MONTHYEARML18152B3591999-08-23023 August 1999 Revised Tech Specs Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in UFSAR & Includes Ref to Applicable UFSAR Section ML18151A6641999-08-0606 August 1999 Rev 0 to Surry Unit 2 Cycle 16 Startup Physics Tests Rept. ML18152B6591999-04-28028 April 1999 Proposed Tech Specs Re Refueling Water Chemical Addition Tank Min Vol ML18152A2131999-02-16016 February 1999 Proposed Tech Specs,Consolidating AFW cross-connect Requirements by Relocation of Electrical Power Requirements from TS 3.16 to TS 3.6 ML18152B5451999-02-16016 February 1999 Proposed Tech Specs Pages,Revising Augmented Insp Requirements for Reactor Coolant Pump Flywheels ML18151A5511999-02-10010 February 1999 to NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept. ML18152B6151998-11-0404 November 1998 Proposed Tech Specs 4.6.A.1.b,re EDG Start & Load Time Testing Requirements & TS 3.16 Bases Re EDG Ratings ML18153A3351998-09-24024 September 1998 Proposed Tech Specs Pages Affected by Suppl to 960912 Resubmittal of Change Request Re Relocation of Fire Protection Requirements from TS to UFSAR ML18153A3311998-09-24024 September 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML18152B7551998-06-19019 June 1998 Proposed Tech Specs Establishing Requirements for Use of Temporary Supply Line (Jumper) to Provide Svc Water to Component Cooling Heat Exchangers ML20249B9911998-05-0606 May 1998 Analysis of Capsule X Virginia Power Surry Unit 1 Reactor Vessel Matl Surveillance Program. W/Evaluation of Surry Unit 1 Surveillance Capsule X Results & Response to NRC RAI Re GL 92-01,rev 1,suppl 1 ML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20199B0711998-01-0505 January 1998 Rev 0 to NE-1148, Surry Unit 2,Cycle 15 Startup Physics Test Rept ML18153A3481997-12-18018 December 1997 Proposed Tech Specs Clarifying Terminology Used for Describing Equipment Surveillances Conducted on Refueling Interval Frequency.Clarification Consistent W/Info Contained in Rev 1 to NUREG-1431 ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18153A3941997-11-0505 November 1997 Proposed Tech Specs Re Change for Increased Enrichment of Reload Fuel ML18153A1761997-11-0505 November 1997 Proposed Tech Specs Re Temporary Svc Water Supply Line to Component Cooling Heat Exchangers ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML20210J5031997-07-31031 July 1997 Rev 0 to NE-1132, Surry Unit 1,Cycle 15 Startup Physics Tests Rept ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML18153A5231997-04-24024 April 1997 Proposed Corrected Tech Specs Pages 6.1-3 & 6.1-8 Re Relocation of Fire Protection TS to Updated Final Safety Analysis Rept ML18153A5031997-03-18018 March 1997 Proposed Tech Specs Rev to Section 4.15 for Surry Power Station to Include Pp Inadvertently Omitted from 970203 Request for Amend to Licenses DPR-32 & DPR-37 ML18153A4921997-02-0303 February 1997 Proposed Tech Specs Re Deletion of Specific ASME Section XI Code Ref ML18153A6351996-11-26026 November 1996 Proposed Tech Specs Re Removal of Record Retention Requirements,Per GL 95-06 & Administrative Ltr 95-06 ML18153A0671996-09-12012 September 1996 Proposed Tech Specs Re Relocation of Fire Protection Requirements ML18151A9761996-08-13013 August 1996 Cycle 14 Startup Physics Test Rept. W/960830 Ltr ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18152A4701996-06-13013 June 1996 Cycle 13 Control Rod Performance Test Results. ML18153A6901996-04-15015 April 1996 Proposed Tech Specs,Clarifying Applicability of Quadrant Power Tilt Ration Requirements ML18153A5391996-03-21021 March 1996 Proposed Tech Specs Re Charcoal Filter Testing