ML17178A367: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17178A367
| number = ML17178A367
| issue date = 06/21/2017
| issue date = 06/21/2017
| title = James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates
| title = Transmittal of Emergency Plan Updates
| author name = Jones J D
| author name = Jones J D
| author affiliation = Exelon Generation Co, LLC
| author affiliation = Exelon Generation Co, LLC
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Exelon Generation  
{{#Wiki_filter:Exelon Generation Company, LLC James A. FitzPatrick A [1£;17" Exelon Generation Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 JAFP-17-0060 June 21, 2017 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555  
: Company, LLC James A. FitzPatrick A [1£;17" Exelon Generation Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 JAFP-17-0060 June 21, 2017 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555  


==Subject:==
==Subject:==
Transmittal of Emergency Plan Updates James A. FitzPatrick Nuclear Power Plant Docket No.50-333 License No. DPR-059  
Transmittal of Emergency Plan Updates James A. FitzPatrick Nuclear Power Plant Docket No.50-333 License No. DPR-059  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
James D. Jones Emergency Preparedness Manager -JAF The documents enclosed with this letter are changes to the James A. FitzPatrick Nuclear Power Plant's (JAF) Emergency Plan made pursuant to 10 CFR 50.54(q).
James D. Jones Emergency Preparedness Manager -JAF The documents enclosed with this letter are changes to the James A. FitzPatrick Nuclear Power Plant's (JAF) Emergency Plan made pursuant to 10 CFR 50.54(q).
This transmittal fulfills the requirements of 10 CFR 50.54(q),
This transmittal fulfills the requirements of 10 CFR 50.54(q), 10 CFR 50 Appendix E Section V, 10 CFR 70.32(i), and 10 CFR 72.44(f) to inform the commission of changes that have been made which do not decrease the effectiveness of the Emergency Plan. The following documents (including change documentation and screening) are attached:
10 CFR 50 Appendix E Section V, 10 CFR 70.32(i),
and 10 CFR 72.44(f) to inform the commission of changes that have been made which do not decrease the effectiveness of the Emergency Plan. The following documents (including change documentation and screening) are attached:
* TOC -Volume 1, Revision 33
* TOC -Volume 1, Revision 33
* TOC -Volume 2, Revision 24
* TOC -Volume 2, Revision 24

Latest revision as of 14:52, 2 April 2019

Transmittal of Emergency Plan Updates
ML17178A367
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/21/2017
From: Jones J D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JAFP-17-0060
Download: ML17178A367 (3)


Text

Exelon Generation Company, LLC James A. FitzPatrick A [1£;17" Exelon Generation Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093 JAFP-17-0060 June 21, 2017 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Transmittal of Emergency Plan Updates James A. FitzPatrick Nuclear Power Plant Docket No.50-333 License No. DPR-059

Dear Sir or Madam:

James D. Jones Emergency Preparedness Manager -JAF The documents enclosed with this letter are changes to the James A. FitzPatrick Nuclear Power Plant's (JAF) Emergency Plan made pursuant to 10 CFR 50.54(q).

This transmittal fulfills the requirements of 10 CFR 50.54(q), 10 CFR 50 Appendix E Section V, 10 CFR 70.32(i), and 10 CFR 72.44(f) to inform the commission of changes that have been made which do not decrease the effectiveness of the Emergency Plan. The following documents (including change documentation and screening) are attached:

  • TOC -Volume 1, Revision 33
  • TOC -Volume 2, Revision 24
  • Section 8, Revision 35
  • Appendix A, Revision 31 The following documents (including change documentation) are attached:
  • IAP-2, Revision 348 (Editorial Correction, cover page & page 2 only)
  • TOC -Volume 3, Revision 27 A (Editorial Correction, cover & page 2 only) This letter contains no new regulatory commitments.

If you should have any questions, please contact Mr. James D. Jones at (315) 349-6030.

Sincerely

yours, Emergency Preparedness Manager JDJ/pp Enclosure(s):

Including change documentation and screening:

  • TOC -Volume 1, Revision 33
  • TOC -Volume 2, Revision 24
  • Section 8, Revision 35
  • Appendix A, Revision 31 Including change documentation:
  • IAP-2, Revision 348 (Editorial Correction, cover page & page 2 only) JAFP-17-0060 Page 2 of 2
  • TOC -Volume 3, Revision 27 A (Editorial Correction, cover & page 2 only) cc w/ procedure documentation, evaluation and screening:

NRC Inspector, Division of Reactor Safety, Region 1 -(electronic copy) cc w/o procedure documentation, evaluation and screening:

USNRC (l&E) Regional Administrator, Region I -Controlled -2 Copies NRC Resident Inspector-Controlled -1 Copy NRC Director NMSS -Uncontrolled -1 Copy NRC Director Division of Spent Fuel Storage and Transportation

-Uncontrolled -1 Copy NRC Director, Division of Security Policy -Uncontrolled -1 Copy NYSEMO -Controlled -1 Copy (electronically submitted)

OCEMO -Controlled -1 Copy JAFP-17-0060 Enclosure(s):

Including change documentation and screening:

  • TOC -Volume 1, Revision 33
  • TOC -Volume 2, Revision 24
  • Section 8, Revision 35
  • Appendix A, Revision 31 Including change documentation:
  • IAP-2, Revision 348 (Editorial Correction, cover page & page 2 only)
  • TOC -Volume 3, Revision 27 A (Editorial Correction, cover & page 2 only)