JAFP-16-0162, Transmittal of Emergency Plan Updates
ML16335A174 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 11/17/2016 |
From: | Jackie Jones Entergy Nuclear Northeast, Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML16341C794 | List: |
References | |
JAFP-16-0162 | |
Download: ML16335A174 (2) | |
Similar Documents at FitzPatrick | |
---|---|
Category:Emergency Preparedness-Emergency Plan
MONTHYEARJAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023
[Table view]Emergency Plan Document Revision JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-18-0049, Oswego County and New York State Participation in the James A. FitzPatrick Nuclear Power Plant Emergency Plan2018-05-11011 May 2018 Oswego County and New York State Participation in the James A. FitzPatrick Nuclear Power Plant Emergency Plan NMP1L3209, Attachment 2 - EP-AA-1011, Revision 2, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station.2018-04-30030 April 2018 Attachment 2 - EP-AA-1011, Revision 2, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station. ML18128A0882018-04-30030 April 2018 Attachment 7 - EP-AA-1014, Addendum 3, Revision 0, James A. FitzPatrick Nuclear Power Plant Emergency Action Levels. ML18128A0832018-04-30030 April 2018 Attachment 4 - EP-AA-1014, Revision 1, Exelon Nuclear Radiological Emergency Plan Annex for James A. FitzPatrick Station. ML18128A0842018-04-26026 April 2018 Attachment 5 - EP-AA-1014, Addendum 1, Revision 0, On-Shift Staffing Analysis Report for James A. FitzPatrick Nuclear Power Plant. ML18128A0792018-04-26026 April 2018 James A. FitzPatrick Nuclear Power Plant and Independent Spent Fuel Storage Installations and Nine Mile Point, Units 1 and 2, Submittal of Emergency Plan Addendum and Annex Revisions ML18128A0802018-04-26026 April 2018 Attachment 1 - 10CFR50.54(q)(5) Change Summary Analysis ML18128A0822018-03-31031 March 2018 Attachment 3 - EP-AA-1014, Revision 0, Exelon Nuclear Radiological Emergency Plan Annex for James A. FitzPatrick Station. ML18128A0892018-03-31031 March 2018 Attachment 8 - EP-AA-1013, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex for Nine Mile Point Station. ML18037A7902018-01-31031 January 2018 Enclosure 2B- EAL Red-Line Basis Document JAFP-18-0014, Enclosure 2A- EAL Comparison Matrix Document2018-01-31031 January 2018 Enclosure 2A- EAL Comparison Matrix Document JAFP-18-0014, Enclosure 2C- EAL Basis Document2018-01-31031 January 2018 Enclosure 2C- EAL Basis Document ML18037A7882018-01-31031 January 2018 Enclosure 2A- EAL Comparison Matrix Document ML18037A7922018-01-31031 January 2018 Enclosure 2C- EAL Basis Document ML18037A7932018-01-31031 January 2018 Enclosure 2D- EAL Front Matter ML18037A7952018-01-31031 January 2018 Enclosure 2E- Procedure Matrix ML17178A3672017-06-21021 June 2017 Transmittal of Emergency Plan Updates JAFP-17-0060, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates2017-06-21021 June 2017 James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates JAFP-17-0060, Emergency Plan Volume 12017-05-31031 May 2017 Emergency Plan Volume 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 JAFP-17-0022, Transmittal of Emergency Plan Updates2017-03-17017 March 2017 Transmittal of Emergency Plan Updates ML17066A3002017-03-15015 March 2017 Transmittal of Emergency Plan Updates JAFP-17-0015, Emergency Plan Updates2017-03-15015 March 2017 Emergency Plan Updates JAFP-17-0015, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates2017-03-15015 March 2017 James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates JAFP-16-0184, Transmittal of Emergency Plan Updates2016-12-12012 December 2016 Transmittal of Emergency Plan Updates JAFP-16-0162, Transmittal of