Clarification ML18153A5271996-03-14014 March 1996 Proposed Tech Specs,Permitting Use of 10CFR50 App J,Option B,performance-based Containment Lrt ML18153A5801996-01-30030 January 1996 Proposed Tech Specs Re Reactor Coolant Sys Liquid Sampling ML18152A0571995-12-20020 December 1995 Startup Physics Test Rept,Surry Unit 1,Cycle 14. W/960111 Ltr ML18153A6761995-11-20020 November 1995 Proposed Tech Specs Re App J Option B,performance-based Containment Leakage Rate Testing ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML18153A7141995-07-20020 July 1995 Proposed Tech Specs Establishing New Setpoint Limit for SG high-high Level & Provides More Restrictive Setting Limits for Certain Rps/Esfas Setpoints ML18153A6991995-07-14014 July 1995 Proposed Tech Specs,Providing Two H Allowed Outage Time for One RHR Pump to Accommodate Plant Safety,Emergency Power Sys Surveillance Testing & Permit Depressurizing SI Accumulators in Lieu of Accumulator Isolation ML18153A8371995-06-0808 June 1995 Proposed Tech Specs,Incorporating Revised Pressure/Temp Limits & Associated Ltops Setpoint That Will Be Valid to end-of-license ML20083C9951995-05-0808 May 1995 Rev 0 to Surry Unit 2,Cycle 13 Startup Physics Tests Rept ML18153B2301995-02-14014 February 1995 Proposed Tech Specs Re App J Testing Requirements ML18153B2131995-01-24024 January 1995 Proposed Tech Specs,Modifying as-found Test Acceptance Criterion for Pressurizer Safety Valves ML18153B1621994-11-29029 November 1994 Proposed Tech Specs Implementing Zirlo Fuel Cladding ML18153B1581994-11-22022 November 1994 Proposed Tech Specs,Deleting Unnecessary Descriptive Phrases Re Number of Cells in Station & EDG Batteries ML18153B1501994-11-10010 November 1994 Proposed Tech Specs Re Changes to TS Will Clarify SR for Reactor Protection & Engineered Safeguard Sys Instrumentation & Actuation Logic ML18153B0941994-10-11011 October 1994 Proposed Tech Specs Surveillance Frequencies for Hydrogen Analyzers ML18152A5061994-09-0606 September 1994 Proposed Tech Specs Re Mgt Safety Review Committee & Station Nuclear Safety & Operating Committee Responsibilities ML18152A1191994-08-30030 August 1994 Proposed Tech Specs to Accomodate Core Uprating 1999-08-06
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML18151A1931998-05-0404 May 1998 Rev 1 to Summary of Changes to Surry Units 1 & 2 Third Interval IST Program. ML18150A4661997-12-16016 December 1997 ISI Plan for Third Insp Interval,Vol 2,Rev 9 for Components & Component Supports,940510-040510, for Surry Power Station,Unit 2 ML18150A4641997-10-27027 October 1997 Risk-Informed ISI (RI-ISI) Pilot Program Submittal. ML18151A3911997-10-16016 October 1997 Rev 8 to VPAP-2103, Odcm. ML18151A7231997-08-0707 August 1997 Rev 1 to Nuclear Safety Analysis Manual Part Iv,Chapter a Probabilistic Safety Assessment Products. ML18150A4441997-06-0909 June 1997 Vol 2,Rev 8 to ISI Plan for Third Insp Interval for Components & Component Supports,Oct 14,1993-Oct 13,2003. ML20134J9861996-07-30030 July 1996 /Unit 2 Fuel Assembly Insp Program ML18151A6421995-08-0101 August 1995 Change 3 to Rev 0 to Third Interval IST Program ML20076F8341994-08-0404 August 1994 Rev 0,Change 1 to Surry Unit 2 Third Interval IST Program ML18151A2451994-07-31031 July 1994 ISI Program,Interval 3,940510-040509, for Surry Power Station,Unit 2,rev 1 ML18151A2101994-07-31031 July 1994 ISI Program,Interval 3,931014-031013, Rev 1 ML18151A9011994-03-0303 March 1994 ISI Program Interval 3,940510- 040509, Rev 0 ML18151A1651993-04-30030 April 1993 Rev 0 to Surry Power Station Unit 1 ISI Program Interval 3 931014-031013. ML18151A3711992-03-19019 March 1992 Rev 3 to Surry