2 RHElA VIS RHR FM-87A K-2 RHE1B VIS *   
Line 1,926: Line 1,926:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88A C-3 CH325-152 VIS CH FM-88A F-4 CH329-152 VIS CH FM-88B J-1 CHFL2 VIS CH FM-88B E-3 CHFL3
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88A C-3 CH325-152 VIS CH FM-88A F-4 CH329-152 VIS CH FM-88B J-1 CHFL2 VIS CH FM-88B E-3 CHFL3
* VIS CH FM-88B E-3 CHFL4A VIS
* VIS CH FM-88B E-3 CHFL4A VIS
Line 1,941: Line 1,941:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (117151 COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= ----------------------CH FM-88B H-3 CH306-602 VIS CH FM-88B B-2 CH307-602 VIS CH FM-88B A-3 CH308-1503 VIS CH Fr1-88B A-6 CH311-1503 VIS CH FM-88B A-7 CH312-1503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (117151 COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= ----------------------CH FM-88B H-3 CH306-602 VIS CH FM-88B B-2 CH307-602 VIS CH FM-88B A-3 CH308-1503 VIS CH Fr1-88B A-6 CH311-1503 VIS CH FM-88B A-7 CH312-1503 VIS
* CH FM-88B A-7 CH313-1503 VIS CH FM-88B H-4 CH317-152 VIS CH FM-88B G-8 CH318-152 VIS CH FM-88B I-7 CH319-152 VIS
* CH FM-88B A-7 CH313-1503 VIS CH FM-88B H-4 CH317-152 VIS CH FM-88B G-8 CH318-152 VIS CH FM-88B I-7 CH319-152 VIS
Line 1,956: Line 1,956:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------CH FM-88B F-6 CH321-1503 VIS CH FM-88B G-6 CH322-1503 VIS CH FM-88B G-2 CH323-152 VIS CH FM-88B H-2 CH324-152 VIS CH FM-88B I-3 CH358-152 VIS CH FM-88B I-3 CH359-152 VIS CH FM-88B G-2 CH367-152 VIS CH FM-88B C-6 CH369-1503 VIS CH FM-88B E-6 CH370-1503 VIS I . J I I I I I I   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------CH FM-88B F-6 CH321-1503 VIS CH FM-88B G-6 CH322-1503 VIS CH FM-88B G-2 CH323-152 VIS CH FM-88B H-2 CH324-152 VIS CH FM-88B I-3 CH358-152 VIS CH FM-88B I-3 CH359-152 VIS CH FM-88B G-2 CH367-152 VIS CH FM-88B C-6 CH369-1503 VIS CH FM-88B E-6 CH370-1503 VIS I . J I I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 1,969: Line 1,969:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B G-6 CH371-1503 VIS CH FM-88B E-8 CH372-152 VIS CH FM-88B H-3 CH373-152 VIS CH FM-88B B-6 CH374-1503 VIS CH FM-88B B-6 CH375-152 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B G-6 CH371-1503 VIS CH FM-88B E-8 CH372-152 VIS CH FM-88B H-3 CH373-152 VIS CH FM-88B B-6 CH374-1503 VIS CH FM-88B B-6 CH375-152 VIS
* CH FM-88B B-6 CH376-1503 VIS CH FM-88B A-6 CH377-1503 VIS CH FM-88B A-4 CH379-1503 VIS CH FM-88B B-5 CH380-1503 VIS
* CH FM-88B B-6 CH376-1503 VIS CH FM-88B A-6 CH377-1503 VIS CH FM-88B A-4 CH379-1503 VIS CH FM-88B B-5 CH380-1503 VIS
Line 1,984: Line 1,984:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B D-6 CH381-1503 VIS CH FM-88B H-1 CH387-152 VIS CH FM-88B C-4 CH389-1503 VIS CH FM-88B B-6 CH390-1503 VIS CH FM-88B A-6 CH391-1503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B D-6 CH381-1503 VIS CH FM-88B H-1 CH387-152 VIS CH FM-88B C-4 CH389-1503 VIS CH FM-88B B-6 CH390-1503 VIS CH FM-88B A-6 CH391-1503 VIS
* CH FM-88B A-3 CH399-152 VIS CH FM-88B F-3 CH400-152 VIS CH FM-88B H-3 CH412-152 VIS CH FM-88B E-4 CH413-1503 VIS
* CH FM-88B A-3 CH399-152 VIS CH FM-88B F-3 CH400-152 VIS CH FM-88B H-3 CH412-152 VIS CH FM-88B E-4 CH413-1503 VIS
Line 2,013: Line 2,013:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.20 ITEM DESCRIPTION  
ITEM NUMBER :c7.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------CH FM-88B H-3 CH465-152 VIS CH FM-88B G-7 CH487-1503 VIS CH FM-88B F-7 CH488-1503 VIS CH FM-88B D-7 CH489-1503 VIS CH FM-88B F-4 CH491-152 VIS CH FM-888 D-3 CH492-152 VIS CH FM-888 J-1 CH493-152 VIS CH FM-888 G-1 CH494-152 VIS CH FM-888 G-2 CH499-l52 VIS I I I I J   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------CH FM-88B H-3 CH465-152 VIS CH FM-88B G-7 CH487-1503 VIS CH FM-88B F-7 CH488-1503 VIS CH FM-88B D-7 CH489-1503 VIS CH FM-88B F-4 CH491-152 VIS CH FM-888 D-3 CH492-152 VIS CH FM-888 J-1 CH493-152 VIS CH FM-888 G-1 CH494-152 VIS CH FM-888 G-2 CH499-l52 VIS I I I I J   
****************************************************************************************************  
****************************************************************************************************  
Line 2,026: Line 2,026:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------CH FM-88B H-7 CH501-152 VIS CH FM-88B G-7 CH502-152 VIS CH FM-88B E-7 CH503-152 VIS CH FM-88B B-8 CH504-152
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------CH FM-88B H-7 CH501-152 VIS CH FM-88B G-7 CH502-152 VIS CH FM-88B E-7 CH503-152 VIS CH FM-88B B-8 CH504-152
* VIS CH FM-88B C-8 CH505-152 VIS
* VIS CH FM-88B C-8 CH505-152 VIS
Line 2,043: Line 2,043:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------CH FM-88B I-4 CH512-152 VIS CH FM-88B C-7 CH524-1503 VIS CH FM-88B E-7 CH525-1503 VIS CH FM-88B G-7 CH526-1503 VIS CH FM-88B A-4 CH531-1503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------CH FM-88B I-4 CH512-152 VIS CH FM-88B C-7 CH524-1503 VIS CH FM-88B E-7 CH525-1503 VIS CH FM-88B G-7 CH526-1503 VIS CH FM-88B A-4 CH531-1503 VIS
* CH FM-88B F-2 CH536-152 VIS CH FM-88B I-1 CH537-152 VIS CH FM-88B G-3 CH538-152 VIS CH FM-88B E-1 CH539-152 VIS I I ! I I I I I I !
* CH FM-88B F-2 CH536-152 VIS CH FM-88B I-1 CH537-152 VIS CH FM-88B G-3 CH538-152 VIS CH FM-88B E-1 CH539-152 VIS I I ! I I I I I I !
Line 2,058: Line 2,058:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (ll7l5) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C E-2 CH305-l502 VIS CH FM-88C I-2 CH306-602 VIS CH FM-88C E-6 CH3l5-l502 VIS CH FM-88C H-6 CH316-1502 VIS CH FM-88C F-2 CH382-l502 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (ll7l5) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C E-2 CH305-l502 VIS CH FM-88C I-2 CH306-602 VIS CH FM-88C E-6 CH3l5-l502 VIS CH FM-88C H-6 CH316-1502 VIS CH FM-88C F-2 CH382-l502 VIS
* CH FM-88C H-3 CH383-602 VIS CH FM-88C G-1 CH384-1502 VIS CH FM-88C H-3 CH385-602 VIS CH FM-88C H-2 CH386-602 VIS * ------1 I I I '   
* CH FM-88C H-3 CH383-602 VIS CH FM-88C G-1 CH384-1502 VIS CH FM-88C H-3 CH385-602 VIS CH FM-88C H-2 CH386-602 VIS * ------1 I I I '   
Line 2,072: Line 2,072:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C H-8 CH392-1503 VIS CH FM-88C E-8 CH394-1503 VIS CH FM-88C B-8 CH396-1503 VIS CH FM-88C B-5 CH398-1502 VIS CH FM-88C G-4 CH399-152 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C H-8 CH392-1503 VIS CH FM-88C E-8 CH394-1503 VIS CH FM-88C B-8 CH396-1503 VIS CH FM-88C B-5 CH398-1502 VIS CH FM-88C G-4 CH399-152 VIS
* CH FM-88C E-5 CH401-1502 VIS CH FM-88C H-5 CH402-1502 VIS CH FM-88C C-5 CH403-1502 VIS CH FM-88C I-4 CH422-152 VIS *   
* CH FM-88C E-5 CH401-1502 VIS CH FM-88C H-5 CH402-1502 VIS CH FM-88C C-5 CH403-1502 VIS CH FM-88C I-4 CH422-152 VIS *   
Line 2,087: Line 2,087:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88C B-4 CH424-152 VIS I CH FM-88C C-4 CH514-152 VIS I I CH FM-88C C-5 CH515-152 VIS I I CH FM-88C G-5 CH516-152 VIS I CH FM-88C C-5 CH517-152 VIS *I I I I
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88C B-4 CH424-152 VIS I CH FM-88C C-4 CH514-152 VIS I I CH FM-88C C-5 CH515-152 VIS I I CH FM-88C G-5 CH516-152 VIS I CH FM-88C C-5 CH517-152 VIS *I I I I
* CH FM-88C G-5 CH518-152 VIS I I CH FM-88C I-4 CH519-152 VIS I CH FM-88C H-2 CH532-602 VIS I CH FM-88C I-3 CH533-602 VIS I 11 !' *   
* CH FM-88C G-5 CH518-152 VIS I I CH FM-88C I-4 CH519-152 VIS I CH FM-88C H-2 CH532-602 VIS I CH FM-88C I-3 CH533-602 VIS I 11 !' *   
Line 2,101: Line 2,101:
* CATEGORY C-H ALL PRESSURE RETAINING .COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING .COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------cs FM-84A I-3 CSlOl-153 VIS cs FM-84A I-3 CS102-153 VIS cs FM-84A C-1 CS103-153 VIS cs FM-84A D-1 CS104-153 VIS cs FM-84A K-1 CS114-152 VIS cs FM-84A C-1 CS122-153 VIS cs FM-8l1A C-3 CS123-153 VIS cs FM-84A C-2 CS124-ICN1 VIS cs FM-84A F-4 CS133-153 VIS I _____ _l   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------cs FM-84A I-3 CSlOl-153 VIS cs FM-84A I-3 CS102-153 VIS cs FM-84A C-1 CS103-153 VIS cs FM-84A D-1 CS104-153 VIS cs FM-84A K-1 CS114-152 VIS cs FM-84A C-1 CS122-153 VIS cs FM-8l1A C-3 CS123-153 VIS cs FM-84A C-2 CS124-ICN1 VIS cs FM-84A F-4 CS133-153 VIS I _____ _l   
* * ** ---------1  
* * ** ---------1  
Line 2,126: Line 2,126:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= ----------------------MS FM-64A C-3 SDHVlOl-601 VIS MS FM-64A C-4 SDHV102-601 VIS MS FM-64A C-6 SDHV103-601 VIS MS FM-64A C-3 SDHV104-601 . VIS MS FM-64A A-2. SHPlOl-601 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= ----------------------MS FM-64A C-3 SDHVlOl-601 VIS MS FM-64A C-4 SDHV102-601 VIS MS FM-64A C-6 SDHV103-601 VIS MS FM-64A C-3 SDHV104-601 . VIS MS FM-64A A-2. SHPlOl-601 VIS
* MS FM-64A A-4 SHP102-601 VIS FM-64A 1. MS A-6 SHP103-601 VIS I MS FN-64A B-3 SHP122-601 VIS MS FM-64A B-4 SHP123-601 VIS *   
* MS FM-64A A-4 SHP102-601 VIS FM-64A 1. MS A-6 SHP103-601 VIS I MS FN-64A B-3 SHP122-601 VIS MS FM-64A B-4 SHP123-601 VIS *   
Line 2,140: Line 2,140:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------MS FM-64A B-6 SHP124-601 VIS MS FM-64A C-8 SHP128-601 VIS MS FM-64A C-8 SHP129-601 VIS MS FM-64A C-8 SHP130-601 VIS MS FM-6'*A F-8 SHP13l-601 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------MS FM-64A B-6 SHP124-601 VIS MS FM-64A C-8 SHP128-601 VIS MS FM-64A C-8 SHP129-601 VIS MS FM-64A C-8 SHP130-601 VIS MS FM-6'*A F-8 SHP13l-601 VIS
* MS FM-64A B-7 SHP132-601 VIS MS FM-64A C-8 SHP135-601 VIS MS FM-64A C-2 SHP137-601 VIS MS FM-64A B-4 SHP138-601 VIS
* MS FM-64A B-7 SHP132-601 VIS MS FM-64A C-8 SHP135-601 VIS MS FM-64A C-2 SHP137-601 VIS MS FM-64A B-4 SHP138-601 VIS
Line 2,155: Line 2,155:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A C-6 SHP139-601 VIS MS FM-64A D-2 SHP145-601 VIS MS FM-64A D-4 SHP146-601 VIS MS FM-64A C-6 SHP147-601 VIS MS FM-64A B-3 SSVlOl-121 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A C-6 SHP139-601 VIS MS FM-64A D-2 SHP145-601 VIS MS FM-64A D-4 SHP146-601 VIS MS FM-64A C-6 SHP147-601 VIS MS FM-64A B-3 SSVlOl-121 VIS
* MS FM-64A B-3 SSV102-121 VIS MS FM-64A C-3 SSV103-121 VIS MS FM-64A C-3 SSV104-121 VIS MS FM-64A B-4 SSV106-121 VIS *   
* MS FM-64A B-3 SSV102-121 VIS MS FM-64A C-3 SSV103-121 VIS MS FM-64A C-3 SSV104-121 VIS MS FM-64A B-4 SSV106-121 VIS *   
Line 2,169: Line 2,169:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A B-4 SSV107-121 VIS MS FM-64A C-4 SSV108-121 VIS MS FM-64A C-4 SSV109-121 VIS MS FM-64A B-4 SSVll0-121 VIS MS FM-64A B-6 SSVlll-121 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A B-4 SSV107-121 VIS MS FM-64A C-4 SSV108-121 VIS MS FM-64A C-4 SSV109-121 VIS MS FM-64A B-4 SSVll0-121 VIS MS FM-64A B-6 SSVlll-121 VIS
* MS FM-64A C-6 SSV112-121 VIS MS FM-64A C-6 SSV114-121 VIS MS FM-64A B-6 SSV115-121 VIS RHR FM-87A E-7 RH102-602 VIS *   
* MS FM-64A C-6 SSV112-121 VIS MS FM-64A C-6 SSV114-121 VIS MS FM-64A B-6 SSV115-121 VIS RHR FM-87A E-7 RH102-602 VIS *   
Line 2,183: Line 2,183:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOl4 FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORO NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RHR FM-87A G-3 RH103-602 VIS RHR FM-87A B-6 RH104-602 VIS RHR FM-87A C-6 RH105-602 VIS RHR FH-87A A-4 RH106-602 VIS RHR FH-87A C-4 RH107-602 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOl4 FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORO NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RHR FM-87A G-3 RH103-602 VIS RHR FM-87A B-6 RH104-602 VIS RHR FM-87A C-6 RH105-602 VIS RHR FH-87A A-4 RH106-602 VIS RHR FH-87A C-4 RH107-602 VIS
* RHR FH-87A A-3 RH108-602 VIS RHR FH-87A B-3 RH109-602 VIS RHR FH-87A D-3 RHll0-602 VIS RHR FH-87A F-6 RHlll-602 VIS * -----1 I I I I I I . I I   
* RHR FH-87A A-3 RH108-602 VIS RHR FH-87A B-3 RH109-602 VIS RHR FH-87A D-3 RHll0-602 VIS RHR FH-87A F-6 RHlll-602 VIS * -----1 I I I I I I . I I   
Line 2,197: Line 2,197:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RHR FH-87A E-5 RH112-602 VIS RHR FH-87A H-4 RH113-602 VIS RHR FM-87A I-5 RH114-602 VIS RHR FM-87A K-5 RH116-602 VIS RHR FM-87A E-7 RH118-602 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RHR FH-87A E-5 RH112-602 VIS RHR FH-87A H-4 RH113-602 VIS RHR FM-87A I-5 RH114-602 VIS RHR FM-87A K-5 RH116-602 VIS RHR FM-87A E-7 RH118-602 VIS
* RHR FM-87A E-4 RH119-602 VIS RHR FM-87A 8-5 RH121-602 VIS RHR FM-87A I-5 RH122-602 VIS RHR FM-87A K-5 RH137-602 VIS
* RHR FM-87A E-4 RH119-602 VIS RHR FM-87A 8-5 RH121-602 VIS RHR FM-87A I-5 RH122-602 VIS RHR FM-87A K-5 RH137-602 VIS
Line 2,225: Line 2,225:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.20 ITEM DESCRIPTION  
ITEM NUMBER :c7.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------RS FM-84A H-6 RSll0-153 VIS RS FM-84A 0-4 RSlll-153 VIS RS FM-84A E-4 RS112-153 VIS I I RS FM-84A G-8 RS114-153 . VIS I RS FM-84A A-3 RS120-153 VIS I I
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------RS FM-84A H-6 RSll0-153 VIS RS FM-84A 0-4 RSlll-153 VIS RS FM-84A E-4 RS112-153 VIS I I RS FM-84A G-8 RS114-153 . VIS I RS FM-84A A-3 RS120-153 VIS I I
* RS FM-84A B-3 RS121-153 VIS 11 11 RS FM-84A D-3 RS122-153 VIS I, I RS FM-84A E-3 RS123-153 VIS I' I RS FM-84A F-8 RS124-153 VIS I I I I *   
* RS FM-84A B-3 RS121-153 VIS 11 11 RS FM-84A D-3 RS122-153 VIS I, I RS FM-84A E-3 RS123-153 VIS I' I RS FM-84A F-8 RS124-153 VIS I I I I *   
Line 2,253: Line 2,253:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.20 ITEM DESCRIPTION  
ITEM NUMBER :c7.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= -------------======= ------------------------SI Fl1-89A E-6 SI219-152 VIS SI FM-89A F-2 SI220-1503 VIS SI FN-89A H-7 SI223-152 VIS SI FN-89A F-6 SI224-153 VIS SI Fl1-89A E-6 SI225-152 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= -------------======= ------------------------SI Fl1-89A E-6 SI219-152 VIS SI FM-89A F-2 SI220-1503 VIS SI FN-89A H-7 SI223-152 VIS SI FN-89A F-6 SI224-153 VIS SI Fl1-89A E-6 SI225-152 VIS
* SI FN-89A H-5 SI230-152 VIS SI Hl-89A A-3 SI248-1502 VIS SI FM-89A A-3 SI249-1502 VIS SI FM-89A E-6 SI255-153 VIS *   
* SI FN-89A H-5 SI230-152 VIS SI Hl-89A A-3 SI248-1502 VIS SI FM-89A A-3 SI249-1502 VIS SI FM-89A E-6 SI255-153 VIS *   
Line 2,267: Line 2,267:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------SI FM-89A F-7 SI256-153 VIS SI FM-89A H-2 SI257-1503 VIS SI FM-89A H-2 SI258-1503 VIS SI FM-89A H-1 SI259-l503 VIS SI FM-89A E-1 SI268-1503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------SI FM-89A F-7 SI256-153 VIS SI FM-89A H-2 SI257-1503 VIS SI FM-89A H-2 SI258-1503 VIS SI FM-89A H-1 SI259-l503 VIS SI FM-89A E-1 SI268-1503 VIS
* SI FM-89A A-1 SI270-1503 VIS SI FM-89A A-2 SI272-1503 VIS SI Fl1-89A E-6 SI278-152 VIS SI FM-89A G-7 SI283-153 VIS
* SI FM-89A A-1 SI270-1503 VIS SI FM-89A A-2 SI272-1503 VIS SI Fl1-89A E-6 SI278-152 VIS SI FM-89A G-7 SI283-153 VIS
Line 2,282: Line 2,282:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------SI FM-89A D-8 SI284-152 VIS SI FM-89A D-6 SI292-153 VIS SI FH-89A F-2 SI293-1503 VIS SI FM-89A F-4 SI302-152 VIS SI FM-89A D-6 SI306-152 VIS SI FM-89A I-6 SI330-152 VIS SI FM-89A J-4 SI331-152 VIS SI Hl-89A C-7 SI332-153 VIS SI FM-89A C-8 SI333-ICN9 VIS I I I I I I I ' I I I I I I *I   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------SI FM-89A D-8 SI284-152 VIS SI FM-89A D-6 SI292-153 VIS SI FH-89A F-2 SI293-1503 VIS SI FM-89A F-4 SI302-152 VIS SI FM-89A D-6 SI306-152 VIS SI FM-89A I-6 SI330-152 VIS SI FM-89A J-4 SI331-152 VIS SI Hl-89A C-7 SI332-153 VIS SI FM-89A C-8 SI333-ICN9 VIS I I I I I I I ' I I I I I I *I   
****************************************************************************************************  
****************************************************************************************************  
Line 2,295: Line 2,295:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======== ======= ------======= ----------------------SI FM-89A E-7 SI334-ICN9 VIS SI FM-89A D-8 SI335-ICN9 VIS SI FM-89A E-7 SI336-ICN9 VIS SI FM-89A F-7 SI337-153 VIS SI FM-89A F-8 SI338-ICN9 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======== ======= ------======= ----------------------SI FM-89A E-7 SI334-ICN9 VIS SI FM-89A D-8 SI335-ICN9 VIS SI FM-89A E-7 SI336-ICN9 VIS SI FM-89A F-7 SI337-153 VIS SI FM-89A F-8 SI338-ICN9 VIS
* SI FM-89A H-7 SI339-ICN9 VIS SI FM-89A H-8 SI340-ICN9 VIS SI FM-89A H-7 SI341-ICN9 VIS SI FM-89A A-1 SI346-1503 VIS
* SI FM-89A H-7 SI339-ICN9 VIS SI FM-89A H-8 SI340-ICN9 VIS SI FM-89A H-7 SI341-ICN9 VIS SI FM-89A A-1 SI346-1503 VIS
Line 2,310: Line 2,310:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c?.20 ITEM DESCRIPTION  
ITEM NUMBER :c?.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------SI FM-89A B-2 SI347-1503 VIS SI FM-89A .E-5 SI348-153 VIS SI FM-89A E-5 5!349-153 VIS SI FM-89A D-5 5!350-153 VIS SI FM-89A D-6 SI351-153 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------SI FM-89A B-2 SI347-1503 VIS SI FM-89A .E-5 SI348-153 VIS SI FM-89A E-5 5!349-153 VIS SI FM-89A D-5 5!350-153 VIS SI FM-89A D-6 SI351-153 VIS
* SI FM-89A A-4 SI352-1502 VIS SI FM-89A A-3 SI353-1502 VIS SI FM-89A D-6 SI360-153 VIS SI FM-89A C-2 5!361-1503 VIS *   
* SI FM-89A A-4 SI352-1502 VIS SI FM-89A A-3 SI353-1502 VIS SI FM-89A D-6 SI360-153 VIS SI FM-89A C-2 5!361-1503 VIS *   
Line 2,324: Line 2,324:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------SI FM-89A D-8 SI362-153 VIS SI FM-89A F-8 SI363-153 VIS SI FM-89A B-2 SI90-1503 VIS SI FM-89B G-8 SI201-153 . VIS SI FM-89B G-8 SI202-153 VIS I
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------SI FM-89A D-8 SI362-153 VIS SI FM-89A F-8 SI363-153 VIS SI FM-89A B-2 SI90-1503 VIS SI FM-89B G-8 SI201-153 . VIS SI FM-89B G-8 SI202-153 VIS I
* SI FM-89B G-7 SI234-1502 VIS SI FM-89B D-5 SI236-602 VIS SI FM-89B B-5 SI245-1502 VIS SI FM-89B F-6 SI246-1502 VIS *   
* SI FM-89B G-7 SI234-1502 VIS SI FM-89B D-5 SI236-602 VIS SI FM-89B B-5 SI245-1502 VIS SI FM-89B F-6 SI246-1502 VIS *   
Line 2,337: Line 2,337:
* CATEGORY C-H All PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H All PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89B C-2 SI248-1502 VIS SI FM-89B C-3 SI249-1502 VIS SI FM-89B B-3 SI250-1502 VIS SI FM-89B B-5 SI263-602 VIS SI FM-89B G-6 SI265-602 VIS SI FM-89B I-1 SI270-1503  
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89B C-2 SI248-1502 VIS SI FM-89B C-3 SI249-1502 VIS SI FM-89B B-3 SI250-1502 VIS SI FM-89B B-5 SI263-602 VIS SI FM-89B G-6 SI265-602 VIS SI FM-89B I-1 SI270-1503  
' VIS SI FM-89B E-1 SI271-1503 VIS SI FM-89B B-1 SI274-1502 VIS SI FM-89B B-2 SI275-1502 VIS I I I I I I I I I I I   
' VIS SI FM-89B E-1 SI271-1503 VIS SI FM-89B B-1 SI274-1502 VIS SI FM-89B B-2 SI275-1502 VIS I I I I I I I I I I I   
Line 2,351: Line 2,351:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.20 ITEM DESCRIPTION  
ITEM NUMBER :c1.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------SI FM-89B E-1 SI276-1503 VIS SI FM-89B B-1 SI285-1502 VIS SI FM-89B G-5 SI297-602 VIS SI FM-89B D-4 SI300-602 VIS SI FM-89B I-3 SI343-l502 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------SI FM-89B E-1 SI276-1503 VIS SI FM-89B B-1 SI285-1502 VIS SI FM-89B G-5 SI297-602 VIS SI FM-89B D-4 SI300-602 VIS SI FM-89B I-3 SI343-l502 VIS
* SI FM-89B B-1 SI344-1502 VIS SI *FM-89B B-1 SI345-1502 VIS SI FM-89B I-1 SI346-1503 VIS I SI FM-89B B-2 SI353-1502 VIS I I ** ------------------------------------------*----------------------i   
* SI FM-89B B-1 SI344-1502 VIS SI *FM-89B B-1 SI345-1502 VIS SI FM-89B I-1 SI346-1503 VIS I SI FM-89B B-2 SI353-1502 VIS I I ** ------------------------------------------*----------------------i   
Line 2,365: Line 2,365:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.20 ITEM DESCRIPTION  
ITEM NUMBER :c7.20 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B D-1 SI354-1502 VIS SI FM-896 C-3 SI355-1502 VIS SI FM-896 D-1 SI356-l502 VIS SI FM-89B C-2 SI357-1502 VIS SI FM-89B D-2 SI358-1502 VIS SI FM-896 C-4 SI359-1502 VIS T I   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B D-1 SI354-1502 VIS SI FM-896 C-3 SI355-1502 VIS SI FM-896 D-1 SI356-l502 VIS SI FM-89B C-2 SI357-1502 VIS SI FM-89B D-2 SI358-1502 VIS SI FM-896 C-4 SI359-1502 VIS T I   
****************************************************************************************************  
****************************************************************************************************  
Line 2,378: Line 2,378:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ------------------------------CH FM-88A C-3 CH325-152 VIS i CH FM-88A F-4 CH329-152 VIS I I, CH FM-88B J-1 CHFL2 VIS 1: CH FM-88B E-3 CHFL3 VIS 1; I' CH FM-88B E-3 CHFL4A VIS I
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ------------------------------CH FM-88A C-3 CH325-152 VIS i CH FM-88A F-4 CH329-152 VIS I I, CH FM-88B J-1 CHFL2 VIS 1: CH FM-88B E-3 CHFL3 VIS 1; I' CH FM-88B E-3 CHFL4A VIS I
* CH FM-88B E-3 CHFL4B VIS I i CH FH-88B G-1 CH194-152 VIS I I I CH FM-88B F-6 CH302-1503 VIS I CH FM-88B G-6 CH303-1503 VIS 11 ! I *   
* CH FM-88B E-3 CHFL4B VIS I i CH FH-88B G-1 CH194-152 VIS I I I CH FM-88B F-6 CH302-1503 VIS I CH FM-88B G-6 CH303-1503 VIS 11 ! I *   
Line 2,405: Line 2,405:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FH-88B F-6 CH321-1503 VIS CH FM-88B G-6 CH322-1503 VIS I CH FH-88B G-2 CH323-152 VIS I I CH FH-88B H-2 I CH324-152 VIS I CH FM-88B I-3 CH358-152 VIS I I
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FH-88B F-6 CH321-1503 VIS CH FM-88B G-6 CH322-1503 VIS I CH FH-88B G-2 CH323-152 VIS I I CH FH-88B H-2 I CH324-152 VIS I CH FM-88B I-3 CH358-152 VIS I I
* CH FM-88B I-3 CH359-152 VIS II CH FM-88B G-2 CH367-152 VIS I CH FH-88B C-6 CH369-1503 VIS I !. CH FH-88B E-6 CH370-1503 VIS I ,I 11 I ,I 11
* CH FM-88B I-3 CH359-152 VIS II CH FM-88B G-2 CH367-152 VIS I CH FH-88B C-6 CH369-1503 VIS I !. CH FH-88B E-6 CH370-1503 VIS I ,I 11 I ,I 11
Line 2,434: Line 2,434:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
****************************************************************************************************
****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------CH FM-88B D-6 CH381-1503 VIS CH FM-88B H-1 CH387-152 VIS CH FM-88B C-4 CH389-1503 VIS CH FM-88B B-6 CH390-1503 VIS CH FM-88B A-6 CH391-1503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------CH FM-88B D-6 CH381-1503 VIS CH FM-88B H-1 CH387-152 VIS CH FM-88B C-4 CH389-1503 VIS CH FM-88B B-6 CH390-1503 VIS CH FM-88B A-6 CH391-1503 VIS
* CH FM-88B A-3 CH399-152 VIS CH FM-88B F-3 CH400-152 VIS CH FM-88B H-3 CH412-152 VIS CH FM-88B E-4 CH413-1503 VIS * --~'J   
* CH FM-88B A-3 CH399-152 VIS CH FM-88B F-3 CH400-152 VIS CH FM-88B H-3 CH412-152 VIS CH FM-88B E-4 CH413-1503 VIS * --~'J   
Line 2,463: Line 2,463:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B H-3 CH465-152 VIS CH FM-88B G-7 CH487-1503 VIS CH FH-88B F-7 CH488-l503 VIS CH FM-88B D-7 CH489-1503 VIS CH FM-88B F-4 CH491-152 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B H-3 CH465-152 VIS CH FM-88B G-7 CH487-1503 VIS CH FH-88B F-7 CH488-l503 VIS CH FM-88B D-7 CH489-1503 VIS CH FM-88B F-4 CH491-152 VIS
* CH FM-88B D-3 CH492-152 VIS CH FH-88B J-1 CH493-152 VIS CH FM-88B G-1 CH494-152 VIS CH FH-88B G-2 CH499-152 VIS
* CH FM-88B D-3 CH492-152 VIS CH FH-88B J-1 CH493-152 VIS CH FM-88B G-1 CH494-152 VIS CH FH-88B G-2 CH499-152 VIS
Line 2,478: Line 2,478:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= ======= ---------------CH FM-88B i H-7 CH501-l52 VIS CH FM-88B G-7 CH502-l52 VIS CH FM-88B E-7 CH503-152 VIS CH FM-88B B-8 CH504-152 VIS CH FM-88B C-8 CH505-152 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= ======= ---------------CH FM-88B i H-7 CH501-l52 VIS CH FM-88B G-7 CH502-l52 VIS CH FM-88B E-7 CH503-152 VIS CH FM-88B B-8 CH504-152 VIS CH FM-88B C-8 CH505-152 VIS
* CH FM-88B C-8 CH506-152 VIS CH FM-88B D-8 CH507-l503 VIS CH FM-88B F-8 CH508-1503 VIS CH FM-88B H-8 CH509-l503 VIS
* CH FM-88B C-8 CH506-152 VIS CH FM-88B D-8 CH507-l503 VIS CH FM-88B F-8 CH508-1503 VIS CH FM-88B H-8 CH509-l503 VIS
Line 2,493: Line 2,493:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLO!~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B I-4 CH512-152 VIS CH FM-888 C-7 CH524-1503 VIS CH FM-888 E-7 CH525-1503 VIS CH FM-88B G-7 CH526-1503 VIS CH FM-88B A-4 CH531-1503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLO!~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B I-4 CH512-152 VIS CH FM-888 C-7 CH524-1503 VIS CH FM-888 E-7 CH525-1503 VIS CH FM-88B G-7 CH526-1503 VIS CH FM-88B A-4 CH531-1503 VIS
* CH FM-88B F-2 CH536-152 VIS CH FM-88B I-1 CH537-152 VIS CH FM-888 G-3 CH538-152 VIS CH FM-888 E-1 CH539-152 VIS
* CH FM-88B F-2 CH536-152 VIS CH FM-88B I-1 CH537-152 VIS CH FM-888 G-3 CH538-152 VIS CH FM-888 E-1 CH539-152 VIS
Line 2,508: Line 2,508:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FH-88C E-2 CH305-1502 VIS CH FH-88C I-2 CH306-602 VIS CH FH-88C E-6 CH315-1502 VIS CH FH-88C H-6 CH316-1502 VIS CH FH-88C F-2 CH382-1502 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FH-88C E-2 CH305-1502 VIS CH FH-88C I-2 CH306-602 VIS CH FH-88C E-6 CH315-1502 VIS CH FH-88C H-6 CH316-1502 VIS CH FH-88C F-2 CH382-1502 VIS
* CH FM-88C H-3 CH383-602 VIS CH FM-88C G-1 CH384-1502 VIS CH FM-88C H-3 CH385-602 VIS CH FM-88C H-2 CH386-602 VIS *   
* CH FM-88C H-3 CH383-602 VIS CH FM-88C G-1 CH384-1502 VIS CH FM-88C H-3 CH385-602 VIS CH FM-88C H-2 CH386-602 VIS *   
Line 2,522: Line 2,522:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------CH FM-88C H-8 CH392-1503 VIS CH FM-88C E-8 CH394-1503 VIS I I CH FM-88C B-8 CH396-1503 VIS I CH FM-88C B-5 CH398-1502 VIS I I CH FM-88C G-4 CH399-152 VIS 11
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------CH FM-88C H-8 CH392-1503 VIS CH FM-88C E-8 CH394-1503 VIS I I CH FM-88C B-8 CH396-1503 VIS I CH FM-88C B-5 CH398-1502 VIS I I CH FM-88C G-4 CH399-152 VIS 11
* CH FM-88C E-5 CH401-1502 VIS I: I CH FM-88C H-5 CH402-1502 VIS CH FM-88C C-5 CH403-1502 VIS CH FM-88C I-4 CH422-152 VIS **   
* CH FM-88C E-5 CH401-1502 VIS I: I CH FM-88C H-5 CH402-1502 VIS CH FM-88C C-5 CH403-1502 VIS CH FM-88C I-4 CH422-152 VIS **   
Line 2,549: Line 2,549:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------cs FM-84A I-3 CSlOl-153 VIS cs FM-84A I-3 CS102-153 VIS cs FM-84A C-1 CS103-153 VIS cs FM-84A D-1 CS104-153 VIS cs FM-84A K-1 CS114-152 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------cs FM-84A I-3 CSlOl-153 VIS cs FM-84A I-3 CS102-153 VIS cs FM-84A C-1 CS103-153 VIS cs FM-84A D-1 CS104-153 VIS cs FM-84A K-1 CS114-152 VIS
* cs FM-84A C-1 CS122-153 VIS cs FM-84A C-3 CS123-153 VIS* cs FM-84A C-2 CS124-ICN1 VIS cs FM-84A F-4 CS133-153 VIS * ~----1 I I I I I I   
* cs FM-84A C-1 CS122-153 VIS cs FM-84A C-3 CS123-153 VIS* cs FM-84A C-2 CS124-ICN1 VIS cs FM-84A F-4 CS133-153 VIS * ~----1 I I I I I I   
Line 2,564: Line 2,564:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------cs FM-84A G-3 CS134-153 VIS cs FM.:84A F-3 CS135-153 VIS cs FM-84A H-4 CS136-153 VIS cs FM-84A G-2 CS174-153 VIS cs FM-84A G-2 CS175-153 VIS FW FM-68A B-5 WFPD109-601 VIS FW FM-68A 8-4 WFPD113-601 VIS FW FM-68A 8-2 WFPDll 7-601 VIS MS FM-64A B-3 SAE105-121 VIS -------\   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------cs FM-84A G-3 CS134-153 VIS cs FM.:84A F-3 CS135-153 VIS cs FM-84A H-4 CS136-153 VIS cs FM-84A G-2 CS174-153 VIS cs FM-84A G-2 CS175-153 VIS FW FM-68A B-5 WFPD109-601 VIS FW FM-68A 8-4 WFPD113-601 VIS FW FM-68A 8-2 WFPDll 7-601 VIS MS FM-64A B-3 SAE105-121 VIS -------\   
****************************************************************************************************  
****************************************************************************************************  
Line 2,577: Line 2,577:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------MS FM-64A C-3 SDHVlOl-601 VIS MS FM-64A C-4 SDHV102-601 VIS MS FM-64A C-6 SDHV103-601 VIS MS FM-64A C-3 SDHV104-601 VIS MS FM-64A A-2 SHPlOl-601 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------MS FM-64A C-3 SDHVlOl-601 VIS MS FM-64A C-4 SDHV102-601 VIS MS FM-64A C-6 SDHV103-601 VIS MS FM-64A C-3 SDHV104-601 VIS MS FM-64A A-2 SHPlOl-601 VIS
* MS FM-64A A-4 SHP102-601 VIS MS FM-64A A-6 SHP103-601 VIS MS FM-64A B-3 SHP122-601 VIS MS FM-64A B-4 SHP123-601 VIS
* MS FM-64A A-4 SHP102-601 VIS MS FM-64A A-6 SHP103-601 VIS MS FM-64A B-3 SHP122-601 VIS MS FM-64A B-4 SHP123-601 VIS
Line 2,609: Line 2,609:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------MS FM-64A C-6 SHP139-601 VIS MS FM-64A ci-2 SHP145-601 VIS MS FM-64A D-4 SHP146-601 VIS HS FM-64A C-6 SHP147-601 VIS MS FM-64A B-3 SSVlOl-121 VIS HS FM-64A B-3 SSV102-121 VIS . HS FH-64A C-3 SSV103-121 VIS HS FM-64A C-3 SSV104-121 VIS MS FM-64A B-4 SSV106-121 VIS --------;1 I I I I I I I I I J   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------MS FM-64A C-6 SHP139-601 VIS MS FM-64A ci-2 SHP145-601 VIS MS FM-64A D-4 SHP146-601 VIS HS FM-64A C-6 SHP147-601 VIS MS FM-64A B-3 SSVlOl-121 VIS HS FM-64A B-3 SSV102-121 VIS . HS FH-64A C-3 SSV103-121 VIS HS FM-64A C-3 SSV104-121 VIS MS FM-64A B-4 SSV106-121 VIS --------;1 I I I I I I I I I J   
****************************************************************************************************  
****************************************************************************************************  
Line 2,622: Line 2,622:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------MS FM-64A B-4 SSV107-121 VIS MS FM-64A C-4 SSV108-121 VIS MS FM-64A C-4 SSV109-121 VIS MS FM-64A B-4 SSVll0-121 VIS MS FM-64A B-6 SSVlll-121 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------MS FM-64A B-4 SSV107-121 VIS MS FM-64A C-4 SSV108-121 VIS MS FM-64A C-4 SSV109-121 VIS MS FM-64A B-4 SSVll0-121 VIS MS FM-64A B-6 SSVlll-121 VIS
* MS FM-64A C-6 SSV112-121 VIS MS FM-64A C-6 SSV114-121 VIS MS FM-64A B-6 SSV115-121 VIS RHR FM-87A E-7 RH102-602 VIS *   
* MS FM-64A C-6 SSV112-121 VIS MS FM-64A C-6 SSV114-121 VIS MS FM-64A B-6 SSV115-121 VIS RHR FM-87A E-7 RH102-602 VIS *   
Line 2,636: Line 2,636:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FM-87A G-3 RH103-602 VIS RHR FM-87A B-6 RH104-602 VIS RHR FM-87A C-6 RHlOS-602 VIS RHR FM-87A A-4 RH106-602 VIS RHR FM-87A C-4 RH107-602 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FM-87A G-3 RH103-602 VIS RHR FM-87A B-6 RH104-602 VIS RHR FM-87A C-6 RHlOS-602 VIS RHR FM-87A A-4 RH106-602 VIS RHR FM-87A C-4 RH107-602 VIS
* RHR FM-87A A-3 RH108-602 VIS RHR FM-87A B-3 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS RHR FM-87A F-6 RHlll-602 VIS
* RHR FM-87A A-3 RH108-602 VIS RHR FM-87A B-3 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS RHR FM-87A F-6 RHlll-602 VIS
Line 2,651: Line 2,651:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FM-87A E-5 RHll2-602 VIS RHR FM-87A H-4 RHll3-602 VIS RHR FM-87A I-5 RHll4-602 VIS RHR FM-87A K-5 RHll6-602 VIS RHR FM-87A E-7 RHll8-602 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FM-87A E-5 RHll2-602 VIS RHR FM-87A H-4 RHll3-602 VIS RHR FM-87A I-5 RHll4-602 VIS RHR FM-87A K-5 RHll6-602 VIS RHR FM-87A E-7 RHll8-602 VIS
* RHR FM-87A E-4 RHll9-602 VIS RHR FM-87A B-5 RH121-602 VIS RHR FM-87A I-5 RH122-602 VIS RHR FM-87A K-5 RH137-602 VIS *   
* RHR FM-87A E-4 RHll9-602 VIS RHR FM-87A B-5 RH121-602 VIS RHR FM-87A I-5 RH122-602 VIS RHR FM-87A K-5 RH137-602 VIS *   
Line 2,679: Line 2,679:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RS FM-84A H-6 RSll0-153 VIS RS FM-84A D-4 RSlll-153 VIS RS FM-84A E-4 RSll2-153 VIS RS FM-84A G-8 RSll4-l53 VIS RS FM-84A A-3 RSl20-l53 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RS FM-84A H-6 RSll0-153 VIS RS FM-84A D-4 RSlll-153 VIS RS FM-84A E-4 RSll2-153 VIS RS FM-84A G-8 RSll4-l53 VIS RS FM-84A A-3 RSl20-l53 VIS
* RS FM-84A B-3 RS12l-153 VIS RS FM-84A D-3 RS122-153 VIS RS FM-84A E-3 RSl23-153 VIS* RS FM-84A F-8 RS124-153 VIS *   
* RS FM-84A B-3 RS12l-153 VIS RS FM-84A D-3 RS122-153 VIS RS FM-84A E-3 RSl23-153 VIS* RS FM-84A F-8 RS124-153 VIS *   
Line 2,693: Line 2,693:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------SI FM-89A A-8 SI201-153 VIS SI FM-89A A-8 SI202-153 VIS SI FM-89A H-8 SI205-153 VIS SI FM-89A F-4 SI207-152 VIS SI FM-89A G-5 SI213-153 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------SI FM-89A A-8 SI201-153 VIS SI FM-89A A-8 SI202-153 VIS SI FM-89A H-8 SI205-153 VIS SI FM-89A F-4 SI207-152 VIS SI FM-89A G-5 SI213-153 VIS
* SI FM-89A G-5 SI214-153 VIS SI FM-89A D-6 SI216-153 VIS SI FM-89A E-6 SI217-l52 VIS SI FM-89A E-6 SI218-152 VIS *   
* SI FM-89A G-5 SI214-153 VIS SI FM-89A D-6 SI216-153 VIS SI FM-89A E-6 SI217-l52 VIS SI FM-89A E-6 SI218-152 VIS *   
Line 2,707: Line 2,707:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------SI FM-89A E-6 SI219-l52 VIS SI FM-89A F-2 SI220-1503 VIS SI FH-89A H-7 SI223-152 VIS SI FH-89A F-6 SI224-153 VIS I SI FH-89A E-6 SI225-152 VIS 11 I
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------SI FM-89A E-6 SI219-l52 VIS SI FM-89A F-2 SI220-1503 VIS SI FH-89A H-7 SI223-152 VIS SI FH-89A F-6 SI224-153 VIS I SI FH-89A E-6 SI225-152 VIS 11 I
* SI FM-89A H-5 SI230-152 VIS !1 SI Fl1-89A A-3 SI248-1502 VIS SI FM-89A A-3 SI249-l502 VIS SI FM-89A E-6 SI255-153 VIS !1 I I *   
* SI FM-89A H-5 SI230-152 VIS !1 SI Fl1-89A A-3 SI248-1502 VIS SI FM-89A A-3 SI249-l502 VIS SI FM-89A E-6 SI255-153 VIS !1 I I *   
Line 2,721: Line 2,721:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A F-7 SI256-l53 VIS SI FM-89A H-2 SI257-l503 VIS SI FM-89A H-2 SI258-l503 VIS SI FM-89A H-1 ' SI259-l503 VIS SI FM-89A E-1 SI268-l503 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A F-7 SI256-l53 VIS SI FM-89A H-2 SI257-l503 VIS SI FM-89A H-2 SI258-l503 VIS SI FM-89A H-1 ' SI259-l503 VIS SI FM-89A E-1 SI268-l503 VIS
* SI FM-89A A-1 SI270-l503 VIS SI FM-89A A-2 SI272-l503 VIS SI FM-89A E-6 SI278-l52 VIS SI FM-89A G-7 SI283-l53 VIS
* SI FM-89A A-1 SI270-l503 VIS SI FM-89A A-2 SI272-l503 VIS SI FM-89A E-6 SI278-l52 VIS SI FM-89A G-7 SI283-l53 VIS
Line 2,750: Line 2,750:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :C7.21 ITEM DESCRIPTION  
ITEM NUMBER :C7.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOI~ FLOI~ SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAl1 COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------SI FM-89A E-7 SI334-ICN9 VIS SI FM-89A D-8 SI335-ICN9 VIS SI FM-89A E-7 SI336-ICN9 VIS SI FM-89A F-7 SI337-153 VIS SI FM-89A F-8 SI338-ICN9 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOI~ FLOI~ SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAl1 COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------SI FM-89A E-7 SI334-ICN9 VIS SI FM-89A D-8 SI335-ICN9 VIS SI FM-89A E-7 SI336-ICN9 VIS SI FM-89A F-7 SI337-153 VIS SI FM-89A F-8 SI338-ICN9 VIS
* SI FM-89A H-7 SI339-ICN9 VIS SI FM-89A H-8 SI340-ICN9 VIS SI FM-89A H-7 SI341-ICN9 VIS SI FM-89A A-1 SI346-1503 VIS *   
* SI FM-89A H-7 SI339-ICN9 VIS SI FM-89A H-8 SI340-ICN9 VIS SI FM-89A H-7 SI341-ICN9 VIS SI FM-89A A-1 SI346-1503 VIS *   
Line 2,764: Line 2,764:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A B-2 SI347-1503 VIS SI FM-89A E-5 SI348-153 VIS SI FM-89A E-5 SI349-153 VIS SI FM-89A D-5 SI350-153 VIS SI FM-89A D-6 SI351-153 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A B-2 SI347-1503 VIS SI FM-89A E-5 SI348-153 VIS SI FM-89A E-5 SI349-153 VIS SI FM-89A D-5 SI350-153 VIS SI FM-89A D-6 SI351-153 VIS
* SI FM-89A A-4 SI352-1502 VIS SI FM-89A A-3 SI353-1502 VIS SI FM-89A D-6 SI360-153 VIS SI FM-89A C-2 SI361-1503 VIS *   
* SI FM-89A A-4 SI352-1502 VIS SI FM-89A A-3 SI353-1502 VIS SI FM-89A D-6 SI360-153 VIS SI FM-89A C-2 SI361-1503 VIS *   
Line 2,778: Line 2,778:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89A D-8 SI362-l53 VIS SI FM-89A F-8 SI363-l53 VIS SI FM-89A B-2 SI90-l503 VIS SI FM-89B G-8 SI20l-l53 VIS SI FM-89B G-8 SI202-l53 VIS SI FM-89B G-7 SI234-l502 VIS SI FM-89B D-5 SI236-602 VIS SI FM-89B B-5 SI245-1502 VIS SI FM-89B F-6 SI246-1502 VIS I I I _J   
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89A D-8 SI362-l53 VIS SI FM-89A F-8 SI363-l53 VIS SI FM-89A B-2 SI90-l503 VIS SI FM-89B G-8 SI20l-l53 VIS SI FM-89B G-8 SI202-l53 VIS SI FM-89B G-7 SI234-l502 VIS SI FM-89B D-5 SI236-602 VIS SI FM-89B B-5 SI245-1502 VIS SI FM-89B F-6 SI246-1502 VIS I I I _J   
****************************************************************************************************  
****************************************************************************************************  
Line 2,791: Line 2,791:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= *--------------SI FM-89B C-2 SI248-1502 VIS SI FM-89B C-3 SI249-1502 VIS SI FM-89B B-3 SI250-1502 VIS SI FM-89B B-5 SI263-602 VIS SI FM-89B G-6 SI265-602 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= *--------------SI FM-89B C-2 SI248-1502 VIS SI FM-89B C-3 SI249-1502 VIS SI FM-89B B-3 SI250-1502 VIS SI FM-89B B-5 SI263-602 VIS SI FM-89B G-6 SI265-602 VIS
* SI FM-89B I-1 SI270-1503 VIS SI FM-89B E-1 SI271-1503 VIS SI FM-89B B-1 SI274-1502 VIS SI FM-89B B-2 SI275-1502 VIS *   
* SI FM-89B I-1 SI270-1503 VIS SI FM-89B E-1 SI271-1503 VIS SI FM-89B B-1 SI274-1502 VIS SI FM-89B B-2 SI275-1502 VIS *   
Line 2,805: Line 2,805:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B E-1 SI276-1503 VIS SI FM-89B B-1 SI285-1502 VIS SI FM-89B G-5 SI297-602 VIS SI FM-89B D-4 SI300-602 VIS SI FM-89B I-3 SI343-1502 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B E-1 SI276-1503 VIS SI FM-89B B-1 SI285-1502 VIS SI FM-89B G-5 SI297-602 VIS SI FM-89B D-4 SI300-602 VIS SI FM-89B I-3 SI343-1502 VIS
* SI FM-89B B-1 SI344-1502 VIS SI FM-89B B-1 SI345-1502 VIS SI FM-89B I-1 SI346-1503 VIS SI FM-89B B-2 SI353-1502 VIS
* SI FM-89B B-1 SI344-1502 VIS SI FM-89B B-1 SI345-1502 VIS SI FM-89B I-1 SI346-1503 VIS SI FM-89B B-2 SI353-1502 VIS
Line 2,820: Line 2,820:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.21 ITEM DESCRIPTION  
ITEM NUMBER :c1.21 ITEM DESCRIPTION
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B D-1 SI354-1502 VIS SI FM-89B C-3 SI355-1502 VIS SI FM-898 D-1 SI356-1502 VIS SI FM-89B C-2 SI357-1502 VIS SI FM-89B D-2 SI358-1502 VIS
: PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B D-1 SI354-1502 VIS SI FM-89B C-3 SI355-1502 VIS SI FM-898 D-1 SI356-1502 VIS SI FM-89B C-2 SI357-1502 VIS SI FM-89B D-2 SI358-1502 VIS
* SI FM-898 C-4 SI359-1502 VIS *   
* SI FM-898 C-4 SI359-1502 VIS *   
Line 2,848: Line 2,848:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.3l ITEM DESCRIPTION  
ITEM NUMBER :c7.3l ITEM DESCRIPTION
: PUMPS, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCPlB VIS RC FM-86A L-1 RCPlC VIS RHR FM-87A C-6 RHPlA VIS RHR FM-87A C-6 RHPlB VIS I I I I I I I I I I I I I I *   
: PUMPS, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCPlB VIS RC FM-86A L-1 RCPlC VIS RHR FM-87A C-6 RHPlA VIS RHR FM-87A C-6 RHPlB VIS I I I I I I I I I I I I I I *   
* * * ---------------------i  
* * * ---------------------i  
Line 2,862: Line 2,862:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.4o ITEM DESCRIPTION  
ITEM NUMBER :c1.4o ITEM DESCRIPTION
: VALVES, PRESSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= FW FH-68A C-5 FW FM-68A C-3 FW FM-68A C-2 HS FM-64A 8-3 HS FH-64A A-4 MS FH-64A 8-5 MS FM-64A 8-3 MS FM-64A 8-4 HS FM-64A B-6 RETAINING BOUNDARY LINE EXAM NUMBER METHOD ======= ------WFPD109-601 VIS WFPD113-601 VIS WFPD117-601 VIS SHPlOl-601 VIS SHP102-601 VIS SHP103-601 VIS SHP122-601 VIS SHP123-601 VIS SHP124-601 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= ! i I I I 11 11 11 11 Ii I I I i: I   
: VALVES, PRESSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= FW FH-68A C-5 FW FM-68A C-3 FW FM-68A C-2 HS FM-64A 8-3 HS FH-64A A-4 MS FH-64A 8-5 MS FM-64A 8-3 MS FM-64A 8-4 HS FM-64A B-6 RETAINING BOUNDARY LINE EXAM NUMBER METHOD ======= ------WFPD109-601 VIS WFPD113-601 VIS WFPD117-601 VIS SHPlOl-601 VIS SHP102-601 VIS SHP103-601 VIS SHP122-601 VIS SHP123-601 VIS SHP124-601 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= ! i I I I 11 11 11 11 Ii I I I i: I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 2,875: Line 2,875:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* **************************************************************************~*************************
* **************************************************************************~*************************
ITEM NUMBER :c1.4o I ITEM DESCRIPTION  
ITEM NUMBER :c1.4o I ITEM DESCRIPTION
: VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------HS FM-64A D-3 SHP145-601 VIS MS FM-64A D-5 SHP146-601 VIS MS FM-64A D-6 SHP147-601 VIS RHR FH-87A E-6 RH102-602 VIS RHR FH-87A B-6 RH104-602 VIS RHR FH-87A D-6 RH105-602 VIS RHR FM-87A A-3 RH108-602 VIS RHR FM-87A I-5 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS I I I I I   
: VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------HS FM-64A D-3 SHP145-601 VIS MS FM-64A D-5 SHP146-601 VIS MS FM-64A D-6 SHP147-601 VIS RHR FH-87A E-6 RH102-602 VIS RHR FH-87A B-6 RH104-602 VIS RHR FH-87A D-6 RH105-602 VIS RHR FM-87A A-3 RH108-602 VIS RHR FM-87A I-5 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS I I I I I   
* * * ****************************************************************************************************  
* * * ****************************************************************************************************  
Line 2,911: Line 2,911:
REVISION:
REVISION:
0000 *
0000 *
* SURRY POWER STATION UNIT 2 CODE_EDITION  
* SURRY POWER STATION UNIT 2 CODE_EDITION
:eoweo * ****************************************************************************************************
:eoweo * ****************************************************************************************************
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.41 ITEM DESCRIPTION  
ITEM NUMBER :c7.41 ITEM DESCRIPTION
: VALVES, PRESSURE RETAINING BOUNDARY I FLmJ FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== -------======= ------======= ======= I, -------FW FM-68A C-5 WFPD109-601 VIS I I FW FM-68A C-3 WFPD113-601 VIS I I FW FM-68A C-2 WFPDll 7-601 VIS I MS FM-64A B-3 SHPlOl-601 VIS I I MS FM-64A A-4 SHP102-601 VIS I I
: VALVES, PRESSURE RETAINING BOUNDARY I FLmJ FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== -------======= ------======= ======= I, -------FW FM-68A C-5 WFPD109-601 VIS I I FW FM-68A C-3 WFPD113-601 VIS I I FW FM-68A C-2 WFPDll 7-601 VIS I MS FM-64A B-3 SHPlOl-601 VIS I I MS FM-64A A-4 SHP102-601 VIS I I
* MS FM-64A B-5 SHP103-601 VIS I I MS FM-64A B-3 SHP122-601 VIS I MS FM-64A B-4 SHP123-601 VIS MS FM-64A B-6 SHP124-601 VIS *   
* MS FM-64A B-5 SHP103-601 VIS I I MS FM-64A B-3 SHP122-601 VIS I MS FM-64A B-4 SHP123-601 VIS MS FM-64A B-6 SHP124-601 VIS *   
Line 2,929: Line 2,929:
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c1.41 ITEM DESCRIPTION  
ITEM NUMBER :c1.41 ITEM DESCRIPTION
: VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 117151 COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= -------------======= ------------------------MS FM-64A D-3 SHP145-601 VIS MS FM-64A D-5 SHP146-601 VIS MS FM-64A D-6 SHP147-601 VIS RHR FM-87A E-6 RH102-602 VIS RHR FM-87A B-6 RH104-602 VIS
: VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 117151 COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= -------------======= ------------------------MS FM-64A D-3 SHP145-601 VIS MS FM-64A D-5 SHP146-601 VIS MS FM-64A D-6 SHP147-601 VIS RHR FM-87A E-6 RH102-602 VIS RHR FM-87A B-6 RH104-602 VIS
* RHR FM-87A D-6 RH105-602 VIS RHR FM-87A A-3 RH108-602 VIS RHR FM-87A I-5 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS *   
* RHR FM-87A D-6 RH105-602 VIS RHR FM-87A A-3 RH108-602 VIS RHR FM-87A I-5 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS *   
Line 2,942: Line 2,942:
* CATEGORY C-H All PRESSURE RETAINING COMPONENTS  
* CATEGORY C-H All PRESSURE RETAINING COMPONENTS  
* ****************************************************************************************************
* ****************************************************************************************************
ITEM NUMBER :c7.41 ITEM DESCRIPTION  
ITEM NUMBER :c7.41 ITEM DESCRIPTION
: VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------RHR FM-87A C-3 RH112-602 VIS RHR FM-87A B-3 RH114-602 VIS RHR FM-87A D-3 RH116-602 VIS RHR FM-87A C-6 RH118-602 VIS RHR FM-87A G-4 RH119-602 VIS
: VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------RHR FM-87A C-3 RH112-602 VIS RHR FM-87A B-3 RH114-602 VIS RHR FM-87A D-3 RH116-602 VIS RHR FM-87A C-6 RH118-602 VIS RHR FM-87A G-4 RH119-602 VIS
* SI FM-89( J-4 SI249-1502 VIS SI FM-89A B-5 SI248-1502 VIS SI FM-89A B-6 SI249-1502 VIS SI FM-89A B-6 SI352-l502 VIS I I ! I I I I I I I, I I I ! I I I I \1 I I I   
* SI FM-89( J-4 SI249-1502 VIS SI FM-89A B-5 SI248-1502 VIS SI FM-89A B-6 SI249-1502 VIS SI FM-89A B-6 SI352-l502 VIS I I ! I I I I I I I, I I I ! I I I I \1 I I I   
Line 2,969: Line 2,969:
