Revised Emergency Plan Implementing Procedures,Including Rev 17 to EPIP-3.01, Callout of Emergency Response Personnel & Rev 3 to EPIP-4.16, Offsite Monitoring
ML20215F670
Person / Time
Site: Surry  
Issue date: 09/25/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
86-609, PROC-860925-01, NUDOCS 8610160319
Download: ML20215F670 (29)


Text

'

i l

VIRGINIA ELECTRIC AND POWER COMPANY REVISIONS TO SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are recent revisions to the Surry Power Station Emergency Plan Implementing Procedures.

Please take the following actions in order to keep pour manual updated with the most recent revisions.

Remove and Destroy Date.d Insert Dated Index Pages 2 & 3 Index Pages 2 & 3 EPIP-3.01 04/03/86 EPIP-3.01 09/03/86 Callout of Emergency Call out of Emergency Response Personnel Response Personnel EPIP-4.16 09/23/83 EPIP-4.16 09/02/86 Offsite Monitoring Offsite Monitoring Emergency Plan Privacy and Proprietary Material has been removed.

Reference Generic Letter No. 81-27.

8610160319 860925 PDR ADOCK 05000 80 F

Lib [

i

-t EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX LATEST EPIP NUMBER TITLE REVISION DATE Q

EPIP-1.01 Emergency Manager Controlling Procedure 07-24-86 EPIP-1.02 Response to Notification of Unusual Event 04-18-86 EPIP-1.03 Response to Alert 05-21-85 EPIP-1.04 Response to Site Area Emergency 04-16-85 EPIP-1.05 Response to General Emergency 12-31-85 EPIP-2.01 Notification of State and Local Governments 04-18-86 EPIP-2.02 Notification of NRC 01-15-85 EPIP-2.03 Reports of Offsite Agencies 04-16-85 EPIP-2.04 Transmittal of Plant Status and Core Assessment Data 01-02-86 EPIP-2.05 Transmittal of Core Damage Data 01-02-86 EPIP-3.01 Callout of Emergency Response Personnel 09-03-86 EPIP-3.02 Activation of Technical Support Center 09-18-84 EPIP-3.03 Activation of Operational Support Center 04-03-86 EPIP-3.04 Activation of Emergency Operations Facility 10-01-85 EPIP-4.01 Radiological Assessment Director Controlling Procedure 08-13-85 EPIP-4.02 Radiation Protection Supervisor Controlling Procedure 10-23-84 i

EPIP-4.03 Dose Assessment Controlling Procedure 04-03-86 EPIP-4.04 Emergency Personnel Radiation Exposure 12-03-85 EPIP-4.05 Respiratory Protection 05-21-85 EPIP-4.06 Personnel Monitoring and Decontamination 07-29-82

~

EPIP-4.07 Protective Measures 09-10-85 EPIP-4.08 Initial Offsite Release Assessment 10-01-85 EPIP-4.09 Source Term Assessment 10-01-85 EPIP-4.10 Determination of X/Q 07-29-82 EPIP-4.11 Follow-Up Offsite Release Assessment 06-17-86 I

EMERGENCY PLAN IMPLEMENTING PROCEDURES INDEX i,

LATEST

-EPIP NUMBER TITLE REVISION DATE EPIP-4.12 Offsite Environmental Monitoring Instructions 09-23-83 EPIP-4.13 Offsite Release Assessment with Environmental Data 09-23-83 EPIP-4.14-In-Plant Monitoring.

09-26-85 EPIP-4.15 Onsite Monitoring 09-23-83 EPIP-4.16 Offsite Monitoring 09-02-86 EPIP-4.17 Monitoring of OSC and TSC 05-21-85

^

EPIP-4.18 Monitoring of EOF 05-21-85 EPIP-4.19 Radio Operations for Health Physics Monitoring 10-01-85 EPIP-4.20 Health Physics Actions for Transport of Contami-nated Injured Personnel 09-12-83 EPIP-4.21 Evacuation and Remote Assembly Area Monitoring 08-15-83 EPIP-4.22 Post Accident Sampling of Containment Air 09-29-83 EPIP-4.23 Post Accident Sampling of Reactor Coolant 02-16-84 EPIP-4.24 Gaseous Effluent Sampling During an Emergency 05-31-84 EPIP-4.25 Liquid Effluent Sampling During an Emergency 07-29-82 EPIP-4.26 High Level Activity Sample Analysis 03-29-84 I

