|
---|
Category:Annual Operating Report
MONTHYEARJAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-21-0035, Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes, for 2019 and 20202021-05-0707 May 2021 Summary of Plant and Independent Spent Fuel Storage Installation Changes, Tests, and Experiments as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes, for 2019 and 2020 JAFP-20-0063, Submittal of 10 CFR 50.46 Annual Report2020-07-28028 July 2020 Submittal of 10 CFR 50.46 Annual Report JAFP-19-0072, 10 CFR 50.46 Annual Report2019-08-0101 August 2019 10 CFR 50.46 Annual Report JAFP-18-0069, Submittal of 10 CFR 50.46 Annual Report2018-08-0101 August 2018 Submittal of 10 CFR 50.46 Annual Report JAFP-17-0076, Submittal of 10 CFR 50.46 Annual Report2017-08-0101 August 2017 Submittal of 10 CFR 50.46 Annual Report JAFP-17-0046, 2016 Annual Radiological Environmental Operating Report2017-05-11011 May 2017 2016 Annual Radiological Environmental Operating Report JAFP-16-0121, James a FitzPatrick - Transmittal of 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2016-08-0101 August 2016 James a FitzPatrick - Transmittal of 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models JAFP-15-0092, James a FitzPatrick, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models2015-08-0303 August 2015 James a FitzPatrick, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models JAFP-14-0061, 2013 Annual Radiological Environmental Operating Report2014-05-13013 May 2014 2013 Annual Radiological Environmental Operating Report CNRO-2014-00003, Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G2014-04-25025 April 2014 Entergy Nuclear Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3) and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G JAFP-13-0067, Annual Radiological Environmental Operating Report2013-05-15015 May 2013 Annual Radiological Environmental Operating Report CNRO-2012-00003, Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2012-04-30030 April 2012 Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(d) Notification of Application of Approved Appendix B to 10CFR72 Subpart G JAFP-11-0097, James a FitzPatrick - 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models2011-08-0101 August 2011 James a FitzPatrick - 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models JAFP-11-0056, 2010 Annual Radiological Environmental Operating Report2011-05-13013 May 2011 2010 Annual Radiological Environmental Operating Report JAFP-11-0055, 2010 Annual Radioactive Effluent Release Report, for the Period of January 1, 2010 Through December 31, 20102011-04-29029 April 2011 2010 Annual Radioactive Effluent Release Report, for the Period of January 1, 2010 Through December 31, 2010 JAFP-10-0084, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models2010-07-31031 July 2010 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models JAFP-10-0055, Annual Radioactive Effluent Release Report2010-04-30030 April 2010 Annual Radioactive Effluent Release Report JAFP-10-0056, 2009 Annual Radiological Environmental Operating Report2009-12-31031 December 2009 2009 Annual Radiological Environmental Operating Report CNRO-2009-00006, Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G2009-04-13013 April 2009 Entergy Operations, Inc., Annual Report for Quality Assurance Program Manual Changes Under 10CFR50.54(a)(3) and 10CFR72.140(e) Notification of Application of Approved Appendix B to 10CFR72 Subpart G JAFP-07-0066, Transmittal of Annual Radiological Environmental Operating Report for the Period of January 1, 2006 Through December 31, 20062007-05-15015 May 2007 Transmittal of Annual Radiological Environmental Operating Report for the Period of January 1, 2006 Through December 31, 2006 ML0729605892007-05-15015 May 2007 Annual Radiological Environmental Operating Report; January 1, 2006 - December 31, 2006 JAFP-05-0069, Summary of Plant Changes, Tests, and Experiments for 2003 and 2004 as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes for 2003 and 20042005-05-0505 May 2005 Summary of Plant Changes, Tests, and Experiments for 2003 and 2004 as Required by 10 CFR 50.59 and 10 CFR 72.48, and Summary of Commitment Changes for 2003 and 2004 ML0534202162004-12-31031 December 2004 Annual