* SURRY .POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY .POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOU FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------cc FM-71B C-7 CC36S-1Sl VIS cc FM-71B G-6 CC366-1Sl VIS cc FM-71B F-7 CC367-1Sl VIS cc FM-71B E-6 CC369-1Sl VIS cc F11-71B D-S CC370-1Sl VIS
RETAINING COMPS. FLOU FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------cc FM-71B C-7 CC36S-1Sl VIS cc FM-71B G-6 CC366-1Sl VIS cc FM-71B F-7 CC367-1Sl VIS cc FM-71B E-6 CC369-1Sl VIS cc F11-71B D-S CC370-1Sl VIS
Line 2,983: Line 2,983:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONEHT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= cc FM-71B G-5 CC375-151 VIS cc FM-71B H-4 CC376-151 VIS cc FM-71B E-4 CC377-151 VIS cc FM-71B B-4 CC378-151 VIS cc FM-71B G-5 CC379-151 VIS
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONEHT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= cc FM-71B G-5 CC375-151 VIS cc FM-71B H-4 CC376-151 VIS cc FM-71B E-4 CC377-151 VIS cc FM-71B B-4 CC378-151 VIS cc FM-71B G-5 CC379-151 VIS
Line 2,997: Line 2,997:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDmlN, PRESS. RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------cc FM-72A E-8 CClS-121 VIS cc FM-72A A-8 CC161-151 VIS cc FM-72A A-7 CC162-151 VIS cc FM-72A A-7 CC163-151 VIS cc FM-72A A-8 CC164-151 VIS cc FM-72A A~8 CC165-151 VIS cc FM-72A C-8 CC166-151 VIS cc FM-72A C-8 CC167-151 VIS cc FM-72A C-8 CC168-151 VIS ---1 I I I I I   
: SUPPORT REACTOR SHUTDmlN, PRESS. RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------cc FM-72A E-8 CClS-121 VIS cc FM-72A A-8 CC161-151 VIS cc FM-72A A-7 CC162-151 VIS cc FM-72A A-7 CC163-151 VIS cc FM-72A A-8 CC164-151 VIS cc FM-72A A~8 CC165-151 VIS cc FM-72A C-8 CC166-151 VIS cc FM-72A C-8 CC167-151 VIS cc FM-72A C-8 CC168-151 VIS ---1 I I I I I   
****************************************************************************************************  
****************************************************************************************************  
Line 3,009: Line 3,009:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== -------======= ------======= ---------------------! cc FM-72A A-6 CC169-151 VIS I I cc FM-72A B-4 CC170-151 VIS I I I cc FM-72A A-5 CC171-151 VIS I I cc FM-72A A-5 CC172-151 VIS I I cc FM-72A D-8 CC173-151 VIS I I
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== -------======= ------======= ---------------------! cc FM-72A A-6 CC169-151 VIS I I cc FM-72A B-4 CC170-151 VIS I I I cc FM-72A A-5 CC171-151 VIS I I cc FM-72A A-5 CC172-151 VIS I I cc FM-72A D-8 CC173-151 VIS I I
Line 3,023: Line 3,023:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMB.ER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------cc FM-72A A-2 CC178-151 VIS cc FM-72A A-3 CC179-151 VIS cc FM-72A A-3 CC180-151 VIS cc FM-72A D-8 CC181-151 VIS cc FM-72A D-3 CC182-151 VIS cc FM-72A C-3 CC183-151 VIS cc FM-72A F-7 CC185-151 VIS cc FM-72A F-4 CC187-151 VIS cc FM-72A F-5 CC188-151 VIS Ii ___ J   
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMB.ER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------cc FM-72A A-2 CC178-151 VIS cc FM-72A A-3 CC179-151 VIS cc FM-72A A-3 CC180-151 VIS cc FM-72A D-8 CC181-151 VIS cc FM-72A D-3 CC182-151 VIS cc FM-72A C-3 CC183-151 VIS cc FM-72A F-7 CC185-151 VIS cc FM-72A F-4 CC187-151 VIS cc FM-72A F-5 CC188-151 VIS Ii ___ J   
Line 3,036: Line 3,036:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------cc FM-72A F-6 CC189-151 VIS cc FM-72A G-7 CC190-151 VIS cc FM-72A G-4 CC192-151 VIS cc FM-72A H-6 CC194-151 VIS cc FM-72A A-2 CC208-151 VIS
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------cc FM-72A F-6 CC189-151 VIS cc FM-72A G-7 CC190-151 VIS cc FM-72A G-4 CC192-151 VIS cc FM-72A H-6 CC194-151 VIS cc FM-72A A-2 CC208-151 VIS
Line 3,049: Line 3,049:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------. cc FM-72A G-1 CC215-151 VIS cc FM-72A H-5 CC219-151 VIS cc FM-72A E-1 CC253-151 VIS cc FM-72A G-8 CC254-151 VIS cc FM-72A G-7 CC272-151 VIS I
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------. cc FM-72A G-1 CC215-151 VIS cc FM-72A H-5 CC219-151 VIS cc FM-72A E-1 CC253-151 VIS cc FM-72A G-8 CC254-151 VIS cc FM-72A G-7 CC272-151 VIS I
Line 3,063: Line 3,063:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (ll7l5) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ---------------------------------------------------cc FM-72B C-2 CCl54-l5l VIS cc FM-72B D-3 CCl55-l5l VIS cc FM-72B D-2 CC186-151 VIS cc FM-72B C-2 CC191-151 VIS cc FM-72B G-2 CC263-l51 VIS
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (ll7l5) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ---------------------------------------------------cc FM-72B C-2 CCl54-l5l VIS cc FM-72B D-3 CCl55-l5l VIS cc FM-72B D-2 CC186-151 VIS cc FM-72B C-2 CC191-151 VIS cc FM-72B G-2 CC263-l51 VIS
Line 3,077: Line 3,077:
* CODE EDITION :aoweo * ****************************************************************************************************
* CODE EDITION :aoweo * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTOOWN,PRESS.
: SUPPORT REACTOR SHUTOOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPOHENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= cc FM-72E H-3 CC146-l5l VIS cc FM-72E I-3 CC148-l5l VIS cc FM-72E E-1 CC72-l21 VIS cc FM-72F D-3 CC149-l51 VIS cc FM-72F B-3 CC152-l21 VIS cc FM-72F E-3 CC156-l51 VIS cc FM-72F D-2 CC159-l51 VIS cc FM-72F D-3 CC160-151 VIS cc FM-72F C-2 CC163-l5l VIS ----I I I I I I I i I I I I I I I I I; II II 11 I 11 I *1 I I: I I I I   
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPOHENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= cc FM-72E H-3 CC146-l5l VIS cc FM-72E I-3 CC148-l5l VIS cc FM-72E E-1 CC72-l21 VIS cc FM-72F D-3 CC149-l51 VIS cc FM-72F B-3 CC152-l21 VIS cc FM-72F E-3 CC156-l51 VIS cc FM-72F D-2 CC159-l51 VIS cc FM-72F D-3 CC160-151 VIS cc FM-72F C-2 CC163-l5l VIS ----I I I I I I I i I I I I I I I I I; II II 11 I 11 I *1 I I: I I I I   
Line 3,090: Line 3,090:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM -LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------cc FM-72F B-3 CC181-121 VIS CH FM-88B L-4 CH342-152 VIS CH FM-88B L-4 CH356-152 VIS CH FM-88B K-4 CH357-152 VIS CH FM-88B J-4 CH358-152 VIS
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM -LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------cc FM-72F B-3 CC181-121 VIS CH FM-88B L-4 CH342-152 VIS CH FM-88B L-4 CH356-152 VIS CH FM-88B K-4 CH357-152 VIS CH FM-88B J-4 CH358-152 VIS
Line 3,105: Line 3,105:
* SURRY POWER STATION UNIT 2 CODE EDITION :aoW80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aoW80 * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== ======= ======= ------======= -------I -------1, FW FM-68A D-7 WAPD103-601 VIS I FW FM-68A D-6 WAPD104-601 VIS I I FW FM-68A E-6 WAPD105-601 VIS I FW FM-68A E-6 WAPD106-60 VIS I I FW FM-68A F-6 WAPD107-601 VIS I
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== ======= ======= ------======= -------I -------1, FW FM-68A D-7 WAPD103-601 VIS I FW FM-68A D-6 WAPD104-601 VIS I I FW FM-68A E-6 WAPD105-601 VIS I FW FM-68A E-6 WAPD106-60 VIS I I FW FM-68A F-6 WAPD107-601 VIS I
Line 3,119: Line 3,119:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NU~IBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------FW FM-68A B-6 WAPD112-60l VIS FW FM-68A B-6 WAPD113-60l VIS FW FM-68A B-6 WAPD114-601 VIS FW FM-68A D-7 WAPDllS-601 VIS FW FM-68A D-6 ~IAPD116-151 VIS FW FM-68A E-7 WAPDll 7-601 VIS FW FM-68A F-6 WAPD118-151 VIS FW FM-68A F-L WAPD119-151 VIS FW FM-68A F-7 WAPD120-601 VIS I I I ! J, I I I I J   
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NU~IBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------FW FM-68A B-6 WAPD112-60l VIS FW FM-68A B-6 WAPD113-60l VIS FW FM-68A B-6 WAPD114-601 VIS FW FM-68A D-7 WAPDllS-601 VIS FW FM-68A D-6 ~IAPD116-151 VIS FW FM-68A E-7 WAPDll 7-601 VIS FW FM-68A F-6 WAPD118-151 VIS FW FM-68A F-L WAPD119-151 VIS FW FM-68A F-7 WAPD120-601 VIS I I I ! J, I I I I J   
Line 3,132: Line 3,132:
* SURRY POWER STATION UNIT 2 COD~ EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 COD~ EDITION :aowao * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -----------------------------------------------------------------------FW FM-68A G-6 WAPD12l-151 VIS FW FM-68A B-7 WAPD150-601 VIS FW FM-68A B-L WAPD151-601 VIS FW FM-68A C-6 WAPD52-601 VIS FW FM-68A G-8 WCMU-151 VIS
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -----------------------------------------------------------------------FW FM-68A G-6 WAPD12l-151 VIS FW FM-68A B-7 WAPD150-601 VIS FW FM-68A B-L WAPD151-601 VIS FW FM-68A C-6 WAPD52-601 VIS FW FM-68A G-8 WCMU-151 VIS
Line 3,146: Line 3,146:
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
* CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************
ITEM NUMBER :01.10 ITEM DESCRIPTION  
ITEM NUMBER :01.10 ITEM DESCRIPTION
: SUPPORT REACTOR SHUTDOWN,PRESS.
: SUPPORT REACTOR SHUTDOWN,PRESS.
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= FW FM-68A E-8 WCMU108-151 VIS FW FM-68A E-8 WCt!Ull0-151 VIS FW FM-68A F-8 WEMU109-151 VIS MS FM-64A B-4 SHP125-601 VIS MS FM-64A B-6 SHP126-601 VIS
RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= FW FM-68A E-8 WCMU108-151 VIS FW FM-68A E-8 WCt!Ull0-151 VIS FW FM-68A F-8 WEMU109-151 VIS MS FM-64A B-4 SHP125-601 VIS MS FM-64A B-6 SHP126-601 VIS
Line 3,160: Line 3,160:
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
* CATEGORY 0-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
* CATEGORY 0-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
ITEM NUMBER :02.10 I ITEM DESCRIPTION  
ITEM NUMBER :02.10 I ITEM DESCRIPTION
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN I FLOW FLOW SYSTEM/ D!AGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= I ----------------cc FM-71B B-1 WS179-21B VIS I I I SW FM-71A E-6 WClOl-10 VIS I SW FM-71A E-6 WC102-10 VIS l1 SW FM-71A F-6 WC103-l0 VIS I I SW FM-71A F-6 WC104-10 VIS I
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN I FLOW FLOW SYSTEM/ D!AGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= I ----------------cc FM-71B B-1 WS179-21B VIS I I I SW FM-71A E-6 WClOl-10 VIS I SW FM-71A E-6 WC102-10 VIS l1 SW FM-71A F-6 WC103-l0 VIS I I SW FM-71A F-6 WC104-10 VIS I
* SW FM-71A C-7 WSlOl-10 VIS I SW FM-71A C-7 ~lS102-10 VIS SW FM-71A C-7 WS104-10 VIS SW FM-71A E-7 WS121-10 VIS *   
* SW FM-71A C-7 WSlOl-10 VIS I SW FM-71A C-7 ~lS102-10 VIS SW FM-71A C-7 WS104-10 VIS SW FM-71A E-7 WS121-10 VIS *   
Line 3,173: Line 3,173:
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
* CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
* CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
ITEM NUMBER :02.10 ITEM DESCRIPTION  
ITEM NUMBER :02.10 ITEM DESCRIPTION
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------SW FH-71A D-6 WS122-10 VIS SW FH-71A 8-7 WS123-10 VIS SW Fl1-71A 8-7 WS124-10 VIS SW FH-71A A-3 WS126-10 VIS SW FH-71A B-3 WS128-10 VIS
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------SW FH-71A D-6 WS122-10 VIS SW FH-71A 8-7 WS123-10 VIS SW Fl1-71A 8-7 WS124-10 VIS SW FH-71A A-3 WS126-10 VIS SW FH-71A B-3 WS128-10 VIS
* SW FM-71A C-3 WS130-10 VIS SW FM-71A C-3 WS132-10 VIS SW FH-71A A-3 WS133-10 VIS SW FH-71A B-3 ~lS134-10 VIS *   
* SW FM-71A C-3 WS130-10 VIS SW FM-71A C-3 WS132-10 VIS SW FH-71A A-3 WS133-10 VIS SW FH-71A B-3 ~lS134-10 VIS *   
Line 3,186: Line 3,186:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
* CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
ITEM NUMBER :02.10 ITEM DESCRIPTION  
ITEM NUMBER :02.10 ITEM DESCRIPTION
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM* LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------SW FM-71A B-3 ~IS135-10 VIS SW FM'-71A C-3 WS136-10 VIS SW FM-71A D-3 WS137-10 VIS SW FM-71A 0-3 WS138-10 VIS SW FM-71B D-8 WS170-136 VIS SW FM-71B D-8 WS171-136 VIS SW FM-71B G-8 WS172-136 VIS SW FM-71B G-8 WS173-136 VIS SW FM-71B D-7 WS174-21B VIS I I I i I I I, i, I 1. :i   
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM* LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------SW FM-71A B-3 ~IS135-10 VIS SW FM'-71A C-3 WS136-10 VIS SW FM-71A D-3 WS137-10 VIS SW FM-71A 0-3 WS138-10 VIS SW FM-71B D-8 WS170-136 VIS SW FM-71B D-8 WS171-136 VIS SW FM-71B G-8 WS172-136 VIS SW FM-71B G-8 WS173-136 VIS SW FM-71B D-7 WS174-21B VIS I I I i I I I, i, I 1. :i   
****************************************************************************************************  
****************************************************************************************************  
Line 3,198: Line 3,198:
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
* CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
* CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************
ITEM NUMBER :02.10 ITEM DESCRIPTION  
ITEM NUMBER :02.10 ITEM DESCRIPTION
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW I: SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------------------------------------SW FM-71B G-7 WS175-21B VIS I I SW FM-71B E-8 WS176-21B VIS I SW FM-71B B-6 WS178-136 VIS I I SW FH-71B H-1 WS180-21B VIS SW FM-71B D-1 WS181-21B VIS
: ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW I: SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------------------------------------SW FM-71B G-7 WS175-21B VIS I I SW FM-71B E-8 WS176-21B VIS I SW FM-71B B-6 WS178-136 VIS I I SW FH-71B H-1 WS180-21B VIS SW FM-71B D-1 WS181-21B VIS
* SW FM-71B H-1 WS182-21B VIS SW FM-716 E-1 WS183-21B VIS SW FM-71B A-1 WS185-21B VIS SW Fl1-71B D-1 WS186-21B VIS *   
* SW FM-71B H-1 WS182-21B VIS SW FM-716 E-1 WS183-21B VIS SW FM-71B A-1 WS185-21B VIS SW Fl1-71B D-1 WS186-21B VIS *   
Line 3,394: Line 3,394:
Proposed installation date is 12/1/83 .   
Proposed installation date is 12/1/83 .   
* *
* *
* PUMPS 2-RH-P-lA 2-RH-P-lB RELIEF REQUEST 7 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED  
* PUMPS 2-RH-P-lA 2-RH-P-lB RELIEF REQUEST 7 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED
: 1) Frequency of Pump Test. 2) Measure Lubrication Level or Pressure BASIS FOR REQUEST 17 It is considered impractical to make a containment entry on a quarterly bases in order to test these pumps. These pumps are not engineered safetr feature pumps. Operability will be determined each cold shutdown when system is placed into operation, (but not more frequently than every three months). ALTERNATE TESTING PROPOSED Pump will be tested each cold shutdown (but not more frequently than every three months) *   
: 1) Frequency of Pump Test. 2) Measure Lubrication Level or Pressure BASIS FOR REQUEST 17 It is considered impractical to make a containment entry on a quarterly bases in order to test these pumps. These pumps are not engineered safetr feature pumps. Operability will be determined each cold shutdown when system is placed into operation, (but not more frequently than every three months). ALTERNATE TESTING PROPOSED Pump will be tested each cold shutdown (but not more frequently than every three months) *   
* *
* *
Line 3,401: Line 3,401:
No flow rate measurement device is currently installed.
No flow rate measurement device is currently installed.
At this time, a method for collecting repeatable flow data has not been determined.
At this time, a method for collecting repeatable flow data has not been determined.
The evaluation is still in progress.  
The evaluation is still in progress.
: 2) Design Change has been initiated.
: 2) Design Change has been initiated.
Proposed completion date is 12/1/83 .   
Proposed completion date is 12/1/83 .   
Line 3,443: Line 3,443:
* administration and execution of the Valve Inservice Program. The Program will be officially implemented on December 22, 1982 and will govern valve testing for a 120 month period. Prior to end of 120 month period, the program will be reviewed and upgraded to assure continued compliance with iO CFR 50.SSa (g) (4). The program will be updated a minumum of at least once every 40 months or for a new system, relief request, etc. To insure compliance of the Valve Program, a training program will be established for inservice test personnel.
* administration and execution of the Valve Inservice Program. The Program will be officially implemented on December 22, 1982 and will govern valve testing for a 120 month period. Prior to end of 120 month period, the program will be reviewed and upgraded to assure continued compliance with iO CFR 50.SSa (g) (4). The program will be updated a minumum of at least once every 40 months or for a new system, relief request, etc. To insure compliance of the Valve Program, a training program will be established for inservice test personnel.
VALVE INSERVICE TEST TABLES The Valve Tept Tables are the essence of the Valve Program to meet ASME Section XI, Subsection IWV requirements.
VALVE INSERVICE TEST TABLES The Valve Tept Tables are the essence of the Valve Program to meet ASME Section XI, Subsection IWV requirements.
The tables reflect the positions taken in support of the relief requests to aid the reader in the interpretation of the Tables, brief explanations of the Table headings and abbreviatoins are provided.  
The tables reflect the positions taken in support of the relief requests to aid the reader in the interpretation of the Tables, brief explanations of the Table headings and abbreviatoins are provided.
: 1) 2) 3) 4) 5) Valve Number -Each valve in the plant has a unique "tag" number which identifies the system to which the equipment belongs and type of equipment.
: 1) 2) 3) 4) 5) Valve Number -Each valve in the plant has a unique "tag" number which identifies the system to which the equipment belongs and type of equipment.
Drawing Locaton -The specific coordinates of each valve. are supplied to facilitate location of the valves on the flow diagrams provided.
Drawing Locaton -The specific coordinates of each valve. are supplied to facilitate location of the valves on the flow diagrams provided.
Line 3,544: Line 3,544:
See valves affected by this relief are identified by Table C. Class: Function:
See valves affected by this relief are identified by Table C. Class: Function:
Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 32 Opening these valves during power operation would introduce cold auxiliary feedwater to the steam generators resulting in thermal stress and possible degradation
Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 32 Opening these valves during power operation would introduce cold auxiliary feedwater to the steam generators resulting in thermal stress and possible degradation
* Alternate Testing Proposed Exercise these valves for operability every cold shutdown .(but not more frequently than every three months) .
* Alternate Testing Proposed Exercise these valves for operability every cold shutdown .(but not more frequently than every three months) .
:; 33 .-.. ' *~
:; 33 .-.. ' *~
* TABLE C Valve Category Class Function 2-FW-27 C 2 Auxiliary Feedwater Header Check 2-FW-58 Valves at Main Feedwater Header. 2-FW-59 2-FW-131 C 2 Auxiliary Feedwater Header 2-FW-133 Check Valves at Containment 2-FW-136 Penetration.
* TABLE C Valve Category Class Function 2-FW-27 C 2 Auxiliary Feedwater Header Check 2-FW-58 Valves at Main Feedwater Header. 2-FW-59 2-FW-131 C 2 Auxiliary Feedwater Header 2-FW-133 Check Valves at Containment 2-FW-136 Penetration.
Line 3,668: Line 3,668:
Category:
Category:
Class: Safety Injection MOV-2890G A 2 RELIEF REQUEST 22 Function:
Class: Safety Injection MOV-2890G A 2 RELIEF REQUEST 22 Function:
Low Head Safety Injection to Reactor Coolant System Cold Legs Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 55 In accordance with Technical Specification_  
Low Head Safety Injection to Reactor Coolant System Cold Legs Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 55 In accordance with Technical Specification_
: 3. 3 .A. 9, during power operation, the A.C. power shall be removed from MOV-2890C with valve in open position.
: 3. 3 .A. 9, during power operation, the A.C. power shall be removed from MOV-2890C with valve in open position.
If this valve was stroked during power operations and failed in the closed position, Low Head Safety Injection System would be rendered inoperable.
If this valve was stroked during power operations and failed in the closed position, Low Head Safety Injection System would be rendered inoperable.
Line 3,737: Line 3,737:
* *
* *
* 67 4.0 REPORTING OF INSERVICE TEST RESULTS 4.1 Pump Inservice Program Records of Pump Inservice Test Results will be in accordance with the intent of Article IWP-6000.
* 67 4.0 REPORTING OF INSERVICE TEST RESULTS 4.1 Pump Inservice Program Records of Pump Inservice Test Results will be in accordance with the intent of Article IWP-6000.
Files will be established for each pump and will include: 1) Pump identification by equipment number, manufacturer and serial number. 2) The record of test shall include *.* a. date of test b. measured and observed quantities  
Files will be established for each pump and will include: 1) Pump identification by equipment number, manufacturer and serial number. 2) The record of test shall include *.* a. date of test b. measured and observed quantities
: c. identification of instruments used, d. comparison with allowable ranges of test valves and analysis of deviations  
: c. identification of instruments used, d. comparison with allowable ranges of test valves and analysis of deviations
: e. requirements for corrective actions f. conducting and analyzing the test 3) Inservice test plans. This may be by surveillance test procedure by which the pump is tested with reference drawing . 4) Summaries of corrective action some by maintenance report number, etc. The Pump Inservice Test Program, associated surveillance test procedures and results will be kept at Surry Power Station. They will be available for audit by Authorized Nuclear Inspector and the NRC. 4.2 Valve Inservice Program Records of Valve Inservice Test Results will be in accordance with the intent of Article IWV-6000, files will be established for each valve and will include *.. 1) Valve identification by equipment number, manufacturer, size, valve type, actuator type. 2) The record of test shall include: a. date of test b. measured and observes quantities where applicable  
: e. requirements for corrective actions f. conducting and analyzing the test 3) Inservice test plans. This may be by surveillance test procedure by which the pump is tested with reference drawing . 4) Summaries of corrective action some by maintenance report number, etc. The Pump Inservice Test Program, associated surveillance test procedures and results will be kept at Surry Power Station. They will be available for audit by Authorized Nuclear Inspector and the NRC. 4.2 Valve Inservice Program Records of Valve Inservice Test Results will be in accordance with the intent of Article IWV-6000, files will be established for each valve and will include *.. 1) Valve identification by equipment number, manufacturer, size, valve type, actuator type. 2) The record of test shall include: a. date of test b. measured and observes quantities where applicable
: c. identification of instruments used where applicable   
: c. identification of instruments used where applicable   
*
*
Line 3,795: Line 3,795:
* 5-11   
* 5-11   
* *
* *
* RELIEF REQUESTS Relief Requests from code required system pressure tests will be in the following format: 1. Identification of the component for which relief is requested:  
* RELIEF REQUESTS Relief Requests from code required system pressure tests will be in the following format: 1. Identification of the component for which relief is requested:
: a. Name and number as located on station drawings.  
: a. Name and number as located on station drawings.
: b. Function c. ASME code class 2. Specific identification of the ASME code requirements that has determined to be impractical for each component.  
: b. Function c. ASME code class 2. Specific identification of the ASME code requirements that has determined to be impractical for each component.
: 3. Information to support the determination that the requirement in (2) is impractical; i.e. the basis of the relief. 4. Specification of the in-service pressure testing that will be performed in lieu of the ASME Code Section XI requirements, if any. 5. The schedule for implementation of the procedure(s) in (4)
: 3. Information to support the determination that the requirement in (2) is impractical; i.e. the basis of the relief. 4. Specification of the in-service pressure testing that will be performed in lieu of the ASME Code Section XI requirements, if any. 5. The schedule for implementation of the procedure(s) in (4)
* 5-12   
* 5-12   
Line 3,809: Line 3,809:
* 5-14
* 5-14
* RR-3 *
* RR-3 *
* la) Pumps located on station drawing 11548-FM-88C as listed: 2-RC-P-lA 2-RC-P-lB 2-RC-P-lC Piping associated from the flange to the pump. b) Chemical volume control system c) Class I 2. Class I System Hydrostatic Test, IWB-5222 3. The number one seal return is the pressure boundary for the reactor coolant pumps. The nature of the design of this system precludes the use of an external pressure source for this test; as excessive pressure could damage the seal. 4. The normal system leakage tests and VT-2 examination of the piping from the flanges to the pumps will be adequate, and an alternative test is not necessary.  
* la) Pumps located on station drawing 11548-FM-88C as listed: 2-RC-P-lA 2-RC-P-lB 2-RC-P-lC Piping associated from the flange to the pump. b) Chemical volume control system c) Class I 2. Class I System Hydrostatic Test, IWB-5222 3. The number one seal return is the pressure boundary for the reactor coolant pumps. The nature of the design of this system precludes the use of an external pressure source for this test; as excessive pressure could damage the seal. 4. The normal system leakage tests and VT-2 examination of the piping from the flanges to the pumps will be adequate, and an alternative test is not necessary.
: 5. N/A 5-15
: 5. N/A 5-15
* RR-4 *
* RR-4 *
Line 3,816: Line 3,816:
* RR-5 *
* RR-5 *
* la) Piping and valves as listed, located on station print 11548-FM-88C:
* la) Piping and valves as listed, located on station print 11548-FM-88C:
HCV-2311 to 2-CH-313 b) Chemical and Volume Control System c) Class I 2. Class I System Hydrostatic Test, IWB-5222.  
HCV-2311 to 2-CH-313 b) Chemical and Volume Control System c) Class I 2. Class I System Hydrostatic Test, IWB-5222.
: 3. The one-way check valve placement prevents pressurization of the area in between the valves when conducting IWB-5222 on the primary system. 4. Alternate testing will be proposed at a later date. 5. End of interval, within last period
: 3. The one-way check valve placement prevents pressurization of the area in between the valves when conducting IWB-5222 on the primary system. 4. Alternate testing will be proposed at a later date. 5. End of interval, within last period
* 5-17 *
* 5-17 *
* RR-6 *
* RR-6 *
* la) Piping and valves located on station print 11548-FM-87A Component MOV-2701 b) Residual Heat Removal c) Class I Connected Piping 14"-RH-101-1502  
* la) Piping and valves located on station print 11548-FM-87A Component MOV-2701 b) Residual Heat Removal c) Class I Connected Piping 14"-RH-101-1502
: 2. Class I System Hydrostatic Test, IWB-5222 Component MOV-2700 3. During a normal hydrostatic test of the primary, MOV-2700 is closed in addition to MOV-2701.
: 2. Class I System Hydrostatic Test, IWB-5222 Component MOV-2700 3. During a normal hydrostatic test of the primary, MOV-2700 is closed in addition to MOV-2701.
This prevents pressurization of MOV-2701 and the piping between the two MOVs. Both valves are closed to prevent possible overpressurization of the Residual Heat Removal System. 4. As an alternative, MOV-2701 and the p1p1ng between MOV-2701 and MOV-2700 will be tested in accordance with the Class II hydrostatic test to be administered to 14"-RH-118-602 on the suction side of the Residual Heat Removal pumps. This piping is protected from overpressure by RV-2721 which is set at 600 psig. Class II test pressure will be* 750 psig. A VT-2 examination at this test pressure will identify any leakage and eliminate the overpressurization risk the Class I hydrostatic test presented . 5. End of interval, within the last period
This prevents pressurization of MOV-2701 and the piping between the two MOVs. Both valves are closed to prevent possible overpressurization of the Residual Heat Removal System. 4. As an alternative, MOV-2701 and the p1p1ng between MOV-2701 and MOV-2700 will be tested in accordance with the Class II hydrostatic test to be administered to 14"-RH-118-602 on the suction side of the Residual Heat Removal pumps. This piping is protected from overpressure by RV-2721 which is set at 600 psig. Class II test pressure will be* 750 psig. A VT-2 examination at this test pressure will identify any leakage and eliminate the overpressurization risk the Class I hydrostatic test presented . 5. End of interval, within the last period
* 5-18
* 5-18
* RR-7 *
* RR-7 *
* la) Piping and valves located on station print 11548-FM-87A Component MOV-2701 b) Residual Heat Removal c) Class I Connected Piping 14"-RH-101-1502  
* la) Piping and valves located on station print 11548-FM-87A Component MOV-2701 b) Residual Heat Removal c) Class I Connected Piping 14"-RH-101-1502
: 2. Class I System Leakage Test, IWB-5221 Component MOV-2700 3. The system leakage test conducted on the primary system is done with both MOV-2700 and MOV-2701 closed for reasons expounded upon in Relief Request 6. This prevents pressurization of MOV-2701 and piping between the two MOVs. 4. As an alternative during the conduct of the Class II functional test on 14"-RH-118-602, MOV-2701 will be open as well as MOV-2700.
: 2. Class I System Leakage Test, IWB-5221 Component MOV-2700 3. The system leakage test conducted on the primary system is done with both MOV-2700 and MOV-2701 closed for reasons expounded upon in Relief Request 6. This prevents pressurization of MOV-2701 and piping between the two MOVs. 4. As an alternative during the conduct of the Class II functional test on 14"-RH-118-602, MOV-2701 will be open as well as MOV-2700.
This piping will be examined to the normal VT-2 requirements at the functional test conditions.  
This piping will be examined to the normal VT-2 requirements at the functional test conditions.
: 5. Once per inspection period
: 5. Once per inspection period
* 5-19
* 5-19
Line 3,864: Line 3,864:
2"-SI-274-1502 b) Safety Injection System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 Component 2-SI-243 2-SI-241 2-SI-242 2-SI-229 . 2"-SI-281-1502 6"-SI-249-1502 2-SI-240 2-SI-227 2-SI-226 2-SI-237 2-SI-250 2-SI-236 2-SI-248 2-SI-235 2-SI-245 3. Check valve boundaries between Class II and Class I systems make it impractical to establish hydrostatic test boundaries so that the primary system is not included.
2"-SI-274-1502 b) Safety Injection System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 Component 2-SI-243 2-SI-241 2-SI-242 2-SI-229 . 2"-SI-281-1502 6"-SI-249-1502 2-SI-240 2-SI-227 2-SI-226 2-SI-237 2-SI-250 2-SI-236 2-SI-248 2-SI-235 2-SI-245 3. Check valve boundaries between Class II and Class I systems make it impractical to establish hydrostatic test boundaries so that the primary system is not included.
Design pressure for this piping is 2800 psig (PD), therefore, normal test pressure would be 3080 psig (T~200&deg;F).
Design pressure for this piping is 2800 psig (PD), therefore, normal test pressure would be 3080 psig (T~200&deg;F).
This pressure would overpressurize the primary since it cannot be isolated.  
This pressure would overpressurize the primary since it cannot be isolated.
: 4. As an alternative, these systems will be tested in conjunction with the Class I Hydrostatic test at a pressure of 2335 psig. A VT-2 examination will be performed on the components and piping listed above . 5. Once each period. 5-26 ie RR-12 *
: 4. As an alternative, these systems will be tested in conjunction with the Class I Hydrostatic test at a pressure of 2335 psig. A VT-2 examination will be performed on the components and piping listed above . 5. Once each period. 5-26 ie RR-12 *
* la) Piping and valves located on station print 11548-FM-89b; Component MOV-2865A 2-SI-105 MOV-2865B 2-SI-126 MOV-2865C 2-SI-143 Connected Piping 12"-:-SI-245-1502 3/4"-SI-233-1502 12"-SI-246-1502 3/4"-SI-234-1502 12"-SI-247-1502 3/4"-SI-235-1502 b) Safety Injection System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 Component 2-SI-107 2-SI-107 2-SI-128 2-SI-128 2-SI-145 2-SI-145 3. The check valve boundary prevents isolation of the adjoining Class I* system from the Class II system mentioned.
* la) Piping and valves located on station print 11548-FM-89b; Component MOV-2865A 2-SI-105 MOV-2865B 2-SI-126 MOV-2865C 2-SI-143 Connected Piping 12"-:-SI-245-1502 3/4"-SI-233-1502 12"-SI-246-1502 3/4"-SI-234-1502 12"-SI-247-1502 3/4"-SI-235-1502 b) Safety Injection System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 Component 2-SI-107 2-SI-107 2-SI-128 2-SI-128 2-SI-145 2-SI-145 3. The check valve boundary prevents isolation of the adjoining Class I* system from the Class II system mentioned.
The lack of overpressure protection within the boundary requires a valve PD (Design Pressure) equal to 2485 psig times 1.1 (T'200&deg;F) for a test pressure of 2733.5 psig. The nominal operating pressure PO for the adjoining Class I system is 660 psig which at 100&deg;F requires a test pressure of 726 psig. As is evident, since isolation is not practical, the Class II test pressure will be far in excess of the test pressure for the Class I system
The lack of overpressure protection within the boundary requires a valve PD (Design Pressure) equal to 2485 psig times 1.1 (T'200&deg;F) for a test pressure of 2733.5 psig. The nominal operating pressure PO for the adjoining Class I system is 660 psig which at 100&deg;F requires a test pressure of 726 psig. As is evident, since isolation is not practical, the Class II test pressure will be far in excess of the test pressure for the Class I system
* 4. As an alternative, it is requested that the Class II components and piping mentioned in (la) be examined (VT2) to the conditions required for the adjacent Class I piping. (PO= 660 psig) (See Note 3) 5. End of interval, within the last period . 5-27 RR-13 * * ** la) Piping and valves located on station print 11548-FM-84A.
* 4. As an alternative, it is requested that the Class II components and piping mentioned in (la) be examined (VT2) to the conditions required for the adjacent Class I piping. (PO= 660 psig) (See Note 3) 5. End of interval, within the last period . 5-27 RR-13 * * ** la) Piping and valves located on station print 11548-FM-84A.
Component Connected Piping Component 2-CS-48 6"-CS-115-152 2-CS-47 6"-CS-114-152 2-CS-46 2 "-CS-119-152 2-CS-45 b) Containment and Recirculation Spray System c) Class II 2. Class II System Hydrostatic Test, IWC-5222(a)  
Component Connected Piping Component 2-CS-48 6"-CS-115-152 2-CS-47 6"-CS-114-152 2-CS-46 2 "-CS-119-152 2-CS-45 b) Containment and Recirculation Spray System c) Class II 2. Class II System Hydrostatic Test, IWC-5222(a)
: 3. Tank 2-CS-TK-l (RWST) and piping up to 2-CS-48 will be tested to system hydrostatic test criteria of IWC-5222(b,c).
: 3. Tank 2-CS-TK-l (RWST) and piping up to 2-CS-48 will be tested to system hydrostatic test criteria of IWC-5222(b,c).
The piping and components in la attach to the system and are included only do to the requirements of Reg. Guide 1.26 (Feb. 1976) to include piping up to the first valve that is either normally closed or capable of automatic closure. Since the requirements of IWC-5222 (b, c) can only be applied from the RWST to 2-CS-48, the piping mentioned in la must be tested in accordance with IWC-5222(a).
The piping and components in la attach to the system and are included only do to the requirements of Reg. Guide 1.26 (Feb. 1976) to include piping up to the first valve that is either normally closed or capable of automatic closure. Since the requirements of IWC-5222 (b, c) can only be applied from the RWST to 2-CS-48, the piping mentioned in la must be tested in accordance with IWC-5222(a).
This test would be excessive since the piping would only see pressure associated with the RWST when performing its safety function.  
This test would be excessive since the piping would only see pressure associated with the RWST when performing its safety function.
: 4. As an alternative, it is requ_ested that the piping and components mentioned in la be tested to the requirements of IWC-5222 (b, c) associated with 2-CS-TK-l (RWST)
: 4. As an alternative, it is requ_ested that the piping and components mentioned in la be tested to the requirements of IWC-5222 (b, c) associated with 2-CS-TK-l (RWST)
* 5. End of interval, within the last period
* 5. End of interval, within the last period
Line 3,880: Line 3,880:
Recirculation Spray Heat Exchangers 2-RS-E-lA 2-RS-E-lB 2-RS-E-lC 2-RS-E-lD Associated Piping Between Below Listed Valves Connecting Heat Exchangers MOV-SW-205A,MOV-SW-204A MOV-SW-205B,MOV-SW-204B MOV-SW-205C,MOV-SW-204C MOV-SW-205D,MOV-SW-204D b) Circulating and Service Water System c) Class II 2. Class III System Hydrostatic Test, IWD-5223 3. The design specification for this component (station # NUS 85) limits the recirculation spray coolers to design pressure (25 psig) and temperature between 42 and 95&deg;F. Under the conditions specifieQ in IWD-5223(a), a value 1.1 times the design pressure or 27.5 psig must be used as test pressure.
Recirculation Spray Heat Exchangers 2-RS-E-lA 2-RS-E-lB 2-RS-E-lC 2-RS-E-lD Associated Piping Between Below Listed Valves Connecting Heat Exchangers MOV-SW-205A,MOV-SW-204A MOV-SW-205B,MOV-SW-204B MOV-SW-205C,MOV-SW-204C MOV-SW-205D,MOV-SW-204D b) Circulating and Service Water System c) Class II 2. Class III System Hydrostatic Test, IWD-5223 3. The design specification for this component (station # NUS 85) limits the recirculation spray coolers to design pressure (25 psig) and temperature between 42 and 95&deg;F. Under the conditions specifieQ in IWD-5223(a), a value 1.1 times the design pressure or 27.5 psig must be used as test pressure.
No substantial gain would be realized at the required test pressure of 27.5 psig considering the design limitation of 25 psig
No substantial gain would be realized at the required test pressure of 27.5 psig considering the design limitation of 25 psig
* 4. As an alternative, it is requested that the test pressure for IWD-5223 Class III system hydrostatic test be the design pressure 25 psig. The normal VT-2 examination will be conducted at this pressure.  
* 4. As an alternative, it is requested that the test pressure for IWD-5223 Class III system hydrostatic test be the design pressure 25 psig. The normal VT-2 examination will be conducted at this pressure.
: 5. End of interval, within the last period . 5-29
: 5. End of interval, within the last period . 5-29
* RR-15 *
* RR-15 *
Line 3,891: Line 3,891:
* RR-17 *
* RR-17 *
* la) Steam Generators located on station print 11448-FM-86A.
* la) Steam Generators located on station print 11448-FM-86A.
2-RC-E-lA 2-RC-E-lB 2-RC-E-lC b) Reactor Coolant System c) Class I 2. System Leakage Test, IWB-5221 System Hydrostatic Test, IWB-5222 Visual Examination, IWA-5240 3. Primary to secondary leakage detection using code described visual detection techniques would be limited in usefulness and hazardous to conduct. 4. The normal primary to secondary leakage surveillance requirements of the plant's technical specifications provide the necessary intended code examination requirements for leakage identification.  
2-RC-E-lA 2-RC-E-lB 2-RC-E-lC b) Reactor Coolant System c) Class I 2. System Leakage Test, IWB-5221 System Hydrostatic Test, IWB-5222 Visual Examination, IWA-5240 3. Primary to secondary leakage detection using code described visual detection techniques would be limited in usefulness and hazardous to conduct. 4. The normal primary to secondary leakage surveillance requirements of the plant's technical specifications provide the necessary intended code examination requirements for leakage identification.
: 5. In accordance with Technical Specifications at Surry . 5-32
: 5. In accordance with Technical Specifications at Surry . 5-32
* RR-18 *
* RR-18 *
* la) Piping and components located on the following prints: 11548-FM-72A 11548-FM-72B 11548-FM-72C b) Component Cooling c) Class III 2. System Hydrostatic Test, IWD-5223 3. Component Cooling is utilized for cooling important safety related components associated with the nuclear core. This system cannot be isolated in most instances without removing fuel totally from the core. This action would be time consuming and delay unnecessarily the refueling process. 4. As an alternative systems, which can be isolated from the main flow pa.th and which do not place the station in violation of its technical specifications, while the core is loaded, will be hydrostatically tested in accordance with IWD-5223.
* la) Piping and components located on the following prints: 11548-FM-72A 11548-FM-72B 11548-FM-72C b) Component Cooling c) Class III 2. System Hydrostatic Test, IWD-5223 3. Component Cooling is utilized for cooling important safety related components associated with the nuclear core. This system cannot be isolated in most instances without removing fuel totally from the core. This action would be time consuming and delay unnecessarily the refueling process. 4. As an alternative systems, which can be isolated from the main flow pa.th and which do not place the station in violation of its technical specifications, while the core is loaded, will be hydrostatically tested in accordance with IWD-5223.
Systems which cannot be isolated will be tested in accordance with HID-5221, which will be normally conducted, and will be more than sufficient.
Systems which cannot be isolated will be tested in accordance with HID-5221, which will be normally conducted, and will be more than sufficient.
Determination of testing will be done with emphasis on practicality, and in conducting IWD-5223 System Hydrostatic Test whenever possible; it should be noted that this is an upgrade of testing requirements over the first 10 year interval.  
Determination of testing will be done with emphasis on practicality, and in conducting IWD-5223 System Hydrostatic Test whenever possible; it should be noted that this is an upgrade of testing requirements over the first 10 year interval.
: 5. End of the interval within the last period . 5-33 RR-19
: 5. End of the interval within the last period . 5-33 RR-19
* la) Piping and components located on the following print: 11548-FM-71B b) Service Water c) Class III 2. System Hydrostatic Test, IWD-5223 3. The service water system as seen on the above mentioned drawing is used for cooling component cooling for the charging pumps and lube oil for the charging pumps. The system was designed without the use of a safety or relief valve due to the. low pressure output of the charging pump service water pumps which is 29 psig (max.) The maximum possible pressure source for the system would occur if an extensive heat exchanger leak occurred at either 2-SW-E-lA or lB between component cooling and service water. This pressure could be no more than 50 psig the maximum discharge pressure of 2-CC-P-2A or 2B. It is felt that having to use PD or 100 psig would be excessive for this system as the maximum pressure potential is 50 psig. 4. As an alternative, it is requested that 50 psig be used as this systems PD valve until a safety or relief valve is placed within the system to make use of PSV . 5. End of the interval, with the last period. 5-34 I I *-I}}
* la) Piping and components located on the following print: 11548-FM-71B b) Service Water c) Class III 2. System Hydrostatic Test, IWD-5223 3. The service water system as seen on the above mentioned drawing is used for cooling component cooling for the charging pumps and lube oil for the charging pumps. The system was designed without the use of a safety or relief valve due to the. low pressure output of the charging pump service water pumps which is 29 psig (max.) The maximum possible pressure source for the system would occur if an extensive heat exchanger leak occurred at either 2-SW-E-lA or lB between component cooling and service water. This pressure could be no more than 50 psig the maximum discharge pressure of 2-CC-P-2A or 2B. It is felt that having to use PD or 100 psig would be excessive for this system as the maximum pressure potential is 50 psig. 4. As an alternative, it is requested that 50 psig be used as this systems PD valve until a safety or relief valve is placed within the system to make use of PSV . 5. End of the interval, with the last period. 5-34 I I *-I}}