EPIP-4.27 Dose Control Emergency Response 11-06-84 EPIP-5.01 Transportation of Contaminated Injured Personnel 04-16-85 EPIP-5.02 Search and Rescue 04-16-85 EPIP-5.03 Personnel Accountability 01-07-86 EPIP-5.04 Access Control 12-03-85 EPIP-5.05 Site Evacuation 04-30-85 EPIP-5.06 Emergency Radiation Exposure Authorization 05-21-85 EPIP-5.07 Administration of Radioprotective Drugs 04-03-86 EPIP-5.08 Damage Control Guideline 04-16-85

)

EPIP-6.01 Re-entry / Recovery Guideline 04-23-85

'g' "*.

um n VIRGINIA POWER SURRY POWER STATION

(~N EMERGENCY PLAN IMPLEMENTING PROCEDURE i

NUMBER PROCEDURE TITLE REVISION 17 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL PAGE (With no Attachments) 1 of 3 PURDOSE 1.

To callout station AND corporate emergency response personnel if they are not already at their normal work locations.

USER Security Team Leader OR Station Emergency Manager ENTRY CONDITIONS 1./

Initiation directed by the Station Emergency Manager.

l

[

REVISION RECORD l

REV.

11 PAGE(S):

Pg. I of 3; Att. pg. 2 and 4 of 6 DATE: 07-19-84 REV.

12 PAGE(S): Page 1 of 3; Pages 1, 2, 3 of 6 of Att.1 DATE: 08-23-84 REV.

13 PAGE(S):

Att. 1 pgs. 1, 2, 3 and 5 of 6 DATE: 11-27-84 REV.

14 PAGE(S):

Pg. 1 of 3; Att.1, pgs. I through 5 of 6 DATE: 03-19-85 REV.

15 PAGE(S): Entire Procedure DATE: 09-26-85 REV.

16 PAGE(S): Entire Procedure DATE: 04-03-86 REV.

17 PAGE(S):

Pg. 1. 2 of 3 DATE;Up a 3 toat APPR AL RECOMMENDED SNSOC REVIEW DA TE 0

A 6CR VI

/

STATION MANAGER APPROVAL DA TE h

9 ~5

  • O

(_

r V

/

me.,tr u7:so i

4 NUNDER PROCEDURE TITLE REVISION V

17 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL PAGE 2 of 3 STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 1.

INITIATE PROCEDURE:

a)

Initiated By:

Time:

Date:

2.

OBTAIN EMERGENCY PERSONNEL NOTIFICATION LIST:

a) Emergency Telephone Direc-Ol tory, Section 2.0.

3.

NOTIFY EMERGENCY RESPONSE PERSONNEL:

a) Use all available tele-phones and Security personnel to make the notification as rapidly as possible b) Notify, in order, the individuals listed until at least one individual is reached in each department c) Transmit the message exactly as written for that department d) Verify that the message has been understood

'!+

No,97487210 l

n MUNDER PROCEDURE TITI.E REVISION

~

17 EPIP-3.01 CALLOUT OF EMERGENCY RESPONSE PERSONNEL pAGE 3 of 3 STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 4.

INFORM STATION EMERGENCY MANAGER TIME CALLOUT COMPLETED:

a) Call out completed at (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) 5.

TERMINATE EPIP-3.01:

a) Close-Out

1) COMPLETED BY:

TIME:

DATE:

b) Forward completed EPIP-3.01, forms and other applicable records to Emergency Adminis-trative Director i

END

9

" 22 A

(

a VIRGINIA POWER SURRY POWER STATION

/D EMERGENCY PLAN IMPLEMENTING PROCEDURE

'R J NUMBER PROCEDURE TITLE REVISION 03 EPIP-4.16 0FFSITE MONITORING PAGE (With 4 Attachments) 1 of 11 PURPOSE Provide guidance for offsite monitoring teams in obtaining equipment, tracking plume, taking samples'and transmitting data.

USER Offsite Monitoring Team members.