Emergency Plan Updates2016-11-17017 November 2016 Transmittal of Emergency Plan Updates JAFP-16-0144, Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 122016-09-19019 September 2016 Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 12 JAFP-16-0126, Submittal of Emergency Plan Updates2016-08-0808 August 2016 Submittal of Emergency Plan Updates JAFP-16-0109, Transmittal of Emergency Plan Updates2016-06-21021 June 2016 Transmittal of Emergency Plan Updates ML16188A1842016-06-15015 June 2016 James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 JAFP-16-0104, James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 322016-06-15015 June 2016 James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 JAFP-16-0104, Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 272016-06-15015 June 2016 Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 27 JAFP-16-0094, Transmittal of Emergency Plan Updates for James A. Fitzpatrick Nuclear Power Plant2016-05-31031 May 2016 Transmittal of Emergency Plan Updates for James A. Fitzpatrick Nuclear Power Plant JAFP-16-0086, Transmittal of Emergency Plan Updates2016-05-20020 May 2016 Transmittal of Emergency Plan Updates JAFP-16-0043, Emergency Plan, Revision 36 Section 6, Revision 35, Section 7; Revision, 37 SAP-20; Revision 13, Appendix J; Revision 34, IAP-2; Revision 10, IAP-2 Figure IAP-2.12016-03-0707 March 2016 Emergency Plan, Revision 36 Section 6, Revision 35, Section 7; Revision, 37 SAP-20; Revision 13, Appendix J; Revision 34, IAP-2; Revision 10, IAP-2 Figure IAP-2.1 ML18128A0862016-02-24024 February 2016 Attachment 6 - EP-AA-1014, Addendum 2, Revision 0, James A. FitzPatrick Nuclear Power Plant Evacuation Time Estimates. ML12215A0042012-07-19019 July 2012 After Action Report/Improvement Plan Excercise Date - June 21, 2011 ML12215A0032012-07-19019 July 2012 After Action Report/ Improvement Plan, Exercise Date - June 22-23, 2011 ML0532604832003-08-31031 August 2003 Enclosure I, Appendix F Evacuation Time Estimates for the James A. Fitzpatrick/Nine Mile Point Emergency Planning Zone (Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station Are Collocated Therefore, This Evaluation Is Id 2023-11-15 Category:Emergency Preparedness-Emergency Plan Implementing Procedures MONTHYEARML19162A1752019-06-0606 June 2019
[Table view]10 CFR 50.54(q)(5) Procedure Change Summary Analysis JAFP-18-0027, Emergency Plan Updates. Includes SAP-2, Revision 63 and SAP-3, Revision 932018-02-0505 February 2018 Emergency Plan Updates. Includes SAP-2, Revision 63 and SAP-3, Revision 93 JAFP-17-0122, Revision 76 to Emergency Plan Implementing Procedure EAP-1.12017-11-16016 November 2017 Revision 76 to Emergency Plan Implementing Procedure EAP-1.1 JAFP-17-0109, Emergency Plan Implementing Procedures EAP-2, Rev. 35, Personnel Injury and SAP-2, Rev. 63, Emergency Equipment Inventory.2017-11-10010 November 2017 Emergency Plan Implementing Procedures EAP-2, Rev. 35, Personnel Injury and SAP-2, Rev. 63, Emergency Equipment Inventory. ML17128A4782017-04-25025 April 2017 Transmittal of Emergency Plan Updates JAFP-17-0036, Emergency Plan Implementing Procedure Updates2017-04-25025 April 2017 Emergency Plan Implementing Procedure Updates JAFP-17-0036, James A. FitzPatrick, Transmittal of Emergency Plan Updates2017-04-25025 April 2017 James A. FitzPatrick, Transmittal of Emergency Plan Updates JAFP-17-0008, Transmittal of Emergency Plan Updates2017-02-17017 February 2017 Transmittal of Emergency Plan Updates JAFP-17-0001, Transmittal of Emergency Plan Updates2017-01-10010 January 2017 Transmittal of Emergency Plan Updates JAFP-16-0162, Transmittal of Emergency Plan Updates2016-11-17017 November 2016 Transmittal of Emergency