Revision as of 11:56, 25 April 2019

Inservice Insp Program,Interval 2,830428-930428.
ML18130A383
Person / Time
Site: Surry Dominion icon.png
Issue date: 12/22/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18130A384 List:
References
PROC-821222, NUDOCS 8212290474
Download: ML18130A383 (399)


Text

SURRY POWER STATION UNIT 2 INSERVICE INSPECTION PROGRAM INTERVAL 2 APRIL 28, 1983 -APRIL 28, 1993 VIRGINIA ELECTRIC & POWER COMPANY NUCLEAR OPERATIONS

& MAINTENANCE DEPT. RICHMOND, VIRGINIA COPY NO.: 78 ASSIGNED TO: NRC CONTROLLED:

YES §) DATE: December 22, 1982

  • *
  • Title ABSTRACT LIST OF DRAWINGS INTRODUCTION TABLE OF CONTENTS INSERVICE INSPECTION PROGRAM FOR COMPONENTS INSERVICE TESTING PROGRAM FOR SUPPORTS INSERVICE TESTING PROGRAM FOR PUMPS AND VALVES INSERVICE SYSTEM PRESSURE TESTS Page i ii 1-1 2-1 3-1 4-1 5-1
  • ABSTRACT VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATIONS UNIT 2 INTERVAL 2 APRIL 28, 1983 TO APRIL 28, 1993 In accordance with 10CFR50.55a Surry Unit 2 is being updated to ASME Section XI, 1980 Edition with Addenda through Winter 1980. Steam generator inspections will continue to be inspected under Plant Technical Specifications.

Specific reliefs are requested in accordance with 10CFR50.55a (g) (5) (iii). The interval for which this program is applicable will commence on April 28, 1983, and end on April 28, 1993, Class 1, 2, and 3 inspections required to be completed during the first interval will be completed at the next refueling outage currently scheduled for the spring of 1983. The ISI Program was developed employing 10 CFR 50 and Reg. Guide 1026. Quality Groups A, B, and C are the same as ASME Classes 1, 2, and 3 . respectively.

The list of drawings identifies the drawings used in developing the program . Section 2 describes the Class 1, 2, and 3 component inspection program developed in accordance with Subsections IWB, IWC, and IWD of ASME Section XI. Section 3 describes the testing program for components.

Section 4 describes the Class 1, 2, and 3 pump and valve inspection program developed in accordance with Subsection IWP and IWV of ASME Section XI. Section 5 describes the system pressure test program . i

  • Unit 2 11548 FM-64A 66A 68A 68B 71A 71B 72A 72B 72C 75C 75E 75J 82A 83A 83B 84A 85A 86A 86B 87A 88A 88B 88C 89A 89B 123A 138A LIST OF DRAWINGS ISI BOUNDARIES ii
  • * *

1.0 INTRODUCTION

1.1 GENERAL

INFORMATION The Inservice Inspection (ISI) and Inservice Testing (IST) Programs for Surry Nuclear Power Station Unit 2 are developed in compliance with the rules and regulations of 10CFR50.55a and Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition including the Addenda through Winter 1980. Where these rules are determined to be impractical, specific relief is requested in writing. The Inservice Inspection and Testing Programs for Class 1, 2 and 3 Components, Component Supports, Pumps, & Valves are applicable for the ten year interval beginning April 28, 1983 and ending April 28, 1993. The upcoming ten year interval is the second inspection interval for Surry Unit 2. 1.2 SYSTEM CLASSIFICATION The construction permits for Surry Units 1 and 2 were issued on June_ 25, 1968. At that time the ASME Boiler and Pressure Vessel Code covered only nuclear vessels. Piping, pumps, and valves were built primarily to the rules of USAS B31.l.O, therefore, the station has essentially no ASME Code Class 1, 2 or 3 designed systems. The system classifications used as a basis for the Inservice Inspection and Testing Programs are based on the requirements set forth in lOCFRSO and Regulatory Guide 1.26. Pursuant to lOCFRSO paragraph (g) (1), inservice inspection requirements of Section XI of the ASME Code are then assigned to these components, within the constraints of existing plant design. Flow Diagrams (FM' s) documenting the system classifications were developed to aid in the review and implementation of the subject programs . 1-1

  • *
  • 2.0 INSERVICE INSPECTION PROGRAM FOR COMPONENTS

2.1 PROGRAM

DESCRIPTION 2.1.1 The Inservice Inspection Program for ISI Class 1, 2 and 3 components meets the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda. Where these requirements are determined to be impractical, specific requests for relief have been written and included in this Section. 2.1.2 The ISI Component Program is presented in Section 2.2 in a tabular format. The components and associated requirements are listed according to ascending Code Category and Item Numbers. The following information is included in the tables: A. Code Category -The Section XI Examination Categories as defined in Table IWB-2500-1, IWC-2500-1, and IWD-2500-1, for Class 1, 2 and 3 components.

B. Item Number and Item Description

-The -Item Number and its description as listed in Tables IWB, IWC, and I~~-2500-1.

All Item Numbers and only applicable item descriptions are listed for each Code Category.

c .Section XI Exam Required lists the methods. This reflects the Section abbreviations used are as follows: VOL -Volumetric per IWA-2230 SUR -Surface per IWA-2220 VIS -Visual per IWA-2211, 12, 13 and 14 examination method or XI requirements.

The D. Relief Requests references either a specific relief request contained in this Section or references one of the Code allowed exemptions listed below. If the latter is referenced, the particular line or component has been exempted from volumetric and/or surface examination by the applicable Code paragraph.

Components exempted from examination by Code allowed exemptions will not appear in the component tables of this program in most cases. EX-1 -IWB-1220(b), lines 1-inch nominal pipe size (n.p.s) and less EX-2 IWB-1220(a), liquid carrying lines 2-inch n.p.s and less EX-3 -IWB-1220(a), steam carrying lines 4-inch n.p.s. and less EX-4 -IWB-1220(c), head connections, 2-inches n.p.s and less, made inaccessible by CRD penetrations 2-1

  • *
  • EX-5 -IWC-1220(b), components not required to operate above a temperature of 200°F or above a pressure of 275 psig. EX-6 -IWC-1220(c), component connections, p1p1ng and associated valves, and vessels and their attachments that are 4 in. n.p.s. EX-7 -IWC-1220(a), lines not required during normal operating conditions but remain flooded under static conditions at a minimum of 80% of the pressure they would be subjected to when required to operate. EX-8 -IWC-1230, piping support members and piping support components encased in concrete.

EX-9 -TWD-1220.1, integral attachments of supports and restraints to components that are 4 in. n.p.s. and smaller. EX-10 -IWD-1220.2(a), integral attachments of supports and restraints in systems whose function is not required in support of reactor residual heat removal and emergency core cooling

  • EX-11 -IWD-1220.2(b), integral attachments of supports and restraints where operating pressure is 275 psig or less and operating temperature is 200°F or less. EX-12 -IWD-5223(e), open ended vent and drain lines from components extending beyond the last shut-off ended safety or relief valve discharge lines. E. Alternate Exam lists the examination method or methods that will be performed in lieu of the required Section XI methods when relief has been requested.

F. Remarks -lists general clarification remarks. 2.1.3 The attached Inservice Inspection Plan Summary lists the applicable Class 1, 2 & 3 systems which are covered in the Inservie Inspection Program

  • 2-2
  • * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE l * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-A PRESSURE RETAINING WELDS IN REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER :Bl.11 ITEM DESCRIPTION:

REACTOR VESSEL CIRCUMFERENTIAL SHELL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT C 11715) COORD NUMBER METHOD ---------======== -------======= -------------RC FM-86A F-5 RPRV VOL RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 2 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-A PRESSURE RETAINING WELDS IN REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER : Bl.12 ITEM DESCRIPTION:

REACTOR VESSEL LONGITUDINAL SHELL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT C 11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86A F-5 RPRV VOL RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 3 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-A PRESSURE RETAINING WELDS IN REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER !Bl.21 ITEM DESCRIPTION:

REACTOR VESSEL CIRCUMFERENTIAL HEAD WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== -------======= -------------RC FM-86A F-5 RPRV VOL RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 4 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-A PRESSURE RETAINING WELDS IN REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER :Bl.30 ITEM DESCRIPTION:

REACTOR VESSEL SHELL-TO-FLANGE WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86A F-5 RPRV VOL RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * *****************************************************************************************l***********
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 5 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-A PRESSURE RETAINING WELDS IN REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER :Bl.40 ITFM DESCRIPTION:

REACTOR VESSEL HEAD-TO-FLANGE WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD_ NUMBER METHOD -----------------======= ======= --------------RC FM-86A F-5 RPRV SUR VOL RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 6 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************

ITEM NUMBER : B2 .11 ITEM DESCRIPTION

PRESSURIZER CIRCUMFERENTIAL SHELL-TO-HEAD

~IELDS FLOW FLOW SYSTEM/ DIAGRAM ' DIAGRAM LINE EXAM COMPONENT C 11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86B G-6 1RCE2 VOL RELIEF REQUEST ======= SR-5 PROGRAM NOTES --------------

  • * * ****************************************************************************************************
  • .*
  • 12/22/82 NUTECH/PRISIM PAGE 7 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************

ITEM NUMBER :B2.12 ITEM DESCRIPTION:

PRESSURIZER LONGITUDINAL SHELL-TO-HEAD WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86B G-6 1RCE2 VOL RELIEF REQUEST --------------PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 8 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-B PRESS. RETAINING WELDS IN VESSELS OTHER THAN RPV * ****************************************************************************************************

ITEM NUMBER :s2.4o ITEM DESCRIPTION

STEAM GENERATORS(PRIMARY SIDE) TUBESHEET-TO-HEAD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86A C-1 2RCE1A VOL RC FM-86A C-6 2RCE1B VOL RC FM-86A J-1 2RCE1C VOL RELIEF REQUEST ======= PROGRAM NOTES --------------I . I 11 I I I I I I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 9 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-D PENET. WELDS OF NOZZLE IN VESSELS-INSPEC. PRGM. B * ****************************************************************************************************

ITEM NUMBER :B3.100 ITEM DESCRIPTION:

REACTOR VESSEL NOZZLE INSIDE RADIUS SECTION FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC FM-86A F-5 RPRV VOL RELIEF REQUEST ======= PROGRAM NOTES ======= I I I 11 11 -----!I

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 10 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-D PENET. WELDS OF NOZZLE IN VESSELS-INSPEC. PRGM. B * ****************************************************************************************************

ITEM NUMBER :B3.150 ITEM DESCRIPTION:

HEAT EXCHANGERSCPRIMARY SIDE) NOZZLE-TO-VESSEL W FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------CH FM-88C F-2 CHE3 VOL ) RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 11 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-D PENET. WELDS OF NOZZLE IN VESSELS-INSPEC. PRGM. B * ****************************************************************************************************

ITEM NUMBER :B3.90 ITEM DESCRIPTION:

REACTOR VESSEL NOZZLE-TO-VESSEL WELDS SYSTEM/ COMPONENT RC FLOW FLOW DIAGRAM (11715) ----------------FM-86A DIAGRAM COORD ======= F-5 LINE NUMBER --------------RPRV EXAM METHOD VOL RELIEF REQUEST --------------PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 12 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************

ITEM NUMBER :B4.12 ITEM DESCRIPTION

ALL VESSELS, FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 CRD NOZZLES LINE NUMBER --------------RPRV PARTIAL PENET. EXAM METHOD ------VIS ~IELDS RELIEF REQUEST --------------PROGRAM NOTES ======= --~~-1
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 13 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************

ITEM NUMBER :B4.13 ITEM DESCRIPTION

ALL VESSELS, FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 INSTR. NOZZLES PART. LINE EXAM NUMBER METHOD ======= ------RPRV VIS PENET. WELDS RELIEF REQUEST --------------PROGRAM NOTES =======
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIN PAGE 14 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-E PRESS. RETAINING PARTIAL PENET. WELDS IN VESSELS * ****************************************************************************************************

ITEM NUMBER :B4.20 ITEM DESCRIPTION

PRESSURIZER FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86B G-6 HEATER PENETRATION WELDS LINE EXAM NUMBER METHOD ======= ------1RCE2 VIS RELIEF REQUEST --------------PROGRAM NOTES ======= I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 15 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
  • CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************

ITEM NUMBER :B5.10 ITEM DESCRIPTION:

REACTOR VESSEL, NPS > 4" NOZZLE-SAFE END BUTT WE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A A-4 RC303-2501R SUR VOL RC FH-86A E-5 RC304-2501R SUR VOL RC FM-86A B-8 RC306-2501R SUR

  • VOL RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A K-4 RC309-2501R SUR I VOL I 11 I ! *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 16 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sowao * ****************************************************************************************************
  • CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************

ITEM NUMBER :ss.20 ITEM DESCRIPTION

PRESSURIZER, NPS > 4" NOZZLE-SAFE END BUTT WE LOS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86B G-8 RC310-2501R SUR VOL RC FM-86B F-5 RC315-1502 SUR VOL RC FM-86B H-5 RC334-1502 SUR VOL RC FM-86B H-5 RC337-1502 SUR
  • VOL RC FM-86B G-5 RC338-1502 SUR VOL RC FM-86B G-5 RC339-1502 SUR VOL *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 17 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-F PRESSURE RETAINING DISSIMILAR METAL WELDS * ****************************************************************************************************

ITEM NUMBER :B5.30 ITEM DESCRIPTION

STEAM GEN., NPS > 4" NOZZLE-SAFE END BUTT WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM . LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A B-2 RC302-2501R SUR VOL RC FM-86A E-5 RC304-2501R SUR VOL RC FM-86A B-6 RC305-2501R VOL RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A L-2 RC308-2501R SUR VOL l II I I 11 I I I ! I I I 11 I ,, I, \! 11 I' ,I I! I
  • * * ~---------------------1
  • 12/22/82 * * *
  • NUTECH/PRISIM INSERVICE INSPECTION PLAN SUtlMARY SURRY POWER STATION UNIT 2
  • PAGE 18 * *
  • REVISION:

0000

  • CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.10 ITEM DESCRIPTION

REACTOR VESSEL CLOSURE HEAD NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------RC FM-86A F-5 RPRV SUR I ! I I I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 19 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.l80 ITEM DESCRIPTION

PUMPS BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD. NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------RC FM-86A A-1 RC-P-lA VOL RC FM-86A A-6 RC-P-lB VOL RC FM-86A L-1 RC-P-lC VOL *
  • I I I I I I I I I 11 I I I I, I ., I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 20 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.190 ITEM DESCRIPTION

PUMPS FLANGE SURFACE,WHEN CONNECTION DISASSEMBLE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-lB VIS RC FM-86A L-1 RC-P-lC VIS l I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 21 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.20 ITEM DESCRIPTION

REACTOR VESSEL CLOSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT C 11715) COORD NUMBER ---------======== ======= ======= RC FM-86A F-5 RPRV STUDS, IN PLACE EXAM METHOD VOL RELIEF REQUEST --------------PROGRAM NOTES --------------
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 22 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B&.200 ITEM DESCRIPTION

PUMPS NUTS,BUSHINGS,AND WASHERS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT I 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-lB VIS RC FM-86A L-1 RC-P-lC VIS * *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 23 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.210 ITEM DESCRIPTION

VALVES BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A D-2 RC301-2501R VOL RC FM-86A D-4 RC303-2501R VOL RC FM-86A D-6 RC304-2501R VOL RC FM-86A D-8 RC306-2501R VOL RC FM-86A I-2 RC307-2501R VOL
  • RC FM-86A I-4 RC309-2501R VOL *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 24 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * **~*************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.220 ITEM DESCRIPTION

VALVES FLANGE SURFACE ,!~HEN CONNECTION DISASSEMBL FLOW FLOl4 SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= -------------------------------------RC FM-86A 0-2 RC301-2501R VIS RC FM-86A D-4 RC303-2501R VIS RC FM-86A 0-6 RC304-2501R VIS RC FM-86A D-8 RC306-2501R VIS RC FM-86A I-2 RC307-2501R VIS
  • RC FM-86A I-4 RC309-2501R VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 25 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :86.230 ITEM DESCRIPTION

VALVES NUTS,BUSHINGS,AND WASHERS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A D-2 RC30l-2501R VIS RC FM-86A D-4 RC303-2501R VIS RC FM-86A D-6 RC304-2501R VIS RC FM-86A D-8 RC306-2501R VIS RC FM-86A I-2 RC307-2501R VIS
  • RC FM-86A I-4 RC309-2501R VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 26 * * * * *
  • IN~ERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.30 ITEM DESCRIPTION:

REACTOR VESSEL CLOSURE STUDS,WHEN REMOVED FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------RC FM-86A F-5 RPRV SUR VOL * *

  • * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 27 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.40 ITEM DESCRIPTION

REACTOR VESSEL THREADS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT C 11715) COORD NUMBER ---------======== -------======= -------RC FM-86A F-5 RPRV IN FLANGE EXAM METHOD ------VOL RELIEF REQUEST ======= PROGRAM NOTES =======
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 28 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-G-1 PRESSURE RETAINING BOLTING > 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B6.50 ITEM DESCRIPTION:

REACTOR VESSEL CLOSURE WASHERS,BUSHINGS FLOW FLml SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A F-5 RPRV VIS l I I l1 I I I I I I 11

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 29 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.10 ITEM DESCRIPTION

REACTOR VESSEL FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A F-5 BOLTS, STUDS, LINE NUMBER ======= RPRV AND NUTS EXAM METHOD ------VIS RELIEF REQUEST ======= PROGRAM NOTES ======= I, I ! I 11 I' I I I I ! I I I I I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 30 * * * * *
  • INSERVICE INSPECTION PLAN SUl111ARY REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * -****************************************************************************************************

ITEM NUMBER :B7.20 ITEM DESCRIPTION

PRESSURIZER BOLTS,STUDS, AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86B G-6 1RCE2 VIS 11 I, JI I !
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 31 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :67.30 ITEM DESCRIPTION

STEAM GENERATORS BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A C-1 2RCE1A VIS RC FM-86A C-6 2RCE1B VIS RC FM-86A J-1 2RCE1C VIS l ! I I 1, 11 I I ! I: 11 t'
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 32 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION : 80~180 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.50 ITEM DESCRIPTION

PIPING BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= -------------------------------CH FM-88C G-6 CH393-1502 VIS CH FM-88C D-6 CH395-1502 VIS CH FM-88C A-6 CH397-1502 VIS RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A C-7 RC416-1502 VIS RC FM-86A B-8 RC417-1502 VIS -1 I I
  • * * -----------------------------------------------------

I ****************************************************************************************************

  • * *' 12/22/82 NUTECH/PRISIN PAGE 33 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.50 ITEM DESCRIPTION

PIPING BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ------------------------------------------------RC FM-86A B-3 RC429-1502 VIS RC FM-86A B-3 RC431-1502 VIS RC FM-86A C-4 RC432-1502 VIS RC FM-86A K-3 RC446-1502 VIS RC FM-86A K-3 RC447-1502 VIS RC FM-86A J-3 RC451-250IR VIS RC FM-86B H-5 RC337-1502 VIS RC FM-86B G-5 RC338-1502 VIS RC FM-866 G-5 RC339-1502 VIS I I I I I I I I I I I I I I I I ! I I I I I I I I I I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 34 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :SOW80 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 ITEM DESCRIPTION

VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------CH FM-88C D-2 CH305-1502 VIS CH FM-88C G-3 CH308-1503 VIS CH FM-88C D-2 CH368-1502 VIS CH FM-88C G-3 CH379-1502 VIS CH FM-88C G-6 CH393-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 35 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 ITEM DESCRIPTION

VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A I-3 RC313-1502 VIS RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-1502 VIS RC FM-86A C-3 RC353,.-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 36 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 ITEM DESCRIPTION

VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A B-8 RC416-1502 VIS RC FM-86A C-8 RC417-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 37 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY PO~lER STATION UNIT 2 CODE EDITION :801480 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :87.70 ITEM DESCRIPTION

VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A B-2 RC43l-1502 VIS RC FM-86A C-3 RC432-1502 VIS RC FM-86A C-2 RC439-1502 VIS RC FM-86A K-3 RC442-1502 VIS RC FM-86A K-3 RC446-1502 VIS
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 38 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 <) ITEM DESCRIPTION

VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FM-86A A-6 RC499-1502 VIS RC FM-86A L-2 RC500-1502 VIS RC FM-86B E-8 RC314-1502 VIS RC FM-86B F-5 RC315-1502 VIS RC FM-86B I-4 RC335-1502 VIS RC FM-86B H-5 RC337-1502 VIS RC FM-86B G-5 RC338-l502 VIS RC FM-86B G-5 RC339-1502 VIS RC FM-86B I-5 RC361-1502 VIS ~l I I I I I
  • * *
  • 12/22/82 NUTECH/PR ISIH PAGE 39 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 ITEM DESCRIPTION

VALVES BOLTS,STUDS,AND NUTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-89B A-3 RC316-l502 VIS RC FM-89B A-1 RC317-l502 VIS RC FM-89B A-2 RC318-l502 VIS RC FM-89B A-1 RC319-l502 VIS RC FM-89B A-2 RC320-l502 VIS
  • RC FM-89B A-3 RC32l-l502 VIS RC FM-89B A-7 RC323-l502 VIS RHR FM-87A H-7 RHlOl-1502 VIS RHR FM-87A L-5 RH116-l502 VIS * -1 ! I II I 11 I I I I I I I I I I I I I ! I I I i! I I I __ _J
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 40 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING <= 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 ITEM DESCRIPTION:

VALVES BOLTS,STUDS,AND*NUTS SYSTEM/ COMPONENT RHR SI SI SI SI SI SI SI SI FLOW FLOW DIAGRAM (11715) ======== FM-87A FM-89B FM-89B FM-89B FM-89B FM-89B FM-89B FM-89B FM-89B DIAGRAM COORD ======= L-5 A-2 B-5 A-8 A-3 B-1 A-2 A-3 A-3 LINE NUMBER ======= RH117-1502 SII81-1502 SI245-1502 SI247-1502 SI272-1503 SI274-1502 SI275-1502 SI277-1503 SI279-1502 EXAM METHOD VIS VIS VIS VIS VIS VIS VIS VIS VIS RELIEF REQUEST ======= PROGRAM NOTES ======= I I Ii I I I I I I ! I II 1, I I I ! I I I I I I I I I

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 41 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-G-2 PRESSURE RETAINING BOLTING<=

2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :B7.70 ITEM DESCRIPTION:

