ML18149A178

From kanterella
Jump to navigation Jump to search
Revised Emergency Plan Implementing Procedures,Consisting of Rev 3 to EPIP-2.02, Notification of NRC & Rev 0 to EPIP-4.27, Dose Control Emergency Response
ML18149A178
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/15/1985
From: Benson D
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18149A177 List:
References
PROC-850115, NUDOCS 8606100222
Download: ML18149A178 (1)


Text

  • ,.

e VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are revised pages to the Surry Power Station Emergency Plan Implementing Procedures.

Please take.the following actions in order to keep your manual updated with the most recent revisions.

EPIP-2.02 EPIP-4.27 NOTIFICATION OF NRC Remove and Destroy Page 1 of 8 Insert Page 1 of 8 and page 1 of 1, Attachment 3 DOSE CONTROL EMERGENCY RESPONSE Remove and Destroy Insert N/A Entire Procedure

' '.