Power Station,Unit 2 Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML18151A6411992-03-19019 March 1992 Rev 5 to Surry Power Station,Unit 1,Inservice Testing Program Plan for Pumps & Valves,Second Insp Interval 821222-921222. ML20079L2091991-09-22022 September 1991 Rev 2 to Station Administrative Procedure VPAP-0805, MOV Program, Upgrading Procedure to Acup Format ML18151A4121991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm. ML20092M9061991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm ML18151A6551990-11-14014 November 1990 Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 ML18152A5231989-04-19019 April 1989 Rev 0 to Motor-Operated Valve Action Plan. ML18152A2911988-10-19019 October 1988 Major Milestones Description of Issue Approach to Resolution. ML18150A0971987-05-21021 May 1987 Revised Emergency Plan Implementing Procedures,Including Rev 17 to EPIP-1.01, Emergency Manager Controlling Procedure & Rev 5 to EPIP-1.02, Response to Notification of Unusual Event. ML20207J1411986-12-23023 December 1986 Amend to Emergency Plan Implementing Procedures Deleting Procedure EPIP-2.05, Transmittal of Core Damage Data. Revised Index Included ML20215B1791986-12-12012 December 1986 Special Test Procedure 2-ST-191, Special Test to Inspect Operation of Mainsteam Trip Valve TV-MS-201C ML20215B1351986-10-28028 October 1986 Administrative Procedure ADM-89.13, Secondary Piping Insps ML20215H3081986-09-29029 September 1986 Rev 16 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure ML20215H3191986-09-29029 September 1986 Rev 0 to Emergency Plan Implementing Procedure EPIP-4.29, Technical Support Ctr/Leof Radiation Monitoring Sys ML20215F6701986-09-25025 September 1986 Revised Emergency Plan Implementing Procedures,Including Rev 17 to EPIP-3.01, Callout of Emergency Response Personnel & Rev 3 to EPIP-4.16, Offsite Monitoring ML20215H3221986-09-19019 September 1986 Rev 10 to Emergency Plan Implementing Procedure EPIP-5.03, Personnel Accountability ML20204F3371986-07-24024 July 1986 Rev 15 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. W/Procedure Index ML18130A4181986-04-0303 April 1986 Revised Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel, Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr & Rev 2 to EPIP-4.03 Re Dose Assessment ML20137J3921986-01-0202 January 1986 Revised Emergency Plan Implementing Procedures,Including Rev 5 to EPIP-1.05, Response to General Emergency, Rev 0 to EPIP-2.04, Transmittal of Plant Status & Core Assessment Data & Rev 0 to EPIP-2.05, Transmittal Core Damage Data ML18142A1971985-03-0505 March 1985 Revised Emergency Plan Implementing Procedures,Including Rev 3 to EPIP-1.02, Response to Notification of Unusual Event & Rev 9 to EPIP-2.01, Notification of State & Local Govts. ML18149A1781985-01-15015 January 1985 Revised Emergency Plan Implementing Procedures,Consisting of Rev 3 to EPIP-2.02, Notification of NRC & Rev 0 to EPIP-4.27, Dose Control Emergency Response. ML18142A0961984-11-0505 November 1984 Procedure 466, Remote Multiplexer Integrated Functional Test Procedure. ML18142A1191984-10-23023 October 1984 Rev 4 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure. ML18142A0751984-09-11011 September 1984 Revised Emergency Plan Implementing Procedures,Including EPIP-2.01 Re Notification of State & Local govts,EPIP-3.02 Re Activation of Technical Support Ctr & EPIP-3.03 Re Activation of Operational Support Ctr ML18141A7211984-06-20020 June 1984 Rev 1 to Emergency Plan Implementing Procedure EPIP-4.24, Gaseous Effluent Sampling During Emergency. W/840620 Ltr ML18142A0111984-06-0707 June 1984 Rev 9 to Emergency Plan