ENTRY CONDITIONS

\\

gj)

Initiation by EPIP-4.02, Radiation Protection Supervisor Controlling Procedure.

REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S): 1, 2, 3, 4, 7, 8, 9, Att. 4 p.1 DATE:02-24-83 REV. 02 PAGE(S): 1 of 12 through 12 of 12; Att.2; & Act.4 DATE:09-23-83 REV. 03 PAGE(S): 1 of 11 through 11 of 11; Att 2 Pgs 1,3 DATE: SEP 0 21996 l

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

APPR L R CO ME D

SNSOC REVIEW DA TE e,r f)

- VI W M M STAfION MANAGER APPR6VXL DA TE f Senwncb46 9-2 ~ 88 g

&?tA307C

/

l'

/

No.C7887213

(-

NUMBER PROCEDURE TITLE REVISION 03 s

EPIP-4.16 0FFSITE MONITORING PAGE 2 of 11 STEP ACTION / EXPECTED RESPONSE RESPONSENOT08TAINED 1.

INITIATE PROCEDURE:

a)

BY:

DATE:

TIME:

2.

TEAM ASSIGNMENT:

a) Offsite monitoring team shall consist of two individuals, one a HP Tech 3.

REQUEST BRIEFING:

a) Request briefing with the Radiation Protection Super-visor as to the following:

1) Required monitoring locations
2) Samples and surveys required
3) Anticipated radiation levels
4) Protective clothing and l

dosimetry and/or respir-l atory gear required I

b) Determine whether survey data is to be reported to TSC OR LEOF O

6 '

No.97 H7210

~

MUNDER PROCEDURE TITLE REVISION

[

03 EPIP-4.16 0FFSITE MONITORING PAGE 3 of 11 STEP ACTION / EXPECTED RESPONSE RESPONSENOTORTAINED 4.

OBTAIN VEHICLE:

a) Health Physics truck will a) Request assistance from be used as primary trans-Radiation Protection Super-portation for Offsite Teams visor or Radiological Assess-ment Director in obtaining vehicles.

b) Insure vehicle has at least 1/4 tank of gas 5.

OBTAIN MONITORING KIT:

a) Obtain Emergency kit a) Additional equipment avail-specified by Radiation able at HP instrument repair Protection Supervisor from shop.

(

Emergency Planning Office 6.

PERFORM INSTRUMENT CHECK:

a) Perform operability check:

1) Battery check
2) Current calibration sticker 3)

Zero self reading dosimetry prior to departure.

7.

PROCEED TO MONITORING LOCATION:

a) Obtain and don protective a)

Il[ no gear specified, clothing, dosimetry, and' GO TO Step 7.b.

respiratory gear specified in Step 3

l me.o7u7:so s

.n NUNDER PROCE00RE TITLE REVISION

\\

03

\\

EPIP-4.16 0FFSITE MONITORING PAGE 4 of 11 1

STEP ACTIONNXPECTED RESPONSE RESPONSENOTOBTAINED 7.

(CONTINUED) b) Use Attachments 1 and 2 b) If no location specified,

~

to determine location report to Security Building to await further instructions c) Proceed to monitoring AND location specified in Step 3 CO TO NOTE prior to Step 8.

NOTE:

Radio contact should be with the TSC until the LEOF is activated.

O 8.

ESTABLISH RADIO CONTACT l

a)

Initiate EPIP-4.19, Use of Radios for Health Physics Monitoring b)

Il[ LEOF NOT activated, b) Contact LEOF and communicate:

contact TSC and communi-cate:

1) Current location
1) Current location
2) Designated monitoring location
2) Designated monitoring location c) Request telephone number of Emergency Center for use in case of radio failure.

O

No.C7 M7210

(

NUNDER PROCEDURE TITLE REVISION O

03 EPIP-4.16 0FFSITE MONITORING PAGE 5 of 11 STEP ACTION / EXPECTED RESPONSE RESPONSENOTORTAINED NOTE:

Survey reading should increase as you approach center of the plume, then decrease once past centerline.

9.

PLUME TRACKING:

a)

IF_ directed to locate a)' GO TO Step 10.

plume:

t

1) Proceed to location specified by TSC (or LEOF) b) obtain portable survey instrument from emergency kit:

l

1) Open beta shield c) Traverse the plume in a c)

Il[ no readings are observed, crosswind direction:

notify TSC (or LEOF).