Plan Updates ML16291A5102016-10-11011 October 2016 Transmittal of Four Emergency Plan Updates JAFP-16-0157, James A. Fitzpatrick - Transmittal of Four Emergency Plan Updates2016-10-11011 October 2016 James A. Fitzpatrick - Transmittal of Four Emergency Plan Updates JAFP-16-0157, Enclosures to JAFP-16-0157: Revision 2 to EAP-4C, Revision 5 to EAP-30, Revision 59 to SAP-2, and Revision 88 to SAP-32016-10-11011 October 2016 Enclosures to JAFP-16-0157: Revision 2 to EAP-4C, Revision 5 to EAP-30, Revision 59 to SAP-2, and Revision 88 to SAP-3 JAFP-16-0109, Transmittal of Emergency Plan Updates2016-06-21021 June 2016 Transmittal of Emergency Plan Updates ML16188A1632016-06-21021 June 2016 Emergency Plan Procedures/Volume 2, Update List ML16188A1642016-06-20020 June 2016 Emergency Plan/Volume 1, Update List JAFP-16-0084, James a Fitzpatrick - Transmittal of Emergency Plan Updates, Including Revision 6 to EAP-36, Environmental Laboratory Use During an Emergency2016-05-20020 May 2016 James a Fitzpatrick - Transmittal of Emergency Plan Updates, Including Revision 6 to EAP-36, Environmental Laboratory Use During an Emergency JAFP-16-0065, Transmittal of Emergency Plan Updates, Including Revision 57 to SAP-2, Emergency Equipment Inventory2016-04-22022 April 2016 Transmittal of Emergency Plan Updates, Including Revision 57 to SAP-2, Emergency Equipment Inventory JAFP-16-0058, Transmittal of Emergency Plan Updates2016-04-0707 April 2016 Transmittal of Emergency Plan Updates JAFP-16-0053, Transmittal of Emergency Plan Updates, Including Revision 13 to EN-EP-801, Emergency Response Organization2016-04-0505 April 2016 Transmittal of Emergency Plan Updates, Including Revision 13 to EN-EP-801, Emergency Response Organization JAFP-16-0052, Transmittal of Emergency Plan Updates2016-04-0505 April 2016 Transmittal of Emergency Plan Updates JAFP-16-0044, James a Fitzpatrick - Transmittal of Emergency Plan Updates2016-03-10010 March 2016 James a Fitzpatrick - Transmittal of Emergency Plan Updates JAFP-16-0038, Transmittal of Emergency Plan Updates, Including Revision 56 to SAP-2 and Revision 21 to SAP-82016-03-0101 March 2016 Transmittal of Emergency Plan Updates, Including Revision 56 to SAP-2 and Revision 21 to SAP-8 JAFP-16-0025, Transmittal of Emergency Plan Updates2016-02-23023 February 2016 Transmittal of Emergency Plan Updates JAFP-16-0024, Transmittal of Emergency Plan Updates, Including, Revision 20 to SAP-82016-02-10010 February 2016 Transmittal of Emergency Plan Updates, Including, Revision 20 to SAP-8 JAFP-16-0009, Transmittal of Emergency Plan Updates, Including Revision 2 to EN-EP-609, Revision 2 to EN-EP-610, Revision 2 to EN-EP-6112016-01-27027 January 2016 Transmittal of Emergency Plan Updates, Including Revision 2 to EN-EP-609, Revision 2 to EN-EP-610, Revision 2 to EN-EP-611 JAFP-16-0003, Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 42016-01-12012 January 2016 Transmittal of Emergency Plan Updates, Including Revision 28 to Section 1, Revision 27 to Section 27 and Revision 27 to Section 4 JAFP-15-0152, Transmittal of Emergency Plan Updates2015-12-18018 December 2015 Transmittal of Emergency Plan Updates JAFP-13-0074, Emergency Plan and Implementing Procedures2013-05-30030 May 2013 Emergency Plan and Implementing Procedures ML0410700502004-03-29029 March 2004 Revised Copy of the James A. Fitzpatrick Emergency Plan and Implementing Procedures ML0407204212004-02-17017 February 2004 Revised Emergency Plan Implementing Procedures ML0334905642003-12-0101 December 2003 Volume 2, Revision 34 to EAP-4, Dose Assessment Calculations, and Volume 3, Revision 21 to EAP-42, Obtaining Meteorological Data. ML0532604872003-11-25025 November 2003 Enclosure