Implementing Procedure EPIP-3.01, Callout of Emergency Response Personnel. ML18141A6211984-05-18018 May 1984 Rev 3 to Emergency Plan Implementing Procedure EPIP-4.02, Radiation Protection Supervisor Controlling Procedure. W/840518 Ltr ML18141A5301984-03-0101 March 1984 Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 ML18141A5051984-02-0202 February 1984 Rev 10 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure. W/840217 Ltr ML20093C5211984-01-13013 January 1984 Public Version of Rev 9 to Emergency Plan Implementing Procedure EPIP-1.01, Emergency Manager Controlling Procedure & Jm Felton 840322 Release Memo ML20083H7701983-12-0808 December 1983 Public Version of Rev 3 to Emergency Plan Implementing Procedure EPIP-4.23, Post-Accident Sampling of Reactor Coolant ML20083J7621983-11-10010 November 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-1.01 Re Emergency Manager Controlling Procedure & EPIP-1.02 Re Response to Notification of Unusual Event ML18142A1361983-11-0404 November 1983 Procedure OP-4.3, Shipping of Spent Fuel TN-8L Shipping Cask,Loading & Handling Procedures. ML20081A8101983-09-29029 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-4.01 Re Radiological Assessment Director & EPIP-4.09 Re Source Term Assessment ML20078F9301983-09-23023 September 1983 Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EPIP-4.22 Re post-accident Sampling of Containment Air & EPIP-4.01 Re Radiological Assessment Director ML18142A1371983-09-15015 September 1983 Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures. ML20080P4501983-09-12012 September 1983 Public Version of Rev 2 to Emergency Plan Implementing Procedure EPIP-4.20, Health Physics Actions for Transport of Contaminated Injured Personnel & Rev 2 to Procedure EPIP-5.01, Transport of Contaminated Injured Personnel 1998-05-04
[Table view] |
Text
.
\ '
go;anx ,
oru n VIRGINIA POWER -
SURRY POWER STATION ,
a EMERGENCY PLAN IMPLEMENTING PROCEDURE
.)
NUMBER PROCEDURE TITLE REVISION 10 EPIP-5.03 PERSONNEL ACCOUNTABILITY PAGE (With 3 Attachments) 1 of 8 PURPOSE
- 1. To determine the personnel who are within the owner controlled area (site) and unaccounted for within 30 minutes following declaration of Site Emer-gency, or General Emergency.
- 2. To provide a periodically updated list of all personnel inside the protect-ed area.
USER Security Team Leader.
I t
I EN TRY CONDITIONS A
U Any one of the following:
- 1. Activation by another EPIP; E
- 2. Declaration of a Site Area Emergency, or General Emergency; E
- 3. Any time required by the Station Emergency Manager.
8610230113 861017 PDR ADOCK 05000280 p PDR :
REVISION RECORO REV. 04 PAGE(S): 1 of 7 and 7 of 7 DATE: 11-10-83 ,
REV. 05 PAGE(S): 1, 3, 4, 5 of 7; Att. 1, pg. 1 & 3 of 3 DATE: 06-28-84 ,
REV. 06 PAGE(S): 1 and 7 and 2 of 7 DATE: 07-19-84 REV. 07 PAGE(S): 1, 2, 3, 4, 5 of 7; Att. 1; Att. 2 DATE: 09-12-84 REV. 08 PAGE(S): 1 of 7; Att. 1; Att. 2 DATE: 04-16-85 REV. 09 PAGE(S): Entire Procedure DATE: 01-07-86 REV. 10 PAGE(S): Entire Procedure DATE: SEP 1 e m (q.) APPROV L R C MME ED SNSOC REVIEW DA TE,
/ M SEP 1 81986 QC REVIEW STA flON MANAGER APPROVAL DA TE F
L1 &JJ 9 -n x
me.stestate NUNDER PROCEDURE TITI.E REVISION O 10 EPIP-5.03 PERSONNEL ACCOUNTABILITY PAGE !
2 of 8
~
) ~ STEP ACTIONMXPECTED RESPONSE RESPONSENOTOCTAINED
- 1. INITIATE EPIP-5.03:
a) INITIATED BY:
TIME:
DATE:
j
- 2. VERIFY EVACUATION STATUS:
j a) Evacuation - NOT ORDERED a) CO TO Step 13. ,
l l
NOTE: Each Emergency Assembly Area will have an Emergency Assembly Area Leader. This person will be a supervisor or other cogni-zant person normally working in the Emergency Assembly Area.