1) Hold survey meter out
1) Request advice on relo-of vehicle window cation
2) Observe readings
2) Return to Step 9.a.

l d) Traverse plume until maximum point (centerline of plume) is located e) Close beta shield:

1) Observe readings OV

..c7m7:n o

NUntBER PROCEDURE TITLE REVISION O~

03 EPIP-4.16 0FFSITE MONITORING PAGE 6 of 11 STEP ACTIONMXPECTED RESPONSE RESPONSE NOTOBTAINED 9.

(CONTINUED) f) Log on Attachment 3:

1) mR/hr
2) Location
3) Date
4) Time 5)

Instrument used and serial number h

g)

Inform TSC (or LEOF) of

\\_s/

monitor readings and location h)

Il[ further monitoring h) Relocate to an area outside required, stay within the plume and await further the plume until com-instructions.

plete.

10.

NOBLE CAS SAMPLING:

a)

Il[ noble gas sample a) GO TO Step 11,.

l I

requested, CO TO the centerline of plume S.E Location specified I

by TSC (or LEOF) b) Obtain a 100 cc gas bom'a from emergency kit

1) Remove top and wave chamber in air l

s sl

a Pee.97887210 o

e NUNDER PROCEDURE TITLE REVISl0N O

03 V

EPIP-4.16 0FFSITE MONITORING 7 of 11 STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 10.

(CONTINUED)

2) Ensure petcocks are closed and replace top
3) Place chamber in plastic bag and label with date, time and location c) Log information on,

NOTE:

Sample volume should be decreased when sampling high activity airborne concentrations.

11.

PARTICULATE AND IODINE SAMPLE:

a) E particulate and/or a) GO TO Step M.

iodine sample required:

1) Obtain battery powered air sampler l
2) Load sampler with particlate filter and silver zeolite cartridge b) E sample required during b) CO TO Step 11.c.

high humidity:

1)

Shelter sample from moisture

2) Report weather conditions l

to TSC (or LEOF)

I i

....,m, w

NUMBER PROCEDURE TITLE REVIS10N O'

03 EPIP-4.16 0FFSITE MONITORING l

PAGE 8 of 11 l

STEP ACTION / EXPECTED RESPONSE RE.tP0NSENOTODTAINED 11.

(CONTINUED) c) Obtain an approximate 10 ft air sample

1) Connect cables to vehicle battery terminal
2) Turn on air sampler
3) Disconnect cables after sample volume collected
4) Log sample volume on Attachment ][

d) Place iodine cartridge in a plastic bag and label:

1) Date l
2) Time i
3) Volume
4) Location e) Place particulate filter in a plastic bag and label:
1) Date
2) Time
3) Volume
4) Location f) Log information on O

~

NOTE

  • Air sample must have been taken using silver zeolite car-tridge to use this method for analysis.

1 l

I>,.-- _. -, -.. _ _ _ _ - -,. -.. -, -. _ _ - _

4 w.s797:so NUNGER PROCEDURE TITLE REVISION 03 EPIP-4.16 0FFSITE MONITORING PAGE 9 of 11 t

STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 12.

ACTIVITY DETERMINATION:

a) 11F air sample analysis required:

1) Proceed to a low back-ground area b) Turn on RM-14 (frisker)
1) Obtain a background count rate (cpm) c) Using a clean pair of gloves remove the silver zeolite O

cartridge from the plastic bag. Hold silver zeolite car-tridge-one-quarter inch from detector, with influent side of cartridge facing the detector d)

IF, gross count rate on d) Return to Step 11, l

scale, GO TO Step 12.e.

AND l

Obtain a smaller sample i

volume e) Determine net count rate:

NET (cpm)

BACKGROUND (cpm)

GROSS (cpm)

=

f) Determine from Attachment 4 the conversion

~

factor for specific sample volume.

g) Determine activity:

ACTIVITY (pCi/ml) l NET (cpm) x Conversion Factor

=

Pee.97887210 w

=

=

MUNDER PROCEDURE TITLE REVISION O

03 EPIP-4.16 0FFSITE MONITORING PAGE 10 of 11 STEP ACTIONNXPECTED RESPONSE RESPONSE NOT08TAINED

~

12.