Radiological Environmental Operating Report - 2004 ML0534202132003-12-31031 December 2003 Annual Radiological Environmental Operating Report. - 2003 JAFP-03-0124, CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models2003-08-28028 August 2003 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models JAFP-03-0065, Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/20022003-05-12012 May 2003 Summary of Plant Changes, Tests, & Experiments for 2001/2002 as Required by 10 CFR 50.59 & 10 CFR 72.48, & Summary of Commitment Changes for 2001/2002 ML0534202102002-12-31031 December 2002 Annual Radiological Environmental Operating Report - 2002 ML18018B0491977-02-25025 February 1977 Letter Enclosing the Annual Environmental Operating Report January 1, 1976 - December 31, 1976 2024-07-31
[Table view] Category:Emergency Preparedness-Emergency Plan
MONTHYEARRS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-21-0071, 10 CFR 50.46 Annual Report2021-07-29029 July 2021 10 CFR 50.46 Annual Report JAFP-18-0049, Oswego County and New York State Participation in the James A. FitzPatrick Nuclear Power Plant Emergency Plan2018-05-11011 May 2018 Oswego County and New York State Participation in the James A. FitzPatrick Nuclear Power Plant Emergency Plan ML18128A0832018-04-30030 April 2018 Attachment 4 - EP-AA-1014, Revision 1, Exelon Nuclear Radiological Emergency Plan Annex for James A. FitzPatrick Station. ML18128A0882018-04-30030 April 2018 Attachment 7 - EP-AA-1014, Addendum 3, Revision 0, James A. FitzPatrick Nuclear Power Plant Emergency Action Levels. NMP1L3209, Attachment 2 - EP-AA-1011, Revision 2, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station.2018-04-30030 April 2018 Attachment 2 - EP-AA-1011, Revision 2, Exelon Nuclear Radiological Emergency Plan Annex for Calvert Cliffs Station. ML18128A0842018-04-26026 April 2018 Attachment 5 - EP-AA-1014, Addendum 1, Revision 0, On-Shift Staffing Analysis Report for James A. FitzPatrick Nuclear Power Plant. ML18128A0802018-04-26026 April 2018 Attachment 1 - 10CFR50.54(q)(5) Change Summary Analysis ML18128A0792018-04-26026 April 2018 James A. FitzPatrick Nuclear Power Plant and Independent Spent Fuel Storage Installations and Nine Mile Point, Units 1 and 2, Submittal of Emergency Plan Addendum and Annex Revisions ML18128A0822018-03-31031 March 2018 Attachment 3 - EP-AA-1014, Revision 0, Exelon Nuclear Radiological Emergency Plan Annex for James A. FitzPatrick Station. ML18128A0892018-03-31031 March 2018 Attachment 8 - EP-AA-1013, Revision 5, Exelon Nuclear Radiological Emergency Plan Annex for Nine Mile Point Station. ML18037A7902018-01-31031 January 2018 Enclosure 2B- EAL Red-Line Basis Document JAFP-18-0014, Enclosure 2A- EAL Comparison Matrix Document2018-01-31031 January 2018 Enclosure 2A- EAL Comparison Matrix Document JAFP-18-0014, Enclosure 2C- EAL Basis Document2018-01-31031 January 2018 Enclosure 2C- EAL Basis Document ML18037A7882018-01-31031 January 2018 Enclosure 2A- EAL Comparison Matrix Document ML18037A7922018-01-31031 January 2018 Enclosure 2C- EAL Basis Document ML18037A7932018-01-31031 January 2018 Enclosure 2D- EAL Front Matter ML18037A7952018-01-31031 January 2018 Enclosure 2E- Procedure Matrix ML17178A3672017-06-21021 June 2017 Transmittal of Emergency Plan Updates JAFP-17-0060, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates2017-06-21021 June 2017 James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates JAFP-17-0060, Emergency Plan Volume 12017-05-31031 May 2017 Emergency Plan Volume 1 JAFP-17-0050, Exigent License Amendment Request to Revise Emergency Action Level HU1.52017-05-19019 May 2017 Exigent License Amendment Request to Revise Emergency Action Level HU1.5 JAFP-17-0022, Transmittal of Emergency Plan Updates2017-03-17017 March 2017 Transmittal of Emergency Plan Updates ML17066A3002017-03-15015 March 2017 Transmittal of Emergency Plan Updates JAFP-17-0015, James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates2017-03-15015 March 2017 James A. FitzPatrick Nuclear Power Plant - Transmittal of Emergency Plan Updates JAFP-17-0015, Emergency Plan Updates2017-03-15015 March 2017 Emergency Plan Updates JAFP-16-0184, Transmittal of Emergency Plan Updates2016-12-12012 December 2016 Transmittal of