- 3. INITIATE ACCOUNTABILITY WITHOUT i EVACUATION:
I a) Make announcement on !
station Gai-Tronics systems as follows ,
>* .1) Emergency Assembly Area Leaders - TAKE ACCOUNTABILITY" i
- 2) " Emergency Assembly Area Leaders report results of accounta-bility to ."
[ Step 3 continued on next page]
O 1
l l
t Ms.C76efa30 NUMBER PROCEDURE TITLE REVISION 10 EPIP-5.03 PERSONNEL ACCOUNTABILITY pAGE 3 of 8
- STEP ACTIONMXPECTED RESPONSE RESPONSENOTQSTAINED l
l l
l
- 3. INITIATE ACCOUNTABILITY WITHOUT l EVACUATION: [ continued]
- 3) " Warehouse, & South Annex call exts.
or and report ,
results of account-ability to Security"(
b) Repeat Step 3.a. THEN ,
l continue with this ,
instruction
- 4. CALL ENGR AND CONST.:
a) Use station PBX - #84-444 a) Use station PBX -
l #84-422 OR_ #84-420 l b) Instruct them to perform accountability c) Instruct them to report results to extension
- 5. CALL TRAINING CENTER:
a) Use station PBX - #270 a) Use station PBX ~f271
. l . OR #272 b)
- Instruct them to perform accountability c) Instruct them to report results to extension O
4 p.e.c7sa7sse NUNDER PROCEDURE TITLE REVISl0N O 10 EPIP-5.03 PERSONNEL ACCOUNTABILITY AAGE 4 of 8
~ STE! . ACTION / EXPECTED RESPONSE RES!0NSENOTOCTAINED ,
- 6. CALL ENGINEERING MODULAR BUILDING:
a) Use Station PBX-#330 a) Use Station PBX - #351 OR #280
--~
b) Instruct them to perform '
accountability
, c) Instruct them to report results to extension
- I
- 7. CALL QA/QC MODULAR BUILDING:
a) Use Station PBX-f254 a) Use Station PBX - #259 O --'OR #278 b) Instruct them to perform accountability c) Instruct them to report results to extension
- 8. CALL PROJECTS MODULAR BUILDING:
a) Use Station PBX-#204 a) Use Station PBX .f360 OR #351
.. b) . Instruct them to perform accountability c) Instruct them to report results to extension
- 9. RECORD RESULTS:-
a) As accountability results arrive . record on Attach-ment 3. Personnel Account-C ability Form i
- . , , - - - - - - _ . . -_---- . . - . - . - - - _ - - - , . . ,--.. - - ~ ,.. - - .- --
m.o7setano NUNDER PROCEDURE TITLE REVISION 10 EPIP-5.03 PERSONNEL ACCOUNTABILITY PAGE 5 of 8
- STEP ACTIONNXPECTED RESPONSE RESPONSENOT08TAINED
- 10. BALANCE RESULTS:
a) Balance Attachment 3 Column 1 against Column 2 l
- 1) Strike names appearing ,
in both columns
- 11. PERFORM COMPUTER SEARCH:
a) Verify names remaining in a) IF computer is inoperable, per-Column 1,against Security formmanualsearchonbadgeta$
Computer printout of per- of the names remaining in Colush sonnel within Protected 1 to determine if they are with-Area. in the Protected Area.
AND Search visitor log and visitor rack.
- 12. FORWARD LIST:
a) Forward list of personnel a) IF TSC NOT manned, forward indicated missing to the results to Station Emergency Emergency Administrative Manager in Control Room.