(CONTINUED) h) Log on Attachment 3_:

1) Date
2) Time
3) Location
4) Activity
1) Place sample in poly bag and label:
1) Date
2) Time
3) Volume l
4) Location 13.

SOIL DEPOSITION:

I a)

IF soil sample is requested:

a) CO TO Step M.

1) Obtain a sample by marking off an approxi-mate one square foot area
2) Remove top 1/4 to 1/2 inch layer of soil
3) Place soil in a clean poly bag b) Label sample with:
1) Date
2) Time
3) Location I

c) Save sample for lab analysis l

1

- _--..-.-,--__. -.. -. -., _, _ - - _ _. _. _ ~.. -. - - _ _ __

No.07 H7210 MUNDER PROCE00RE TITLE REVISION 03

' s-EPIP-4.16 0FFSITE MONITORING PAGE 11 of 11 s#

STEP ACTIONMXPECTED RESPONSE RESPONSENOT08TAINED 14.

TRANSMIT DATA:

a) Transmit results of all surveys OR sample analysis l

to TSC (or LEOF) as soon as possible 15.

LABORATORY ANALYSIS OF SAMPLES:

a) All samples will be saved for future analysis at laboratory facilities b) Bag all samples in clean poly bags

\\~-

c)

Insure samples are properly labeled t

d) Return all samples to the Security Building 16.

CONTINUED SAMPLING:

i l

a)

Il[ TSC (or LEOF) does NOT a) C0 TO Step 17,.

request return to station:

1) Return to Step 9, AND Repeat sampling and i

surveys as requested ~

1/.

TERMINATE EPIP-4.16:

a)

COMPLETED BY:

i DATE:

TIME:

b) Forward EPIP-4.16, forms and applicable records to Radiological Assessment Director

- END -

MUNDER ATTACHMENT TITLE MVISION O

EPIP4.16 SECTOR MAP SURRY POWER STATION ATTACHNENT PAGE 1

1 of 6 (e

w

,i' a

..k 2

l a,

1 i

y c

'i.,

f.. y.. > JAMES CITY

../._/_. l. -

Mib 3 COUNTY ~*..

n YORK,v, 7,,

COUN Y*

< er x.

s e

z

., fe s

,. ]4 y:

4. t; 1<4'7...\\

f8h j. %

o.

=

.=

.. =

j i__.

. (.

,4 t-O P,-,, s.

w.

c.

_. ;fp. ___

y

_~.

ur-- N.

i

\\

V N

m.

TT !

.aw a \\^t

~

Q

<1.-~

\\

[

=

k

\\

',g D

~

P

=

4

. {

d'f, s'

- k _,

l, i

/

ATION e

./

u

't o

5m'

,N

\\

4 l

/

E s

i.,

j

=

i 4

l I \\'..' m *E, f'.R

,,p y

e j

' f

S

\\,,

~q/

t s

i

,y

\\,

l' 6

\\

N

(

V

\\

.h) " I

's y/

~~ ',%x h,

N 3

j,,,*

N s

."W

'N's w.};.<.. =

/

l

]:#sp t.g

(/

'N,

\\

,,, y N \\.

E t.'::

/

q2 > I bNf I.#

f' h,

!N Y.;

h

~

.-T

m.c7eerano MUNGER ATTACHNENT TITLE REVISION EPIP-4.16 ~

03 GRID W SURRY POWER STATION ATTACHNENT PAGE 3

2 of 6 y

  1. E f

f*

    • j h
t&Q-

}:

,x y

-- Q o.

'm

-)

,s y

= = -.

f,i

.~:.

.w-

.,jI 5

(' }

J

/,

1,:

=

. =.

)

'V j,I,

~

3' 4'.k,

.f7,,a x

d' t

O

=~: P

- x, i

s a

x,

._w

,,.. ~gx =.Wyt w.w.

_ - - +\\

s f'4ss._

)-..'

x i

m, z. ss s1 g

x_.

q f g m1, 4

'W

(

.I

.- l 6

\\

l u

j j

4

)

r

' e i p' GRID ',

\\'

GRID

~

7, 7

n /W A,

'i w

N'. e p

A.