VALVES BOLTS,STUDS,AND NUTS SYSTEM/ COMPONENT SI SI SI SI FLOW FLOW DIAGRAM C 11715) ======== FM-89B FM-89B FM-898 FM-898 DIAGRAM COORD ======= B-1 B-1 B-1 A-2 LINE NUMBER ======= SI285-1502 SI344-1502 SI345-1502 5!353-1502 EXAM METHOD VIS VIS VIS VIS RELIEF REQUEST ======= PROGRAM NOTES ======= I I ! I I I I ,, I I

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 42 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-H INTEGRAL ATTACHMENTS FOR VESSELS * ****************************************************************************************************

ITEM NUMBER :B8.20 ITEM DESCRIPTION

PRESSURIZER INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------------------------------------------RC FM-86A F-5 RPRV VOL RC FM-86B G-6 1RCE2 VOL * *
  • * **
  • 12/22/82 NUTE CH/PR !SIM PAGE 43 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING 14ELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.ll ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A E-2 RC301-2501R SUR VOL RC FM-86A B-2 RC302-2501R SUR VOL RC FM-86A A-4 RC303-2501R SUR VOL RC FM-86A E-5 RC304-2501R SUR
  • VOL RC FM-86A B-6 RC305-2501R SUR VOL I I RC FM-86A B-8 RC306-2501R SUR I VOL I **
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 44 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.ll ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A H-2 RC307-2501R SUR VOL RC FM-86A L-2 RC308-2501R SUR VOL RC FM-86A K-4 RC309-2501R SUR VOL RC FM-86A D-2 RC3ll-2501R SUR
  • VOL RC FM-86A D-7 RC312-2501R SUR VOL RC FM-86A I-3 RC313-2501R SUR VOL *
  • . * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 45 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER !B9.ll ITEM DESCRIPTION

PIPING CIRC. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86B G-8 RC FM-86B E-8 RC FM-86B F-5 RC FM-86B H-5 RC FM-86B H-5 RC FM-86B G-5 WELDS, NPS >= 4 LINE NUMBER ======= RC310-2501R RC314-1502 RC315-1502 RC334-1502 RC337-1502 RC338-1502 IN. EXAM METHOD ------SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES =======

l ******************************************************~*********************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 46 * * * * * *' INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.ll ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86B G-5 RC339-1502 SUR VOL RliR FM-87A H-7 RHlOl-1502 SUR VOL RHR FM-87A K-5 RH116-1502 SUR VOL I RHR FM-89B B-8 RH117-1502 SUR I ,. i VOL I SI FM-86A E-2 RC316-1502 SUR I VOL I SI FM-86A E-4 RC317-1502 SUR I VOL I 1, I 11 I I *
  • e ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 47 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.ll ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------SI FM-86A. E-6 RC318-1502 SUR VOL SI FM-86A E-7 RC319-l502 SUR VOL SI FM-86A H-4 RC320-1502 SUR VOL SI FM-86A H-2 RC321-1502 SUR VOL SI FM-86A E-7 RC344-1502 SUR VOL SI FH-86A E-4 SI245-1502 SUR VOL I ! I I I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 48 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.ll ITEM DESCRIPTION:

PIPING CIRC. WELDS, NPS >= 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------SI FM-86A H-3 SI247-1502 SUR VOL SI FM-86A H-4 SI275-1502 SUR VOL SI FM-86A E-7 SI285-1502 SUR VOL SI FM-89B B-1 RC317-1502 SUR

  • VOL SI FM-898 A-7 RC323-1502 SUR VOL SI FM-89B C-7 SI246-1502 SUR* VOL I I I *1 1: i I I I ! e
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 49 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.ll ITEM DESCRIPTION:

PIPING CIRC. WELDS; NPS >= 4 IN. SYSTEM/ . COMPONENT SI FLOW FLOW DIAGRAM (11715) ======== FM-89B DIAGRAM COORD ======= B-1 LINE NUMBER ======= 5!345-1502 EXAM METHOD SUR VOL RELIEF REQUEST --------------PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 50 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :s9.12 ITEM DESCRIPTION

PIPING LONG. FLOW FLOW SYSJEM/ DIAGRAM DIAGRAM COMPONENT C 11715 l COORD ---------======== ======= RC FM-86A B-2 RC FM-86A B-6 RC FM-86A L-2 WELDS, NPS >= 4 LINE NUMBER ======= RC302-2501R RC305-2501R RC308-2501R IN. EXAM METHOD ------SUR VOL SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES ======= I I I i 11 I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 51 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER !89.21 ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS < 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ------------------------======= ------======= --------------------------------------CH FM-86A F-8 CH301-1502 SUR CH FM-88C H-3 CH379-1503 SUR RC FM-86A B-7 RC416-1502 SUR RC FM-86A C-8 RC417-l502 SUR RC FM-86A B-2 RC43l-l502 SUR
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 52 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.21 ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS < 4 IN. I, FLOW FLOW 'I 11 SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM i' COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86B I-5 RC361-1502 SUR SI FM-86A H-4 SI275-1502 SUR SI FM-86A E-1 SI280-1502 SUR SI FM-86A E-5 SI281-1502 SUR SI FM-86A E-7 SI285-1502 SUR
  • I . ---___ _I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 53 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.21 ITEM DESCRIPTION

PIPING CIRC. WELDS, NPS < 4 IN. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ---------------------------------------------SI FM-89B B-1 SI274-1502 SUR SI FM-89B E-2 SI277-1503 SUR SI FM-89B C-3 SI279-1502 SUR SI FM-89B I-3 SI347-l503 SUR * *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 54 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.31 ITEM DESCRIPTION

PIPING, NPS >= FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD -----------------======= -----------------CH FM-86A . F-8 RC FM-86A C-2 RC FM-86A B-7 RC FM-86A B-2 RC FM-86A K-2 RC FM-866 G-8 4 IN. ,BRANCH LINE NUMBER --------------CH301-1502 RC353-l502 RC416-l502 RC431-1502 RC447-1502 RC310-2501R PIPE CONNECTION WELD EXAM METHOD ------SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL SUR VOL RELIEF REQUEST --------------SR-3 PROGRAM NOTES --------------l I I 1, I I I I I I I I ,' I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 55 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER ST A TION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.31 ITEM DESCRIPTION

PIPING, NPS >= 4 IN. ,BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86B E-8 RC314-1502 SUR SR-3 VOL RC FM-86B E-7 RC315-1502 SUR SR-3 VOL RHR FM-87A H-7 RHlOl-1502 SUR SR-3 VOL SI FM-86A E-2 RC316-1502 SUR SR-3 VOL SI FM-86A E-4 RC317-1502 SUR SR-3 VOL SI FM-86A E-6 RC318-1502 SUR SR-3 VOL I! II II I I I I
  • * * .--* . -----, I I I ****************************************************************************************************

I * * * * *

  • 12/22/82 NUTECH/PRISIH INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 56 * *
  • REVISION:

0000

  • CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.31 ITEM DESCRIPTION

PIPING, NPS >= 4 IN. ,BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= -----------------------SI FM-86A E-7 RC319-1502 SUR SR-3 VOL SI FM-86A H-4 RC320-1502 SUR SR-3 VOL SI FM-86A H-2 RC321-1502 SUR SR-3 VOL SI FM-86A E-4 SI245-1502 SUR SR-3 VOL SI FM-86A H-3 SI247-1502 SUR VOL SI FM-89B A-7 RC323-1502 SUR SR-3 VOL I I I I 11 I I 11 I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 57 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.32 ITEM DESCRIPTION

PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= --------------------------------------------------------CH FM-86A E-4 CH305-1502 SUR CH FM-86B E-5 CH368-1502 SUR RC FM-86A C-5 RC327-1502 SUR RC FM-86A H-2 RC344-1502 SUR RC FM-86A E-3 RC345-1502 SUR
  • RC FM-86A E-7 RC346-1502 SUR I RC FH-86A C-2 RC353-1502 SUR I I' RC FM-86A A-7 RC356-1502 SUR I' RC FM-86A G-1 RC358-1502 SUR I I *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 58 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :801480 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.32 ITEM DESCRIPTION

PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A K-2 RC359-1502 SUR RC FM-86A A-7 RC360-1502 SUR RC FM-86A I-4 RC405-1502 SUR RC FM-86A B-8 RC415-1502 SUR RC FM-86A A-2 RC425-1502 SUR
  • * * ****************************************************************************************************
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2 PAGE 59 * * *

  • REVISION:

0000

  • CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.32 ITEM DESCRIPTION

PIPING, NPS < 4 IN., BRANCH PIPE CONNECTION WELD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAH RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A L-2 RC500-1502 SUR SI FM-86A E-1 SI280-1502 SUR SI FM-86A E-5 SI281-1502 SUR SI FM-89B C-3 SI279-1502 SUR -----I I I I I I I I I I I I I ______ I
  • * *
  • 12/22/82 NUTECH/PRISIH PAGE 60 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.40 ITEM DESCRIPTION

PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------CH FM-86A F-8 CH301-1502 SUR CH FM-86A E-4 CH305-1502 SUR CH FM-86A A-2. CH308-1503 SUR CH FM-86A A-7 CH309-1503 SUR CH FM-86A L-2 CH310-1503 SUR
  • i I I I I I II 1: I I I I I I I I i
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 61
  • I * '* * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ***************************************************************************************~************

I

  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING
  • I ****************************************************************************************************

ITEM NUMBER :B9.40 ITEM DESCRIPTION

PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A . C-5 RC327-1502 SUR RC FM-86A H-2 RC344-1502 SUR RC FM-86A E-3 RC345-1502 SUR RC FM-86A E-7 RC346-1502 SUR RC FM-86A K-5 RC353-1502 SUR
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 62 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.40 ITEM DESCRIPTION

PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= -----------------------------RC FM-86A A-7 RC360-l502 SUR RC FM-86A I-4 RC405-1502 SUR RC FM-86A A8 RC412-1502 SUR RC FM-86A B-8 RC415-1502 SUR RC F11-86A C-8 RC417-1502 SUR RC FM-86A C-8 RC417-2501R SUR RC FM-86A C-7 RC421-1502 SUR RC FM-86A A-2 RC425-1502 SUR RC FM-86A A-2 RC428-2501R SUR -1 I I I I I
  • * * --------------------1
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 63 * *
  • REVISION:

0000

  • CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :s9.40 ITEM DESCRIPTION

PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-3 RC429-1502 SUR RC FM-86A C-3 RC432-1502 SUR RC FM-86A C-2 RC439-1502 SUR RC FM-86A L-2 RC4_41-1502 SUR RC FM-86A L-3 RC442-1502 SUR RC FM-86A K-3 RC446-1502 SUR RC FM-86A J-3 RC448-1502 SUR RC FM-86A J-2 RC453-1502 SUR RC FM-86A A-2 RC498-1502 SUR I I I I I I I I I I I I: II I I 1* Ii I I 1, I Ii I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 64 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :B9.40 ITEM DESCRIPTION

PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RC FM-86A A-6 RC499-l502 SUR RC FM-86A L-2 RC500-l502 SUR RC FM-86B I-4 RC335-l502 SUR RC FM-86B I-5 RC36l-l502 SUR SI FM-86A H-4 SI275-l502 SUR
  • ii I Ii \, 11 I ' I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 65 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
  • CATEGORY B-J PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :s9.40 ITEM DESCRIPTION

PIPING SOCKET WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89A E-5 SI273-l503 SUR SI FM-89B C-3 SI272-l503 SUR SI FM-89B E-2 SI273-l503 SUR SI FM-89B B-1 SI274-l502 SUR SI FM-89B E-2 SI277-l503 SUR
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 66 * * * * *
  • INSERVICE INSPECTIOl1 PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************

ITEM NUMBER :Bl0.10 ITEM DESCRIPTION

PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-86A F-8 CH301-1502 SUR CH FM-86A L-2 CH310-1503 SUR CH FH-88C H-3 CH379-1503 SUR RC FM-86A K-5 RC353-1502 SUR RC FM-86A G-1 RC358-1502 SUR RC FM-86A B-7 RC416-1502 SUR RC FM-86A B-2 RC431-1502 SUR RC FH-86A K-2 RC447-1502 SUR RC FM-86A A-6 RC499-1502 SUR l I I I ---________________

J

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 67 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ~***************************************************************************************************
  • CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************

ITEM NUMBER :s10.10 ITEM DESCRIPTION

PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715 l COORO NUMBER METHOD REQUEST NOTES I ---------======== ======= -------------======= ------------------------------I I RC FM-86A E-1 SI280-1502 SUR I I RC FM-86B G-8 RC310-2501R SUR I RC. FM-86B E-8 RC314-1502 SUR RC FM-866 F-5 RC315-1502 SUR RC FM-86B H-5 RC334-1502 SUR
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 68
  • I * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-K-l INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************

ITEM NUMBER :s10.10 ITEM DESCRIPTION

PIPING INTEGRALLY WELDED ATTACHMENTS FLOl4 FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= ======= --------------RHR FM-89B . B-8 RHll7-1502 SUR SI FM-86A E-4 SI245-l502 SUR SI FM-86A H-3 SI247-l502 SUR SI FM-86A E-5 SI281-l502 SUR SI FM-89B A-7 RC323-l502 SUR
  • * * ---------, ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 69 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-K-1. INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************

ITEM NUMBER :s10.20 ITEM DESCRIPTION

PUMPS INTEGRALLY WELDED ATTACHMENTS FLO!~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RC.:.P-lA SUR RC FM-86A A-6 RC-P-1B SUR RC FM-86A L-1 RC-P-lC SUR I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 70 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-K-1 INTEGRAL ATTACHMENTS FOR PIPING, PUMPS, AND VALVES * ****************************************************************************************************

ITEM NUMBER :Bl0.30 ITEM DESCRIPTION:

VALVES INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= -----------------------------CH FH-86A L-2 CH310-1503 SUR RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 71 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2, CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-L-2 PUMP CASINGS * ****************************************************************************************************

ITEM NUMBER :Bl2.10 ITEM DESCRIPTION

PUMP CASING WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RC FM-86A A-1 RCPlA VOL RC FM-86A A-6 RCPlB VOL RC FM-86A L-1 RCPlC VOL I I I I I I . I I I I I I _I
  • * * '* 12/22i82 NUTECH/PRISIH PAGE 72 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-L-2 PUMP CASINGS * ****************************************************************************************************

ITEM NUMBER :B12.20 ITEM DESCRIPTION

PUMP CASING FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ------------------------------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCP1B VIS RC FM-86A L-1 RCPlC VIS * * -------1 I I I I ! I I I I I I I I r' I I I I I I I I I I I I I I ! I I I
  • * *
  • 12/22/82 NUTECH/PR

!SIM PAGE 73 * * * * *

  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************

ITEM NUMBER :Bl2.40 ITEM DESCRIPTION

VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A E-1 RC301-2501R VIS SR-1 RC FM-86A D-3 RC303-2501R VIS SR-1 RC FM-86A D-6 RC304-2501R VIS SR-1 RC FM-86A D-8 RC306-2501R VIS SR-1 RC FM-86A H-1 RC307-2501R VIS SR-1
  • RC FM-86A H-3 RC309-2501R VIS SR-1 RC FM-86A C-4 RC311-2501R VIS SR-1 RC FM-86A C-8 RC312-2501R VIS SR-1 RC FM-86A I-4 RC313-2501R VIS SR-1 *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 74 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************

ITEM NUMBER :Bl2.40 ITEM DESCRIPTION

VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------RC FM-86B H-4 RC337-1502 VIS SR-1 RC FM-86B G-4 RC338-l502 VIS SR-1 RC. FM-86B F-4 RC339-l502 VIS SR-1 RC FM-89B A-2 RC316-1502 VIS SR-1 RC FM-89B A-1 RC317-1502 VIS SR-1
  • RC FM-89B A-2 RC318-1502 VIS SR-1 RC FM-89B A-1 RC319-1502 VIS SR-1 RC FM-89B A-1 RC320-1502 VIS SR-1 RC FM-89B A-3 RC321-1502 VIS SR-1 *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 75 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-M-2 VALVE BODIES * ****************************************************************************************************

ITEM NUMBER =Bl2.40 ITEM DESCRIPTION

VALVES, VALVE BODY EXCEEDING 4 IN. NOMINAL PIPE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== .;.. ______ --------------------======= ---------------------RHR FM-87A
  • I I I I I I I I I I I I I JI
  • * * ****************************************************i'************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 76 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER :Bl3.10 ITEM DESCRIPTION

REACTOR VESSEL, VESSEL INTERIOR FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= ======= ---------------RPV FM-86A F-5 RPRV VIS I I J
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 77 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-N-1 INTERIOR OF REACTOR VESSEL * ****************************************************************************************************

ITEM NUMBER =Bl3.30 ITEM DESCRIPTION:

REACTOR VESSELCPWRJ CORE SUPPORT STRUCTURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RPV FM-86A F-5 RPRV VIS RELIEF REQUEST ======= PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 78 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-0 PRESSURE RETAINING WELDS IN CONTROL ROD HOUSINGS * ****************************************************************************************************

ITEM NUMBER :Bl4.10 ITEM DESCRIPTION

REACTOR VESSEL WELDS IN CRD FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE COMPONENT (11715) COORD NUMBER ---------======== ======= -----------------------RC FM-86A F-5 RPRV HOUSING EXAM METHOD ------VOL RELIEF REQUEST --------------PROGRAM NOTES --------------I I . ' I I I 11 I I I !

~----------------------------------------------------

  • * * ****************************************************************************************************
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 79 * *
  • REVISION:

0000

  • CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.10 ITEM DESCRIPTION

REACTOR VESSEL PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A F-5 RPRV VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 80 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.ll ITEM DESCRIPTION

REACTOR VESSEL PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======== ------======= ======= ---------RC FM-86A F-5 RPRV VIS * *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 81 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :s1s.20 ITEM DESCRIPTION:

PRESSURIZER PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ======= ======= ------RC Ft1-86B G-6 1RCE2 VIS RELIEF REQUEST --------------PROGRAM NOTES =======

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 82 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.21 ITEM DESCRIPTION:

PRESSURIZER PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ------------------------======= ---------------------RC FM-86B

  • G-6 1RCE2 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= l I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 83 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

.REVISION

0000 *
  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C I-6 CHll-1502 VIS CH FM-88C D-2 CH301-1502 VIS CH FM-88C D-2 CH305-1502 VIS CH FM-88C I-3 CH308-1503 VIS CH FM-88C G-3 CH309-1503 VIS
  • l
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 84 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :sis.so ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------CH FM-88C F-6 CH408-1502 VIS CH FM-88C C-3 CH423-1502 VIS CH FM-88C B-3 CH523-1502 VIS RC FM-86A E-2 RC301-2501R VIS RC FM-86A B-2 RC302-2501R VIS
  • RC FM-86A A-4 RC303-2501R VIS RC FM-86A E-5 RC304-2501R VIS RC FM-86A A-6 RC305-2501R VIS *RC FM-86A B-8 RC306-2501R VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 85 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER !Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RC FM-86A H-2 RC307-2501R VIS RC FM-86A K-2 RC308-2501R VIS RC FM-86A K-4 RC309-2501R VIS. RC FM-86A H-I RC310-2501R VIS RC FM-86A D-2 RC311-2501R VIS
  • J
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 86 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * **************************~'*************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FM-86A E-2 RC316-1502 VIS RC FM-86A E-4 RC317-1502 VIS RC FM-86A E-6 RC318-1502 VIS RC FM-86A E-6 RC319-1502 VIS RC FM-86A .H-4 RC320-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 87 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER !BlS.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FH-86A H-3 RC344-l502 VIS RC FM-86A E-3 RC345-l502 VIS RC FH-86A E-7 RC346-l502 VIS RC FH-86A E-2 RC347-l502 VIS RC FM-86A E-7 RC348-l502 VIS
  • RC FM-86A H-2 RC349-l502 VIS RC FH-86A C-3 RC353-l502 VIS RC FM-86A B-2 RC355-l502 VIS RC FM-86A A-7 RC356-l502 VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 88 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :8QW80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER !815.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------RC FM-86A B-5 RC357-1502 VIS RC FM-86A I-1 RC358-1502 VIS RC-FM-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A D-3 RC363-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 89
  • I * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A B-1 RC394-1502 VIS RC FM-86A C-2 RC395-1502 VIS RC FM-86A A-6 RC396-1502 VIS RC FM-86A A-6 RC397-1502 VIS RC FM-86A A-6 RC398-1502 VIS
  • RC FM-86A C-6 RC399-1502 VIS RC FM-86A K-1 RC400-1502 VIS RC FM-86A K-1 RC401-1502 VIS RC FM-~6A K-1 RC402-1502 VIS *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 90 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

.REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-86A J-2 RC403-1502 VIS RC FM-86A I-5 RC405-1502 VIS RC FM-86A I-5 RC406-1502 VIS RC FM-86A A-8 RC412-1502 VIS RC FM-86A A-8 RC413-2501R VIS RC FM-86A A-8 RC414-1502 VIS RC FM-86A C-8 RC415-1502 VIS RC FM-86A A-7 RC416-1502 VIS RC FM-86A B-8 RC417-1502 VIS I I! I I l I I ' I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 91 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------RC FH-86A B-7 RC418-1502 VIS RC FM-86A B-8 RC419-2501R VIS RC FM-86A B-8 RC420-1502 VIS RC FM-86A C-7 RC421-1502 VIS RC FM-86A C-7 RC422-1502 VIS
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 92 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-3 RC427-1502 VIS RC FM-86A B-3 RC428-2501R VIS RC FM-86A B-3 RC429-1502 VIS RC FM-86A B-4 RC430-l502 VIS RC FM-86A B-2 RC431-1502 VIS RC FM-86A C-3 RC432-1502 VIS RC FM-86A B-3 RC433-2501R VIS RC FM-86A C-3 RC434-1502 VIS RC FM-86A C-2 RC436-1502 VIS ---~-I I I I I I I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 93 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A C-2 RC437-1502 VIS RC FM-86A C-2 RC438-1502 VIS RC FM-86A C-2 RC439-l502 VIS RC FM-86A A-7 RC440-1502 VIS RC FM-86A L-2 RC441-1502 VIS
  • RC FM-86A K-3 RC442-1502 VIS RC FM-86A L-3 RC443-1502 VIS RC FM-86A K-3 RC444-2501R VIS RC FM-86A K-4 RC445-1502 VIS * --_l
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 94 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES. ----------========

======= -------------======= ======= -------RC FM-86A K-4 RC446-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-3 RC449-1502 VIS RC FM-86A J-3 RC451-2501R VIS RC FM-86A J-4 RC452-1502 VIS RC FM:-86A J-2

  • RC453-l502 VIS RC FM-86A J-2 RC454-1502 VIS RC FM-86A J-2 RC455-1502 VIS RC FM-86A J-2 RC456-l502 VIS I I i I I \, 11 11 I 11 ! 11 ii 1; I I I I
                                                                                                                                                                                              • !*****
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 95 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FH-86A J-4 RC461-1502 VIS RC FM-86A H-4 RC462-1502 VIS RC-FM-86A I-2 RC463-1502 VIS RC FM-86A D-2 RC465-1502 VIS RC FM-86A E-6 RC466-l502 VIS

, ****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 96
  • I * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :sis.so ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-2 RC498-1502 VIS RC FM-86A A-6 RC499-1502 VIS RC FM-86A L-2 RCS00-1502 VIS RC FM-86B F-4 RC325-602 VIS RC FM-86B G-4 RC326-602 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 97 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

.REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :sis.so ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RC FM-86B G-4 RC338-1502 VIS RC FM-86B G-4 RC339-1S02 VIS RC FM-868 H-7 RC3S0-1502 VIS RC FM-86B I-5 RC351-1502 VIS RC FM-86B 2-5 RC361-1502 VIS
  • * *-* 12/22/82 NUTECH/PRISIM PAGE 98 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY I FLOW FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES I ,1 ---------====::===

======= ======= ------======= ======= 11 SI FM-89B B-6 SI239-1502 VIS 11 II SI FM-89B F-7 SI240-1502 VIS 'I 11 SI FM-898 B-8 SI241-1502 VIS 1: SI FM-89B B-5 SI245-1502 VIS SI FM-89B C-7 SI246-1502 VIS

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 99 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 * '* SURRY POWER STATION UNIT.2 CODE EDITION :80W80 * ****************************************************************************************************

  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.50 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== -------======= -------------SI FM-89B B-3 SI279-1502 VIS SI FM-89B B-3 SI280-1502 VIS SI FM-89B B-2 SI281-1502 VIS SI FM-89B I-2 SI347-1503 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= 11 II I' ti I ii I Ii ii II II I I I i !' I I I
  • '~**************************************************************************************************
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 100 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C I-6 CHll-1502 VIS CH FM-88C 0-2 CH301-1502 VIS CH FM-88C D-2 CH305-1502 VIS CH FM-88C I-3 CH308-1503 VIS CH FM-88C G-3 CH309-1503 VIS

1 ****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 101 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88C F-6 CH408-1502 VIS CH FM-88C C-3 CH423-l502 VIS CH FM-88C B-3 CH523-1502 VIS RC FM-86A E-2 RC301-2501R VIS RC FM-86A B-2 RC302-2501R VIS
  • RC FM-86A A-4 RC303-2501R VIS RC FM-86A E-5 RC304-2501R VIS RC FM-86A A-6 RC305-2501R VIS RC FM-86A B-8 RC306-2501R VIS *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 102 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------RC FM-86A H-2 RC307-2501R VIS RC FM-86A K-2 RC308-2501R VIS RC* FM-86A K-4 RC309-2501R VIS RC FM-86A H-I RC310-2501R VIS RC FM-86A D-2 RC3il-2501R VIS RC FM-86A D-7 RC312-2501R VIS RC FM-86A I-2 RC313-2501R VIS RC F11-86A E-4 RC314-1502 VIS RC FM-86A H-4 RC315-1502 VIS ----1 I I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 103 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION *: 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ----------------------RC FN-86A
  • E-2 RC316-1502 VIS RC FM-86A E-4 RC317-1502 VIS RC FM-86A E-6 RC318-1502 VIS RC FM-86A E-6 RC319-l502 VIS RC FM-86A H-4 RC320-1502 VIS RC FM-86A H-2 RC321-1502 VIS RC FM-86A E-5 RC322-1502 VIS RC FM-86A E-8 RC323-1502 VIS RC FM-86A H-3 RC324-1502 VIS l I Ii 11 ! ! I I I: I' ' I I I I I I I I I' i' i II II ii 'I I II ------------------------

-_______ ii

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 104 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

.REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RC FM-86A H-3 RC344-1502 VIS RC FM-86A E-3 RC345-1502 VIS RC FM-86A E-7 RC346-l502 VIS RC FM-86A E-2 RC347-1502 VIS RC FM-86A -E-7 RC348-1502 VIS RC FM-86A H-2 RC349-1502 VIS RC FM-86A C-3 RC353-1502 VIS RC FM-86A B-2 RC355-1502 VIS RC FM-86A A-7 RC356-1502 VIS i II
  • * *
  • 12/22/82 NUTECH/PR

!SIM PAGE 105 * * * * *

  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD RELIEF PROGRAM I, ,! REQUEST NOTES I ---------======== ======= ======= -------------======= -------RC FM-86A B-5 RC357-1502 VIS RC FM-86A I-1 RC358-1502 VIS RC FH-86A K-2 RC359-1502 VIS RC FM-86A A-7 RC360-1502 VIS RC FM-86A D-3 RC363-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 106 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :BI5,51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A B-1 RC394-1502 VIS RC FM-86A C-2 RC395-1502 VIS RC FM-86A A-6 RC396-1502 VIS RC FM-86A A-6 RC397-1502 VIS RC FM-86A A-6 RC398-1502 VIS
  • RC FM-86A C-6 RC399-1502 VIS RC FM-86A K-1 RC400-1502 VIS RC FM-86A K-1 RC401-1502 VIS I . I I RC FM-86A K-1 RC402-1502 VIS I I I I I I' *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 107 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :815.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= I -------I I RC FM-86A J-2 RC403-1502 VIS I I RC FM-86A I-5 RC405-1502 VIS [, RC FH-86A I-5 RC406-1502 VIS I I RC FM-86A A-8 RC412-1502 VIS I I RC FM-86A A-8 RC413-2501R VIS [, I
  • RC FH-86A A-8 RC414-1502 VIS ;i ! RC FM-86A C-8 RC415-1502 VIS ii RC FM-86A A-7 RC416-1502 VIS II RC FM-86A B-8 RC417-1502 VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 108 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A B-7 RC418-1502 VIS I RC FM-86A B-8 RC419-2501R VIS I RC FM-86A B-8 RC420-l502 VIS ! I RC FM-86A C-7 RC421-1502 VIS I RC FM-86A C-7 RC422-1502 VIS I I
  • RC FM-86A C-7 RC423-1502 VIS I I RC FM-86A C-6 RC424-1502 VIS I 1, RC FM-86A A-2 RC425-1502 VIS rl I RC FM-86A B-3 RC426-1502 VIS *
  • 1* 1 ____ ------1 I ****************************************************************************************************
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 109 * *
  • REVISION:

0000

  • CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A A-3 RC427-1502 VIS RC FM-86A B-3 RC428-2501R VIS RC* FM-86A B-3 RC429-1502 VIS RC FM-86A B-4 RC430-1502 VIS RC FM-86A B-2 RC431-1502 VIS RC FM-86A C-3 RC432-l502 VIS RC FM-86A B-3 RC433-2501R VIS RC FM-86A C-3 RC434-1502 VIS RC FM-86A C-2 RC436-1502 VIS I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 110
  • I * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :615.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST .NOTES I ---------======== ======= -------------======= ======= I -------11 RC FM-86A
  • C-2 RC437-1502 VIS 1; RC FM-86A C-2 RC438-1502 VIS !' RC FM-86A C-2 RC439-1502 VIS I RC FM-86A A-7 RC440-1502 VIS RC FM-86A L-2 RC441-1502 VIS ** RC FM-86A K-3 RC442-1502 VIS RC FM-86A L-3 RC443-l502 VIS RC FM-86A K-3 RC444-2501R VIS RC FM-86A K-4 RC445-1502 VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 111 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

-REVISION

0000 *
  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RC FM-86A K-4 RC446-1502 VIS RC FM-86A J-3 RC448-1502 VIS RC FM-86A J-3 RC449-1502 VIS RC FM-86A J-3 RC451-2501R VIS RC FM-86A J-4 RC452-1502 VIS
  • I 11 I' I! I' ii I I I I I I i1 I I I I I I I I I I J
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 112 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY PO~IER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P All PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B1s.s1 ITEM DESCRIPTION

PIPING PRESSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= RC FM-86A J-4 RC FM-86A H-4 RC FM-86A I-2 RC FM-86A D-2 RC FM-86A E-6 RC FM-86A D-6 RC FM-86A G-5 RC FM-86A K-2 RC FM-86A G-5 RETAINING BOUNDARY LINE EXAM NUMBER METHOD ======= ------RC461-1502 VIS RC462-1502 VIS RC463-1502 VIS RC465-l502 VIS RC466-l502 VIS RC472-1502 VIS RC473-l502 VIS RC477-1502 VIS RC492-1502 VIS RELIEF REQUEST ======= PROGRAM NOTES =======
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 113 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :Bl5.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A A-2 RC498-1502 VIS RC FM-86A A-6 RC499-l502 VIS RC FM-86A L-2 RCS00-1502 VIS RC FM-86B F-4 RC325-602 VIS RC FM-86B G-4 RC326-602 VIS
  • * *
  • 12/22/82 NUTECH/PRISIN PAGE 114 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------RC FM-86B G-4 RC338-1502 VIS RC FM-86B G-4 RC339-1502 VIS RC FM-86B H-7 RC350-1502 VIS RC FM-86B I-5 RC351-1502 VIS RC FM-86B 2-5 RC361-1502 VIS I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 115 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B,15.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ---------------------------------------------SI FM-89B B-6 SI239-1502 VIS SI FM-89B F-7 SI240-l502 VIS SI FM-89B B-8 SI241-1502 VIS I I SI FM-89B B-5 SI245-1502 VIS I I SI FM-89B .C-7 SI246-1502 VIS 11
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 116 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER !615.51 ITEM DESCRIPTION

PIPING PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------SI FM-896 B-3 SI279-1502 VIS SI FM-896 B-3 SI280-l502 VIS SI* FM-898 B-2 SI281-1502 VIS SI FM-89B I-2 SI347-1503 VIS *
  • * * ---~--------------------
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 117 * *
  • I * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :015.60 ITEM DESCRIPTION

PUMPS PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RC FM-86A A-1 RC-P.-lA VIS RC FM-86A A-6 RC-P-18 VIS RC FM-86A L-1 RC-P-lC VIS I I I 1, 11 I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 118 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 COD~ EDITION !80W80 * ****************************************************************************************************
  • CATEGORY B-P ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :B15.61 ITEM DESCRIPTION

PUMPS PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RC FM-86A A-1 RC-P-lA VIS RC FM-86A A-6 RC-P-1B VIS RC FM-86A L-1 RC-P-lC VIS * *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 119 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************

ITEM NUMBER :c1.10 ITEM DESCRIPTION

PRESSURE VESSELS SHELL CIRCUMFERENTIAL WELDS FLOI~ FLOI~ SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT (11715) COORD NUMBER METHOD ---------======== ----------------------------------CH F11-72A F-4 CHE4 VOL CH FH-88B G-3 CHEl VOL CH FM-88B C-2 CHE2 VOL CH FM-88B J-1 CHFL2 VOL CH FM-88B E-3 CHFL3 VOL CH FH-88B E-3 CHFL4A VOL CH FM-88B E-3 CHFL4B VOL CH FM-88B H-2 CHTK2 VOL CH FM-88C F-2 CHE3 VOL RELIEF REQUEST ======= SR-4 PROGRAM NOTES =======
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 120 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************

ITEM NUMBER :c1.10 ITEM DESCRIPTION

PRESSURE VESSELS SHELL CIRCUMFERENTIAL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM COMPONENT ( 11715) COORD NUMBER METHOD ---------======== ======= ======= ------MS FM-64A A-2 2RCE1A VOL MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL RHR FM-87A K-2 RHElA VOL RHR FM-87A K-2 RHE1B VOL RELIEF REQUEST ======= PROGRAM NOTES =======
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 121 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 ~ODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PRESSURE VESSELS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT C 11715) COORD ---------======== --------------CH FM-72A F-4 CH FM-88B G-3 CH FM-88B C-2 CH FM-88B J-1 CH FM-88B E-3 CH FM-88B E-3 CH FM-88B E-3 CH FM-888 H-2 MS Fl1-64A A-2 HEAD CIRCUMFERENTIAL LINE EXAM NUMBER METHOD ======= ------CHE4 VOL CHEl VOL CHE2 VOL CHFL2 VOL CHFL3 VOL CHFL4A VOL CHFL4B VOL CHTK2 VOL 2RCE1A VOL WELDS RELIEF REQUEST ======= SR-4 PROGRAM NOTES ======= J.
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 122 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PRESSURE VESSELS HEAD CIRCUMFERENTIAL WELDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL RHR FM-87A K-2 RHElA VOL RHR FM-87A K-2 RHElB VOL *
  • JI I * * * ****************************************************************************************************
  • 12/22/82 * * *
  • NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 123 * *
  • REVISION:

0000

  • CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-A PRESSURE RETAINING WELDS IN PRESSURE VESSELS * ****************************************************************************************************

ITEM NUMBER :c1.30 ITEM DESCRIPTION

PRESSURE VESSELS TUBESHEET-TO-SHELL WELD FLOI~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------CH FM-88C F-2 CHE3 VOL MS FM-64A A-2 2RCE1A VOL MS FM-64A A-4 2RCE1B VOL MS FM-64A A-6 2RCE1C VOL I I I I ______ J
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 124 * *
  • I * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowso * ****************************************************************************************************
  • CATEGORY C-B PRESSURE RETAINING WELDS IN NOZZLE VESSELS * ****************************************************************************************************

I ITEM NUMBER :c2.10 ITEM DESCRIPTION

PRESS. VESSELS,NOZ.

IN VESSELS<=

1/2" NOM. THIC FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= -----------------------------CH FM-72A F-4 CHE4 SUR CH FM-88B G-3 CHEl SUR CH FM-88B C-2 CHE2 SUR CH FM-88B J-1 CHFL2 SUR CH FM-88B E-3 CHFL3 SUR

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 125 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl4ER STATION UNIT 2 COD!;. EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-B PRESSURE RETAINING WELDS IN NOZZLE VESSELS * ****************~***********************************************************************************

ITEM NUMBER :c2.20 ITEM DESCRIPTION

PRESS. VESSELS,NOZ.