Emergency Plan Updates JAFP-16-0162, Transmittal of Emergency Plan Updates2016-11-17017 November 2016 Transmittal of Emergency Plan Updates JAFP-16-0144, Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 122016-09-19019 September 2016 Transmittal of 6 Emergency Plan Updates: EAP-4A, Rev. 0 (Editorial Correction); EAP-4B, Rev. 1 (Editorial Correction); EAP-17, Rev. 125; EN-EP-310, Rev. 5; EN-EP-311, Rev. 3; SAP-17, Rev. 12 JAFP-16-0126, Submittal of Emergency Plan Updates2016-08-0808 August 2016 Submittal of Emergency Plan Updates JAFP-16-0109, Transmittal of Emergency Plan Updates2016-06-21021 June 2016 Transmittal of Emergency Plan Updates JAFP-16-0104, James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 322016-06-15015 June 2016 James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 JAFP-16-0104, Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 272016-06-15015 June 2016 Emergency Plan Update, Emergency Plan, Volume 2, Rev. 23 and Volume 3, Rev. 27 ML16188A1842016-06-15015 June 2016 James A. Fitzpatrick Nuclear Power Plant Emergency Plan Update, Emergency Plan Volume 1, Rev. 32 JAFP-16-0094, Transmittal of Emergency Plan Updates for James A. Fitzpatrick Nuclear Power Plant2016-05-31031 May 2016 Transmittal of Emergency Plan Updates for James A. Fitzpatrick Nuclear Power Plant JAFP-16-0086, Transmittal of Emergency Plan Updates2016-05-20020 May 2016 Transmittal of Emergency Plan Updates JAFP-16-0043, Emergency Plan, Revision 36 Section 6, Revision 35, Section 7; Revision, 37 SAP-20; Revision 13, Appendix J; Revision 34, IAP-2; Revision 10, IAP-2 Figure IAP-2.12016-03-0707 March 2016 Emergency Plan, Revision 36 Section 6, Revision 35, Section 7; Revision, 37 SAP-20; Revision 13, Appendix J; Revision 34, IAP-2; Revision 10, IAP-2 Figure IAP-2.1 ML18128A0862016-02-24024 February 2016 Attachment 6 - EP-AA-1014, Addendum 2, Revision 0, James A. FitzPatrick Nuclear Power Plant Evacuation Time Estimates. ML12215A0042012-07-19019 July 2012 After Action Report/Improvement Plan Excercise Date - June 21, 2011 ML12215A0032012-07-19019 July 2012 After Action Report/ Improvement Plan, Exercise Date - June 22-23, 2011 ML0532604832003-08-31031 August 2003 Enclosure I, Appendix F Evacuation Time Estimates for the James A. Fitzpatrick/Nine Mile Point Emergency Planning Zone (Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Station Are Collocated Therefore, This Evaluation Is Id 2024-07-12
[Table view] Category:Letter type:JAFP
MONTHYEARJAFP-24-0055, Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation2024-10-29029 October 2024 Response to Request for Additional Information for License Amendment Request to Add Temporary Change to TS 3.3.2.1, Condition C, Control Rod Block Instrumentation JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0065, License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2023-12-14014 December 2023 License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications JAFP-23-0069, Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request – Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements JAFP-23-0057, And Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 And Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation JAFP-23-0064, Emergency Plan Document Revision2023-11-15015 November 2023 Emergency Plan Document Revision JAFP-23-0063, Registration of Spent Fuel Cask Use2023-11-13013 November 2023 Registration of Spent Fuel Cask Use JAFP-23-0059, Registration of Spent Fuel Cask Use2023-10-24024 October 2023 Registration of Spent Fuel Cask Use JAFP-23-0050, Physical Security Plan, Revision 242023-08-31031 August 2023 Physical Security Plan, Revision 24 JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-31031 August 2023 Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0047, Correction to the 2022 Annual Radioactive Effluent Release Report2023-08-30030 August 2023 Correction to the 2022 Annual Radioactive Effluent Release Report JAFP-23-0040, License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2023-08-0303 August 2023 License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-23-0043, 10 CFR 50.46 Annual Report2023-07-31031 July 2023 10 CFR 50.46 Annual Report JAFP-23-0038, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2023-07-28028 