(/

N.

c e

'i

/

g \\,

s

-/

. 3

\\

se i;

s

=

N/

'i h

k.

g=,)'

'N s

o x,

  • j N%

L-

.n O

i,

^

).~

r ~ Ex %,

.g

'N, i

/.

[

t H

e 6-n-

W s eu

i.c,..i>>>

MUNDER ATTACHNENT TITLE REVISION O

03 GRID A MAP SURRY POWER STATION ATTACHMENT pAgg 1

3 of 6

\\

\\

.,EHf 9/) _f

""~

q

\\ %

=

.R g

.v 5

)

4. ) p.

'.,e 3

l i

e

- @),

y

.., ( ' = q\\

i e~

Jy t,

fff4-l,,,i.-

.~ '

..y

~...,

T... Isf,=

l

),sj x.-,

?! L,,,

=

,0

% w\\[:

  • i')_n

(

e L

i C'

,f....

,-L j

~

'~

,u 9'. -

3

'*0 g

, w/,. -

y

.uJ.

s 3...

.g L

s

-ue s s

RIV5R~ ~

,/

s, l

~

~-

~~g o

b 4.-

> 3 (

.e-d.

v

  1. 6%-

A

,s /

-W w

v l's

/

jW M,.,. r v ll 4l

- CN uaz o

m m.m

.r_m y s

,No49708,7220

.<i MUMBER ATTACHMENT TITLE REVISION O-EPIP-4.16-03 GRID B SURRY POWER STATION ATTACHMENT PAGE 1

4 of 6

. e..M@.

A+

s (r

}

.a=

X jL

.m..

/t-

..i u

-"?,4;'4:r m

=

s

.....s O

"'.. ' ~;

i.:., =

.\\

~

.a, c.

\\

,...k'.

J

.-('wacA

. 4 sh,.y 1

N b

=._

y%

s

-k,un

\\

4@'* S,._

'\\

l N

g s

4 Q

\\,,

9 ll.

' r N, C,

/

e Y

iiii, )

so q

=

g.

9 4,

g :'i u

} "^

,' ye ii.-

p,,

/

' 'ig:3.

N

.f E

O 1L: SU, RRY-POWER

. ~.... M.yU. W

.Peo. 97887223 i

NUMBER A TTACHMENT TITLE REVISION O

EPIP-4,16 03 GRID C SURRY POWER STATION ATTACHMENT PAGE 1

5 of 6 E

'SURRY-POWERm

.;.w...w 4.-

f\\

3 STATION

.y-.

.l o

  • =. -

w!!

h:. '

" : i;y: se.

s,,,

g"n.

l

_.j.T :.... r.*. ~.. *-

'l.h.!

(.,C-18"!.8 '

ll;ll

~

.t*

~

g g

~ '. ".

M!!

M!!

i

~e,,s. f * * ~e

~ $ " ' ii!

,,3 -

...t

e::

I

.lg p,

n'

~

O

.,l

~

p"":.

~;

=

&n: ;; _

4 8.~ *.

g&

a e.

.. a.

18; z

+

g 8

y f

}

y

=

s lq%.

i e

sS

.:.;;;i: w

^

=

a..

~

ll';f:. -

see 102

..t o

a

.....:........t:

setwpofrf.:

!$.Y.*8 f[

N, y;.

\\

wi s

.e 9

~

[

h N

.h a

1

-N

'x u

m...

a r

1

(

E.l A. /

,rh L" Sk -

N

af.o4784,7220 MUNDER A TTACHMENT TITLE REVISION O

EPIP-4.16 -

03 GRID D SURRY POWER STATION ATTACHMENT PAGE 1

6 of 6 e

fm p

m

.g

./

p g(

y e

3

/g

'T

- E/

(<'h suisv',., '/

, g3 y

t

      • m l

g u.

~

,y e

p..

'd, r1

?

"' /

"/

\\

(^)

r.-

.f e

- i, I

gr,3 y.

l

~ ew w

f 9gs \\

5:M'

,o 4

f e

5i1 jig ~-

"'\\ 's..'

n w

l I

$I, g

-f t

, g '\\

_f.

' +

si

-.f y

m i,.

Ei)

i e$

d

?

's

%a

,..j.