IN VESSELS> 1/2" NOM. THICK FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------FW FM-64A A-2 2RCE1A SUR VOL FW FH-64A A-4 2RCE1B SUR VOL FW FM-64A A-6 2RCE1C SUR VOL MS FM-64A A-2 2RCE1A SUR

  • VOL MS FH-64A A-4 2RCE1B SUR VOL HS FM-64A A-6 2RCE1C SUR VOL *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 126 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************

ITEM NUMBER :c3.10 ITEM DESCRIPTION

PRESSURE VESSELS INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------------------------------------------------------------------------------CH FM-88B G-3 CHEl SUR CH FM-88B C-2 CHE2 SUR CH FM-88B J-1 CHFL2 SUR CH FM-88B E-3 CHFL3 SUR CH FM-88B E-3 CHFL4A SUR ., CH FM-88B E-3 CHFL4B SUR CH FM-88B H-2 CHTK2 SUR RHR FM-87A K-2 RHElA SUR RHR FM-87A K-2 RHE1B SUR *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 127 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************

ITEM NUMBER :c3.40 ITEM DESCRIPTION

PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------I FW FM-68A B-5 WFPD109-601 SUR FW FM-68A B-3 WFPD113-601 SUR FW FH-68A B-2 WFPDll 7-601 SUR HS FH-64A A-2 SHPlOl-601 SUR MS FH-64A A-4 SHP102-601 SUR HS FH-64A A-6 SHP103-601 SUR MS FM-64A 0-3 SHP145-601 SUR HS FH-64A 0-5 SHP146-601 SUR MS FM-64A 0-6 SHP147-601 SUR -------, I I I I I
  • * * -------------------------------------1 I I ****************************************************************************************************

I' * *

  • 12/22/82 NUTECH/PRISIM PAGE 128 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 *:oDE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-C INTEGRAL ATTACH. -VESSELS,PIPING,PUMPS, & VALVES * ****************************************************************************************************

ITEM NUMBER :c3.4o ITEM DESCRIPTION

PIPING INTEGRALLY WELDED ATTACHMENTS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------RHR FM-87A D-3 RHll0-602 SUR RHR FM-87A J-5 RH112-602 SUR RHR FM-87A L-5 RH116-1502 SUR RHR FM-87A D-7 RH118-602 SUR SI FM-89B C-2 SI248-l502 SUR SI FM-89B C-2 SI249-l502 SUR SI FM-89B B-2 5!344-1502 SUR SI FM-89B B-1 5!345-1502 SUR SI FM-89B B-2 5!353-1502 SUR 11 I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 129 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-D PRESSURE RETAINING BOLTING> 2" IN DIAMETER * ****************************************************************************************************

ITEM NUMBER :c4.30 ITEM DESCRIPTION

PUMPS BOLTS AND STUDS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= -----------------------------CH FM-88B D-7 CHPlA VOL CH FM-888 E-7 CHP1B VOL CH FM-88B G-7 CHPlC VOL * *

,* ----------------*--



****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 130 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY PQl,lER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.11 ITEM DESCRIPTION

PIPING CIRC. WELDS<= l/2 IN. NOM. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== --------------------======= ======= -----------------------cs FM-84A C-2 CS103-153 SUR cs FM-84A D-1 CS104-153 SUR cs FM-84A D-1 CS123-l53 SUR cs FM-84A F-4 CS133-153
  • SUR cs FM-84A G-4 CS134-153 SUR
  • _J
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 131 * *
  • I * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.11 ITEM DESCRIPTION

PIPING CIRC. WELDS<= 1/2 IN. NOH. WALL THICKNES FLOI~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------MS FH-64A A-6 SHP124-601 SUR MS FH-64A C-3 SHP137-601 SUR MS FH-64A B-4 SHP138-601 SUR MS FH-64A C-6 SHP139-60l SUR HS FM-64A D-3 SHP145-601 SUR .;, MS FM-64A D-5 SHP146-601 SUR MS FM-64A D-6 SHP147-601 SUR RC FH-84A G-6 RS109-153 SUR RHR FM,-87A D-7 RH102-602 SUR *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 132 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE. EDITION :aowso * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************f***********************************************************************************

ITEM NUMBER :c5.ll ITEM DESCRIPTION

PIPING CIRC. WELDS<= 1/2 IN. NOM. ~lALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT

<11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RHR FM-87A B-6 RH104-602 SUR RHR FM-87A D-6 RH105-602 SUR RHR FM-87A D-3 RH107-602 SUR RHR FM-87A B-3 RH108-602 SUR RHR FM-87A B-3 RH109-602 SUR

  • l' I I I I I I I I I I I I I I I I I ______ J
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 133 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.11 ITEM DESCRIPTION

PIPING CIRC. WELDS <= 1/2 IN. NON. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT , C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= ----------------RHR FH-87A E-4 RH119-602 SUR RHR FH-87A K-5 RH137-602 SUR RS FM-84A B-6 RSlOl-153 SUR RS FM-84A C-5 RS102-153 SUR RS FM-84A C-2 RS103-153 SUR RS FM-84A C-2 RS104-153 SUR RS FM-84A C-2 RS109-153 SUR RS FM-84A G-6 RSll0-153 SUR RS FM-84A C-2 RSlll-153 SUR I I I I I ! 1! I I I ii II 11 I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 134 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.11 ITEM DESCRIPTION

PIPING CIRC. WELDS <= 1/2 IN. NOM. WALL THICKNES FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------RS FM-84A C-6 RS112-153 SUR RS FM-84A C-2 RS120-153 SUR RS FM-84A C-2 RS121-153 SUR I I RS FM-84A C-2 RS122-153 SUR I RS FM-84A C-A RS123-153 SUR I
  • * ----------------------

!I --I ****************************************************************************************************

  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 135 * *
  • REVISION:

0000 * :ODE EDITION :aowao * ****************************************************************************************************

  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :c5.ll ITEM DESCRIPTION

PIPING CIRC. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= SI FM-89B C-3 SI FM-89B C-3 WELDS <= 1/2 IN. NOM. LINE EXAM NUMBER METHOD ======= ------SI248-1502 SUR SI249-l502 SUR WALL THICKNES RELIEF REQUEST ======= PROGRAM NOTES ======= I I I I I I I I

-I ****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 136 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING l~ELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :c5.2l ITEM DESCRIPTION

PIPING CIRC. WELDS > l/2" NON. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= FW FM-68A B-5 WFPD109-60l SUR VOL FW FM-68A B-3 WFPD113-60l SUR VOL FW FM-68A B-2 WFPDll 7-6 01 SUR VOL MS FM-64A A-2 SHPlOl-601 SUR
  • VOL MS FM-64A A-4 SHP102-60l SUR VOL MS FM-64A A-6 SHP103-60l SUR VOL *
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 137 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.21 ITEM DESCRIPTION

PIPING CIRC. WELDS > 1/2" NOH. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------MS FM-64A A-2 SHP122-601 SUR VOL MS FM-64A A-4 SHP123-601 SUR VOL I, MS FM-64A A-6 SHP124-601
  • VOL SI FM-89A C-2 SI248-1502 SUR VOL SI FM-89A C-2 SI249-1502 SUR VOL 11 I' I i *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 138 * *
  • I * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :c5.21 ITEM DESCRIPTION

PIPING CIRC. WELDS > 1/2" NOH. WALL THICKNESS FLOW FLO~l SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------SI FM-89A A-3 SI345-1502 SUR VOL SI FM-89A A-4 5!352-1502 SUR VOL SI FM-89B C-3 SI248-1502 SUR VOL SI FM-89B C-3 SI249-1502 SUR * , VOL SI FM-89B C-2 SI250-1502 SUR VOL SI FM-89B B-2 SI344-1502 SUR VOL *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 139 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.21 ITEM DESCRIPTION:

PIPING CIRC. WELDS> 1/2" NOM. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (117151 COORD ---------======== ======= SI FM-89B B-1 SI FM-898 B-2 LINE NUMBER --------------SI345-1502 SI353-1502 EXAM METHOD ------SUR VOL SUR VOL RELIEF REQUEST ======= PROGRAM NOTES ======= I I ! I I I I I I I

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 140 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cs.22 ITEM DESCRIPTION

PIPING LONG. WELDS > 1/2" NDM. WALL THICKNESS FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715 l CDDRD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= ----------------------MS FM-64A A-2 SHPlOl-601 SUR VOL MS FM-64A A-4 SHP102-601 SUR VOL MS FM-64A A-6 SHP103-601 SUR VOL MS FM-64A A-2 SHP122-601 SUR
  • VOL MS FM-64A A-4 SHP123-601 SUR VOL MS FM-64A A-6 SHP124-60l SUR VOL * ------1 I I I l1 II I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 141 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

ciooo *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-F PRESSURE RETAINING WELDS IN PIPING * ****************************************************************************************************

ITEM NUMBER :cS.31 ITEM DESCRIPTION

PIPING CIRCUMFERENTIAL WELD,PIPE BRANCH CONNECT! FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------MS FM-64A A-2 SHP122-601 SUR MS FM-64A A-4 SHP123-601 SUR MS FH-64A A-6 SHP124-601 SUR HS FH-64A C-2 SHP137-601 SUR MS FM-64A B-4 SHP138-601 SUR
  • MS FM-64A C-6 SHP139-601 SUR MS FM-64A D-3 SHP145-60l SUR MS FM-64A D-5 SHP146-601 SUR MS FM-64A D-6 SHP147-601 SUR * -1 i I I I I i1 I I !' I I I I ! I I I I ---__ __J
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 142 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION U!HT 2 :ODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H All PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.10 ITEM DESCRIPTION

PRESSURE VESSELS,PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------CH FM-72A F-4 CHE4 VIS CH FM-888 G-3 CHEl VIS CH FM-888 C-2 CHE2 VIS CH FM-88B H-2 CHTK2 VIS I MS FM-64A A-2 2RCE1A VIS I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 143 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.u ITEM DESCRIPTION

PRESSURE VESSELS,PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-72A F-4 CHE4 VIS CH FM-88B G-3 CHEl VIS CH FM-888 C-2 CHE2 VIS CH FM-888 H-2 CHTK2 VIS MS FM-64A A-2 2RCE1A VIS
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 144 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY PmlER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88A C-3 CH325-152 VIS CH FM-88A F-4 CH329-152 VIS CH FM-88B J-1 CHFL2 VIS CH FM-88B E-3 CHFL3
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 145 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (117151 COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= ----------------------CH FM-88B H-3 CH306-602 VIS CH FM-88B B-2 CH307-602 VIS CH FM-88B A-3 CH308-1503 VIS CH Fr1-88B A-6 CH311-1503 VIS CH FM-88B A-7 CH312-1503 VIS
  • I I I I I I I I, Ii I I I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 146 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------CH FM-88B F-6 CH321-1503 VIS CH FM-88B G-6 CH322-1503 VIS CH FM-88B G-2 CH323-152 VIS CH FM-88B H-2 CH324-152 VIS CH FM-88B I-3 CH358-152 VIS CH FM-88B I-3 CH359-152 VIS CH FM-88B G-2 CH367-152 VIS CH FM-88B C-6 CH369-1503 VIS CH FM-88B E-6 CH370-1503 VIS I . J I I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 147 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B G-6 CH371-1503 VIS CH FM-88B E-8 CH372-152 VIS CH FM-88B H-3 CH373-152 VIS CH FM-88B B-6 CH374-1503 VIS CH FM-88B B-6 CH375-152 VIS
  • 11 I I I ! I J, I
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 148 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B D-6 CH381-1503 VIS CH FM-88B H-1 CH387-152 VIS CH FM-88B C-4 CH389-1503 VIS CH FM-88B B-6 CH390-1503 VIS CH FM-88B A-6 CH391-1503 VIS
  • I I I I 11 I I I I I i: I I I I I _l
  • * *
  • 12/22/82 NUTECH/PR ISIM PAGE 149 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 :ooE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 I ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY I FLm~ FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I I COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES II I ----------------======== ======= -------------======= ======= I CH FM-88B D-6 CH414-1503 VIS I I CH FM-88B F-3 CH417-152 VIS I I I CH FM-88B G-3 CH418-152 VIS I I CH FM-88B I-1 CH419-152 VIS I II CH FM-88B H-2 CH420-152 VIS I

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 150 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl4ER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------CH FM-88B H-3 CH465-152 VIS CH FM-88B G-7 CH487-1503 VIS CH FM-88B F-7 CH488-1503 VIS CH FM-88B D-7 CH489-1503 VIS CH FM-88B F-4 CH491-152 VIS CH FM-888 D-3 CH492-152 VIS CH FM-888 J-1 CH493-152 VIS CH FM-888 G-1 CH494-152 VIS CH FM-888 G-2 CH499-l52 VIS I I I I J
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 151 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ------------------------======= ------======= ======= ---------------CH FM-88B H-7 CH501-152 VIS CH FM-88B G-7 CH502-152 VIS CH FM-88B E-7 CH503-152 VIS CH FM-88B B-8 CH504-152
  • 11 1: ;1 II I ,, I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 152 * ** *
  • I * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------CH FM-88B I-4 CH512-152 VIS CH FM-88B C-7 CH524-1503 VIS CH FM-88B E-7 CH525-1503 VIS CH FM-88B G-7 CH526-1503 VIS CH FM-88B A-4 CH531-1503 VIS
  • 11 I I I : I f: :1 I J"
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 153 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (ll7l5) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C E-2 CH305-l502 VIS CH FM-88C I-2 CH306-602 VIS CH FM-88C E-6 CH3l5-l502 VIS CH FM-88C H-6 CH316-1502 VIS CH FM-88C F-2 CH382-l502 VIS

~ ****************************************************************************************************

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 154 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88C H-8 CH392-1503 VIS CH FM-88C E-8 CH394-1503 VIS CH FM-88C B-8 CH396-1503 VIS CH FM-88C B-5 CH398-1502 VIS CH FM-88C G-4 CH399-152 VIS

~---~--------------~--------------------*--


****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 155 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88C B-4 CH424-152 VIS I CH FM-88C C-4 CH514-152 VIS I I CH FM-88C C-5 CH515-152 VIS I I CH FM-88C G-5 CH516-152 VIS I CH FM-88C C-5 CH517-152 VIS *I I I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 156 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 :ODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING .COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------cs FM-84A I-3 CSlOl-153 VIS cs FM-84A I-3 CS102-153 VIS cs FM-84A C-1 CS103-153 VIS cs FM-84A D-1 CS104-153 VIS cs FM-84A K-1 CS114-152 VIS cs FM-84A C-1 CS122-153 VIS cs FM-8l1A C-3 CS123-153 VIS cs FM-84A C-2 CS124-ICN1 VIS cs FM-84A F-4 CS133-153 VIS I _____ _l
  • * ** ---------1
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY Pm~ER STATION UNIT 2 PAGE 157 REVISION:

0000 CODE EDITION :eoweo * * * * * * ****************************************************************************************************

  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT C 11715 l COORD NUMBER METHOD REQUEST NOTES ======== ======= ======= ------*======= ======= cs FM-84A G-3 CS134-153 VIS cs FM-84A F-3 CS135-153 VIS cs FM-84A H-4 CS136-153 VIS cs FM-84A G-2 CS174-153 VIS cs FM-84A G-2 CS175-153 VIS FW FM-68A B-5 WFPD109-601 VIS FW FM-68A B-4 WFPD113-601 VIS FW FM-68A B-2 WFPDll 7-601 VIS MS FM-64A B-3 SAE105-121 VIS I I I I I l I I I I I

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 158 * ., * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -------------------------------------======= ======= ----------------------MS FM-64A C-3 SDHVlOl-601 VIS MS FM-64A C-4 SDHV102-601 VIS MS FM-64A C-6 SDHV103-601 VIS MS FM-64A C-3 SDHV104-601 . VIS MS FM-64A A-2. SHPlOl-601 VIS
  • MS FM-64A A-4 SHP102-601 VIS FM-64A 1. MS A-6 SHP103-601 VIS I MS FN-64A B-3 SHP122-601 VIS MS FM-64A B-4 SHP123-601 VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 15? * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****~***********************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------MS FM-64A B-6 SHP124-601 VIS MS FM-64A C-8 SHP128-601 VIS MS FM-64A C-8 SHP129-601 VIS MS FM-64A C-8 SHP130-601 VIS MS FM-6'*A F-8 SHP13l-601 VIS
  • I i I I I I I I ! I I I I I'
  • *
  • 12/22/82 NUTE CH/PR !SIN PAGE 160 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :so1~so * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A C-6 SHP139-601 VIS MS FM-64A D-2 SHP145-601 VIS MS FM-64A D-4 SHP146-601 VIS MS FM-64A C-6 SHP147-601 VIS MS FM-64A B-3 SSVlOl-121 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 161 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= MS FM-64A B-4 SSV107-121 VIS MS FM-64A C-4 SSV108-121 VIS MS FM-64A C-4 SSV109-121 VIS MS FM-64A B-4 SSVll0-121 VIS MS FM-64A B-6 SSVlll-121 VIS
  • * *
  • 12/22/82 NUTECH/PRISIH PAGE 162 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *'

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOl4 FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORO NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RHR FM-87A G-3 RH103-602 VIS RHR FM-87A B-6 RH104-602 VIS RHR FM-87A C-6 RH105-602 VIS RHR FH-87A A-4 RH106-602 VIS RHR FH-87A C-4 RH107-602 VIS
  • RHR FH-87A A-3 RH108-602 VIS RHR FH-87A B-3 RH109-602 VIS RHR FH-87A D-3 RHll0-602 VIS RHR FH-87A F-6 RHlll-602 VIS * -----1 I I I I I I . I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 163 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 :ODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= RHR FH-87A E-5 RH112-602 VIS RHR FH-87A H-4 RH113-602 VIS RHR FM-87A I-5 RH114-602 VIS RHR FM-87A K-5 RH116-602 VIS RHR FM-87A E-7 RH118-602 VIS
  • I I I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 164 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :C7.20 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== ======= ======= ------======= ======= I RHR FH-87A C-6 RH150-602 VIS I RHR FM-87A E-7 RH2-602 VIS I RS FM-84A B-7 RSlOl-153 VIS I I RS FH-84A D-7 RS102-153 VIS I RS FM-84A A-4 RS103-l53 VIS I I

  • RS FM-84A C-4 RS104-153 VIS RS FM-84A F-8 RS107-153 VIS RS FM-84A F-8 RS108-153 VIS RS FM-84A G-6 RS109-153 VIS I I :1 I 11 I, Ii I *
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 165 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 * *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------RS FM-84A H-6 RSll0-153 VIS RS FM-84A 0-4 RSlll-153 VIS RS FM-84A E-4 RS112-153 VIS I I RS FM-84A G-8 RS114-153 . VIS I RS FM-84A A-3 RS120-153 VIS I I
  • RS FM-84A B-3 RS121-153 VIS 11 11 RS FM-84A D-3 RS122-153 VIS I, I RS FM-84A E-3 RS123-153 VIS I' I RS FM-84A F-8 RS124-153 VIS I I I I *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 166 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.20 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A A-8 SI201-153 VIS SI FM-89A A-8 SI202-153 VIS SI FM-89A H-8 SI205-153 VIS SI FM-89A F-4 SI207-152 VIS SI FM-89A G-5 SI213-153 VIS

  • 1: I I I I -~~--~I, 11 ****************************************************************************************************
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 167 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= -------------======= ------------------------SI Fl1-89A E-6 SI219-152 VIS SI FM-89A F-2 SI220-1503 VIS SI FN-89A H-7 SI223-152 VIS SI FN-89A F-6 SI224-153 VIS SI Fl1-89A E-6 SI225-152 VIS
  • SI FN-89A H-5 SI230-152 VIS SI Hl-89A A-3 SI248-1502 VIS SI FM-89A A-3 SI249-1502 VIS SI FM-89A E-6 SI255-153 VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 168 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= -----------------------SI FM-89A F-7 SI256-153 VIS SI FM-89A H-2 SI257-1503 VIS SI FM-89A H-2 SI258-1503 VIS SI FM-89A H-1 SI259-l503 VIS SI FM-89A E-1 SI268-1503 VIS
  • I 11 ! 11 I I I I J
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 169 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------SI FM-89A D-8 SI284-152 VIS SI FM-89A D-6 SI292-153 VIS SI FH-89A F-2 SI293-1503 VIS SI FM-89A F-4 SI302-152 VIS SI FM-89A D-6 SI306-152 VIS SI FM-89A I-6 SI330-152 VIS SI FM-89A J-4 SI331-152 VIS SI Hl-89A C-7 SI332-153 VIS SI FM-89A C-8 SI333-ICN9 VIS I I I I I I I ' I I I I I I *I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 170 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 ~ODE EDITION :eoweo * **~*************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======== ======= ------======= ----------------------SI FM-89A E-7 SI334-ICN9 VIS SI FM-89A D-8 SI335-ICN9 VIS SI FM-89A E-7 SI336-ICN9 VIS SI FM-89A F-7 SI337-153 VIS SI FM-89A F-8 SI338-ICN9 VIS
  • I ______ J
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 171 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c?.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= --------------------======= --------------SI FM-89A B-2 SI347-1503 VIS SI FM-89A .E-5 SI348-153 VIS SI FM-89A E-5 5!349-153 VIS SI FM-89A D-5 5!350-153 VIS SI FM-89A D-6 SI351-153 VIS
                                                                                                                                                                    • ~*****************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 172 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------SI FM-89A D-8 SI362-153 VIS SI FM-89A F-8 SI363-153 VIS SI FM-89A B-2 SI90-1503 VIS SI FM-89B G-8 SI201-153 . VIS SI FM-89B G-8 SI202-153 VIS I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 173 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY PmlER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H All PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89B C-2 SI248-1502 VIS SI FM-89B C-3 SI249-1502 VIS SI FM-89B B-3 SI250-1502 VIS SI FM-89B B-5 SI263-602 VIS SI FM-89B G-6 SI265-602 VIS SI FM-89B I-1 SI270-1503

' VIS SI FM-89B E-1 SI271-1503 VIS SI FM-89B B-1 SI274-1502 VIS SI FM-89B B-2 SI275-1502 VIS I I I I I I I I I I I

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 174 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------SI FM-89B E-1 SI276-1503 VIS SI FM-89B B-1 SI285-1502 VIS SI FM-89B G-5 SI297-602 VIS SI FM-89B D-4 SI300-602 VIS SI FM-89B I-3 SI343-l502 VIS
  • SI FM-89B B-1 SI344-1502 VIS SI *FM-89B B-1 SI345-1502 VIS SI FM-89B I-1 SI346-1503 VIS I SI FM-89B B-2 SI353-1502 VIS I I ** ------------------------------------------*----------------------i
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 175 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.20 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B D-1 SI354-1502 VIS SI FM-896 C-3 SI355-1502 VIS SI FM-896 D-1 SI356-l502 VIS SI FM-89B C-2 SI357-1502 VIS SI FM-89B D-2 SI358-1502 VIS SI FM-896 C-4 SI359-1502 VIS T I
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 176 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ------------------------------CH FM-88A C-3 CH325-152 VIS i CH FM-88A F-4 CH329-152 VIS I I, CH FM-88B J-1 CHFL2 VIS 1: CH FM-88B E-3 CHFL3 VIS 1; I' CH FM-88B E-3 CHFL4A VIS I
  • CH FM-88B E-3 CHFL4B VIS I i CH FH-88B G-1 CH194-152 VIS I I I CH FM-88B F-6 CH302-1503 VIS I CH FM-88B G-6 CH303-1503 VIS 11 ! I *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 177 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------CH FM-88B H-3 CH306-602 VIS CH FM-88B B-2 CH307-602 VIS CH FM-88B A-3 CH308-1503 VIS CH FM-88B A-6 CH311-1503 VIS CH FM-88B A-7 CH312-1503 VIS CH FM-88B A-7 CH313-1503 VIS CH FM-88B H-4 CH317-152 VIS CH FM-88B G-8 CH318-152 VIS CH FM-88B I-7 CH319-152 VIS ---,1 I I 'I I i I I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 178 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY Pm~ER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FH-88B F-6 CH321-1503 VIS CH FM-88B G-6 CH322-1503 VIS I CH FH-88B G-2 CH323-152 VIS I I CH FH-88B H-2 I CH324-152 VIS I CH FM-88B I-3 CH358-152 VIS I I
  • CH FM-88B I-3 CH359-152 VIS II CH FM-88B G-2 CH367-152 VIS I CH FH-88B C-6 CH369-1503 VIS I !. CH FH-88B E-6 CH370-1503 VIS I ,I 11 I ,I 11
  • II ii ,, I i!
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 179 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ======== ======= ======= ------======= ======= CH FM-88B G-6 CH371-1503 VIS CH FM-88B E-8 CH372-152 VIS CH FM-88B H-3 CH373-152 VIS CH FM-88B I B-6 CH374-1503 VIS r' CH FM-88B B-6 CH375-152 VIS 11

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 180 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------CH FM-88B D-6 CH381-1503 VIS CH FM-88B H-1 CH387-152 VIS CH FM-88B C-4 CH389-1503 VIS CH FM-88B B-6 CH390-1503 VIS CH FM-88B A-6 CH391-1503 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 181 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------CH FM-88B D-6 CH414-1503 VIS CH FM-88B F-3 CH417-152 VIS CH FM-88B G-3 CH418-152 VIS CH FM-88B I-1 CH419-152 VIS CH FM-88B H-2 CH420-152 VIS

  • I 11 11 11 1: I 1: I I I I I ! I \1 I .--1.
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 182 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POHER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B H-3 CH465-152 VIS CH FM-88B G-7 CH487-1503 VIS CH FH-88B F-7 CH488-l503 VIS CH FM-88B D-7 CH489-1503 VIS CH FM-88B F-4 CH491-152 VIS
  • CH FM-88B D-3 CH492-152 VIS CH FH-88B J-1 CH493-152 VIS CH FM-88B G-1 CH494-152 VIS CH FH-88B G-2 CH499-152 VIS
  • j
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 183 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= -------------======= ======= ---------------CH FM-88B i H-7 CH501-l52 VIS CH FM-88B G-7 CH502-l52 VIS CH FM-88B E-7 CH503-152 VIS CH FM-88B B-8 CH504-152 VIS CH FM-88B C-8 CH505-152 VIS
  • I I I I I I I I I I I I I I ! I! 1: I I I I 11 I I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 184 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLO!~ FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FM-88B I-4 CH512-152 VIS CH FM-888 C-7 CH524-1503 VIS CH FM-888 E-7 CH525-1503 VIS CH FM-88B G-7 CH526-1503 VIS CH FM-88B A-4 CH531-1503 VIS
  • I _J
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 185 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= CH FH-88C E-2 CH305-1502 VIS CH FH-88C I-2 CH306-602 VIS CH FH-88C E-6 CH315-1502 VIS CH FH-88C H-6 CH316-1502 VIS CH FH-88C F-2 CH382-1502 VIS
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 186 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= ---------CH FM-88C H-8 CH392-1503 VIS CH FM-88C E-8 CH394-1503 VIS I I CH FM-88C B-8 CH396-1503 VIS I CH FM-88C B-5 CH398-1502 VIS I I CH FM-88C G-4 CH399-152 VIS 11
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 187 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.21 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= ----------------------CH FM-88C B-4 CH424-152 VIS CH FM-88C C-4 CH514-152 VIS CH FM-88C C-5 CH515-152 VIS I I CH FM-88C G-5 CH516-152 . VIS ! CH FM-88C C-5 CH517-152 VIS I

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 188 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------cs FM-84A I-3 CSlOl-153 VIS cs FM-84A I-3 CS102-153 VIS cs FM-84A C-1 CS103-153 VIS cs FM-84A D-1 CS104-153 VIS cs FM-84A K-1 CS114-152 VIS
  • cs FM-84A C-1 CS122-153 VIS cs FM-84A C-3 CS123-153 VIS* cs FM-84A C-2 CS124-ICN1 VIS cs FM-84A F-4 CS133-153 VIS * ~----1 I I I I I I
  • ****************************************************************************************************
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2

  • PAGE 189 * *
  • REVISION:

0000

  • CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------cs FM-84A G-3 CS134-153 VIS cs FM.:84A F-3 CS135-153 VIS cs FM-84A H-4 CS136-153 VIS cs FM-84A G-2 CS174-153 VIS cs FM-84A G-2 CS175-153 VIS FW FM-68A B-5 WFPD109-601 VIS FW FM-68A 8-4 WFPD113-601 VIS FW FM-68A 8-2 WFPDll 7-601 VIS MS FM-64A B-3 SAE105-121 VIS -------\
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 190 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------MS FM-64A C-3 SDHVlOl-601 VIS MS FM-64A C-4 SDHV102-601 VIS MS FM-64A C-6 SDHV103-601 VIS MS FM-64A C-3 SDHV104-601 VIS MS FM-64A A-2 SHPlOl-601 VIS
  • I I I I I I I I I ! 1: I' I I ! I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 191 * *
  • I *
  • j!
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo
  • jl ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

I I ITEM NUMBER :c1.21 I ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== ======= ======= -------------======= -------I I MS FM-64A B-6 SHP124-601 VIS I, )I MS FM-64A C-8 SHP128-601 VIS I I I MS FM-64A C-8 SHP129-601 VIS l1 MS FM-64A C-8 SHP130-601 VIS I I MS FM-64A F-8 SHP131-601 VIS 11 !1

  • MS FM-64A 8-7 SHP132-601 VIS : MS FM-64A C-8 SHP135-601 VIS I MS FM-64A C-2 SHP137-601 VIS MS FM-64A B-4 SHP138-601 VIS
  • _l
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 192 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------MS FM-64A C-6 SHP139-601 VIS MS FM-64A ci-2 SHP145-601 VIS MS FM-64A D-4 SHP146-601 VIS HS FM-64A C-6 SHP147-601 VIS MS FM-64A B-3 SSVlOl-121 VIS HS FM-64A B-3 SSV102-121 VIS . HS FH-64A C-3 SSV103-121 VIS HS FM-64A C-3 SSV104-121 VIS MS FM-64A B-4 SSV106-121 VIS --------;1 I I I I I I I I I J
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 193 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= -------MS FM-64A B-4 SSV107-121 VIS MS FM-64A C-4 SSV108-121 VIS MS FM-64A C-4 SSV109-121 VIS MS FM-64A B-4 SSVll0-121 VIS MS FM-64A B-6 SSVlll-121 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 194 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FM-87A G-3 RH103-602 VIS RHR FM-87A B-6 RH104-602 VIS RHR FM-87A C-6 RHlOS-602 VIS RHR FM-87A A-4 RH106-602 VIS RHR FM-87A C-4 RH107-602 VIS
  • _____ J
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 195 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FM-87A E-5 RHll2-602 VIS RHR FM-87A H-4 RHll3-602 VIS RHR FM-87A I-5 RHll4-602 VIS RHR FM-87A K-5 RHll6-602 VIS RHR FM-87A E-7 RHll8-602 VIS
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 196 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RHR FN-87A C-6 RH150-602 VIS RHR FM-87A E-7 RH2-602 VIS RS FH-84A B-7 RSlOl-153 VIS RS FH-84A D-7 RS102-l53 VIS RS FH-84A A-4 RS103-l53 VIS

  • i I I I I I I II !1 I I I I I 1, --~J
  • *
  • 12/22/82 NUTECH/PRISIH PAGE 197 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------RS FM-84A H-6 RSll0-153 VIS RS FM-84A D-4 RSlll-153 VIS RS FM-84A E-4 RSll2-153 VIS RS FM-84A G-8 RSll4-l53 VIS RS FM-84A A-3 RSl20-l53 VIS
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 198 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POl~ER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------SI FM-89A A-8 SI201-153 VIS SI FM-89A A-8 SI202-153 VIS SI FM-89A H-8 SI205-153 VIS SI FM-89A F-4 SI207-152 VIS SI FM-89A G-5 SI213-153 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 199 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------SI FM-89A E-6 SI219-l52 VIS SI FM-89A F-2 SI220-1503 VIS SI FH-89A H-7 SI223-152 VIS SI FH-89A F-6 SI224-153 VIS I SI FH-89A E-6 SI225-152 VIS 11 I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 200 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715 l COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A F-7 SI256-l53 VIS SI FM-89A H-2 SI257-l503 VIS SI FM-89A H-2 SI258-l503 VIS SI FM-89A H-1 ' SI259-l503 VIS SI FM-89A E-1 SI268-l503 VIS
  • II II .I I i ii I I. I, I I J

1 I ****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 201 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION:

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715 J COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ---------------------SI FM-89A D-8 SI284-l52 VIS SI FM-89A 0-6 SI292-l53 VIS SI FM-89A F-2 SI293-l503 VIS SI FM-89A F-4 SI302-l52 VIS I SI FM-89A D-6 SI306-l52 VIS I I

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 202 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :SOW80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :C7.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOI~ FLOI~ SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAl1 COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------SI FM-89A E-7 SI334-ICN9 VIS SI FM-89A D-8 SI335-ICN9 VIS SI FM-89A E-7 SI336-ICN9 VIS SI FM-89A F-7 SI337-153 VIS SI FM-89A F-8 SI338-ICN9 VIS

---;1 ****************************************************************************************************

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 203 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------SI FM-89A B-2 SI347-1503 VIS SI FM-89A E-5 SI348-153 VIS SI FM-89A E-5 SI349-153 VIS SI FM-89A D-5 SI350-153 VIS SI FM-89A D-6 SI351-153 VIS
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 204 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89A D-8 SI362-l53 VIS SI FM-89A F-8 SI363-l53 VIS SI FM-89A B-2 SI90-l503 VIS SI FM-89B G-8 SI20l-l53 VIS SI FM-89B G-8 SI202-l53 VIS SI FM-89B G-7 SI234-l502 VIS SI FM-89B D-5 SI236-602 VIS SI FM-89B B-5 SI245-1502 VIS SI FM-89B F-6 SI246-1502 VIS I I I _J
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 205 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= -------------======= *--------------SI FM-89B C-2 SI248-1502 VIS SI FM-89B C-3 SI249-1502 VIS SI FM-89B B-3 SI250-1502 VIS SI FM-89B B-5 SI263-602 VIS SI FM-89B G-6 SI265-602 VIS
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 206 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B E-1 SI276-1503 VIS SI FM-89B B-1 SI285-1502 VIS SI FM-89B G-5 SI297-602 VIS SI FM-89B D-4 SI300-602 VIS SI FM-89B I-3 SI343-1502 VIS
  • i i l1 I 1: I I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 207 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.21 ITEM DESCRIPTION

PIPING, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SI FM-89B D-1 SI354-1502 VIS SI FM-89B C-3 SI355-1502 VIS SI FM-898 D-1 SI356-1502 VIS SI FM-89B C-2 SI357-1502 VIS SI FM-89B D-2 SI358-1502 VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 208 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.30 ITEM DESCRIPTION:

PUMPS, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C li715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= ----------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCPlB VIS RC FM-86A L-1 RCPlC VIS RHR FM-87A C-6 RHPlA VIS RHR FM-87A C-6 RHPlB VIS *

  • _ __j
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 209 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 COOE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.3l ITEM DESCRIPTION

PUMPS, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------RC FM-86A A-1 RCPlA VIS RC FM-86A A-6 RCPlB VIS RC FM-86A L-1 RCPlC VIS RHR FM-87A C-6 RHPlA VIS RHR FM-87A C-6 RHPlB VIS I I I I I I I I I I I I I I *
  • * * ---------------------i
  • *
  • 12/22/82 NUTECH/PRISIN PAGE 210 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.4o ITEM DESCRIPTION

VALVES, PRESSURE FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM COMPONENT (11715) COORD ---------======== ======= FW FH-68A C-5 FW FM-68A C-3 FW FM-68A C-2 HS FM-64A 8-3 HS FH-64A A-4 MS FH-64A 8-5 MS FM-64A 8-3 MS FM-64A 8-4 HS FM-64A B-6 RETAINING BOUNDARY LINE EXAM NUMBER METHOD ======= ------WFPD109-601 VIS WFPD113-601 VIS WFPD117-601 VIS SHPlOl-601 VIS SHP102-601 VIS SHP103-601 VIS SHP122-601 VIS SHP123-601 VIS SHP124-601 VIS RELIEF REQUEST ======= PROGRAM NOTES ======= ! i I I I 11 11 11 11 Ii I I I i: I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 211 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • **************************************************************************~*************************

ITEM NUMBER :c1.4o I ITEM DESCRIPTION

VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ======= -------HS FM-64A D-3 SHP145-601 VIS MS FM-64A D-5 SHP146-601 VIS MS FM-64A D-6 SHP147-601 VIS RHR FH-87A E-6 RH102-602 VIS RHR FH-87A B-6 RH104-602 VIS RHR FH-87A D-6 RH105-602 VIS RHR FM-87A A-3 RH108-602 VIS RHR FM-87A I-5 RH109-602 VIS RHR FM-87A D-3 RHll0-602 VIS I I I I I
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 212 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :sOW80 * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.40 ITEM DESCRIPTION:

VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------RHR FM-87A C-3 RH112-602 VIS RHR FM-87A B-3 RH114-602 VIS RHR FM-87A D-3 RH116-602 VIS RHR FM-87A C-6 RH118-602 VIS RHR FM-87A G-4 RH119-602 VIS SI FM-891 J-4 SI249-1502 VIS SI FM-89A B-5 SI248-1502 VIS SI FM-89A B-6 SI249-1502 VIS SI FM-89A B-6 SI352-1502 VIS -1 I I I I 11

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 213 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.40 ITEM DESCRIPTION:

VALVES, PRESSURE RETAINING BOUNDARY SYSTEM/ COMPONENT SI FLOW FLOW DIAGRAM (11715) ----------------FM-89B DIAGRAM COORD ======= J-3 LINE NUMBER ======= SI248-l502 EXAM METHOD VIS RELIEF REQUEST ======= PROGRAM NOTES ======= I I I I I I I ! I 1: I I ! I I I I I I I I I I I I I I I I I 11 I I ___ J

  • *
  • 12/22/82 NUTE CH/PR !SIM PAGE 214 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE_EDITION
eoweo * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.41 ITEM DESCRIPTION

VALVES, PRESSURE RETAINING BOUNDARY I FLmJ FLOW I SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== -------======= ------======= ======= I, -------FW FM-68A C-5 WFPD109-601 VIS I I FW FM-68A C-3 WFPD113-601 VIS I I FW FM-68A C-2 WFPDll 7-601 VIS I MS FM-64A B-3 SHPlOl-601 VIS I I MS FM-64A A-4 SHP102-601 VIS I I
  • MS FM-64A B-5 SHP103-601 VIS I I MS FM-64A B-3 SHP122-601 VIS I MS FM-64A B-4 SHP123-601 VIS MS FM-64A B-6 SHP124-601 VIS *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 215 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c1.41 ITEM DESCRIPTION

VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT C 117151 COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= -------------======= ------------------------MS FM-64A D-3 SHP145-601 VIS MS FM-64A D-5 SHP146-601 VIS MS FM-64A D-6 SHP147-601 VIS RHR FM-87A E-6 RH102-602 VIS RHR FM-87A B-6 RH104-602 VIS
                                                                                        • l********************************************************
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 216 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :801~80 * ************************************************l!***************************************************
  • CATEGORY C-H All PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.41 ITEM DESCRIPTION

VALVES, PRESSURE RETAINING BOUNDARY FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------RHR FM-87A C-3 RH112-602 VIS RHR FM-87A B-3 RH114-602 VIS RHR FM-87A D-3 RH116-602 VIS RHR FM-87A C-6 RH118-602 VIS RHR FM-87A G-4 RH119-602 VIS
  • SI FM-89( J-4 SI249-1502 VIS SI FM-89A B-5 SI248-1502 VIS SI FM-89A B-6 SI249-1502 VIS SI FM-89A B-6 SI352-l502 VIS I I ! I I I I I I I, I I I ! I I I I \1 I I I
  • I * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 217 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eowso * ****************************************************************************************************
  • CATEGORY C-H ALL PRESSURE RETAINING COMPONENTS
  • ****************************************************************************************************

ITEM NUMBER :c7.41 ITEM DESCRIPTION:

VALVES, PRESSURE RETAINING BOUNDARY SYSTEM/ COMPONENT SI FLOW FLOW DIAGRAM ( 11715) ======== FM-89B DIAGRAM COORD ======= J-3 LINE NUMBER ======= SI248-1502 EXAM METHOD VIS RELIEF REQUEST ======= PROGRAM NOTES --------------l Ii I I I I

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 218 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY .POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOU FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ------======= ======= --------cc FM-71B C-7 CC36S-1Sl VIS cc FM-71B G-6 CC366-1Sl VIS cc FM-71B F-7 CC367-1Sl VIS cc FM-71B E-6 CC369-1Sl VIS cc F11-71B D-S CC370-1Sl VIS

  • cc Fl1-71B G-S CC371-1Sl VIS cc F11-71B E-S CC372-1Sl VIS cc FM-71B c-s CC373-1Sl VIS cc FM-71B I-S CC374-1Sl VIS *
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 219 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONEHT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= cc FM-71B G-5 CC375-151 VIS cc FM-71B H-4 CC376-151 VIS cc FM-71B E-4 CC377-151 VIS cc FM-71B B-4 CC378-151 VIS cc FM-71B G-5 CC379-151 VIS

  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 220 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDmlN, PRESS. RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------cc FM-72A E-8 CClS-121 VIS cc FM-72A A-8 CC161-151 VIS cc FM-72A A-7 CC162-151 VIS cc FM-72A A-7 CC163-151 VIS cc FM-72A A-8 CC164-151 VIS cc FM-72A A~8 CC165-151 VIS cc FM-72A C-8 CC166-151 VIS cc FM-72A C-8 CC167-151 VIS cc FM-72A C-8 CC168-151 VIS ---1 I I I I I
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 221 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT C 11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== -------======= ------======= ---------------------! cc FM-72A A-6 CC169-151 VIS I I cc FM-72A B-4 CC170-151 VIS I I I cc FM-72A A-5 CC171-151 VIS I I cc FM-72A A-5 CC172-151 VIS I I cc FM-72A D-8 CC173-151 VIS I I

  • cc FM-72A D-5 CC174-151 VIS I I cc FM-72A D-5 CC175-151 VIS !! cc FM-72A C-7 CC176-151 VIS I I cc Fl1-72A A-3 CC177-151 VIS I ' *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 222 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMB.ER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------cc FM-72A A-2 CC178-151 VIS cc FM-72A A-3 CC179-151 VIS cc FM-72A A-3 CC180-151 VIS cc FM-72A D-8 CC181-151 VIS cc FM-72A D-3 CC182-151 VIS cc FM-72A C-3 CC183-151 VIS cc FM-72A F-7 CC185-151 VIS cc FM-72A F-4 CC187-151 VIS cc FM-72A F-5 CC188-151 VIS Ii ___ J

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 223 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= -------------======= ---------------------cc FM-72A F-6 CC189-151 VIS cc FM-72A G-7 CC190-151 VIS cc FM-72A G-4 CC192-151 VIS cc FM-72A H-6 CC194-151 VIS cc FM-72A A-2 CC208-151 VIS

  • * *
  • 12/22/82 NUTECH/PRISIN PAGE 224 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= --------------. cc FM-72A G-1 CC215-151 VIS cc FM-72A H-5 CC219-151 VIS cc FM-72A E-1 CC253-151 VIS cc FM-72A G-8 CC254-151 VIS cc FM-72A G-7 CC272-151 VIS I

  • cc FM-72A G-7 CC275-151 VIS I I I I cc FM-72A C-1 CC7-121 VIS I cc FM-72A C-1 CC9-121 VIS ! I cc FM-72B E-3 CC153-151 VIS I Ii I I I *
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 225 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (ll7l5) COORD NUMBER METHOD REQUEST NOTES -----------------======= ======= ---------------------------------------------------cc FM-72B C-2 CCl54-l5l VIS cc FM-72B D-3 CCl55-l5l VIS cc FM-72B D-2 CC186-151 VIS cc FM-72B C-2 CC191-151 VIS cc FM-72B G-2 CC263-l51 VIS

  • * * ****************************************************************************************************
  • * * * *
  • 12/22/82 NUTECH/PRISIM INSERVICE INSPECTION PLAN

SUMMARY

SURRY POWER STATION UNIT 2 PAGE 226 * * *

  • REVISION:

0000

  • CODE EDITION :aoweo * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTOOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPOHENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= cc FM-72E H-3 CC146-l5l VIS cc FM-72E I-3 CC148-l5l VIS cc FM-72E E-1 CC72-l21 VIS cc FM-72F D-3 CC149-l51 VIS cc FM-72F B-3 CC152-l21 VIS cc FM-72F E-3 CC156-l51 VIS cc FM-72F D-2 CC159-l51 VIS cc FM-72F D-3 CC160-151 VIS cc FM-72F C-2 CC163-l5l VIS ----I I I I I I I i I I I I I I I I I; II II 11 I 11 I *1 I I: I I I I

                                                                                                                                                                                  • l***********
  • *
  • 12/22/82 NUTECH/PRISIN PAGE 227 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM -LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= -------cc FM-72F B-3 CC181-121 VIS CH FM-88B L-4 CH342-152 VIS CH FM-88B L-4 CH356-152 VIS CH FM-88B K-4 CH357-152 VIS CH FM-88B J-4 CH358-152 VIS

____J_

  • *
  • 12/22/82 NUTECH/PRISIM PAGE 228 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aoW80 * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES I ---------======== ======= ======= ------======= -------I -------1, FW FM-68A D-7 WAPD103-601 VIS I FW FM-68A D-6 WAPD104-601 VIS I I FW FM-68A E-6 WAPD105-601 VIS I FW FM-68A E-6 WAPD106-60 VIS I I FW FM-68A F-6 WAPD107-601 VIS I

  • * * ----------I ****************************************************************************************************
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 229 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NU~IBER METHOD REQUEST NOTES ---------======== -------======= -------------======= --------------FW FM-68A B-6 WAPD112-60l VIS FW FM-68A B-6 WAPD113-60l VIS FW FM-68A B-6 WAPD114-601 VIS FW FM-68A D-7 WAPDllS-601 VIS FW FM-68A D-6 ~IAPD116-151 VIS FW FM-68A E-7 WAPDll 7-601 VIS FW FM-68A F-6 WAPD118-151 VIS FW FM-68A F-L WAPD119-151 VIS FW FM-68A F-7 WAPD120-601 VIS I I I ! J, I I I I J

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 230 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 COD~ EDITION :aowao * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM. LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -----------------------------------------------------------------------FW FM-68A G-6 WAPD12l-151 VIS FW FM-68A B-7 WAPD150-601 VIS FW FM-68A B-L WAPD151-601 VIS FW FM-68A C-6 WAPD52-601 VIS FW FM-68A G-8 WCMU-151 VIS

  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 231 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :80W80 * ****************************************************************************************************
  • CATEGORY D-A SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION * ****************************************************************************************************

ITEM NUMBER :01.10 ITEM DESCRIPTION

SUPPORT REACTOR SHUTDOWN,PRESS.