Director in the TSC b) GO TO Step M
- 13. INITIATE ACCOUNTABILITY WITH EVACUATION:
a) As personnel evacuate, collect security badges -
b) ~ Remind evacuating personnel to keep pocket dosimeters O a rto-i (Step p continued on next page]
>=.c7ss7ato NUNDER PROCEDURE TITLE REVISION 10 EPIP-5.03 PERSONNEL ACCOUNTABILITY PA GE 6 of 8 l l
- STEP ACTIONNXPECTED RESPONSE RESPONSEN0TORTAINED t
- 13. INITIATE ACCOUNTABILITY WITH EVACUATION: [ continued]
c) Concurrent with evacuation, process security badges AND Return badges to appropriate rack positions o
- 14. INPLANT NOTIFICATION:
a) Make announcement on O station Gai-Tronics system as follows:
- 1) " Emergency Response Facility leaders per-form accountability"
- 2) " Emergency Response Facility leaders call extension and report results of accountability" .
- b) . Repeat Step 14.a.
AND continue with this instruction
- 15. RECORD RESULTS:
a) As accountability results arrive, record r.ames l
l
~
me.c7sents l NUntBER PROCEDURE TITI.E REVISl0N la EPIP-5.03 PERSONNEL ACCOUNTABILITY FAGE 7 nf A
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED i
- 16. PERFORM COMPUTER SEARCH:
a) Verify badges processed a) Process badges. l b) Obtain names of all b) IF computer is inoperable, personnel within the perform manual search on badge Protected Area from racks to obtain names of all computer personnel within the Protected Area.
- 17. BALANCE THE LIST: s a) Check the names from O st P ts. ith ce P=ter list and highlight names of all personnel missing -
within the Protected Area
- 18. FORWARD LIST:
a) Forward lists of all a) IF TSC NOT manned, forward lists
( personnel within the E Station Emergency Manager in Protected Area to Emer- Control Room.
l gency Administrative Director in TSC .
b) GO TO Step 20.
- 19. RUN COMPUTER LISTING:
I a) Produce a computer list of a) If computer is down, THEN log l all personnel within the all personnel in and out.
l Protected Area as directed l by the Emergency Adminis- '
l trative Director b) Record date and time of preparation on the list c) Forward list to Emergency Administrative Director
' pee.c7sstato NUMBER PROCEDURE TITLE REVISION O in EPIP-5.03 PERSONNEL ACCOUNTABILITY PAGE 8 nf R
- STEP ACTION / EXPECTED RESPONSE RESPONSE NOT08TAINE0
- 20. VERIFY EMERGENCY STATUS:
a) Emergency - NOT terminated a) GO TO Step H.
b) GO TO Step g
- 21. TERMINATE EPIP-5.03:
a) Close-Out
- 1) COMPLETED BY: ,
i TIME: l DATE:
b) Forward completed EPIP-5.03, forms and other applicable records to Emergency Adminis-trative Director l
l- ;
e i i
END O
No. 97887220 (D NUMBER A TTACHMENT TITLE REV!!!ON EPIP-5.03 10 PERSONNEL ACCOUNTABILITY A TTACHMENT PAGE 1 (NON-EMERGENCY RESPONSE PERSONNEL) 1 of 3 NOTE: If relocation necessary, notify designated assembly area leader at present and new locations.
ASSEMBLY AREA (Area Leader)
SECURITY: (Asst. Supervisor - Security Shift)
Visitors - Persons not regularly working at the site CPTS: (Supervisor - Business Systems)
CPTS Staff j Dose Control Trailer Staff [
Purchasing Staff f O Contracts Staff Accounting Staff TRAINING AUDITORIUM: (Supervisor - Power Stations Support)
Training Staff
. Students Telecommunications Staff 1
l ,
WAREHOUSE / STOREROOM: (Supervisor - Stores)
Warehouse Personnel -
- Storeroom Personnel PROJECTS MODULE (SUPT PROJECTS)
Projects Staff Loss Prevention Staff Westinghouse Site Service Manager Control Operations AD OPS (Startup)
(O l
~ -
N3.97es7220 NUMBER A TTACHMENT TITLE REVISION EPIP-5.03 10 PERSONNEL ACCOUNTABILITY A TTACHMENT PAGE 1 (NON-EKERGENCY RESPONSE PERSONNEL) 2 of 3 ASSEMBLY AREA (Area Leader)
SOUTH ANNEX: (Supervisor - Personnel Services)
Personnel Services Staff Records Mget Staff Medical Staff Safety Staff Environmental Staff INSTRUMENT SHOP: (Supervisor - Instrument) i Station Management Staff [
Instrument Staff- F Cal' Lab Staff O- Licensing NRC Staff HEALTH PHYSICS OFFICE: (Supervisor - H.P. Shift)
Health Physics Staff Clean Change Room Personnel MAINTENANCE SERVICES OFFICE: (Foreman - Labor)
Maintenance Services Staff 1.