J, Entergy Nuclear Operations, Inc., James A. FitzPatrick Nuclear Power Plant Emergency Plan Implementing Procedure, Dose Assessment Calculations EAP-4, Effective December 3, 2003 ML0329506302003-10-0202 October 2003 Revision 32 to EAP-1, Revision 24 to EAP-14.1, Revision 22 to EAP-14.2, and Revision 15 to EAP-14.5 ML0330002122003-09-29029 September 2003 Revision 16 to EAP-14.6, Habitability of the Emergency Facilities and Revision 23 to EAP-19, Emergency Use of Potassium Iodine (Ki). ML0326902022003-09-16016 September 2003 Emergency Plan and Implementing Procedures ML0532604832003-08-31031 August 2003 Enclosure I, Appendix F Evacuation Time Estimates for the James A. Fitzpatrick/Nine Mile Point Emergency Planning Zone (Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station Are Collocated Therefore, This Evaluation Is Id ML0325503822003-08-29029 August 2003 Emergency Plan Implementing Procedures IAP-1, Rev. 31 and SAP-6, Rev. 20 ML0330000642003-08-20020 August 2003 Transmittal of Emergency Plan Implementing Procedure Revisions to EAP-1.1, EAP-8, EAP-17 and EAP-43 ML0323101632003-08-13013 August 2003 Emergency Plan and Implementing Procedures, Revision 24 to IAP-2, Vol. 2, Revision 10 to EAP-32 and Revision 37 to SAP-7 ML0323101732003-07-24024 July 2003 Emergency Plan and Implementing Procedures, Revision 36 to SAP-2 ML0317503162003-06-0909 June 2003 Emergency Plan and Implementing Procedures ML0314906822003-05-19019 May 2003 4 to Emergency Plan Implementing Procedure IAP-2, Classification of Emergency Conditions. ML0315001572003-05-19019 May 2003 Revisions to Emergency Plan Implementing Procedures, Including Rev 17 to EAP-6, In-Plant Emergency Survey/Entry, Rev 11 to EAP-9, Search & Rescue Operations & Rev 15 to EAP-14.6, Habitability of the Emergency Facilities. ML0315001582003-05-19019 May 2003 Revisions to Emergency Plan Implementing Procedures, Including Rev 6 to EAP-29, EOF Ventilation Isolation During an Emergency & Rev 1 to EAP-30, Emergency Termination & Transition to Recovery. ML0315702022003-05-19019 May 2003 Revised Emergency Plan and Implementing Procedures ML0307900172003-03-0707 March 2003 Emergency Plan & Implementing Procedures ML0305600932003-02-14014 February 2003 Emergency Plan and Implementing Procedures ML0304203272003-02-0505 February 2003 Emergency Plan & Implementing Procedures ML0303400432003-01-24024 January 2003 Submittal of Revisions to Emergency Plan and Implementing Procedures 2019-06-06 Category:Emergency Preparedness-Review of Emergency Plan Changes MONTHYEARML19246A7182019-08-23023 August 2019
[Table view]Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis JAFP-16-0162, Transmittal of Emergency Plan Updates2016-11-17017 November 2016 Transmittal of Emergency Plan Updates 2019-08-23 Category:Letter type:JAFP MONTHYEARJAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023
[Table view]License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 and Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0083, Notification of Readiness for NRC 95001 Inspection2021-09-0909 September 2021 Notification of Readiness for NRC 95001 Inspection JAFP-21-0081, Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2021-09-0303 September 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements JAFP-21-0075, Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2021-08-12012 August 2021 Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0073, Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance.2021-08-0909 August 2021 Response to Request for Additional Information Regarding Application to Revise the James A. FitzPatrick Nuclear Power Plant Limiting Condition for Operation (LCO) 3.5.1, ECCS - Operating