A

\\

l v-Q E

7'

{

h' Ote' _ -

\\.

w gjl un==

..... j

.w v eu %

. I. g, '

==

/

=

r-

~,.

Y f,T

~LR E s

No091h12M NUMBER A TTACHMENT TITLE REVISION

'd EPIP-4.16 03 PRESELECTED MONITORING LOCATIONS A TTACHMENT PAGE 2

1 of 3

.0 CATION SECTOR DISTANCE (mi)

DESCRIPTION 1.

B-2 2 miles North on Route 650 at Hog Island Air Sampling Station.

2.

F-1.6 Low level circulating water pumps at beginning of intake canal.

3.

H-1.9 1.9 miles South on Route 650, left at road to public boat landing.

Monitoring point 1 mile, under power lines.

O 4.

J-2 2 miles South on Route 650; monitoring l

point at naturai gas pipeline signs.

5.

K-2.1 Route 650 South, right on Route 617, right on Route 10, right on Route 634.

]

Follow signs to Chippokes State Park, enter park and follow signs to historic section. Monitoring point at Chippokes Mansion.

6.

L-2.3 Route 650 South, right on Route 617, right on Route 10, right on Route 634.

Follow signs to Chippokes State Park; enter park and follow signs to Historic section. Monitoring point located at intersection of road and College Run Creek.

7.

H-5.5 Rushmere Shores. South on Route 650, l

left on Route 628, left on Route 676.

At bend in the road, bear right on Route 686, left on Route 2001 into I

Rushmere Shores.

8.

J-5 Route 650 South, left on Route 628.

Monitoring point 1.2 miles from O

intersection of Routes 650 and 628.

(Remote Assembly Area).

No.978t7220 a e r

., i NUMBER A TTACHMENT TITLE REVISION h

EPIP-4.16 03 PRESELECTED MONITORING LOCATIONS PAGE A TTACHMENT

~

2 2 of 3 LOCATION SECTOR DISTANCE (mi)

DESCRIPTION 9.

K-5 Route 650 South, right on Route 10.

Monitoring point \\ mile from intersection of Routes 10 and 650 at bend in road.

10.

L-5 Route 650 South, right on Route 617, right on Route 10, right on Route 633.

Monitoring point North on Route 633.

11.

M-5 Route 650 South, right on Route 617, right on Route 10 for approximately 5 miles, right on Route 634. Monitoring point 1.3 miles from intersection of g-~g

( )

Routes 634 and 10.

Alliance Air Sampling Station, intersection of Routes 634 and 662.

12.

N-4 From location 11, monitoring point 2 miles North on Route 662.

13.

P-5 Scotland Wharf. Surry side on James River Ferry on Route 31 North.

14.

Q-5 James River Ferry to Jamestown Route 31, right on Route 359. Follow signs to Colonial Parkway, left on Colonial i

Parkway. Monitoring location ik mile on Colonial Parkway.

15.

R-5 James River Ferry to Jamestown side, Route 31 East, right on Route 682 " Neck of Land Road", left on Lake Powell Road, 1.3 miles to intersection of Routes 617 and 618.

16.

A-5 James River Ferry, Route 31 East, right en Route 359, follow signs to Colonial Parkway, left on Parkway. Monitoring point 6.5 miles, k mile past Halfway O

Creek.

l l

i

,,_m.

_..,y,,

7-,, - -. - -. -,, -, -, -,,. - -,

N2f9 272M

('

NUMBER A TTACHMENT TITLE REVISION EPIP-4.16 03 PRESELECTED MONITORING LOCATIONS A TTACHMENT PAGE 2

3 of 3 LOCATION SECTOR DISTANCE (mi)

DESCRIPTION 17.

B-5 Take Colonial Parkway from Jamestown, 7 miles to Route 199 East, Route 60 East, 3 lights, right on Kingsmill Road.

Monitoring location 1 mile from Route 60 and Kingsmill Road intersection.

18.

C-5 Take Colonial Parkway from Jamestown, 7 miles to 199 East, Route 60 East, 3%

miles to Ron Springs Road (road prior

~

to Carter's Grove), right on Log Cabin Beach Road to sewage treatment plant.

19.