RETAINING COMPS. FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= FW FM-68A E-8 WCMU108-151 VIS FW FM-68A E-8 WCt!Ull0-151 VIS FW FM-68A F-8 WEMU109-151 VIS MS FM-64A B-4 SHP125-601 VIS MS FM-64A B-6 SHP126-601 VIS

  • MS Ftl-64A B-7 SHP127-601 VIS MS FM-64A G-8 SHP157-601 VIS SI FM-89A G-2 SI260-1503 VIS SI FM-89A I-1 SI287:-1503 VIS *
  • *
  • 12/22/82 NUTE CH/PR ISIM PAGE 232 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION !80W80 * ****************************************************************************************************
  • CATEGORY 0-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************

ITEM NUMBER :02.10 I ITEM DESCRIPTION

ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN I FLOW FLOW SYSTEM/ D!AGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT ( 11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------======= I ----------------cc FM-71B B-1 WS179-21B VIS I I I SW FM-71A E-6 WClOl-10 VIS I SW FM-71A E-6 WC102-10 VIS l1 SW FM-71A F-6 WC103-l0 VIS I I SW FM-71A F-6 WC104-10 VIS I
  • *
  • 12/22/82 NUTECH/PRISIM PAGE 233 * * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :aowao * ****************************************************************************************************
  • CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************

ITEM NUMBER :02.10 ITEM DESCRIPTION

ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== -------======= ------======= ======= ----------------SW FH-71A D-6 WS122-10 VIS SW FH-71A 8-7 WS123-10 VIS SW Fl1-71A 8-7 WS124-10 VIS SW FH-71A A-3 WS126-10 VIS SW FH-71A B-3 WS128-10 VIS
  • SW FM-71A C-3 WS130-10 VIS SW FM-71A C-3 WS132-10 VIS SW FH-71A A-3 WS133-10 VIS SW FH-71A B-3 ~lS134-10 VIS *
  • * * ****************************************************************************************************
  • *
  • 12/22/82 NUTECHiPRISIM PAGE 234 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************

ITEM NUMBER :02.10 ITEM DESCRIPTION

ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM* LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORO NUMBER METHOD REQUEST NOTES ------------------------======= -------------======= -------------------------------SW FM-71A B-3 ~IS135-10 VIS SW FM'-71A C-3 WS136-10 VIS SW FM-71A D-3 WS137-10 VIS SW FM-71A 0-3 WS138-10 VIS SW FM-71B D-8 WS170-136 VIS SW FM-71B D-8 WS171-136 VIS SW FM-71B G-8 WS172-136 VIS SW FM-71B G-8 WS173-136 VIS SW FM-71B D-7 WS174-21B VIS I I I i I I I, i, I 1. :i
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 235 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

REVISION:

0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************

ITEM NUMBER :02.10 ITEM DESCRIPTION

ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW I: SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM I COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= -------------------------------------------SW FM-71B G-7 WS175-21B VIS I I SW FM-71B E-8 WS176-21B VIS I SW FM-71B B-6 WS178-136 VIS I I SW FH-71B H-1 WS180-21B VIS SW FM-71B D-1 WS181-21B VIS
  • * *
  • 12/22/82 NUTECH/PRISIM PAGE 236 * * * * *
  • INSERVICE INSPECTION PLAN

SUMMARY

. REVISION : 0000 *

  • SURRY POWER STATION UNIT 2 CODE EDITION :eoweo * ****************************************************************************************************
  • CATEGORY D-B SYS. SUPPORT OF ECCS,CHR,ATMCU, & REACTOR RHR * ****************************************************************************************************

ITEM NUMBER :02.10 ITEM DESCRIPTION:

ECCS,CHR,ATMCU,RRHR, PRESSURE RETAINING COMPONEN FLOW FLOW SYSTEM/ DIAGRAM DIAGRAM LINE EXAM RELIEF PROGRAM COMPONENT (11715) COORD NUMBER METHOD REQUEST NOTES ---------======== ======= ======= ------======= ======= SW FM-71B H-I WS187-21B VIS SW FM-71B D-1 WS188-21B VIS SW FM-71B D-7 WS190-136 VIS *

  • i I I !1 I I I I! I ! ___ _Jj
  • I. II.
  • III.
  • RELIEF REQUEST NO. SR-1 IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE REQUIREMENTS In Class 1 systems, valves which are greater than four inches nominal pipe size are subject to visual examination.

These valves vary in size, design and manufacturer but are all manufactured from either cast stainless steel or carbon steel. None of the valve bodies are welded.Section XI of the ASME Code, 1980 Edition through the Winter 1980 Addenda requires that a visual examination of the internal pressure boundary surfaces of one valve in each group of valves of the same constructional design and manufacturing method that perform similar functions in the system. (Category B-M-2). Since these examinations must be met whether or not the valves have to be disassembled for maintenance, this requirement is considered impractical.

BASIS FOR RELIEF The requirement to disassemble primary system valves for the sole purpose of performing a visual examination of the internal pressure boundary surfaces has only a very small potential of increasing plant safety margins and a very disproportionate impact on expenditures of plant manpower and radiation exposure.

Performing these visual examinations, under such adverse conditions as high dose rates and poor as-cast surface condition, realistically, provides little additional information as to the valve casing integrity.

The performance of both carbon and stainless cast valve bodies has been excellent in PWR applications.

Based on this experience and both industry and regulatory acceptance of these alloys, continued excellent service performance is anticipated.

A more practical approach that would essentially provide an equivalent sampling program

  • and significantly reduced radiation exposure to plant personnel is to inspect the internal pressure boundary of only those valves that require disassembly for maintenance purposes.

This would still provide a reasonable samapling of primary system valves and give adequate assurance that the integrity of these components is being maintained.

ALTERNATE PROVISIONS An examination of the internal pressure boundary surfaces will be performed, to the extent practical, each time a valve is disassembled for maintenance purposes.

  • I. II.
  • III.
  • RELIEF REQUEST NO. SR-2 IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE REQUIREMENTS The design of the Residual Heat Removal Heat Exchanger nozzle to vessel welds calls for the use of a reinforcement pad. These pads are fillet welded and completely encase the nozzle to vessel weld. (See Figure 3)Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda requires a volumetric and surface examination of the nozzle inside radius section (Category C-B). Relief from this requirement is requested due to the physical inaccessibility of the subject weld. BASIS FOR RELIEF The fabrication of these welds precludes any type of surface or volumetric examination.

Additional assurance of the continued integrity of these welds is afforded by the fact that the reinforcement pads strengthen the welds and reduce stresses on the internal welds. ALTERNATE PROVISIONS A visual examination for evidence of leakage will be performed in accordance with Subsection IWC-5000 requirements .

  • I. II.
  • III.
  • RELIEF REQUEST NO. SR-3 IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE REQUIREMENTS The configuration of the Reactor Coolant branch nozzle connection welds precluded complete examination (See Figure 2).Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda requires a volumetric and surface examination of branch pipe connection welds on piping having a nominal pipe size of four inches or greater. In particular, paragraph III-4430 requires an angle beam examination of the weld root from the weld crown. Relief is requested from the requirements of paragraph III-4430 due to physical configuration of these branch nozzle connection welds. BASIS FOR RELIEF Due to the configuration of the weld crown, transducer contact cannot be maintained on the weld. The slope of the weld crown precludes examination of the weld root when scanning from the weld crown. ALTERNATE PROVISIONS The volumetric examinations on these welds will be performed to the extent practical .
  • *
  • I. RELIEF REQUEST NO. SR-4 IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE REQUIREMENTS The Reactor Coolant Filter has three circumferential welds subject to examination. (See Figure 4)Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda,
  • requires a volumetric examination of circumferential shell welds (Category G-A). II. BASIS FOR RELIEF The stainless steel material and thickness (O .188") preclude any type of meaningful examination by ultrasonic examination.*

III. ALTERNATE PROVISIONS A surface examination will be performed in lieu of the volumetric examination

  • *
  • I. RELIEF REQUEST NO. SR-5 IDENTIFICATION OF COMPONENTS AND IMPRACTICAL CODE REQUIREMENTS The shell to top head circumferential weld on the Surry 2 Pressurizer is not accessible for examination.

Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda requires a volumetric examination of the pressurizer head to shell weld (Category B-B). Relief is requested from this requirement due to the physical unaccessibility of this weld. II. BASIS FOR RELIEF III. The shell to top head circumferential weld is not accessible for volumetric or surface examination due to interference from the insulation support ring. ALTERNATE PROVISIONS A visual examination for evidence of leakage will be performed during system pressure tests .

.-.

  • 3.0 INSERVICE TESTING PROGRAM FOR SUPPORTS 3.1 GENERAL INFORMATION The 1980 Edition of the ASME Section XI with Addenda through Winter 1980 was expanded to include Subsection IWF. This subsection is still largely in course of preparation by the ASME and as written (IWF 1100 (a)) excludes supports not constructed to Subsection NF. However, since some scope previously included in.IWB 2000, IWC 2000, and IWD 2000 has . been transposed into Subsection IWF, VEPCO will continue to examine, as a minimum, the support boundaries required to be examined by the 1974 Edition with Addenda through Summer 1975. The acceptance standards of .the 80W80 Code will be applied. Surry Power Station is in course of preparing an Inservice Inspection Program for Class I, II and II supports including administrative control for repairs and replacements.

Snubbers will continue to be inspected and tested in accordance with the Plant Technical Specifications

  • 3-1
    • *
  • 4.0 INSERVICE TESTING PROGRAM FOR PUMPS AND VALVES 4.1 PROGRAM DESCRIPTION This Inservice Testing Program for ISI Class 1, 2, 3 and NC pumps and valves meets the requirements of Subsections IWP and IWV of Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition through the Winter 1980 Addenda. Where these requirements are determined to be impractical, specific requests for relief have been written and included in the program plan attached
  • 4-1
  • *
  • VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 2 Pump and Valve Inservice Test Program Plan
  • *
  • TABLE OF CONTENTS

1.0 INTRODUCTION

2.0 PUMP INSERVICE TEST PROGRAM DESCRIPTION

2.1 Program

Development Philosophy

2.2 Program

Implementation

2.3 Program

Administration 2.4 Pump Reference List 2.5 Pump Inservice Test Tables 2.6 Pump Test Program Relief Request 3.0 VALVE INSERVICE TEST PROGRAM DESCRIPTION

3.1 Program

Development Philosophy

3.2 Program

Implementation

3.3 Program

Administration

3.4 Valve

Inservice Test Table 3.5 Valve Test Program Relief Request 4.0 REPORTING OF INSERVICE TEST RESULTS 4.1 Pump Inservice Program 4.2 Valve Inservice Program 4.3 Reports to Regulatory Agencies 5.0 QUALITY ASSURANCE PROGRAM 6.0 PIPING AND DIAGRAMS

  • * *

1.0 INTRODUCTION

This Pump and Valve Inservice Test Program Plan is applicable to the Surry Power Station Unit 2. Surry Power Station Unit 2 is a Pressurized Water Reactor located on Gravel Neck and adjacent to the James River in Surry County, Virginia.

The plant employs a Westinghouse Electric Corp. Nuclear Steam Supply System. This program plan has been prepared as the controlling document governing Pump and Valve Inservice Testing for Surry Power Station Unit 2. The requirements for Pump and Valve Inservice Testing are outlined in the ASME Boiler and Pressure Vessel Code,Section XI entitled "Rules for Inservice Inspection of Nuclear Power Plant Components".

The scope of this plan encompasses the testing of ASME Section III Nuclear Class 1, 2, and 3 pumps and valves as defined by Sub-Section IWP and IWV of ASME Section XI. Surry Power Station Unit 2 will be testing Class 1, 2 and 3 pumps and valves according to the requirements of Section XI of the ASME Boiler and Pressure Vessel Code, 1980 Edition with addenda through Winter 1980. This is consistent with Federal Regulations, part 50 (10 CFR 50.SSa [g]). This program was prepared in accordance with this code edition and addenda. This program plan is comprised of two independent sub programs -the Pump Inservice Test Program and the Valve Inservice test program. The development, implementation and administration of these two programs is detailed in subsequent sections *

  • *
  • 2 2.1 PROGRAM DEVELOPMENT PHILOSOPHY Highly reliable safety grade equipment is a vital consideration in the operation of a nuclear generating station. To help assure operability, the Surry Power Station Unit 2 Pump Inservice Test Program has been developed.

The Program is designed to detect and evaluate significant hydraulic or mechanical change in the operating parameters of vital pumps and to initiate corrective action when necessary.

The Program is based on the requirements of the ASME Boiler and Pressure Vessel Code,Section XI, Subsection IWP. To the maximum extent practical, the Program complies with the specifications of ASME Boiler and Pressure Vessel Code,Section XI,* Subsection IWP, 1980 Edition with Addenda through Winter of 1980; 10 CFR 50.55a (g); and NRC Staff guidelines for complying with certain provisions of 10 CFR 50.55a (g) "Inservice Inspection

~equirements".

The Nuclear Regulatory Commission and Code Committee recognizes that design differences among plants may render impractical certain Code requirements.

Where such impracticalities exist, they have been substantiated as exceptions as allowed by the Code. Alternate testing requirements have been proposed when warranted.

2.2 PROGRAM

IMPLEMENTATION Surveillance testing is performed, to detect equipment malfunction or degradation and to initiate corrective action. Since the safeguards pumps are normally in standby mode, periodic testing of this equipment is especially important.

The Surry Power Station Unit Unit 2 Inservice

  • **
  • 3 Test Program provides a schedule for testing safety grade, pumps and will be implemented as part of normal periodic surveillance testing. Reference data will be gathered during initial surveillance test. In most cases, test parameters will be measured with normal plant instrumentation.

This approach will simplify the test program and will promote timely completion of periodic surveillance testing. When permanently installed instrumentation is not available, portable instrumentation will be used to record the required parameters.

During subsequent surveillance test, flow rate will normally be selected as the independent test parameter and will be set up to match the reference flow rate. Other hydraulic and mechanical performance parameters will be measured and evaluated against the appropriate reference valves. The results of such evaluations will determine whether or not corrective action is warranted.

Each pump in the Pump Test Program will ~e tested according to a detailed test procedure.

The procedure will include, as minimum: a) b)

References:

This section will identify references applicable to Technical Specifications, and other necessary material as drawings.

Purpose: This section will identify test objectives.

c) Initial Conditions:

Each procedure should identify those independent actions or procedures which shall be completed and station conditions which shall exist prior to use. d) Precautions:

Precautions should be established to alert the individual performing the task to thoses situations in which important measures should be taken early or where extreme care should be used to protect equipment and personnel.

Cautionary notes applicable to specific steps in the procedure shall be included in the main body of the procedure as appropriate and shall be identified as such .

  • *
  • e) f) 4 Instructions*:

The main body of a procedure should contain step by step instructions in the degree of detail necessary for performing a required test. Instructions shall reference or include detailed steps to remove a system from service and to return the system to operating status or standby. Acceptance Criteria:

The ranges within which test data will be considered acceptable will be established and included in the test procedure.

In the event that data falls, outside the acceptable range, operator action will be governed by approved station procedures.

Finally, it is recognized that the Pump Inservice Test Program Sets forth minimum testing requirements.

Additional Testing will be performed, as required, after pump maintenance or as determined necessary by administrative personnel at Surry Power Station. 2.3 PROGRAM ADMINISTRATION The operations and engineering staff at Surry Power Station is responsible for administration and execution of the Pump Inservice Test Program. The Program will be officially implemented on April 1, 1983 and will govern pump testing for a 120 month period. Prior to the end of the 120 month period, the Program will be reviewed and upgraded to assure continued compliance with 10 CFR 50.SSa (g) (4). The Program will be updated a minimum of at least once every 40 months for new systems, relief request, etc .

  • *
  • 5 2.4 PUMP REFERENCE LIST This list gives a brief description of each pump identified in the Pump Test Program. The pumps ASME Code Classifications are specified in "Pump Inservice Test Tables." 2-CH-P-lA 2-CH-P-lB 2-CH-P-lC High Head Safety Injection of Charging Pumps provide high pressure flow for safety injection system and during normal operation, maintain pressurizer level, and seal water injection to the reactor coolant pumps. See drawing 11548-FM-88B.

2-SI-P-lA 2-SI-P-lB Low Head Safety Injection pumps provides low pressure_

safety injection to core for long term cooling and as a backup to accumulators.

See drawing 11548-FM-89A.

2-CS-P-lA 2-CS-P-lB Containment Spray Pumps provides a cooled, chemically treated, borated spray to reduce containment pressure following a loss of coolant accident.

See drawing 11548-FM-84A.

2-RS-P-2A 2-RS-P-2B Outside Recirculation Spray Pumps aid the containment spray system in reducing c_ontainment pressure rapidly following a loss of coolant accident.

See drawing 11548-FM-84A.

2-RS-P-lA 2-RS-P-lB

  • *
  • 6 Inside Recirculation Spray Pump aid the containment spray system in reducing containment pressure rapidly following a loss of coolant accident.

See drawing 11548-FM-84A.

2-FW-P-3A 2-FW-P-3B 2-FW-P-2 Auxiliary Feedwater pump supplies the steam generator with fee*dwater in the event of a complete loss of normal feedwater.

See drawing 11548-FM-68A.

2-RH-P-lA 2-RH-P-lB The function of Residual Heat Removal Pumps is to remove heat energy from the core when the reactor coolant system is below 350°F. See drawing 11548-FM-87A . 1-CC-P-lC 1-CC-P-lD Component Cooling Water Pumps are used to supply water to remove heat from the Residual Heat Removal Systems. See drawings 11448-FM-72D .

  • *
  • l-CH-P-2C l-CH-P-2D 7 Boric Acid Transfer Pumps supply boric acid to suction of charging pumps via normal coolant boron concentration and emergency makeup. See drawings 11448-FM-88A.

2'.-cc-P-2A 2-CC-P-2B Charging Pump Cooling Water Pump provides water to transfer heat from the charging pump mechanical seals. See drawing 11548-FM-71B.

2-SW-P-lOA 2-SW-P-lOB Charging Pump Service Water Pumps provides cooling water for charging pump cooling water systems. See drawings 11548-FM-71B.

EE-P-lB EE-P-lC EE-P-lE Fuel Oil Pumps supply fuel oil to emergency diesel generators wall mounted tank. See drawing 11448-FB-4B.

2.5 PUMP INSERVICE TEST TABLES This tabulation identifies the pumps to be tested, code, class required test quantities and frequencies.

Relief from test requirements is requested in cases where their test requirements have been determined to be impractical.

Where relief is requested, technical justification is provided along with alternative test methods when applicable

..... , . * *

  • PUMP INSERVICE TEST TABLE Pump ASME Inlet Discharge Diffierential Flow Bearing Pump Lubrication Relief Identification Class Pressure Pressure Pressure Rate Vibration Temperature Speed Level/Pressure Request *2-CH-P-lA 2 NA Q NA NA Q NR NA Q 0, 1, 2 2-CH-P-lB 2 NA Q NA NA Q NR NA Q 0, 1, 2 2-CH-P-lC 2 NA Q NA NA Q NR NA Q 0, 1, 2 2-Sl-P-lA 2 NA Q NA Q Q NR NA Q* 0, 1, 3 2-SI-P-lB 2 NA Q NA Q Q NR NA Q* 0, 1, 3 2-CS-P-lA 2 Q Q Q Q Q NR NA Q 0, 1 2-CS-P-lB 2 Q Q Q Q Q NR NA Q 0, 1 2-RS-P-2A 2 NA Q NA NA Q NR NA Q* 0, 1, 4 2-RS-P-2B 2 NA Q NA NA Q NR NA Q* 0, 1, 4 2-RS-P-lA 2 NA NA NA NA NA NR NA NA 0, 1, 5 2:..RS-P-lB 2 NA NA NA NA NA NR NA NA 0, 1, 5 .z..:.Fw-P-3A 3 Q Q Q NA Q NR NA Q 0, 1, 6 2-FW-P-3B 3 Q Q Q NA Q NR NA Q 0, 1, 6
  • 2-FW-P.-2 3 Q Q Q NA Q NR Q Q 0 ,-1, 6 2-RH-P-lA 2 CSD CSD CSD CSD CSD NR NA Q* 0, 1, 7 2-RH-P..:lB 2 CSD CSD CSD CSD CSD NR NA Q* 0, 1, 7. *These pumps are cooled by fluid through pump. Therefore, other pump parameters will ensure proper level of lubrication.
  • *
  • PUMP INSERVICE TEST TABLE Pump ASME Inlet Discharge Diffierential Flow Bearing Pump Lubrication Relief Identification Class Pressure Pressure Pressure Rate Vibration Temperature Speed Level/Pressure Request 1-CC-P-lC 3 Q Q Q NA Q NR NA Q 0, 1 1-CC-P-lD 3 Q Q Q NA Q NR NA Q 0, 1 l-CH-P-2C 3 NA Q NA NA NA NR NA Q* 0, 1, 9 l-CH-P-2D 3 NA Q NA NA NA NR NA Q* 0, 1, 9 2-CC-P-2A 3 NA Q NA Q Q NR NA Q** 0, 1, 10 2-CC-P-2B 3 NA Q NA Q Q NR NA Q** 0, 1, 10 2-SW-P-lOA 3 NA Q NA Q Q NR NA Q** 0, 1, 10 2-SW-1'-lOB 3 NA Q NA Q Q NR NA Q** 0, 1, 11 1-EE-P-lR 3 Q Q Q NA NA NR NA Q 0, 1, 11 1-EE-P-lC 3 Q Q Q NA NA NR NA Q 0, 1, 11 1-EE-P-lE 3 Q Q Q NA NA NR NA Q 0, 1 ' 11 *These pumps are cooled by fluid through pump. Therefore, other pump parameters will ensure proper level of lubrication.
    • Pump bearings are carried in drive motor and are greased and lubricated; therefore, other parameters will ensure proper level of lubrication.
  • *
  • 8 2.6 PUMP TEST PROGRAM RELIEF REQUEST Relief Request identify code requirements which are impractical for Surry Unit 2 and provide justification for the requested exception.

Where appropriate, we also propose alternate testing to be performed in lieu of the code requirements .

  • *
  • NOTE "O" PUMPS All IWP Program Pumps except 2-FW-P-2.

SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED Quarterly measurements of pump speeds. BASIS FOR REQUEST 9 IWP-4400 does not require pump speeds measurement if pump is directly coupled to a constant speed motor driver

  • ALTERNATE TESTING PROPOSED None *
  • *
  • 10 RELIEF REQUEST 1 PUMPS All IWP Program Pumps SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED Measure pump bearing temperatures and vibration in mils. BASIS FOR REQUEST Pump vibration and bearing temperature measurements are used to detect changes in the mechanical characteristics of a pump. Regular testing should detect developing problems, thus repairs can be initiated prior to a pump becoming inoperable.

The ASME Section XI minimum standards require measurements of the vibration amplitude displacement in mils every three months and bearing temperatures once per year. Our proposed program is based on vibration readings in velocity units rather than vibration amplitude in mils displacement.

This technique is an industry accepted method which is more sensitive to small changes that are indicative of developing mechanical problems and hence more meaningful.

Velocity measurements detect not only high amplitude vibrations that indicate a major mechanical problem but also the equally harmful low amplitude high frequency vibrations due to misalignment in balance, or bearing wear that usually go undetected by simple displacement measurements.

In addition, these readings go far beyond the capabilities of a bearing temperature monitoring program. A bearing will be seriously

  • *
  • 11 degraded prior to the detection of increased heat at the bearing housing. Quarterly vibration velocity readings should achieve a much higher probability of detecting developing problems than the once per year reading of bearing temperatures.

Bearing temperature data gathering test present problems which include the following:

The enforced thirty minute run time causes problems for pumps having no recirculation test loop and the temperature of lubricating fluid will vary with ambient conditions and make meaningful data trending impractical.

Therefore, the detection of possible bearing failure by a yearly temperature measurement is extremely unlikely.

The small probability of detection of a bearing failure by temperature measurement does not justify the additional pump operating time required to obtain.the measurements.

In addition, it is impractical to measure bearing temperatures on many pumps. ALTERNATE TESTING PROPOSED:

Pump vibration measurements will be taken in vibration velocity (in/sec).

table. The evaluation of the readings will be per the attached For more information, see ASME Publication 78-WA/NE-5 and minutes of November 28, 1979 meeting of the Operating and Maintenance Working Group -Testing of Pumps and Valves in San Jose, California, dated January 9, 1980 .

  • ALLOWABLE RANGES OF TEST QUANTITIES(l)

ALERT RANGE REQUIRED ACTION RANGE LOW HIGH LOW QUANTITY ACCEPTABLE RANGE VALUES VALUES VALUES V When 0 V .15 in/sec 0 to .3 in/sec None .3 in/sec to None v r -.45 in/sec V When .15 in/sec V 0 to .45 in/sec None .45 in/sec to None v .3 in/sec r

  • 7 5 in/sec V When .3 in/sec V 0 to .9 in/sec None .9 in/sec to None v .6 in/sec r 1. 5 in/ sec V When .6 in/sec V 0 to. 1.1 in/sec None 1.1 in/sec to None v 1.0 in/sec r 1.5 in/sec Where: v = velocity measured in inches/second, peak. v = referenced velocity measurement (initial measurement after installation or rework) r (1) See ASME Technical Paper 78-WA/NE-5, Table 2 HIGH VALUES .45 in/sec .75 in/sec 1.5 in/sec 1.5 in/sec *
  • *
  • L___ PUMPS 2-CH-P-lA 2-CH-P-lB 2-CH-P-lC RELIEF REQUEST 2 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED Measure Inlet Pressure, Differential Pressure and Flow BASIS FOR REQUEST Instrumentation not installed ALTERNATE TESTING PROPOSED 12 1) Design Change has been initiated for flow measurement instrumentation Proposed installation date is 12/1/83. 2) Suction pressure instrumentation is not installed nor required, therefore differential pressure can not be calculated.

These pumps are capable of producing greater than 2400 psig discharge pressure, while the suction pressure is normally 20 psig. Therefore, differential pressure developed by the pump is more than 100 times the suction pressure and a gage for suction pressure would not provide significant data. Therefore, we propose to observe Volume Control Tank Pressure using control room indication to assure repeated initial conditions for testing the pumps *

  • *
  • PUMPS 2-SI-P-lA 2-SI-P-lB RELIEF REQUEST 3 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED 13 Measure Inlet Pressure, Differential Pressure, and Lubrication level or Pressure.

BASIS FOR REQUEST 1) Inlet and differential pressure instrumentation not installed . ALTERNATE TESTING PROPOSED These pumps take suction from the RWST for performance testing. The tank level has a minimum requirement by Technical Specification which will insure initial conditions for testing .

  • *
  • PUMPS 2-RS-P-2A 2-RS-P-2B RELIEF REQUEST 4 14 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED Measurement Inlet Pressure, Differential Pressure, Flow, and Lubrication level or Pressure.

BASIS FOR REQUEST 1) Inlet Pressure, Differential Pressure and Flow instrumentation not installed.

ALTERNATE TESTING PROPOSED 1)

  • Suction pressure instrumentation is not installed, therefore differential pressure cannot be calculated.

Suction pressure is same for each test since suction pressure is only head of water in filled pump casing. Design instrumentation.

Change* has been initiated for flow measurement Proposed installation date is 12/ 1/83. Until Design Change is completed and Technical Specification Change 11113 for ASME Section XI is approved by NRC, the pumps will be flow tested at shutoff head .

  • *
  • PUMPS 2-RS-P-lA 2-RS-P-lB RELIEF REQUEST 5 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED 15 Measurement Inlet Pressure, Discharge Pressure, Differential Pressure, Flow, Vibration, and Lubrication Level and Pressure.

BASIS FOR REQUEST Technical Specification 4.5.A.2 requires the pumps be dry tested. Testing of these pumps would require spraying water on components in containment.

Also dry testing of pump will not give meaningful data. ALTERNATE TESTING PROPOSED Motor current is measured monthly and composed with previous reading. Also it can be determined that pump shafts are turning by rotation sensors which indicate in Main Control Room *

  • *
  • PUMPS 2-FW-P-3A 2-FW-P-3B 2-FW-P-2 RELIEF REQUEST 6 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED Measure Flow. BASIS FOR REQUEST Instrumentation not installed . ALTERNATE TESTING PROPOSED 16 All inservice inspection data is collected except flow, therefore, there is sufficient date collected for evaluation of pump performance, A Design Change has been initiated for flow measurement instrumentation.

Proposed installation date is 12/1/83 .

  • *
  • PUMPS 2-RH-P-lA 2-RH-P-lB RELIEF REQUEST 7 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED
1) Frequency of Pump Test. 2) Measure Lubrication Level or Pressure BASIS FOR REQUEST 17 It is considered impractical to make a containment entry on a quarterly bases in order to test these pumps. These pumps are not engineered safetr feature pumps. Operability will be determined each cold shutdown when system is placed into operation, (but not more frequently than every three months). ALTERNATE TESTING PROPOSED Pump will be tested each cold shutdown (but not more frequently than every three months) *
  • *
  • i [ __ PUMPS 2-CH-P-2C 2-CH-P-2D RELIEF REQUEST 9 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED 18 Measure inlet pressure, differential pressure, flow, vibration, and lubrication level or flow. BASIS FOR REQUEST 1) No instrumentation installed for inlet pressure, differential pressure and flow . 2) Pumps are totally incased in insulation, therefore, probes for vibration can not get in contact with pumps for a reading. ALTERNATE TESTING METHOD 1) These pumps take suction from Boric Acid Storage Tanks. Tank Level will be observed to establish*

initial condition of testing. A design change has been initiated to install inlet pressure gages so that inlet pressure can be measured and differential pressure calculated.

No flow rate measurement device is currently installed.

At this time, a method for collecting repeatable flow data has not been determined.

The evaluation is still in progress.

2) Design Change has been initiated.

Proposed completion date is 12/1/83 .

  • *
  • PUMPS 2-SW-P-lOA 2-SW-P-lOB 2-CC-P-2A 2-CC-P-2B RELIEF REQUEST 10 SECTION CI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED 19 Measure inlet pressure, differential pressure, and lubricant level or pressure . BASIS OF REQUEST No installed instrumentation for inlet pressure and differential pressure.

ALTERNATE TESTING PROPOSED A design change has been initiated to install inlet and discharge pressure gages. Also design change will add accurate flow measurement devices. The design change proposed completion date is 12/1/83. Flow rate and vibration will be monitored for pump performance until completion of design change .

  • PUMPS EE-P-lB EE-P-lC EE-P-lE RELIEF REQUEST 11 SECTION XI CODE REQUIREMENTS FOR WHICH RELIEF IS REQUESTED 20 Measure inlet pressure, differential pressure, flow rate, lubrication level pressure and vibration.

BASIS FOR RELIEF

  • Code interpretations consider these pumps to be outside the scope of ASME Section XI. Hence all testing of thes pumps is voluntary.

Attached is copy of specified inquiry and reply on which relief is based. ALTERNATE TESTING PROPOSED Monitor Pump discharge pressure . *

  • *
  • FILE NUMBER BC/77/666 SUBJECT INQUIRY AND REPLY AS SENT TO INQUIRER 08/14/81 INQUIRER COMPANY WPPSS SCOPE OF SECTION XI, DIVISION 1 Question:

21 REPLY SENT 78/02/17 Is it the intent of Subarticle IWA-1100 that the rules and requirements of Section XI, Division 1 for inservice inspection of Class 1, 2 & 3 pressure retaining components (and their supports) be applied only to water and steam systems in light water cooled nuclear power p~ants? Reply: Systems containing other than steam or water were not originally considered by the connnittee in formulating the rules in Section XI; they may, however, be included for further consideration and for revisions to future editions of Section XI. The requirements shown in Section XI, Article IWA-1100 on Scope and Responsibility, specifically paragraph IWA-1400, requires the owner of the nuclear plant to determine the appropriate code, class or classes for each component of the nuclear power plant to be examined according to Section XI rules *

  • *
  • 22 3.0 VALVE INSERVICE TEST PROGRAM 3.1 PROGRAM DEVELOPMENT PHILOSOPHY Surry Power Station Unit 2 is a Pressurized Water Reactor being operated in compliance with the ASME Boiler and Pressure Vessel Code. The Code requires periodic testing of certain safety related valves in order to verify their operability and physical integrity.

The Surry Unit 2 Valve Inservice Test Program satisfies these requirements.

The program will detect potentially adverse changes in the mechanical condition of valves within the scope of Section XI, Subsection IWV of the Code. The scope includes all valves "which are required to perform a specific function in shutting down a reactor to a cold shutdown condition or in mitigating the consequences of an . accident." It is important to note that the scope of ASME Section XI, and the Surry Program for its implementaion includes many values which are not required to operate to meet FSAR license condition of hot shutdown nor limiting conditions in the plant Technical Specifications.

Therefore corrective action as specified in Subsection IWV will be applied as much as practical but is not interpreted to supercede or append any existing limiting condition of operation.

To generate the Surry Unit 2 Valve Program, all ASME Class 1, 2 and 3 valves were analyzed to determine their required type, and frequency of test_ing.

The valves to be tested under Section XI, Subsection IWV commitments are listed, by system and drawing, in the Valve Test Tables .

  • *
  • 23 The Surry Unit 2 is committed to meeting the requirements of both 10 CFR 50, Appendix J, and Seeton XI. Each of these documents addresses particular but slightly different concerns with respect to valve leakage. Each contains guidance for valve leak rate testing. Appendix J is primarily concerned with leakage out of containment subsequent to Loss of Coolant Accident (LOCA). It requires leak rate testing of containment isolation valves at the maximum differential pressure (WP) expected during an accident.

Section XI requires leak rate testing of all valves for which seat leakage "is limited to a specific maximum amount" and that testing be performed at the valves operating (WP) unless a lower (WP) can be shown to give conservative results. Operating (WP) may be many times the maximum post-LOCA-WP

  • Plant Technical Specifications address leak rate testing and imposed specific testing requirements.

The testing requirements imposed by the various sources are not identical nor are they mutually exclusive.

It is anticipated that Appendix J testing will satisfy Seeton XI Leak Rate testing. However, some valves require only Section XI testing. Valves are identified which are subject to leak rate testing under the scope of Section XI, Subsection IWV. The Code recognized that certain of its requirements may be impractical for a specific plant and contains provisions for requesting

  • relief from impractical requirements .
  • *
  • 24 The relief requests for the Valve Inservice Test Program identify testing impracticalities, provide technical basis for the request and propose alternate testing where warranted.

The stroke times of solenoid controlled, air operated valves is both extremely rapid and subject to considerable variation.

Exception is taken to complying with stroke time variations defined by Artical IWV-3410 (c) (3). The valve stroke timing tolerance specified is based on a reference valve. This will not exceed the maximum stroke time. VEPCO is confident that Surry Unit 2 Valve Inservice Test Program complies with the intent of all applicable codes, regulations~

and guidelines and that it will make a positive contribution to the safe operation of the plant *

  • *
  • 25 3.2 PROGRAM IMPLEMENTATION The Valve Test Program will be executed as part of the normal plant surveillance routine. Two types of test will be conducted as part of the Valve Test Program: 1) Valve Operability Tests 2) Valve Leak Rate Tests 3) Safety Valve Tests The Operbility Tests will verify: 1) the valve responds to control commands, 2) the valve stroke time is within specific limits and, 3) remote position indication accurately reflects the observed valve position.

Remote valve position indication will be verified every two years. Fail safe valves will be tested by observing the valve operation upon loss of actuating power. In most cases, this can be accomplished using normal control circuits.

The following clarification shall apply to those valves thich are scheduled to be excercised during cold shutdown: "Valve testing shall commence not later than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> after reaching cold shutdown and continue until complete or unit is ready to return to power. Completion of the valve testing is not a prerequisite to return to power. Any testing not completed at one cold shutdown should be performed during the subsequent scheduled cold shutdowns to meet the code specified testing frequency.

Valve Leakage Test will verify valves are leak tight in accordance with Appendix J or ASME Section XI. Relief and Safety valves are not required to leak rate tested (IWV-3512) and are not included as valve to be leak tested. Safety and Relief valves setpoints are tested in accordance with PTC-25.3-1976 as directed by IWV-3512.

Main Steam Safety valves will be tested in accordance with Section 4.091(a) (2). All other safety and relief valves will be tested in accordance with Section 4.09l(c)(l).

  • *
  • 26 3.3 PROGRAM ADMINISTRATION 3.4 The operations and engineering staff at Surry Power Station is responsible for
  • administration and execution of the Valve Inservice Program. The Program will be officially implemented on December 22, 1982 and will govern valve testing for a 120 month period. Prior to end of 120 month period, the program will be reviewed and upgraded to assure continued compliance with iO CFR 50.SSa (g) (4). The program will be updated a minumum of at least once every 40 months or for a new system, relief request, etc. To insure compliance of the Valve Program, a training program will be established for inservice test personnel.

VALVE INSERVICE TEST TABLES The Valve Tept Tables are the essence of the Valve Program to meet ASME Section XI, Subsection IWV requirements.

The tables reflect the positions taken in support of the relief requests to aid the reader in the interpretation of the Tables, brief explanations of the Table headings and abbreviatoins are provided.

1) 2) 3) 4) 5) Valve Number -Each valve in the plant has a unique "tag" number which identifies the system to which the equipment belongs and type of equipment.

Drawing Locaton -The specific coordinates of each valve. are supplied to facilitate location of the valves on the flow diagrams provided.

Function -A brief description of the function of the valve. Code Class -ASME Code Class of each valve as per 10 CFR 50.SSa and Regulatory Guide 1.26. NOTE: -are for non-class values . Category -Categories are defined by ASME Section XI. IWV. Each Valve has specific testing requirements determined by the category to which it belongs. Subsection which are

  • 6) 7) 8) 9)
  • 10)
  • 27 Size -Nominal pipe diameter to which valve connects is given in inches. Valve Type -The following abbreviatons are used to describe valve type: CK -Check RV -Relief SF -Safety BA -Ball GL -Globe GA -Gate BF -Butterfly SCK -Stop Check PL -Plug DA -Diaphram Actuator Type -The following abbreviations are used to describe actuator types. Valves may be actuated in more than one way. SA -Self Actuating (actuated by a change in system parameters such as Flow, or Pressure, e.g., check and relief valves). MO -Motor Operated PN -Pneumatic (Air Operated)

MAN-Manually Operated SOV -Electronic Solonoid Operated Valves Normal Position -The following abbreviations are used to describe valve positions:

0 -Open C -Closed OC -Open or Closed T -Throttled Test Required -Testing requirements identified for the valves are identified here. ST -Stroke Times shall be measured per Section XI subartical IWV-3410 or as modified by specific relief request. EV -Exercise Valve for operability at least once every 3 months per Section XI subarticle IWV-3410 or as modified by specific relief request. LT -Leak Test shall be performed per Section XI subartical IWV-3420 or as modified by specific relief request. Valves marked by asterisk(*)

will be tested in accordance with Appendix J. CV -Check Valves shall be exercised at least once every 3 months per Section XI subarticle IWV-3520 or as modified by specific relief request. VP -Valve Position Indication Verification shall be verified per Section XI subarticle IWV-3300 or as modified by specific relief request . SP -Set points of safety and relief valves shall be tested per Section IX subarticle IWV-3510 or as modified by specific relief request.