Surveillance. JAFP-21-0069, Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-07-30030 July 2021 Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors JAFP-21-0070, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b2021-07-30030 July 2021 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk- Informed Extended Completion Times - RITSTF Initiative 4b JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0064, Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-07-0707 July 2021 Supplemental Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting JAFP-21-0053, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-14014 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0052, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0051, Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-13013 June 2021 Emergency License Amendment Request - One Time Extension to TS 3.5.1 Condition a, TS 3.6.1.9 Condition a, and TS 3.6.4.1 Condition a Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0050, Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement2021-06-12012 June 2021 Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments JAFP-21-0042, Reply to a Notice of Violation; EA-20-1382021-06-0303 June 2021 Reply to a Notice of Violation; EA-20-138 JAFP-21-0041, Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing2021-05-17017 May 2021 Supplement to Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing JAFP-21-0040, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2021-05-14014 May 2021 Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs 2023-08-31 |
Text
-,-
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.
James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 James D. Jones Emergency Preparedness Manager JAFP-16-0162 November 17, 2016 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Transmittal of Emergency Plan Updates James A. FitzPatrick Nuclear Power Plant Docket No.50-333 License No. DPR-059
Dear Sir or Madam:
The documents enclosed with this letter are changes to the James A. FitzPatrick Nuclear Power Plant's (JAF) Emergency Plan made pursuant to 10 CFR 50.54(q). This transmittal fulfills the requirements of 10 CFR 50.54(q), 10 CFR 50 Appendix E Section V, 10 CFR 70.32(i), and 10 CFR 72.44(f) to inform the commission of changes that have been made which do not decrease the effectiveness of the Emergency Plan.
The following documents (including change documentation and screening) are attached:
- APPENDIX C, Revision 38
- EAP-2, Revision 34
- EAP-3, Revision 27
- EAP-11, Revision 24
- EAP-19, Revision 30
- EAP-23, Revision 16
- EN-EP-301, Revision 4
- EN-EP-306, Revision 8
- EN-EP-308, Revision 4
- EN-EP-801, Revision 14
- SAP-23, Revision 2 This letter contains no new regulatory commitments.
If you should have any questions, please contact Mr. James D. Jones at (315) 349-6030.
t;yj~~coN)
I James D. Jones a~ '°fi(tW\1..v Emergency Preparedness Manager JDJ:pjp
JAFP-16-0162 Page 2 of 2 I Enclosure( s ):
Including change documentation and screening:
APPENDIX C, Revision 38 EAP-2, Revision 34
- EAP-3, Revision 27
- EAP-11, Revision 24
- EAP-19, Revision 30
- EAP-23, Revision 16
- EN-EP-301, Revision 4
- EN-EP-306, Revision 8
- EN-EP-308, Revision 4
- EN-EP-801, Revision 14
- SAP-23, Revision 2 cc w/o procedure documentation, evaluation and screening:
USNRC (l&E) Regional Administrator, Region I - Controlled - 2 Copies NRC Resident Inspector - Controlled - 1 Copy NRC Director NMSS - Uncontrolled - 1 Copy NRC Director Division of Spent Fuel Storage and Transportation - Uncontrolled - 1 Copy NRC Director, Division of Security Policy - Uncontrolled - 1 Copy NYSEMO - Controlled - 1 Copy OCEMO - Controlled - 1 Copy