D-5 Take Colonial Parkway from Jamestown, 7 miles to 199 East, Route 60 East, past Carter's Grove to Badische Corporation, right 1 mile to Virginia Power Substation.

20.

E-5 Take Colonial Parkway from Jamestown, 7 miles to 199 East. Take Route 60 East to Fort Eustis. Right at Fort Eustis, right at Lee Blvd., right on Kerr Road.

Monitoring point located at load dock.

21.

F-4.8 Take Colonial Parkway from Jamestown, 7 miles to 199 East. Take Route 60 East to Fort Eustis, right at Fort Eustis, right at Taylor Road, left on Harrison i

l Road. Monitoring location 0.6 miles j

South from intersection of Harrison Road and Back River Road.

O L

4 ns snenno

= = e

')

NUMBER A TTACHMENT TITLE REVISION s/

EPIP-4.16 03 OFFSITE MONITORING A TTACHMENT DATA SHEET PAGE 3

1 of 1 DATE:

BY:

INSTRUMENT:

MODEL #

SERIAL #

WIND SAMPLE LOCATION TIME SPEED MR/HR VOLUME ANALYSIS REMARKS O

o l

?

E 4

e

%. ore.a.nso no.

e cu o n NUNDER

,o_

ATTACHMENT TITLE REVISION t

i L./

EPIP-4.16 03

^

M##

RM-14 CONVERSION FACTOR 4

1 of 1 l

t

_-r e

_- #%.+ = =.--jd ----m

_n

__m se

_ _ _ = _. _ -= _

.=_4_._..;

5_ - - - - - - - - -

-==4=:

r

__.;_4

_.g

_5_. _7._:3___.

4

' %--e: s s= e_ 1

- =1==i;s=e

i= g &s 1==S.=::ri-: _=. =iw=1m

=

=

=:g --

-%: _=.

s_

m w

tN_

fg-eo x

+

s (n) x m

1 g

I

-bt :*Ib.NNN YkN1 d#d

_. 7.. 3.g___ _ _ __ __-N'_

s

- 5.;m;_JIT-FNk2 N:k_ _1-5 _-;b~--

-- MN

~

-~

__: =_':

._._:::.:

g 1-

_c

.__g s

~. _. _-3 d.-_.

_. __k_ N ;._-.. _ ~ _ ~N N5-?

~~

'. ____ U. :=d1. _ _

.. -.E-h-I5

_i_i mms 7 E._ __

_m y_

_7 _

.==m-

_.... ___m____.

__m

_.s__.-

. w - %. _

~

g N.

/O-it A

l y

=

-! =..t-- =st = =;=_ _.l.:... =_nu ;=._=1+=__.=__u==_.:___;w..-x =W _=:. _ =,.a=.

_ _ _ _w.mit e

. _ _:-- +_..a

=... _. _ _ _.

f m.

=___=.m=.,,=.._.

_g:__

=_,imm x=14wiv=-a=t.4-is

_s4-2=2:=tw=i=_==:

3_

i

+_

i= _ = _... =. _

==

2 _

u_ q__.._.

. _ _ _ _ _ = _. _ _ _

_ _____x 1

a I

I i

I

]

E g2

. nc

...jg,

.jg,-

VOLUME <FT4

(~'T/

%s a

,4

\\

/

n VIHOINIA ELucruic Ann Pownu Cownwxv Ricnxowr),VINOINIA 2020s1 me:d O3 m a

w. I.. stuwm
v..i,.......

wuct... o.. m...

September 25, 1986 Dr. J. Nelson Grace Serial No.86-609 Regional Administrator N0/JBL:vih Region II Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 Suite 2900 License Nos. DPR-32 101 Marietta St., N.W.

DPR-37 Atlanta, Georgia 30323

Dear Dr. Grace:

VIRGINIA ELECTRIC AND POWER COMPANT SURRY POWER STATION UNIT NOS. 1 AND 2 REVISIONS TO EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan Implementing Procedures are submitted.

These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).

Please update your manual by performing the actions described in the enclosed tabulation of changes.

Very truly yours, Os W. L. Stewart Enclosures cc: Document Control Desk (2)

Mr. Lester S. Rubenstein, Director - w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel - w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. William E. Holland - w/o enclosures NRC Senior Resident Inspector Surry Power Station

-