CONDENSATE POLISHING BUILDING: (Coordinator - Operations Water Treatment)
Operations Staff Tool Room Personnel -
i MACHINE SHOP: (Coordinator Mechanical Maintenance)
, Mechanical Maint. Personnel Electrical Maint. Personnel
() Weld Shop Personnel Planning Staff I
No. 97881220
) NUMBER A TTACHMENT TITLE REVISION EPIP-5.03 .
10 PERSONNEL ACCOUNTABILITY A TTACHMENT PAGE 1 (NON-EMERGENCY RESPONSE PERSONNEL) 3 of 3 ASSEMBLY AREA (Area Leader)
~#1 TURBINE BLDG. BASEMENT: (Supervisor - Construction)
E & C Construction and Contractor Personnel (Inside PA)
E & C Construction and Contractor Supervision (Inside PA)
E & C CONSTRUCTION SITE: (Superintendent - Construction)
E & C Admin. Bldg. Staff g CPP Security Staff l E & C Site Engineering Staff
() Construction Admin. Staff Daniel Admin. Staff Daniel Craft Personnel E & C Warehouse Personnel Westinghouse Staff NDE Planning and Support Services Staff ENGR MODULE (Supv Safety Engineering - Nuclear)
Safety Engineering Staff Surveillance and Test Engineering Staff ,
Plant Engineering QA/QC MODULE (Supv. Administrative Services, QA)
QA/QC O
no. neenso
( NUMBER A TTACHMENT TlTLE REVISION EPIP-5.03 10 PERSONNEL ACCOUNTABILITY A TTACHMENT PAGE 2- (EMERGENCY RESPONSE PERSONNEL) 1 of 2 ASSEMBLY AREA (Area Leader)
TECHNICAL SUPPORT CENTER: (Supervisor - Records Management)
Emergency Directors & Alternates Administrative Support Team Radiological Support Team
' Maintenance Support Team Technical Support Team Operations Support Team ,
NRC Residents HEALTH PHYSICS OFFICE: (Supervisor - Radiation Protection)
Radiological Protection Personnel Inplant Monitoring Team Onsite' Monitoring Team Sample Analysis Team Offsite Monitoring Teams (2)
DOSE CONTROL OFFICE: (Asst. Supervisor - H.P. Dose Control)
Dose Control Staff ,
OPERATIONS SUPPORT CENTER: (Director - OSC)
OSC Director & Alternate
-Safety Coordinator & Alternate Loss Prevention Coordinator & Alternate Electrical Support Team Mechanical Support Team Instrument Support Team Fire Team- l First Aid Team O
Ns,91881220 NUMBER A TTACHMENT TITLE REVISION EPIP-5.03 10 PERSONNEL ACCOUNTABILITY A TTACHMENT PAGE 2 (EMERGENCY RESPONSE PERSONNEL) 2 of 2 ASSEMBLY AREA (Area Leader)
CHEMISTRY OFFICE: (Supervisor - Chemistry)
Supervisor Chemistry Chemistry Staff MAIN CONTROL ROOM: (Shift Supervisor - Operations) i Shift Supervisor Operations Staff l Shift Technical Advisor SECURITY: (Supervisor - Security)
Supervisor' Security Operations
. Security Staff t
e l
l l
'O l
i ,
No. 970 8 7220 NUMBER A TTACHMENT TITLE REVISION l
EPIP-5.03 10 PERSONNEL ACCOUNTABILITY A TTACHMENT PAGE 3 (EMERGENCY ASSEMBLY AREA) 1 of 1 LOCATION:
NAME:
Missing (Should Be In Area) Here (Should Not Be In Area) t i
f i,
i l
4 O
NOTP: Please Print. "Do Not Include" Names of Persons who did not report to work on this day (vacation, sick, rest day, etc.).