  • System Name: Main Steam Valve Number TV-MS-210 2-MS-176 2-MS-178 2-HS-182 Drawing Location E-7 F-8 F-8 F-8 Function
  • Code Class Main Steam Drain to Blow-2 down Main Steam to Turbine Driven 2 Aux FW Check Valves gory B C Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing Number: 11548 -FM -64A Valve Size Type 2 GA 3 CK Actuator Normal Type Position PN 0 SA C Test Relief Required Request EV,ST CV NO VP NO
  • System Name: Aux. Steam and Air Removal Valve Drawing Code Cate-Number Location Function Class gori TV-SV-202A K-1 Air Removal Direct to 2 A Reactor Containment 2-VP-12 K-1 Air Removal Direct to 2 AC Reactor Containment Size 6 6
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -66A Valve Actuator Normal Test Ti:ee Tn~e Position Reguired GA PN C LT*, EV, ST, VP CK SA C LT* Relief Reguest None None
  • *
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1' 2, and 3 Valves System Name: Auliliary Feed Cross Connect Drawing No. 11548 -FM -68B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request MOV-FW-260A J-5 Cross-Connect for Unit 1 ET, sv, MOV-FW-260B J-6 Aux. Feed. from Unit 2 3 B 6 GL MOV C VP None 2 FW-272 1-7 Cross-Connect for Unit 2 2-FW-273 I-7 Aux. Feed. for Unit 1 Check 3 C 6 CK SA C CV 4 Valves at Cont. Penet. 2-FW-305 J-4 Cross-Connect for Unit 2 2-FW-306 J-4 Aux. Feed. for Unit 1 Check 3 C 6 CK SA C CV 4 Valves at Cont. Penet.
  • *
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Service Water Drawing No. 11548 -FM -71A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request MOV-CW-206A E-4 MOV-CW-206B E-4 Condenser Inlet 3 B 96 BF MOV 0 EV, ST None MOV-CW-206C F-4 Isolation Valves VP MOV-CW-206D F-4 MOV-SW-202A E-6 Service Water to component EV, ST, MOV-SW-202B F-6 Cooling Water Heat Ex-3 B 42 BF MOV 0 VP None changers MOV-SW-203A B-6 Service Water to recircu-EV, ST, MOV-SW-203B B-6 lation Spray Heat Ex-3 B 30 BF MOV C VP 6 MOV-SW-203C D-6 changers MOV-SW-203D E-6 MOV-SW-204A A-2 Recirculation Spray Heat EV, ST MOV-SW-204B B-2 Exchangers Suction Isola-3 B 24 BF MOV 0 VP None MOV-SW-204C C-2 tion Valves MOV-SW-204D C-2 MOV-SW-205A A-2 NOV-SW-205B A-2 Recirculation Spray Heat EV,ST MOV-SW-205C B-2 Exchanger Discharge Isola-3 B 24 BF MOV 0 VP None MOV-SW-205D C-2 tion Valves MOV-SW-206A D-4 Recirculation Spray Heat EV,ST MOV-SW-206B D-4 Exchangers Cross-Connect 3 B 36 BF MOV 0 VP None Valves
  • * .7 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1' 2, and 3 Valves System Name: Service Water Drawing No. 11548 -FM -71A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request MOV-SW-201A B-4 Bearing Cooling water EV, ST MOV-SW-201B C-4 Heat Exchange islotion 3 B 36 BF MOV 0 VP None Valves MOV-CW-200A E-2 MOV-CW-200B E-2 Condenser Discharge EV, ST MOV-CW-200C F-2 Islotion Valves 3 B 96 BF MOV 0 VP None .MOV-CW-200D F-2 2-SW-206 A-1 Containment Isolation 2-SW-208 A-1 Valves for Service Water 2 A 2 GA Man C LT* None Drains to Heat Exchanger
  • *
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Circulating and Service Water Drawing No. 11548 -FM -71B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request 2-CC-764 D-6 Charging Pump Cooling 2-CC-329 G-6 Water Pump Discharge Check 3 C 2 CK SA oc CV None Valve 2-SW-113 D-8 Charging Pump Service 2-SW-108 G-8 Water Pump Check Valve 3 C 2 CK SA oc CV None
  • *
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Component Cooling Drawing No. 11548 -FM -72A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request RV-CC-219A L-2 Component Cooling from RHR RV-CC-219B L-3 Heat Exchanger Relief 3 C 1~ RV SA C SP 1 Valve 2-CC-176 A-1 Component Cooling to RHR 2-CC-177 A-1 Heat Exchanger Check Valve 2 C 18 CK SA oc CV 7 2-CC-l A-1 Component Cooling to 2-CC-58 A-2 Reactor Coolant Pumps 2 C 6 CK SA 0 CV 8 2-CC-59 A-2 RV-CC-216A B-3 Component Cooling reactor RV-CC-216B B-5 Coolant Pump Relief 3 C 1 RV SA C SP 1 RV-CC-216C B-8 Component Cooling Piping RV-CC-224 F-1 Relief Valve 3 C 3/4 RV SA C SP 1 Component Cooling Excess RV-CC-218 G-4 Let down Heat Exchanger 3 C 1 RV SA C SP 1 Relief Valve
  • System Name: Component Cooling Water Valve Number 2-CC-242 2-CC-233 2-CC-224 Drawing Location C-2 D-2 E-2 Function Component Cooling to reactor Containment Air Recirculation Coolers
  • Code Class 2 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -72B Cate-gory Size C 6 Valve Type CK Actuator Normal Type Position SA 0 Test Relief Required Request CV 7
  • System Name: Component Cooling Water Valve Number RV-CC-210 . RV-CC-209 Drawing Location F-3 I-7 Function Component Cooling to Regenerative Heat Exchanger Relief Valve Component Cooling to Seal Water Heat Exchanger Relief Valve Code Class 3 3 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -72E Cate-gory Size C 3/4 C 3/4 Valve Type RV RV Actuator Normal Type Position SA C SA C Test Relief Required Request SP 1 SP 1
  • System Name: Component Cooling Water Valve Drawing Number Location Function l-CC-569 C-2 Component Cooling Pump l-CC-578 C-2 Discharge Check
  • Gode Class 3 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -72D Cate-gory Size C 18 Valve Type CK Actuator Normal Type Position SA oc Test Relief Required Request CV None
  • * .13 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1' 2, and 3 Valves System Name: Component Cooling Drawing No. 11548 -FM -72F Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request TV-CC-205A A-1 Component Cooling from EV, VP 1'V-CC-205B B-1 Reactor Coolant pumps 2 B 6 BA PN 0 ST 8 TV-CC-205C C-1 Component Cooling from EV, VP TV-CC-207 A-1 Reactor Coolant pumps 2 B 2~ GL PN 0 ST 8 TV-CC-209A E-4 Component Cooling from RHR ST TV-CC-209B E-3 Heat Exchangers.

2 B 18 BU PN 0 EV, ST None Tv-cc.:.210A D-2 Component Cooling from EV, VP TV-CC-210B D-2 Reactor Containment Air 2 B 6 BU PN 0 ST None 1'V-CC-210C C-2 Recirculation Coolers

  • System Name: Compressed Valve Drawing Number Location 2-IA-704 L-2 l-IA-704 K-2 I Air Function Back up Instrument Air to Containment Back up Instrument Air to Containment from Unit 1
  • Code Cate-Class gory 2 A 2 A Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -75C Valve Actuator Normal Test Relief Size Type Type Position Required Request 2 GA Man C LT* None 2 GA Man C LT1, None
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Compressed Air System Drawing No. 11548 -FM -75C Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request Instrument Air to Contain-2-IA-864 H-2 ment 2 AC 2 CK SA 0 CV, LT* 9 Instrument Air to Contain-2-IA-868 H-2 ment 2 AC 2 CK SA 0 CV, LT* 9
  • ** System Name: Compressed Air System Valve Number 2-SA-81 2-SA-82 Drawing Location D-7 E-7 Function Service Air to Containment Service Air to Containment Code Class 2 2 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -75E Cate-gory Size A 2 A 2 Valve Type GA GA Actuator Normal Type Position Man C Man C Test Relief Required Request LT* None . LT* None
  • System Name: Containment Instrument Air Valve Number TV-lA-201A TV-IA-201B TV-IA-200 Drawing Location K-7 J-7 K-1 Function Instrument Air Suction from Containment Instrument Air Discharge from Containment
  • Code Cate-Class gory 2 A 2 A Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -75J Valve Actuator Normal Test Relief Size Type Type Position Required Request LT*, EV 3 GA PN 0 ST, VP None LT*, EV 2 GA PN 0 ST, VP None
  • * .18 Surry Power Station Unit.No. 2 Inservice Testing ASME Code Class 1' 2, and 3 Valves System Name: Sampling System Drawing No. 11548 -FM -82B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request TV-SS-203A D-1 Residual Heat Removal LT*, EV TV-SS-203B E-1 System Sample 2 A 3/8 GA PN C ST, VP None TV-SS-200A D-1 Pressurizer Liquid Space LT*, EV TV-S~-200B E-1 Sample 1 A 3/8 GA PN C ST, VP None TV-SS-201A D-1 Pressurizer Vapor Space LT*, EV TV-SS-201B E-1 Sample 1 A 3/8 GA PN C ST, VP None TV-SS-206A D-2 Primary Coolant Hot Leg LT*, EV TV-SS-206B E-2 Samples 1 A 3/8 GA PN C ST, VP None TV-SS-202A D-2 Primary Coolant Cold Leg LT*, EV TV-SS-202B E-2 Sample 1 A 3/8 GA PN C ST, VP None TV-SS-204A D-2 Pressurizer Relief Tank LT*, EV TV-SS-204B E-2 Gas Space Sample 2 A 3/8 GA PN C ST, VP None
  • * .19 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Vents and Drains Drawing No. 11548 -FM -83A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request Reactor Containment Sump LT*, VP TV-DA-200B I-8 Pump Discharge Isolation 2 A 2 GA PN C EV, ST None TV-DA-203A 1-9 Post Accident Sample LT*, VP TV-DA-203B 1-9 Return Line 2 A 2 GA PN C EV, ST None 2-VA-l I-5 Primary Vent Pot Vent 2 A 2 GA PN C LT* None Primary Drain Transfer LT*, VP TV-DG-208B I-4 Pump Discharge Isolation 2 A 2 GA PN C EV, ST None LT*, VP TV-VG-209B 1-2 Gas Vent Header Isolation 2 A 2 GA PN C EV, ST None
  • * .20 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Sy_stem Name: Vents & Drains Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gori Size TiEe Tn~e Position Re9.uired Re9.uest TV-DA200A I-8 R. C. Sump Pump 2 A 2 GA PN oc LT*, EV None Discharge Isolation ST, VP TV-DC208A L-4 Pr. Dr. Transfer Pump 2 A 2 GA PN oc LT*, EV None . Disch. Isolation ST, VP TV-VG209A L-2 Gas Vent Hdr. Isolation 2 A 2 GA PN 0 LT*, EV None ST, VP 2-VA-9 L-4 Containment Isolation 2 A 2 GA MAN 0 LT* None
  • * .21 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Containment and Recirculation Spray System Drawing No. 11548 -FM -84B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Reguired Request MOV-RS-255A F-8 Recirculation Spray Pump LT*, EV MOV-RS-255B F-8 Suction from Containment 2 A 12 PL MOV 0 ST, VP None Sum MOV-RS-256A F-6 Recirculation Spray Pump LT*, EV MOV-RS-256B F-6 Discharge 2 A 10 GA MOV 0 ST, VP None 2-RS-11 F-6 Recirculation Spray Pump 2-RS-17 F-6 Discharge Check Valves 2 AC 10 CK SA C CV LT* 10 MOV-CS-201A F-2 MOV-CS-201B F-2 Containment Spray Pump 2 A 8 GA MOV C LT*, EV None MOV-CS-201C F-1 Discharge ST, VP MOV-CS-201D F-1 2-CS-13 E-2 Containment Spray Pump 2-CS-24 E-1 Discharge Check Valves 2 AC 8 CK SA C CV, LT* 10 2-CS-105 F-2 Containment Spray Pump 2-CS-104 D-2 Discharge Check Valve 2 AC 8 CK SA C CV 1-Q MOV-CS-202A J-3 Chemical Addition Tank to EV, ST MOV-CS-202B K-3 RWST Isolation Valve 2 B 6 GA MOV C VP None MOV-CS-203A J-3 Chemical Addition Tank MOV-CS-203B J-3 Discharge to Suction 2 B 3 BF MOV 0 EV, ST None MOV-CS-203C J-3 Containment Spray Pump VP MOV-CS-203D J-3
  • * .22 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1' 2, and 3 Valves System Name: Containment Vacuum and Leakage Monitoring Drawing No. 11548 -FM -BSA Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Ty:ee Ty:ee Position Required Request TV-LM-200A E-3 TV-LM-200B E-3 TV-LM-200C E-3 TV-LM-200D E-3 Leakage Monitoring System LT*, EV TV-LM-200E E-3 Isolation 2 A 3/8 GA PN C ST, VP None TV-LM-200F E-3 TV-LM-200G D-3 TV-LM-200H E-3 Containment Air Ejector HVC-CV-200 J-5 Isolation 2 A 8 GA PN C LT*, VP None Containment Air Ejector 2-CV-2 I-5 Isolation 2 A 8 GA Man C LT* None TV-CV-250A H-7 TV-CV-250B H-7 Containment Vacuum Pump LT*, EV TV-CV-250C H-8 Suction Isolation 2 A 2 GA PN 0 VP, ST None TV-CV-250D H-8
  • System Name: Reactor Coolant System Valve Number HCV-2656A HCV-2656B HCV-2656C SOV-RC-200A-l S0V-RC-200A-2 S0V-RC-200B-l SOV-RC-200B-2 Drawing Location A-2 A-7 L-2 G-7 G-7 G-7 G-7 Function Loop Fill Boundary Reactor Vessel Head Vent
  • Code Cate-Class gory 1 A 1 A Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -86A Valve Actuator Normal Test Size Type Type Position Required 2 GA PN C LT, VP 1 PN C EV, ST Relief Request 30 31

  • * .24 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Reactor Coolant Drawing No. 11548 -FM -86B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request SV-2551-A F-4 SV-2551-B G-4 Pressurizer Safety Valves 1 AC 6 SF SA C SP, LT 1
  • 30 SV-2551-C H-4 Primary Grade Water to LT*, EV TV-2519 A-6 PRZ Relief Tank 2 A 3 GA PN C ST, VP None Primary Grade Water to 2-RC-160 B-7 PRZ Relief Tank 2 AC 3 CK SA C LT*, CV 9 MOV-2535 I-4 EV, ST MOV-2536 I-5 PORV Block Valve 1 A 3 BF MOV 0 VP, LT 30 PCV-2456 J-4 EV, ST PCV-2456C J-5 PORV Pressurizer 1 A 3 GA PN C VP, LT 30 SOV-201-A-1 J-7 SOV-201-B-1 J-7 SOV-201-A-2 J-7 Pressurizer Head Vent 1 A 1 PN C EV, ST 31 SOV-201-B-2 J-7
  • ** .25 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Residual Heat Removal Drawing No. 11548 -FM -87A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request MOV-2700 H-7 RHR Suction from reactor ST, EV MOV-2701 G-7 Coolant System 1 A 4 GA MO C LT, VP 12, 30 MOV-2720-A K-5 RHR Discharge to reactor ST, EV MOV-2720-B K-5 Coolant System 1 A 10 GA MO C LT, VP 13, 30 RV-2721 I-4 RHR System Relief Valve 2 C 3 RV SA C SP 1 2-RH-5 D-6 RHR Pump Discharge Check 2-RH-11 C-6 Valve 2 C 10 CK SA C CV 11 MOV-RH-200 K-3 RHR to RWST 2 A 6 GA MO C LT*, VP None
  • System Name: Chemical and Volume Control Valve Drawing Code Cate-* Number Location Function Class gory l-CH-109 E-7 Boric Acid transfer Pump l-CH-116 G-7 Discharge Valve 3 C Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -88A Valve Actuator Normal Test Size Type Type Position Required 2 CK SA oc CV Relief Request None
  • * .27 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Chemical and Volume Control Drawing No. 11548 -FM -88B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request 2-CH-258 D-6 2-Cll-267 F-6 Charging Pump Discharge 2 C 3 CK SA oc CV 14 2-CH-276 G-6 Check Valve Charging Pump Suction from LCV-2115B C-9 RefueLing Water Storage 2 B 8 GA MOV C EV, ST None LCV-2115D C-9 Tank VP LCV-2115C H-3 Charging Pump Suction from EV, ST LCV-2115E H-3 Volume Control Tanks 2 B 4 GA MOV 0 VP 15 MOV-2275A D-6 MOV-2275B F-6 Charging Pump Recirculation EV, ST MOV-2275C H-6 Flow Path Isolation 2 B 2 GA MOV 0 VP None Charging Pump Recirculation EV, ST MOV-2373 F-5 Header Stop Valve 2 B 3 GA MOV 0 VP 16 Reactor Coolant Pump Seal EV, ST MOV-2381 A-3 Water Return 2 A 3 GA MOV 0 VP, LT* 17 Reactor Coolant System Let-LT*, EV TV-2204 A-3 down Isolation Trip Valve 2 A 2 GA PN 0 ST, VP 18 Reactor Coolant System Let-RV-2209 F-1 down Relief Valve 2 C 3 RV SA C SP 1 Volume Control Tank Relief RV-2257 H-1 Valve 2 C 3 RV SA C SP 1
  • * .28 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Chemical and Volume Control Drawing No. 11548 -FM -88B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request MOV-2289A B-5 Normal Charging Header LT*, EV Isolation 2 A 4 GA MOV 0 ST, VP 19 RCS Loop Fill Header LT*, EV FCV-2160 A-3 Isolation 1 A 2 GL PN C VP None Seal Water Return Line RV-2382-B F-3 to VCT 2 C 2 RV SA C SP 1 MOV-2289B B-5 Normal Charging Header 2 B 4 GA MOV 0 EV, ST 19 Isolation VP
  • System Name: Chemical and Volume Control Valve Number RV-2203 HCV-2200A HCV-2200B HCV-2200C RV-2382A 2-CH-309 Drawing Location H-1 H-2 H-2 H-2 H-4 J-3 Function Letdown Header Relief Letdown Orifice Isolation Seal Water Return to Pressurizer Relief Tank Normal Charging Isolation Check Valve
  • Code Class 2 2 1 2 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -88C Cate-gory Size C 2 *A 2 AC 2 AC 4 Valve Type RV GA RV CK Actuator Normal Type Position SA C PN oc SA C SA 0 Test Relief Required Request SP LT*, EV ST, VP SP CV, LT* 1 None 1, 30 9 I I . I I
  • * .30 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Safety Injection Drawing No. 11548 -FM -89A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request Low Head safety Injection Pump Suction from Contain-LT*, EV MOV-2860A, B B-8, E-8 ment Sump 2 A 12 GA MO C ST, VP None Low Head Safety Injection Pump Suction from Contain-2-SI-56, 47 C-8, F-8 ment Sump Check 2 C 12 CK SA C CV 20 Low Head Safety Injection Pump Suction from Refueling EV, ST MOV-2862A, B G-9, G-3 Water Storage Tank 2 B 12 GA MO 0 VP None Low Head Safety Injection Pump Suction from Refueling 2-S1-46A, B G-9, G-8 Water Storage Tank Check 2 C 12 CK SA C CV 21 Low Head Safety Injection 2-SI-43, 50 D-7, G-7 Pump Discharge Check 2 C 10 CK SA C CV 21 Low Head Safety Injection Pump Discharge to High Head EV, ST MOV-2863A, B E-6, G-6 Safety Injection Pump 2 B 8 GA MO C VP Suction None Low Head Safety Injection MOV-2.885A, B C-7, G-6 Pump Recirculation to EV, ST C, D G-6, C-7 Refueling Water Storage 2 B 2 GA MO 0 VP None Tank Low Head Safety Injection Pump Recirculation to 2-SI-61, 53 C-6, G-6 Refueling Water Storage 2 C 2 CK SA C CV None
  • * .1 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Safety Injection Drawing No. 11548 -FM -89A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type TyEe Position Required Request Low Head safety Injection Pump Discharge to Reactor EV, LT* MOV-2864A, B D-6, G-5 Coolant System Cold Legs 2 B 10 GA MO 0 ST, VP None RV-2845A, B C-6, D-5 Low Head Safety Injection 2 C 1 VE SA C SP 1 C, C-5 Flow Path Relief Low Head Safety Injection to Reactor Coolant System LT*, EV MOV-2890 A, B B-6, B-5 Hot Legs 2 AE 10 GA MO C ST, VP None Low Head Safety Injection to Reactor Coolant System LT*, EV MOV-2890C B-6 Cold Legs 2 AE 10 GA MO 0 ST, VP 22 MOV-2869A, B A-3, 1-3 High Head safety Injection LT*, EV 2842 A-1 to reactor Coolant System 2 AE 3 GA MO C ST, VP 23 Boron Injection Tank LT*, EV MOV-2867 C, D B-1, B-2 Outlet Isolation 2 A 3 GA MO C ST, VP 24 Boron Injection Tank EV, ST MOV-2867 A, B I-2, I-2 Inlet Isolation 2 B 3 GA MO C VP 25
  • * .2 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Safety Injection Drawing No. 11548 -FM -89A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request Boron Injection Tank EV, ST TV-2884A H-1 Recirculation 2 B 1 GA PN 0 VP None Boron Injection Tank EV, ST TV-:-2884B, C H-1, G-2 Recirculation

-3 B 1 GA PN 0 VP None Boron Injection Tank RV-2857B D-1 Relief 2 C 3/4 RV SA C SP 1 LT*, EV TV-SI-200 B-4 Nitrogen Accumulators A 1 GA PN 0 ST, VP None 2-SI-73 A-5 Accumulators Isolation AE 3/4 GL Man C LT* None 2-SI-32 A-5 Accumulator Isolation AE 1. GL Man C LT* None 2-s1~1so C-1 Boron Injection Tank A 1 GL Man 0 LT* None High Head Safety Injection 2-SI-174 B-2 to R. C. S:ystem A 3/4 GA Man C LT* None


1 * * .3. Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Safety Injection Drawing No. 11548 -FM -89A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request RV-2858 A, B C-4, G-5 Accumulator Tank Relief C C-7 2 C 1 RV SA C SP 1 2-SI-107, 109 C-5, A-5 128, 130 G-7, A-7 145, 147 C-8, A-9 Accumulator Discharge Check 1 C 12 CK SA C LT 26, 30 MOV-1865 A, B C-5, G-6 EV, ST C C-8 Accumulator Discharge 2 BE 12 GA MO 0 VP None 2-SI-88, 91

  • A-2, A-2 94, 238 A-3, B-2 Safety Injection to RCS 239, 240 B-2, A-3 Hot Legs 1 C 6 CK SA C CV, LT 27, 30 2-SI-235, 236 B-1, B-1 High Head Safety Injection 237 B-2 to RCS Cold Legs 1 C 2 CK SA C CV 27, 30 2-SI-241, 242 B-1, B-1 Low Head Safety Injection 243 B-2 to RCS Cold Legs 1 C 6 CK SA C CV, LT 27, 30 2-SI-224, 225 J-1, J-1 High Head Safety Injection 226, 227 J-2, J-3 Check Valves at Containment 1, 2 C 3 CK SA C CV 27 Penetrations Low Head Safety Injection 2-Sl-228, 229 J-3, J-3 Check Valves at Containment 2 C 6 CK SA C CV 27 Penetrations
  • * .4 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Safety Injection Drawing No. 11548 -FM -89B Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request 2-SI-79, 82 A-1, A-1 Safety Injection to RCS 85 A-2 Cold Legs 2 C 6 CK SA C CV, LT 27 Accumulator Nitroge~ LT*, EV TV-SI-201A, B J-5, J-5 Relief Line Isolation A 1 GA PN 0 ST, VP None 2-SI-234 J-4 Nitrogen Accumulators AC 1 CK SA C CV, LT* 9 Accumulator Return to RV-2859 1-4 RWST Relief 2 C 3/4 RV SA C SP 1
  • * .35 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Gaseous Waste Disposal Drawing No. 11548 -FM -90A Valve Drawing Code Cate-Valve Actuator Normal Test* Relief Number Location Function Class gory Size Type Type Position Required Request TV-GW-200 E-3 Suction Line to Hydrogen LT*, ST TV-GW-201 E-3 Analyzer -Unit 1 2 A 3/8 GA sov C EV, VP None TV-GW-202 D-3 Discharge Line to Hydrogen LT*, ST TV-GW-203 D-3 Analyzer -Unit 1 2 A 3/8 GA sov C EV, VP None TV-GW-204 C-2 Suction Line to Hydrogen LT*, ST TV-GW-205 C-2 Analyzer -Unit 2 2 A 3/8 GA sov C EV, VP None TV-GW-206 C-3 Discharge Line to Hydrogen LT*, ST TV-GW-207 C-3 Analyzer -Unit 2 2 A 3/8 GA sov C EV, VP None TV-GW-211A E-3 LT*, ST TV-GW-21 lB D-3 Containment Grab Sample 2 A 3/8 GA sov C EV, VP None
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1' 2, and 3 Valves System Name: R.W.S.T. Cross Tie Drawing No. 11548 -FM -106C Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request TV-SI-202A D-3 Unit No. 1 RWST to Unit ST, EV TV-SI-202B D-3 No. 2 RWST Cross Tie 2 B 8 GA PN C VP None Charging Pump Suction from 2-SI-25 F-3 RWST Check Valve 2 C 8 CK SA C CV 28 Charging Pump Suction from 2-SI-400 E-3 RWST Check Valve 2 . C 10 CK SA C CV 28
  • System Name: Reactor Cavity Purification Valve Drawing Code Number Location Function Class Reactor Cavity Purifica-RL-5, RL-3 H-4, G-4 tion Return Line 2 Reactor Cavity Purifica-RL-13, RL-15 H-6, G-6 tion Return Line 2 Cate-gory A A Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -118A Valve Actuator Normal Test Size Type Type Position Required 3 DA Man C LT* 3 DA Man C LT* Relief Request None None
  • System Name: Steam Generator Blowdown Valve Drawing Code Number Location Function Class TV-BD-200 A, B H-2, H-2 C, D H-4, H-4 Steam Generator Blowdown E, F H-5, H-5 Isolation 2 Cate-gory B Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FM -124A Valve Actuator Normal Test Size Type Type Position Required EV, ST 3 GA PN 0 VP Relief Request 29
  • Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves System Name: Radiation Monitor -Containment Particulate Drawing No. 11548 -SPS -14A Valve Drawing Code Cate-Valve Actuator Normal Test Relief
  • Number Location Function Class gory Size Type Type Position Required Request Isolation on Monitor 2-RM-03 D-8 Return Line 2 AC 3/4 CK SA 0 LT*, CV 9 Isolation on Monitor LT*, EV TV-RM-ZOOA F-8 Return Line 2 A 3/4 GA PN 0 ST, VP None TV-RM-200B F-4 Isolation on Monitor LT*, EV TV-RM-200C E-4 Return Line 2 A 3/4 GA PN 0 ST, VP None
  • System Name: Fuel Oil Lines Valve Number SOV-EE-105 SOV-EE-102 SOV-EE-104 Drawing Location H-7 J-4 H-7 Function Disel Fuel Oil Pump Discharge Valves
  • Code Class 3 Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. 11548 -FB -4B Cate-gory Size B 1 Valve Type GA Actuator Normal Type Position PN C Test Relief Required Request EV None
  • Surry Power Station Unit No. 2 lnservice Testing ASME Code Class 1' 2, and 3 Valves System Name: Containment Purge Drawing No. 11548 -FB -6A Valve Drawing Code Cate-Valve Actuator Normal Test Relief Number Location Function Class gory Size Type Type Position Required Request MOV-VS-200A 1-5 Containment Purge Supply MOV-VS-200B 1-5 MOV's 2 A 36 BF MOV C LT*, VP. None MOV-VS-202 1-5 Containment Vacuum.Breaker 2 A 8 BF MOV C LT*, VP None MOV-VS-200C 1-5 Containment Purge Exhaust MOV-VS-200D 1-5 MOV's 2 A 36 BF MOV C LT*, VP None Containment Purge Exhaust MOV-VS-201 1-5 Bypass 2 A 4 GA Man C LT* None
  • System Name: Containment Fire Protection Valve Number 2-FP-151 2-FP-152 Drawing Location Function Containment Stand Pipe Supply
  • Code Class 2 Cate-Surry Power Station Unit No. 2 Inservice Testing ASME Code Class 1, 2, and 3 Valves Drawing No. ------------

Test Relief gory Size Valve Type Actuator Normal Type Position Required Request A BA Man C LT* None

  • *
  • 28 3.5 Valve Test Program Relief Request Relief request identify code requirements which are impractical for Surry Unit 2 and provide justification for the requested exception.

Where appropriate, we also 9ropose alternate testing to be performed in lieu of code requirements

  • *
  • 29 NOTE 1 Safety and Relief Valves setpoints are tested in accordance with PTC-25.3-1976 as directed by IWV-3512.

Main Steam safety valves will be tested in accordance with Section 4.091 (a) (2). All other Safety and Relief Valves will be tested in accordance with Section 4.091 (a) (1). TABLE A Valve Category Class Function SV-MS-201A, B, C C 2 Main Steam Safety Valves SV-MS-202A, B, C SV-MS-203A, B, C SV-MS-204A, B, C SV-MS-205A, B, C RV-MS-201A C 2 Main Steam PORV RV-MS-201B RV-MS-201C

' RV-CC-219A C 3 Component Cooling from RHR RV-CC-219B Heat Exchanger Relief Valve RV-CC-216A C 3 Component Cooling Reactor RV-CC-216B Coolant Pump RV-CC-216C RV-CC-224 C 3 Component Cooling Piping Relief Valve RV-CC-218 C 3 Component Cooling from Excess Letdown Heat Exchanger Relief. RV-1721 C 2 RHR System Relief Valve RV-CC-211A C 3 Component Cooling to Fuel Pit RV-CC-211B Coolers Relief Valves RV-CC-210 C 3 Component Cooling to Non Regenerative Heat Exchanger Relief Valve RV-CC-209 C 3 Component Cooling to Seal Water Tank Relief Valve 29

  • TABLE A -,: ., Valve Category Class Function SV-2551A AC 1 Pressurizer Safety Valves SV-2551B SV-2551C RV-2209 C 2 Reactor Coolant System Letdown Relief Valve RV-2257 C 2 Volume Control Tank Relief Valve RV-2203 C 2 Letdown Header Relief RV-2845A, B, C C 2 Low Head Safety Injection Flow Path Relief RV-2857 C 2 Boron Injection Tank Relief Valve RV-2858A, B, C C 2 Accumulator Relief Valve RV-2382B C 2 Seal Water Return Line to VCT . * .. RV-2382A C 1 Seal Water Return to Pressurizer Relief Tank RV-2859 C 2 Accumulator Return to RWST Relief *
  • *
  • System: Valve(s):

Main Steam TV-MS-201A TV-MS-201B TV-MS-201C Category:

B Class: 2 RELIEF REQUEST 2 Function:

Main Steam Line Trip ValvesSection XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 30 Full Stroke or partial stroke exercise of these valves during power operation could result in a turbine and reactor trip. Alternate Testing Proposed Full stroke exercise during each cold shutdown or startup in accordance with Technical Specification

  • *

Category:

See valves affected by this relief are identified by Table C. Class: Function:

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 32 Opening these valves during power operation would introduce cold auxiliary feedwater to the steam generators resulting in thermal stress and possible degradation

  • Alternate Testing Proposed Exercise these valves for operability every cold shutdown .(but not more frequently than every three months) .
33 .-.. ' *~

2-FW-138 2-FW-142 C 3 Auxiliary Feedwater Pump 2-FW-157 Discharge Check Valves 2-FW-172 2-FW-310 C 3 Cross-Connect for Unit #1 Aux. 2-FW-309 Feed from Unit #2 Check Valves at Containment Penetration.

2-FW-305 C 3 Cross-Connect for Unit 1 Aux. 2-FW-306 Feed from Unit 2 Check Valves at Containment Penetration

  • * *
  • *

2-FW-10 2-FW-12 2-FW-41 Category:

C Class: 2 2-FW-43 2-FW-72 2-FW-74 RELIEF REQUEST 5 Function:

Main Feedwater Check Valves at Containment Penetrations.

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 34 Closure of these valves during power operation would require securing feedwater which would result in reactor trip. Alternate Testing Proposed Exercise these valves for operability every cold shutdo~"'Il (but not more frequently than every three months) .

35

  • RELIEF REQUEST 6 *

MOV-SW-203A MOV-SW-203C MOV-SW-203B MOV-SW-203D Category:

B Class: 3 Function:

Service Water to Recirculation Spray Heat ExchangersSection XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request Opening these valves would result in the introduction of service water into the recirculation spray heat exchanger and possibly cause fouling and degradation.

To prevent this problem draining of heat exchangers and piping is required which causes for a containment entry. Alternate Testing Proposed Exercise these valves for operability every cold shutdown (but not more frequently than three months) .

36

  • RELIEF REQUEST 7 *
  • System: Various Valve(s):

Category:

See valves affected by this relief are identified by Table D. Class: Function:

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request These check valves are located in the containment and may closed depending on system lineup. A containment entry other system valves is necessary to test these valves. impractical during power operation

  • Alternate Testing Proposed be normally open or and manipulation of This is considered Exercise these valves for operability every cold shutdown (but not more frequently than three months) *
  • *
  • Valve 2-CC-176 2-CC-177 2-CC-242 2-CC-233 2-CC-224 Category C C TABLED Class 2 3 37 Function Component Cooling to RHR Heat Exchangers Check valves Component Cooling to Reactor Containment Air Recirculation Coolers
  • *
  • RELIEF REQUEST 8 System: Component Cooling Valve(s):

Category:

See valves affected by this relief are identified by Table E. Class: Function:

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 38 To perform operability test, the component cooling lines must be isolated and thereby stopping flow of cooling water to the Reactor Coolant Pump. Loss of cooling water to these pumps can be damaging, even for short periods

  • Alternate Testing Proposed Exercise these valves for oper*ability every cold shutdown (but not more frequently than three months)
  • 39
  • TABLE E Valve Catego!Y .Class Function 2-CC-l C 2 *Component Cooling to Reactor 2-CC-58 Coolant Pumps 2-CC-59 TV-CC-205A B 2 Component Cooling from Reactor TV-CC-205B Coolant Pumps TV-CC-205C TV-CC-207 B 2 Component Cooling from Reactor Coolant Pumps *
  • 1.' * *
  • 40 RELIEF REQUEST 9 System: Various Valve(s):

Category:

See valves affected by this relief are identified in Table F. Class: Function:

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request These check valves cannot be aligned for a reverse flow test during power operation or cold shutdown.

Do to the fact that removing system from operation is required and these systems are required even at cold shutdown, these valves will be tested every refueling shutdown.

Alternate Testing Proposed These valves will be subject to reverse flow during leakage test which are performed during each refueling

  • 41 ',., * .;* TABLE F Valve Category Class Function 2-IA-864 AC 2 Instrument Air to Containment 2-IA-868 AC 2 Instrument Air to Containment 2-RM-3 AC 2 Isolation on Monitor Return line. 2-RC-160 AC 2 Primary Grade water to PRZ Relief Tank 2-SI-234 AC 2 Nitrogen Accumulators N2 supply. 2-CH-309 AC 2 Normal Charging Isolation Check Valve * *
  • *
  • RELIEF REQUEST 10 System: Containment and Recirculation Spray Valve(s):

2-RS-11 2-RS-17 Category:

AC Class: 2 2-CS-13 2-CS-14 2-CS-105 2-CS-127 Function:

Spray Pump Discharge Check ValvesSection XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 42 These valves are located inside the containment and not accessible during power operation.

Using flow to exercise these valves would result in spraying the containment, therefore manual exercising of these valves will be done. Do to the fact scaffolding and dismantling of valves is required, they will be tested every refueling shutdown.

Alternate Testing Proposed Full stroke manual testing will be performed each refueling shutdown *

  • *

Category:

Class: Function:

2-RH-5 2-RH-11 C 2 RHR Pump Discharge Check Valve Section XI Code Requirement For Which Relief is Requested Exercise valves for operability every three months. Basis for Request 43 The valves can only be cycled when RHR pumps are started. These valves will be tested with RHR pumps

  • Alternate Testing Proposed Exercise these valves for operability every cold shutdown (but not more frequently than three months):
  • *

Category:

Class: Function:

MOV-2700 MOV-2701 A I RHR Suction from Reactor Coolant System Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 44 (1) Valves are interlocked with reactor coolant system pressure such that valves can not be opened at elevated reactor coolant system pressure . (2) Over pressurization of the suction line may cause the loss LOCA. (3) Interlocks cannot be bypassed with normal control circuits.

Alternate Testing Proposed Exercise these valves for operability every cold shutdown (but not more frequently than three months) *

  • *

MOV-2720A MOV-2720B Category:

A Class: I Function:

RHR Discharge to Reactor Coolant System Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 45 (1) With MOV shut and if its respective check valve was leaking, there is no way to determine whether an overpressure condition exists before opening a MOV. (2) Since MOV is also part discharging piping of an accumulator, there is a possibility of dumping an accumulator into RHR system and disabling it. Alternate Testing Proposed Exercise these valves for operability every cold shutdown (but not more frequently than three months) *

  • *
  • RELIEF REQUEST 14 System: Chemical and Volume Control Valve(s):

Category:

Class: Function:

2-CH-258 2-CH-267 2-CH-276 C 2 Charging Pump Discharge Check Valve Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 46 With present plant design, these valves can only be partial stroke exercised during power operation and the charging pumps cannot achieve design accident flow when pumping into the reactor coolant system at operating pressure.

The only available flow path to test these valves is into the reactor coolant system. During cold shutdown, stroke exercising these valves could result in an over-pressurization of the reactor coolant system and could force a safety system to function.

Alternate Testing Proposed These valves will be partially stroke every three months and full flow tested each refueling

  • *
  • RELIEF REQUEST 15 System: Chemical and Volume Control Valve(s):

Category:

Class: Function:

LCV-2115C LCV-2115E B 2 Charging Pump Suction from Volume Control TanksSection XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 47 Exercising these valves during power operation would require the charging pump suctions to be aligned with the refueling water storage tank. This would cause a sudden increase in reactor coolant system boron inventory thereby a plant transient.

Alternate Testing Proposed These valves will be exercised during each cold shutdown \but not more frequently than every three months) *

  • *
  • RELIEF REQUEST 16 System: Chemical and Volume Control Valve(s):

Category:

Class: Function:

MOV-2373 B 2 Charging Pump Recirculation Header Stop Valve Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 48 This valve cannot be exercised without possible damage to the charging pumps .* Alternate Testing Proposed This valve will be exercised each cold shutdown (but not more frequently than every three months) *

  • -*
  • RELIEF REQUEST 17 System: Chemical and Volume Control Valve(s):

MOV-2381 Category:

A Class: 2 Function:

Reactor Coolant Pump Seal Water Return Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 49 Closure of this valve with reactor coolant pumps in. operation will cause a loss of seal flow resulting in possible pump seal damage

  • Alternate Testing Proposed This valve will be exercised during each cold shutdown (but not more frequently than every three months) *
  • *
  • RELIEF REQUEST 18 System: Chemical and Volume Control Valve(s):

TV-2204 Category:

A Class: 2 Function:

Reactor Coolant System Letdown Isolation Trip Valve-Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 50 Exercising this valve during power operation could result in a loss of Reactor coolant inventory control and pressurizer level control, Alternate Testing Proposed This valve will be exercised every cold shutdown (but not more frequently than every three months) *

  • *
  • RELIEF REQUEST 19 System: Chemical and Volume Control Valve(s):

Category:

Class: Function:

MOV-2289A HOV-2289B A 2 Normal Charging Header Isolation Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 51 Failure of these valves in the closed position during exercising would cause a loss of charging flow and could result in an inability to maintain reactor coolant inventory.

Alternate Testing Proposed This valve will be exercised every cold shutdown (but not more frequently than every three months) .

  • * ** System: Safety Injection Valve(s):

2-SI-56 2-SI-47 Category:

C Class: 2 52 RELIEF REQUEST 20 -Function:

Low Head Safety Inje.ction Pump Suction from Containment Sump Check Valve Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request This normally closed check valve cannot be exercised without isolating suction to Low Head Safety Injection by installing flanges and draining portions of the system. Alternate.

Testing Proposed These valves will be partial-stroked exercised during each refueling

  • *
  • 53 RELIEF REQUEST 21 System: Safety Injection Valve(s):

Category:

See valves affected by this relief are identified in Table G. Class: Function:

Section XI Code Requirement For Which Relief is Requested Exe*rcise valves every three nionths. Basis for Request These valves cannot be full stroke exercised during plant power operation.

The only full flow path is into the reactor coolant system and Low Head Safety Injection pumps cannot overcome reactor coolant system operating pressure

  • These valves will be partial stroked, exercised quarterly through pump recirculation line. During cold shutdown, the reactor coolant system presssure still prevents full flow of check valve. During cold shutdown, the charging flow could cause an over-pressurization condition.

Alternate Testing Proposed These valves will be partial-stroked every three months and full stroked every refueling .

  • *
  • Valve 2-SI-46A 2-SI-46B 2-SI-43 2-SI-50 Category C .C TABLE G Class 2 2 54 Function Low Head Safety Injection Pump Suction from Refueling Water Storage Tank Check Low Head Safety Injection Pump Discharge Check
  • *
  • System: Valve(s):

Category:

Class: Safety Injection MOV-2890G A 2 RELIEF REQUEST 22 Function:

Low Head Safety Injection to Reactor Coolant System Cold LegsSection XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 55 In accordance with Technical Specification_

3. 3 .A. 9, during power operation, the A.C. power shall be removed from MOV-2890C with valve in open position.

If this valve was stroked during power operations and failed in the closed position, Low Head Safety Injection System would be rendered inoperable.

Alternate Testing Proposed This valve will be exercised during each cold shutdown (but not more frequently than every three months) *

  • *
  • System: Valve(s):

Category:

Class: Safety Injection MOV-2869A MOV-2869B MOV-2842 A 2 RELIEF REQUEST 23 Function:

High Head Safety Injection to Reactor Coolant System Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 56 These valves cannot be exercised during power operation.

Opening these valves would allow charging flow into the reactor coolant system causing reactivity transients and possible thermal shock to High Head Safety Injection system. During cold shutdown, the charging flow could cause an over-pressurization of the reactor coolant system and could force a safety system to function.

Alternate Testing Proposed These valves are full stroked exercised during refueling outages .

  • *
  • System: Safety Injection Valve(s):

MOV-2867C MOV-2967D Category:

A Class: 2 RELIEF REQUEST 24 Function:

Boron Injection Tank Outlet Isolation Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 57 Opening these valves during power operation.

would allow concentrated boric acid to flow into the piping systems that are not heat traced and a boron buildup could crystalize and block system flow. Alternate Testing Proposed These valves will be exercised during each cold shutdown (but not more frequently than every three months) .

  • *
  • System: Safety Injection Valve(s):

MOV-2867A MOV-2967B Category:

B Class: 2 RELIEF REQUEST 25 Function:

Boron Injection Tank Outlet Isolation Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 58 To exercise these valves will allow lower concentrated borated water into the Boron Injection Tank, thereby causing the tank's boron concentration to go below Technical Specification limits. Alternate Testing Proposed These . valves will be exercised during each cold shutdown (but not more frequently than every three months) *

  • *
  • RELIEF REQUEST 26 System: Safety Injection Valve(s):

2-SI-107 2-SI-128 2-SI-145 Category:

C Class: 1 2-SI-109 2-SI-130 2-SI-147 Function:

Accumulator Discharge Check Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 59 These check valves are partially stroked at refueling shutdown by varying reactor coolant system pressure and observing increases and decreases in accumulator level and pressures.

Stroke verification by passing design flow is not practical due to the large volume of water that would be added to the Reactor Coolant System. Calculations have shown that a differential pressure

  • of approximately 25 psi will shear any particles that may attempt to prevent the valve from functioning.

Based on this calculation and partial stroke testing presently performed, full stroke testing requirements are waived. Alternate Testing Proposed These valves will be partially stroked each refueling

  • *
  • System: Safety Injection Valve(s):

RELIEF REQUEST 27 Category:

See valves affected by this relief are identified in Table H. Class: Function:

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 60 These valves cannot be exercised during power operation, because flow through these valves would thermal shock the injection system and cause unnecessary plant transients.

During cold shutdown, the reactor coolant system pressure still prevents full design flow. Also, there could result an overpressurization of the reactor coolant system and force a safety system to function.

Alternate Testing Proposed These valves are full stroke exercised during refueling outages when the vessel head is removed

  • 61
  • TABLE Valve Category Class Function 2-SI-88, 91 AC 1 Safety Injection to RCS Hot Legs 2-SI-94, 238 2-SI-239, 240 2-SI-235 AC 1 High Head Safety Injection to 2-SI-236 RCS Cold Legs 2-SI-237 2-SI-241 AC 1 Low Head Safety Injection to 2-SI-242 RCS Cold Legs 2-SI-243 2-SI-224, 225 C 2 Head Head Safety Injection Check 2-SI-226, 227 Valve at Containment Penetrations 2-SI-228, 229 C 2 Low Head Safety Injection Check Valves at Containment Penetrations
  • 2-SI-79, 82, 85 A 1 Safety Injection to RCS Cold Legs *
  • *
  • System: R.W.S.T. Cross Tie Valve(s):

2-SI-25 2-SI-400 Category:

C Class: 2 RELIEF REQUEST 28 Function:

Charging Pump Suction From R.W.S.T. Cross Tie Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 62 Exercising these valves during power operat~on would require the charging pump suctions to be aligned with the refueling water storage tank. This would cause a sudden increase in reactor coolant boron inventory.