July 2023 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-23-0033, License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation2023-06-28028 June 2023 License Amendment Request - Technical Specifications (TS) Section 3.3.1.2, Source Range Monitors (SRM) Instrumentation JAFP-23-0025, 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Annual Radiological Environmental Operating Report JAFP-23-0023, 2022 Annual Radioactive Effluent Release Report2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report JAFP-23-0010, 2022 REIRS Transmittal of NRC Form 52023-03-20020 March 2023 2022 REIRS Transmittal of NRC Form 5 JAFP-23-0008, Supplement to Inservice Inspection Summary Report Cycle 252023-02-22022 February 2023 Supplement to Inservice Inspection Summary Report Cycle 25 JAFP-22-0053, Inservice Inspection Summary Report Cycle 252022-12-20020 December 2022 Inservice Inspection Summary Report Cycle 25 JAFP-22-0046, Core Operating Limits Report Cycle 262022-10-17017 October 2022 Core Operating Limits Report Cycle 26 JAFP-22-0040, 10 CFR 50.46 Annual Report2022-07-29029 July 2022 10 CFR 50.46 Annual Report JAFP-22-0033, Core Operating Limits Report Mid-Cycle 252022-06-23023 June 2022 Core Operating Limits Report Mid-Cycle 25 JAFP-22-0032, Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b..2022-06-16016 June 2022 Response to Request for Additional Information for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b.. JAFP-22-0030, Oswego County and New York State Participation in the Emergency Plan2022-05-13013 May 2022 Oswego County and New York State Participation in the Emergency Plan JAFP-22-0029, 2021 Annual Radiological Environmental Operating Report2022-05-11011 May 2022 2021 Annual Radiological Environmental Operating Report JAFP-22-0028, 2021 Annual Radioactive Effluent Release Report2022-04-27027 April 2022 2021 Annual Radioactive Effluent Release Report JAFP-22-0026, 2021 REIRS Transmittal of NRC Form 52022-04-0707 April 2022 2021 REIRS Transmittal of NRC Form 5 JAFP-22-2020, Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Info2022-03-0404 March 2022 Supplemental Information No. 1 for James A. FitzPatrick Nuclear Power Plant to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b. and 10CFR 50.69, Risk-Informed JAFP-22-0017, Amendments to Indemnity Agreements2022-02-15015 February 2022 Amendments to Indemnity Agreements JAFP-22-0007, Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102022-01-31031 January 2022 Summary of Changes to Exelon Generation Company, LLC, Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 JAFP-22-0010, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments2022-01-24024 January 2022 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Draft Conforming License Amendments JAFP-22-0008, Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary2022-01-14014 January 2022 Response to Request for Supplemental Information by the Office of Nuclear Reactor Regulation to Support Review of a License Amendment Request to Eliminate Selected Response Time Testing for Reactor Protection System and Primary JAFP-21-0093, Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation2021-10-18018 October 2021 Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation 2024-09-25
[Table view] |
Text
10 CFR 50.46 JAFP-21-0071 July 29, 2021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 James A. FitzPatrick Nuclear Power Plant Renewed Facility Operating License No. DPR-59 NRC Docket No. 50-333
Subject:
10 CFR 50.46 Annual Report The purpose of this letter is to submit the 10 CFR 50.46 reporting information for James A. FitzPatrick Nuclear Power Plant (JAF). The most recent 10 CFR 50.46 Annual Report for JAF was provided on July 28, 2020 (JAFP-20-0063).
Two attachments are included in this letter that provide the current JAF 10 CFR 50.46 status. Attachment 1, "Peak Cladding Temperature (PCT) Rack-Up Sheet", provides updated information regarding the PCT for the limiting analysis and Attachment 2, "Assessment Notes", contains a detailed description of each change or error reported.
No new regulatory commitments are established in this submittal.
If additional information is needed, please contact Christian Williams at (610) 765-5729.