Alternate Testing Proposed Exercise the valves for operability every cold shutdown (but not more frequently than every three months) *

  • *

TV-BD-200A TV-BD-200B TV-BD-200C Category:

B Class: 2 TV-BD-200D TV-BD-200E TV-BD-200F Function:

Steam Generator Blowdown Isolation.

Section XI Code Requirement For Which Relief is Requested Exercise valves every three months. Basis for Request 63 Closing th~se valves during power operation causes the downstream piping to become empty due to drainage and water flashing to steam. When the valves reopened, a flow surge occurs which automatically isolates the inner valves due to high flow. Then a containment entry is necessary to reset these valves and upon reopening, the process may occur again. Alternate Testing Proposed Exercise the valves for operability every cold shutdown (but not more frequently than every three months) .

  • *

Valve HCV-2156A HCV-2156B HCV-2156C SV-2551A SV-2551B SV-2551C MOV-2535 MOV-2536 PCV-2456 PCV-2456C 2-SI-107, 109 2-SI-128, 130 2-SI-145, 147 2-SI-88, 91 2-SI-94, 238 2-SI-239, 240 2-SI-235 2-SI-236 2-SI-237 MOV-2700 MOV-2701 MOV-2720A MOV-2720B RV-2382A TABLE A Category Class A 1 AC 1 A 1 A 1 AC 1 AC 1 AC 1 A 1 A 1 AC 1 Function Loop Fill Boundary Pressurizer Safety Valves PORV Block Valves PORV Accumulator Discharge Check Valve Safety Injection to RCS Hot Legs High Head Safety Injection to RCS Cold Legs RHR Suction from Reactor Coolant System RHR Discharge to Reactor Coolant System Seal Water Return to Pressurizer Relief Tank

  • *
  • System: Reactor Coolant Valves: SOV-RC-200A-l SOV-RC-200A-2 SOV-RC-200B-l SOV-RC-200B-2 Category:

A Class: 1 RELIEF REQUEST 31 SOV-RC-201A-l SOV-RC-201A-2 SOV-RC-201B-l SOV-RC-201B-2 Function:

Head Vent for Reactor Vessel and Pressurizer Section XI Code Requirements For Which Relief is Requested Exercise valves every three months. Basis for Request 65 Due to. head vents location on Reactor Coolant System, valve cycling during power operation could put plant in unsafe condition.

Also at cold shutdown and at power operation, cycling these valves could cause an airborne contamination problem due to the fact that they

  • discharge to containment atmosphere.

Alternate Testing Proposed These valves will be tested each refueling by exercising and verifying flow *

  • *
  • System: Valves: Category:

Class: Main Steam HCV-MS-204 B 2 RELIEF REQUEST 32 Function:

Decay Heat Release Control Valve Section XI Code Requirements For Which Relief is Requested 66 Opening of this valve during power would result in added steam load to reactor. The opening and closing of this valve at power could result in a over power condition and possible reactor trip as reactor power increases to meet the new steam load. Alternate Testing Proposed Exercise these valves for operability every cold shutdown (but not more frequently than every three months) .

  • *
  • 67 4.0 REPORTING OF INSERVICE TEST RESULTS 4.1 Pump Inservice Program Records of Pump Inservice Test Results will be in accordance with the intent of Article IWP-6000.

Files will be established for each pump and will include: 1) Pump identification by equipment number, manufacturer and serial number. 2) The record of test shall include *.* a. date of test b. measured and observed quantities

c. identification of instruments used, d. comparison with allowable ranges of test valves and analysis of deviations
e. requirements for corrective actions f. conducting and analyzing the test 3) Inservice test plans. This may be by surveillance test procedure by which the pump is tested with reference drawing . 4) Summaries of corrective action some by maintenance report number, etc. The Pump Inservice Test Program, associated surveillance test procedures and results will be kept at Surry Power Station. They will be available for audit by Authorized Nuclear Inspector and the NRC. 4.2 Valve Inservice Program Records of Valve Inservice Test Results will be in accordance with the intent of Article IWV-6000, files will be established for each valve and will include *.. 1) Valve identification by equipment number, manufacturer, size, valve type, actuator type. 2) The record of test shall include: a. date of test b. measured and observes quantities where applicable
c. identification of instruments used where applicable
  • d. e. f. comparisons with allowable analysis of deviations.

maintenance history signature of the person conducting and analyzing the ranges of or persons test. 68 test valves and responsible for 3. Summaries of maintenance history may be maintenance report numbers, etc. The Valve Inservice Test Program, associated surveillance test procedures and results will be kept at Surry Power Station. They will be available for audit by Authorized Nuclear Inspector and NRC Region Inspectors.

4.3 Reports

to Regulatory Agencies Reports to Regulatory Agencies will be summary reports on pump and valve program which will give sufficient information to insure a test was performed.

All procedures of test will be kept on site . Each refueling outage, a report shall be submitted to regulatory agencies with NDE Report. 5.0 QUALITY ASSURANCE PROGRAM The Pump and Valve Inservice Test Program activities will be conducted in accordance with Nuclear Power Station Quality Assurance Manual and Technical Specifications for Surry Power Station .

  • 5.0 SYSTEM PRESSURE TESTS 5.1 Program Description 5 .1.1 The Surry Unit 2 System Pressure Test program* shall be in accordance with the ASME Boiler and Pressure Vessel Code Section XI, 1980 Edition, Winter of 1980 Addenda inclusive.

All principles and guidelines established by this code shall be adopted while conducting system pressure tests, except in cases where relief has been requested and provided within this document.

Relief requests will identify the specific deviation from code requirements and provide an alternative testing arrangement.

Surry Unit 2 is currently entering the second inspection interval of Inspection Program B, IWA-2420.

This new interval starts April 28,1983, and coincides with the planned implementation of the proposed inspection program ccmtained within this document.

This proposed program will be effective at Surry Unit 2 for the next 10 years or as modified by future ASME Code changes which are adopted at this station . 5-1 **-----***-------.----~--~~.:::__-*-*

..::::..:.*--**:...::..:...*>>.:..:;__*.

~:_::__::..;--

  • ..:...**

.:.=.** *=..c* "'-'--'-'" -=--=--~--------~

.I. CLASS I SYSTEM PRESSURE TESTS (10 YEAR SCHEDULE)

A. EXAMINATION CATEGORY B-E, PRESSURE RETAINING PARTIAL PENETRATION WELDS IN VESSELS. ITEM PARTS TO BE EXAM. EXAM. ACCEPTANCE SCHEDULE NOTES RELIEF NO. BE EXAMINED METHOD REQRMT. CRITERIA REQUEST B4.10 PARTIAL VT-2 EXTERNAL IWA-5250 CONDUCTED 2,5 PENETRATION SURFACE DURI~G WELDS SYSTEM HYDROSTATIC TEST B4.ll VESSEL VT-2 EXTERNAL IWA-5250 CONDUCTED 2,5 NOZZLES SURFACE DURING SYSTEM HYDROSTATIC TEST B4.12 CONTROL VT-2 EXTERNAL IWA-5250 CONDUCTED 2,5 ROD DRIVE SURFACE DURING NOZZLES SYSTEM HYDROSTATIC

  • TEST B4.13 INSTRUMENT A-VT-2 EXTERNAL IWA-5250 CONDUCTED 2,5 TION NOZZLES SURFACE DURING SYSTEM HYDROSTATIC TEST B4.20 PRESSURIZER VT-2 EXTERNAL IWA-5250 CONDUCTED 2,5 *HEATER SURFACE DURING PENETRATION SYSTEM WELDS HYDROSTATIC TEST
  • 5-2
  • B. EXAMINATION CATEGORY B-P, ALL PRESSURE RETAINING COMPONENTS ITEM PARTS TEST EXAM. ACCEPT. SCHEDULE NOTES RELIEF NO. EXAM. REQRMT. METHOD STANDARD REQUEST Bl5 .10 REACTOR SYSTEM VISUAL, IWA-5250 EACH 1,5,9 VESSEL LEAKAGE VT-2 REFUELING PRESSURE TEST, OUTAGE RETAINING IWB-5221 BOUNDARY Bl5.ll REACTOR SYSTEM VIst!AL, IWA-5250 ONE 1,2,5,9 VESSEL HYDRO-VT-2 TEST RETAINING STATIC BOUNDARY TEST, IWB-5222 Bl5.20 PRESSUR-SYSTEM VISUAL, IWA-5250 EACH 1,5,9 IZER LEAKAGE VT-2 REFUELING PRESSURE TEST, OUTAGE RETAINING IWB-5221 BOUNDARY Bl5.21 PRESSUR-SYSTEM VISUAL, IWA-5250 ONE 1,2,5,9 IZER HYDRO-VT-2 TEST
  • PRESSURE STATIC RETAINING TEST, BOUNDARY IWB-5222 Bl5.30 STEAM SYSTEM VISUAL, IWA-5250 EACH 1,5,9 17 GENERATORS LEAKAGE VT-2 REFUELING PRESSURE TEST, OUTAGE RETAINING IWB-5221 BOUNDARY Bl5.31 STEAM SYSTEM VISUAL, IWA-5250 ONE 1,2,5,9 17 GENERATORS HYDRO-VT-2 TEST PRESSURE STATIC RETAINING TEST, BOUNDARY IWB-5222 Bl5.40 HEAT SYSTEM VISUAL, IWA-5250 EACH 1,5,6,9 EXCHANGES LEAKAGE VT-2 REFUELING PRESSURE TEST, OUTAGE RETAINING IWB-5221 BOUNDARY
  • 5-3
  • B. EXAMINATION CATEGORY B-P, ALL PRESSURE RETAINING COMPONENTS ITEM PARTS TEST EXAM. ACCEPT. SCHEDULE NOTES RELIEF NO. EXAM. REQRMT. METHOD STANDARD REQUEST Bl5.41 HEAT SYSTEM VISUAL, IWA-5250 ONE 1,2,5,6,9 EXCHANGERS HYDRO-VT-2 TEST PRESSURE STATIC RETAINING TEST, BOUNDARY IWB-5222 Bl5.50. PIPING SYSTEM VISUAL, IWA-5250 EACH 1,3,5,9 7 PRESSURE LEAKAGE VT-2 REFUELING-RETAINING TEST, OUTAGE BOUNDARY IWB-5221 Bl5.51 PIPING SYSTEM VISUAL, IWA-5250 ONE 1,2,5,9 1,3,4, PRESSURE HYDRO-VT-2 TEST 5,6 RETAINING STATIC BOUNDARY TEST, IWB-5222 Bl5.60 PUMPS SYSTEM VISUAL, IWA-5250 EACH 1,5,9 PRESSURE LEAKAGE VT-2 REFUELING RETAINING TEST, OUTAGE --15.61 BOUNDARY TWB-5221 PUMPS SYSTEM VISUAL, IWA-5250 ONE 1,2,5,9 3 PRESSURE HYDRO-VT-2 TEST RETAINING STATIC BOUNDARY TEST, IWB-5222 Bl5.70 VALVES SYSTEM VISUAL, IWA-5250 EACH 1,3,5,9 7 PRESSURE LEAKAGE VT-2 REFUELING RETAINING TEST, OUTAGE BOUNDARY IWB-5221 Bl5.71 VALVES SYSTEM VISUAL, IWA-5250 ONE 1,2,5,9 1,4,5,6 PRESSURE HYDRO-VT-2 TEST RETAINING STATIC BOUNDARY TEST, IWB-5222
  • 5-4

.II. CLASS II SYSTEM PRESSURE TEST (10 YEAR COMPONENTS)

A. EXAMINATION CATEGORY C-H, ALL PRESSURE RETAINING COMPONENTS ITEM PARTS TEST EXAM. ACCEPT. SCHEDULE NOTES RELIEF NO. EXAMINED REQRMT. METHOD STANDARD REQUEST C7 .10 PRESSURE SYSTEM VISUAL, IWA-5250 ONCE 4,5,6,9 VESSEL FUNCTIONAL VT-2 PER PRESSURE TEST, INSPECTION RETAINING IWC-5221 PERIOD COMPONENTS C7.ll PRESSURE SYSTEM VISUAL, IWA-5250 ONE 2,4,5,6, 8 VESSELS HYDRO-VT-2 TEST 9 PRESSURE STATIC RETAINING TEST, COMPONENTS IWC-5222 C7.20 PIPING SYSTEM VISUAL, IWA-5250 ONCE 4,5,9 11 PRESSURE FUNCTIONAL VT-2 PER . RETAINING TEST, INSPECTION COMPONENTS IWC-5221 PERIOD C7.21 PIPING SYSTEM VISUAL, IWA-5250 ONE 2,4,5, 8,9,10,11,

  • PRESSURE HYDRO-VT-2 TEST 7,9 12,13,16 RETAINING STATIC COMPONENTS TEST, IWC-5222 C7.30 PUMPS SYSTEM VISUAL, IWA-5250 ONCE 4,5,9 PRESSURE FUNCTIONAL VT-2 PER RETAINING TEST, INSPECTION COMPONENTS IWC-5221 PERIOD C7.31 PUMPS SYSTEM VISUAL, IWA-5250 ONE 2,4,5,9 PRESSURE HYDRO-VT-2 TEST RETAINING STATIC COMPONENTS TEST, IWC-5222 C7.40 VALVES SYSTEM VISUAL, IWA-5250 ONCE 4,5,9 PRESSURE FUNCTIONAL VT-2 PER RETAINING TEST, INSPECTION COMPONENTS IWC-5221 C7.41 VALVES SYSTEM VISUAL, IWA-5250 ONE 2,4,5, 8,9,10,11, PRESSURE HYDRO-VT-2 TEST 7,9 12,13,16 RETAINING STATIC COMPONENTS TEST, IWC-5222
  • 5-5

.IV. CLASS III SYSTEM PRESSURE TEST (10 YEAR SCHEDULE)

A. EXAMINATION CATEGORY D-A, SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION.

ITEM PARTS TEST EXAM. ACCEPT. SCHEDULE NOTES RELIEF NO. EXAMINED REQRMT. METHOD STANDARD REQUEST Dl.10 PRESSURE SYSTEM VISUAL, NO ONCE 5,6,8,9 RETAINING IN-SERVICE VT-2 LEAKAGE PER COMPONENTS TEST, INSPECTION IWD-5221 PERIOD Dl .10 PRESSURE SYSTEM VISUAL, NO ONE 2,5,6 18,19 RETAINING HYDRO-VT-2 LEAKAGE 8,9 COMPONENTS STATIC TEST, IWD-5223 *

  • 5-6
  • B. EXAMINATION CATEGORY D-B, SYSTEMS IN SUPPORT OF EMERGENCY CORE COOLING, CONTAINMENT HEAT REMOVAL, ATMOSPHERE CLEANUP, AND REACTOR RESIDUAL HEAT REMOVAL. ITEM PARTS TEST EXAM. ACCEPT. SCHEDULE NOTES RELIEF NO. EXAMINED REQRMT. METHOD STANDARD REQUEST D2.10 PRESSURE SYSTEM VISUAL, NO ONCE 5,6,8, RETAINING IN-SERVICE VT-2 LEAKAGE PER 9 COMPONENTS TEST, INSPECTION IWD-5221 PERIOD D2.10 PRESSURE SYSTEM VISUAL, NO ONE 2,5,6, 14, 15 RETAINING HYDRO-VT-2 LEAKAGE TEST 8,9 18,19 COMPONENTS STATIC TEST, IWD,5223 ** * .5-7
  • c. EXAMINATION CATEGORY D-C, SYSTEMS IN SUPPORT OF RESIDUAL HEAT REMOVAL FROM SPENT FUEL STORAGE POOL ITEM PARTS TEST EXAM. ACCEPT. SCHEDULE NOTES RELIEF NO. EXAMINED REQRMT. METHOD STANDARD REQUEST D3.10 PRESSURE SYSTEM VISUAL, IWA-5250 ONCE 5,6, RETAINING IN-SERVICE VT-2 PER 8,9 COMPONENTS TEST, INSPECTION IWD-5221 PERIOD D3.10 PRESSURE SYSTEM VISUAL, IWA-5250 ONE 2,5,6 18 RETAINING HYDRO-VT-2 TEST 8,9 COMPONENTS STATIC TEST, IWD-5223 *
  • 5-8
  • *
  • Note 1 NOTES Class I Systems are drawn on the following station prints: 11548-FM-64A 11548-FM-68A 11548-FM-72A 11548-FM-82A 11548-FM-86A 11548-FM-86B 11548-FM-87 A 11548-FM-88C 11548-FM-88B 11548-FM-89B These systems are designated by an A and are enclosed by brackets on the station prints. Note 2 Class I, II and III System Hydrostatic Tests shall be conducted near the end of the second interval within the last period. This coincides with the inspection conducted in the first interval
  • Note 3 The piping between the following valves will be tested prior to reaching 1000 psig when entering a refueling shutdown.

The piping is normally pressurized to 660 psig but depressurizes at 1000 psig on the primary. 2-SI-109 AND 2-SI-130 AND 2-SI-147 AND 2-SI-107, HCV-2850B 2-SI-128, HCV-2850D, MOV-2720A 2-SI-145, HCV-2850F, MOV-2720B Note 4 Class II systems are drawn on the following station prints: 11548-FM-64A 11548-FM-64B 11548-FM-66A 11548-FM-68A 11548-FM-71A 11548-FM-72A 11548-FM-72B 11448-FM-72C 11448-FM-72F 11548-FM-75C 11548-FM-7 SE 11548-FM-7 SJ 11548-FM-82A 11548-FM:....83A 11548-FM-83B 11548-FM-84A 11548-FM-SSA 11548-FM-86A 11548-FM-86B 11548-FM-87A 11548-FM-88A 11548-FM-88B 11548-FM-88C 11548-FM-89A 5-9 11548-FM-89B 11448-FM-90A 11448-FM-106C 11448-FM-llSA 11448-FM-123A 11448-FM-124A 11548-FM-138A 11448-SPS-14A 11448-FB-6A

  • *
  • Class II systems or components will be designated by a Band will be enclosed in brackets.

Note 5 This station will use the following guidance for determining the completion of scheduled system pressure tests (i.e. Category B-D, B-P, C-H, D-A, D-B, D-C); Alls test which meet the pressure, temperature, hold time, and VT-2 examination requirements as stipulated in the code will be treated as complete for scheduled inspection purposes.

All discrepancies will be treated in* accordance with IWA 5250 and the station's repair/replacement program. Weld leaks and excessive mechanical leaks will be addressed through a station engineering evaluation to determine continued operability. (NOTE: This does not apply to repair/replacements which must exhibit no leakage at the area of examination determined in the repair/replacement) . Note 6 Visual Examination of Heat Exchangers will be conducted using the following methods: a) When pressurizing the tube side of a heat exchanger, the tube integrity will be checked by the following methods. Fill and vent the shell side of the heat exchanger prior to the test and monitor an open vent path on the shell side during pressurization for overflow.

Any overflow, will be an indication of leakage. A drain method can be used by draining the shell side and observing leakage out the open drain path on the shell side. b) When pressurizing the shell side of a heat exchanger, the tube integrity can be checked by the following method. Fill and vent the tube side of the heat exchanger prior to pressurization.

Monitor an open vent path on the tube side for overflow.

Any overflow will be an indication of leakage. The required visual examination of heat exchanger will be considered complete using either method above. All discrepancies will be referred to the station's repair/replacement program . 5-10

  • Note 7 For identification purposes, piping extending beyond the below listed *
  • valves on station print 11548-FM-SSA will be considered open ended and in accordance with the requirements of IWC-5222(d) for test purposes.

2-LM-28 2-LM-29 2-LM-30 2-LM-31 PIPING 3/8"-LM-11 l-N7 3/8"-LM-112-N7 3/8"-LM-113-N7 3/8"-LM-116-N7 Note 8 Class III Systems are on the following station prints: 11548-FM-64A 11548-FM-68A 11548-FM-68B 11548-FM-71A 11548-FM-71B 11548-FM-72A

.11548-FM-72B 11548-FM-72C 11548-FM-84A 11548-FM-87A 11548-FM-88B 11548-FM-88C 11548-FM-89A These systems will be enclosed in brackets and designated by a C symbol . Note 9 Pressure tests required by repairs or replacements will be conducted in accordance with the station's repair/replacement program as documented at the station

  • 5-11
  • *
  • RELIEF REQUESTS Relief Requests from code required system pressure tests will be in the following format: 1. Identification of the component for which relief is requested:
a. Name and number as located on station drawings.
b. Function c. ASME code class 2. Specific identification of the ASME code requirements that has determined to be impractical for each component.
3. Information to support the determination that the requirement in (2) is impractical; i.e. the basis of the relief. 4. Specification of the in-service pressure testing that will be performed in lieu of the ASME Code Section XI requirements, if any. 5. The schedule for implementation of the procedure(s) in (4)
  • 5-12
  • *
  • RELIEF REQUESTS RR-1 la) Piping between following check valves located on station print: 11548-FM-89B 11548-FM-88C 2-SI-79 AND 2-SI-235, 2-SI-241 2-SI-82 AND 2-SI-236, 2-SI-242 2-SI-85 AND 2-SI-237, 2-SI-243 2-SI-88 AND 2-SI-226, 2-SI-227 2-SI-91 AND 2-SI-226, 2-SI-227 2-SI-94 AND 2-SI-226, 2-SI-227 l-CH-312 AND HCV-2310A, 2-CH-310 b) Safety Injection System Chemical Volume and Control c) Class I AND AND AND 2. Class I System Hydrostatic Test, IWB-5222 2-SI-238 2-SI-239 2-SI-240 3. The double check valve combination prevents pressurization of the area in between the check valves when conducting IWB-5222 on the primary system . 4. The alternative test proposed is to pressurize the primary system to 2335 psig while the reactor is in a shutdown condition.

The reactor will be borated to equal to or greater than cold shutdown Boron Concentration.

The pressurized primary will act as a boundary for the test forcing closed the first check valve in the pressure boundary.

A charging test pump will provide test pressure and a VT-2 examination will be conducted on the area. 5. This test will be conducted toward the end of the second interval within the third inspection period . 5-13

  • RR-2 Relief Request Withdrawn
  • 5-14
  • RR-3 *
  • la) Pumps located on station drawing 11548-FM-88C as listed: 2-RC-P-lA 2-RC-P-lB 2-RC-P-lC Piping associated from the flange to the pump. b) Chemical volume control system c) Class I 2. Class I System Hydrostatic Test, IWB-5222 3. The number one seal return is the pressure boundary for the reactor coolant pumps. The nature of the design of this system precludes the use of an external pressure source for this test; as excessive pressure could damage the seal. 4. The normal system leakage tests and VT-2 examination of the piping from the flanges to the pumps will be adequate, and an alternative test is not necessary.
5. N/A 5-15
  • RR-4 *
  • la) Piping and valves as follows, located on station print 11548-FM-88C:

2-CH-323 to the flange prior to 2-RC-P-lA 2-CH-333 to the flange prior to 2-RC-P-lB 2-CH-349 to the flange prior to 2-RC-P-lC b) Chemical and Volume Control System c) Class I 2. Class I System Hydrostatic Test, IWB-5222 3. It is requested that the piping and valves described be examined during the Class II hydrostatic test which will be conducted on the attached piping. This hydrostatic test will be conducted at 1.25 times the pressurizer safety set point (2485 psig). The hold time for this hydro is the same as a Class I hydro. A Classs II hydrostatic test will be the more restrictive test. 4. The alternative test is a Class II hydrostatic test. 5. The end of the interval, within the last period . 5-16

  • RR-5 *
  • la) Piping and valves as listed, located on station print 11548-FM-88C:

HCV-2311 to 2-CH-313 b) Chemical and Volume Control System c) Class I 2. Class I System Hydrostatic Test, IWB-5222.

3. The one-way check valve placement prevents pressurization of the area in between the valves when conducting IWB-5222 on the primary system. 4. Alternate testing will be proposed at a later date. 5. End of interval, within last period
  • 5-17 *
  • RR-6 *
  • la) Piping and valves located on station print 11548-FM-87A Component MOV-2701 b) Residual Heat Removal c) Class I Connected Piping 14"-RH-101-1502
2. Class I System Hydrostatic Test, IWB-5222 Component MOV-2700 3. During a normal hydrostatic test of the primary, MOV-2700 is closed in addition to MOV-2701.

This prevents pressurization of MOV-2701 and the piping between the two MOVs. Both valves are closed to prevent possible overpressurization of the Residual Heat Removal System. 4. As an alternative, MOV-2701 and the p1p1ng between MOV-2701 and MOV-2700 will be tested in accordance with the Class II hydrostatic test to be administered to 14"-RH-118-602 on the suction side of the Residual Heat Removal pumps. This piping is protected from overpressure by RV-2721 which is set at 600 psig. Class II test pressure will be* 750 psig. A VT-2 examination at this test pressure will identify any leakage and eliminate the overpressurization risk the Class I hydrostatic test presented . 5. End of interval, within the last period

  • 5-18
  • RR-7 *
  • la) Piping and valves located on station print 11548-FM-87A Component MOV-2701 b) Residual Heat Removal c) Class I Connected Piping 14"-RH-101-1502
2. Class I System Leakage Test, IWB-5221 Component MOV-2700 3. The system leakage test conducted on the primary system is done with both MOV-2700 and MOV-2701 closed for reasons expounded upon in Relief Request 6. This prevents pressurization of MOV-2701 and piping between the two MOVs. 4. As an alternative during the conduct of the Class II functional test on 14"-RH-118-602, MOV-2701 will be open as well as MOV-2700.

This piping will be examined to the normal VT-2 requirements at the functional test conditions.

5. Once per inspection period
  • 5-19
  • RR-8 *
  • la) Steam generators and piping located on station prints: 11548-FM-64A 11548-FM-64B 11548-FM-68A 11548-FM-124A 11548-FM-138A 11548-FM-123A Component 2-RC-E-lA 2-RC-E-lA 2-RC-E-lA 2-RC-E-lA 2-RC-E-lA 2-RC-E-lA 2-RC-E-lA Connected Piping 30"-SHP-101-601 to 30"-SHP-122-601 to 4"-SHP-137-601 30"-SHP-101-601 to 2"-GN-123'601 30"-SHP-101-601 to 6-SHP-145-601 30"-SHP-101-601 to 30"-SHP-122-601 to 3"-SDHV-101-601 to 4"-SDHB-104-601 30"-SHP-101-601 14"-WFPD-117-601 5-20 Component SV-MS-201A SV-MS-202A SV-MS-203A SV-MS-204A SV-MS-205A RV-MS-201A 2-GN-l NRV-MS-201A 2-MS-80,81,266,74 HCV-MS-204 2-MS-87,2-MS-379 2-FW-27 2-FW-10 2-WT-10 2-BD-l 2-BD-2 2-BD-4 2-RT-l
  • Component Connected Piping Component 2-RC-E-lB 30"-SHP-102-601 SV-MS-201B to 30"-SHP-123-601 SV-MS-202B to 4"-SHP-138-601 SV-MS-203B SV-MS-204B SV-MS-205B RV-MS-201B 2-RC-E-lB 30"-SHP-102-601 2-GN-2 to 2"-GN-124-601 2-RC-E-lB 30"-SHP-102-601 NRV-MS-201B to 6"-SHP-146-601 2-MS 112,268,113, 106 2-RC-E-lB 30"-SHP-102-601 HCV-MS-204 to 30"-SHP-123-601 to 3"-SDHV-102-601 to 4"-SDHV-104-601 2-RC-E-lB 30"-SHP-102-601 2-MS-120,2-MS-378 2-RC-E-lB 14"-WFPD-113-601 2-FW-41,58 2-WT-177
  • 2-RC-E-lB 2-BD-11 2-BD-12 2-BU.:-14 2-RT-20
  • 5-21
  • Component Connected Piping Component 2-RC-E-lC 30"-SHP-103-601 SV-MS-201C to 30"-SHP-124-601 SV-MS-202C to 4"-SHP-139-601 SV-MS-203C SV-MS-204C SV-MS-205C RV-MS-201C 2-RC-E-lC 30"-SHP-103-601 2-GN-3 to 2"-GN-125-601 2-RC-E-lC 30"-SHP-103-601 NRV-MS-201C to 6"-SHP-147-601 2-MS-152,149,208 143 2-:RC-E-lC 30"-SHP-103-601 HCV-MS-204 to 30"-SHP-124-601 to 3"-SDHV-103-601 to 4"-SDHV-104-601 2-RC-E-lC 30"-SHP-103-601 2-MS-158 2-MS-377 2-RC-E-lC 14"-WFPD-109-601 2-FW-72
  • 2-FW-89 2-WT-182 2-RC-E-lC 2-BD-21 2-BD-22 2-BD-24 2-BD-39
  • 5-22
  • *
  • b) c) 2. Main Steam Feed Water Stm Gen Nitrogen Conn Chemical Feed Blow Down Recirc and Transfer Class II
  • IWA 5213(d) System Hydrostatic Tests -after attaining test pressure and insulated systems. 4 hrs. holding time required temperature conditions for 3. Westinghouse requires specific testing requirements in order to maintain integrity and warranty of the steam generators.

These requirements are found in the Westinghouse Technical Manual Steam Generator Vepco Surry Power Station Units 1 & 2 Volume 1, March 1979, Section 3.10.2, "Secondary Side Hydrostatic Test-." 4. The requirements of 3 .10. 2 of the Westinghouse Technical Manual require the following: "The secondary side hydrostatic test shall be conducted in accordance with the ASME Code Section XI for Class 2 Components.

The secondary side pressure is to be raised to 1356 psig, held for 30 minutes and then reduced to 1085 psig for a time sufficient to permit proper examination of welds, closures and surfaces for leakage or weeping . 5. End of interval, within last period

  • 5-23
  • RR-9 *
  • la) Valves and piping on the following station drawings:

Component Connected Piping Component 2-FW-12 14"-WFPD-117-601 2-FW-10 2-FW-43 14"-WFPD-113-601 2-FW-41 2-FW-74 14"-WFPD-109-601 2-FW-72 2-FW-31 3"-WAPD-110-601 2-FW-27 to 3"-WAPD-109-601 2-FW-30 3"-WAPD-109-601 2-FW-27 2-FW-62 3"-WAPD-112-601 2-FW-58 to 3"-WAPD-111-601 2-FW-61 3"-WAPD-111-601 2-FW-58 2-FW-93 3"-WAPD-114-601 2-FW-89 to 3"-WAPD-113-601 2-FW-92 3"-WAPD-113-601 2-FW-89 b) Feedwater and auxiliary feedwater connections.

c) Class II 2. IWA 5213(d) System Hydrostatic Tests -4 hrs. holding time required after attaining test pressure and temperature conditions for insulated systems. 3. The check valves ascociated with the piping as listed open to the steam generators.

Hydrostatic test pressure would therefore pressurize the steam generator area and would subject them to the conditions discussed in Relief Request 8. 4. As an alternative, these areas will be tested to the pressure and conditions discussed in Relief Request 8. As th_e individual steam generators are tested, the piping and valves attached in this request will be tested. 5. End of inspection interval, within last period

  • 5-24
  • RR-10 *
  • la) Piping and valves as listed, located on station print 11548-FM-88C:

Component Piping Connected Component 2-CH-310 3/4"-CH-540-1502 2-CH-311 b) Chemical and Volume Control System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 3. The one-way check valve placement of 2-CH-310 makes it impossible to isolate the primary Class I system from the Class II pressure test required.

Since no safety or relief valve exists for this hydrostatic test boundary design pressure*

of the pipe, PD, (IWC-5222a) must be used as a substitute for PSV. This valve PD is 2735 psig, therefore, required test pressure would be 1.25 times PD or 3419 psig. Since the primary cannot be isolated, this test pressure would over pressu.rize the primary system which is limited to the Class I Hydrostatic test condition described in IWB 5222. 4. As an alternative during the *test described in Relief Request 5, the piping and components covered by this relief will receive a VT-2 examination

  • 5. End of interval, within the last period . 5-25
  • RR-11 _:.
  • la) Piping valves located on station prints 11548-FM-89A and 11548-FM-89B:.

Components MOV-2890C MOV-2890A MOV-2890B 2-SI-174 and MOV-2869A MOV-2869B 2-SI-150 MOV-2867C MOV-2867D

-MOV-2842 Connected Piping 10"-SI-352-1502 to 6"-SI-353-1502 to 6"-SI-345-1502 to 6"-SI-344-1502 6"-SI-249~1502 6"-SI-248-1502 to 6"-SI-343-1502 to 6"-SI-248-1502 to 6"0SI-250-1502 3"-SI-272-1503 3"-SI-347-1503 3"-SI-270-1503 to 2"-SI-270-1503/

2"-SI-275-1502 3"-SI-90-1503/

3"-SI-270-1503 2"-SI-276-1503 2"-SI-285-1502 3"-SI-346-1503 to 2"-SI-271-1503/

2"-SI-274-1502 b) Safety Injection System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 Component 2-SI-243 2-SI-241 2-SI-242 2-SI-229 . 2"-SI-281-1502 6"-SI-249-1502 2-SI-240 2-SI-227 2-SI-226 2-SI-237 2-SI-250 2-SI-236 2-SI-248 2-SI-235 2-SI-245 3. Check valve boundaries between Class II and Class I systems make it impractical to establish hydrostatic test boundaries so that the primary system is not included.

Design pressure for this piping is 2800 psig (PD), therefore, normal test pressure would be 3080 psig (T~200°F).

This pressure would overpressurize the primary since it cannot be isolated.

4. As an alternative, these systems will be tested in conjunction with the Class I Hydrostatic test at a pressure of 2335 psig. A VT-2 examination will be performed on the components and piping listed above . 5. Once each period. 5-26 ie RR-12 *
  • la) Piping and valves located on station print 11548-FM-89b; Component MOV-2865A 2-SI-105 MOV-2865B 2-SI-126 MOV-2865C 2-SI-143 Connected Piping 12"-:-SI-245-1502 3/4"-SI-233-1502 12"-SI-246-1502 3/4"-SI-234-1502 12"-SI-247-1502 3/4"-SI-235-1502 b) Safety Injection System c) Class II 2. Class II System Hydrostatic Test, IWC-5222 Component 2-SI-107 2-SI-107 2-SI-128 2-SI-128 2-SI-145 2-SI-145 3. The check valve boundary prevents isolation of the adjoining Class I* system from the Class II system mentioned.

The lack of overpressure protection within the boundary requires a valve PD (Design Pressure) equal to 2485 psig times 1.1 (T'200°F) for a test pressure of 2733.5 psig. The nominal operating pressure PO for the adjoining Class I system is 660 psig which at 100°F requires a test pressure of 726 psig. As is evident, since isolation is not practical, the Class II test pressure will be far in excess of the test pressure for the Class I system

  • 4. As an alternative, it is requested that the Class II components and piping mentioned in (la) be examined (VT2) to the conditions required for the adjacent Class I piping. (PO= 660 psig) (See Note 3) 5. End of interval, within the last period . 5-27 RR-13 * * ** la) Piping and valves located on station print 11548-FM-84A.

Component Connected Piping Component 2-CS-48 6"-CS-115-152 2-CS-47 6"-CS-114-152 2-CS-46 2 "-CS-119-152 2-CS-45 b) Containment and Recirculation Spray System c) Class II 2. Class II System Hydrostatic Test, IWC-5222(a)

3. Tank 2-CS-TK-l (RWST) and piping up to 2-CS-48 will be tested to system hydrostatic test criteria of IWC-5222(b,c).

The piping and components in la attach to the system and are included only do to the requirements of Reg. Guide 1.26 (Feb. 1976) to include piping up to the first valve that is either normally closed or capable of automatic closure. Since the requirements of IWC-5222 (b, c) can only be applied from the RWST to 2-CS-48, the piping mentioned in la must be tested in accordance with IWC-5222(a).

This test would be excessive since the piping would only see pressure associated with the RWST when performing its safety function.

4. As an alternative, it is requ_ested that the piping and components mentioned in la be tested to the requirements of IWC-5222 (b, c) associated with 2-CS-TK-l (RWST)
  • 5. End of interval, within the last period
  • 5-28
  • RR-14 *
  • la) Components and associated piping to the first isolation valve as follows located on station print 11548-FM-71A.

Recirculation Spray Heat Exchangers 2-RS-E-lA 2-RS-E-lB 2-RS-E-lC 2-RS-E-lD Associated Piping Between Below Listed Valves Connecting Heat Exchangers MOV-SW-205A,MOV-SW-204A MOV-SW-205B,MOV-SW-204B MOV-SW-205C,MOV-SW-204C MOV-SW-205D,MOV-SW-204D b) Circulating and Service Water System c) Class II 2. Class III System Hydrostatic Test, IWD-5223 3. The design specification for this component (station # NUS 85) limits the recirculation spray coolers to design pressure (25 psig) and temperature between 42 and 95°F. Under the conditions specifieQ in IWD-5223(a), a value 1.1 times the design pressure or 27.5 psig must be used as test pressure.

No substantial gain would be realized at the required test pressure of 27.5 psig considering the design limitation of 25 psig

  • 4. As an alternative, it is requested that the test pressure for IWD-5223 Class III system hydrostatic test be the design pressure 25 psig. The normal VT-2 examination will be conducted at this pressure.
5. End of interval, within the last period . 5-29
  • RR-15 *
  • la) Open ended intake piping before the first shut-off valve in non-closed systems located on 11548-FM-71A.

b) Circulating and Service Water System c) Class III 2. System Hydrostatic Test, IWD-5223 3. The code addresses the problem of performing hydrostatic test on open ended portions of discharge lines beyond the last shut-off valve in non-closed systems in IWD-5223(d) of the code. A similar problem exists for the intake piping at Surry Unit 2 as it is non-isolatable for the increased pressure requirements of a hydrostatic test. 4. As an alternative, the requirements applied to open ended portions of discharge lines IWD-5223(d) will be applied in this case; that is confirmation of adequate flow during system operation shall be acceptable in lieu of system hydrostatic test. 5. End of inter~al,.

within the last period . 5-30 RR-16

  • la) Components and p1p1ng as listed, located on station print 11548-FM-72B, 11448-FM-72F, and 11448-FM-72C.

Component Piping Component 2-CC-241 6"-CC-154-151 2-CC-242 TV-CC-210A 6"-CC-156-151 RO-CC-200,2-CC-246 2-CC-232 6"-CC'l55-151 2-CC-233 TV-CC-210B 6"-CC-158-151 TV-CC-210C 6"-CC-160-151 RO-CC-201,2-CC-228 2-CC-223 6"-CC'l53-151 2-CC-224 b) Component Cooling Water c) Class II 2. System Hydrostatic Test, IWC-5222 3. The piping and components listed above cannot be isolated from the Class III system encompassing the reactor containment air recirculation coolers. Since the Class II boundary contains no safety or relief valve, PD (150 psig) will be used in determining test pressure or 165 psig. This pressure is higher than the test pressure to be used on the Class III side which is based on PSV of 146 psig for a test pressure of 160.6 psig. 4. As an alternative to two separate Class II and Class III hydrostatic tests, it is requested that a Class III hydro be run utilizing the relief valves RV-CC-212A,B,C set at 146 psig as PSV

  • for the test. This test will encompass the components and piping listed in item la and a normal VT-2 examination will take place. 5. End of interval, within the last period. 5:-31
  • RR-17 *

2-RC-E-lA 2-RC-E-lB 2-RC-E-lC b) Reactor Coolant System c) Class I 2. System Leakage Test, IWB-5221 System Hydrostatic Test, IWB-5222 Visual Examination, IWA-5240 3. Primary to secondary leakage detection using code described visual detection techniques would be limited in usefulness and hazardous to conduct. 4. The normal primary to secondary leakage surveillance requirements of the plant's technical specifications provide the necessary intended code examination requirements for leakage identification.

5. In accordance with Technical Specifications at Surry . 5-32
  • RR-18 *
  • la) Piping and components located on the following prints: 11548-FM-72A 11548-FM-72B 11548-FM-72C b) Component Cooling c) Class III 2. System Hydrostatic Test, IWD-5223 3. Component Cooling is utilized for cooling important safety related components associated with the nuclear core. This system cannot be isolated in most instances without removing fuel totally from the core. This action would be time consuming and delay unnecessarily the refueling process. 4. As an alternative systems, which can be isolated from the main flow pa.th and which do not place the station in violation of its technical specifications, while the core is loaded, will be hydrostatically tested in accordance with IWD-5223.

Systems which cannot be isolated will be tested in accordance with HID-5221, which will be normally conducted, and will be more than sufficient.

Determination of testing will be done with emphasis on practicality, and in conducting IWD-5223 System Hydrostatic Test whenever possible; it should be noted that this is an upgrade of testing requirements over the first 10 year interval.

5. End of the interval within the last period . 5-33 RR-19
  • la) Piping and components located on the following print: 11548-FM-71B b) Service Water c) Class III 2. System Hydrostatic Test, IWD-5223 3. The service water system as seen on the above mentioned drawing is used for cooling component cooling for the charging pumps and lube oil for the charging pumps. The system was designed without the use of a safety or relief valve due to the. low pressure output of the charging pump service water pumps which is 29 psig (max.) The maximum possible pressure source for the system would occur if an extensive heat exchanger leak occurred at either 2-SW-E-lA or lB between component cooling and service water. This pressure could be no more than 50 psig the maximum discharge pressure of 2-CC-P-2A or 2B. It is felt that having to use PD or 100 psig would be excessive for this system as the maximum pressure potential is 50 psig. 4. As an alternative, it is requested that 50 psig be used as this systems PD valve until a safety or relief valve is placed within the system to make use of PSV . 5. End of the interval, with the last period. 5-34 I I *-I