Respectfully, David T. Gudger Senior Manager, Licensing Exelon Generation Company, LLC Attachments: 1) Peak Cladding Temperature Rack-Up Sheet
- 2) Assessment Notes cc: USNRC Administrator, Region I USNRC Project Manager, JAF USNRC Senior Resident Inspector, JAF A. L. Peterson, NYSERDA
ATTACHMENT 1 Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Peak Cladding Temperature Rack-Up Sheet for JAF
Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Attachment 1 Peak Cladding Temperature Rack-Up Sheet for JAF Page 1 of 2 PLANT NAME: James A. FitzPatrick ECCS EVALUATION MODEL: SAFER/GESTR-LOCA supplemented with PRIME REPORT REVISION DATE: 07/29/2021 CURRENT OPERATING CYCLE: 25 ANALYSIS OF RECORD CALCULATIONS
- 1. 0000-0076-4111-R0 Rev 0, James A. Fitzpatrick Nuclear Power Plant GNF2 ECCS-LOCA Evaluation, August 2008 (JAF-RPT-08-00014 Rev 0)
Fuels Analyzed in Calculations and in Operation: GNF2 Limiting Fuel Type: GNF2 Limiting Single Failure: Battery Failure Limiting Break Size and Location: Double-Ended Guillotine in a Recirculation Suction Pipe Reference Peak Cladding Temperature (PCT): GNF2 = 1800 °F MARGIN ALLOCATION A. PRIOR LOCA MODEL ASSESSMENTS 10 CFR 50.46 Report dated December 22, 2008 (Note 1) GNF2: PCT = 0 10 CFR 50.46 Report dated July 31, 2009 (Note 2) GNF2: PCT = 0 10 CFR 50.46 Report dated July 31, 2010 (Note 3) GNF2: PCT = 0 10 CFR 50.46 Report dated August 1, 2011 (Note 4) GNF2: PCT = 50 10 CFR 50.46 Report dated August 1, 2012 (Note 5) GNF2: PCT = 0 10 CFR 50.46 Report dated August 1, 2013 (Note 6) GNF2: PCT = 40 10 CFR 50.46 Report dated August 1, 2014 (Note 7) GNF2: PCT = 35 10 CFR 50.46 Report dated August 3, 2015 (Note 8) GNF2: PCT = -25 10 CFR 50.46 Report dated August 1, 2016 (Note 9) GNF2: PCT = 0 10 CFR 50.46 Report dated August 1, 2017 (Note 10) GNF2: PCT = 0 10 CFR 50.46 Report dated August 1, 2018 (Note 11) GNF2: PCT = 0 10 CFR 50.46 Report dated August 1, 2019 (Note 12) GNF2: PCT = 0 10 CFR 50.46 Report dated July 28, 2020 (Note 13) GNF2: PCT = 0 NET PCT GNF2: 1900 °F
Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Attachment 1 Peak Cladding Temperature Rack-Up Sheet for JAF Page 2 of 2 B. CURRENT LOCA MODEL ASSESSMENTS Notification 2021-01 (Note 14) GNF2: PCT = 0 Notification 2021-02 (Note 14) GNF2: PCT = 0 Total PCT change from current assessments GNF2: PCT = 0 Cumulative PCT change from current assessments GNF2: lPCTl = 0 NET PCT GNF2: 1900 °F
ATTACHMENT 2 Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Assessment Notes for JAF
Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Attachment 2 Assessment Notes for JAF Page 1 of 4
- 1) Prior LOCA Model Assessment GNF2 fuel was first installed during Refueling Outage 18, October 2008.
No changes or errors were reported against GNF2 during this reporting period.
[
Reference:
Letter from E. Dorman (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-08-0133, 10 CFR 50.46 Annual Report - Errors in Emergency Core Cooling System (ECCS) Evaluation Models, dated December 22, 2008.]
- 2) Prior LOCA Model Assessment No changes or errors were reported against GNF2 during this reporting period.
[
Reference:
Letter from J. Pechacek (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-09-0091, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models, dated July 31, 2009.]
- 3) Prior LOCA Model Assessment No changes or errors were reported against GNF2 during this reporting period.
[
Reference:
Letter from J. Pechacek (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-10-0084, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models, dated July 31, 2010.]
- 4) Prior LOCA Model Assessment Two errors were reported against GNF2 fuel during this reporting period.
Error 2011-02 described the database error for heat deposition on peak cladding temperature (PCT) for 10x10 fuel bundles. The error was estimated to increase the GNF2 PCT by +45 F.
Error 2011-03 described the updated formulation for gamma heat deposition to the channel wall for 10x10 fuel bundles. The error was estimated to increase the GNF2 PCT by +5 F.
[
Reference:
Letter from Eugene W. Dorman (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-11-0097, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System (ECCS) Evaluation Models, dated August 1, 2011.]
Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Attachment 2 Assessment Notes for JAF Page 2 of 4
- 5) Prior LOCA Model Assessment No changes or errors were reported against GNF2 during this reporting period.
[
Reference:
Letter from Jorge OFarrill (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-12-0089, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models, dated August 1, 2012.]
- 6) Prior LOCA Model Assessment One change was reported against GNF2 during this reporting period.
Change 2012-01 described the impact from PRIME implementation to compute fuel properties.
The error was estimated to increase the GNF2 PCT by +40 F.
[
Reference:
Letter from Chris M. Adner (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-13-0096, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models, dated August 1, 2013.]
- 7) Prior LOCA Model Assessment Four changes and errors were reported against GNF2 fuel during this reporting period.
Change 2014-01 described code maintenance changes. These changes were estimated to have no impact upon the GNF2 PCT.
Error 2014-02 described a mass non-conservatism. The error was estimated to increase the GNF2 PCT by +10 F.
Error 2014-03 described an error in the minimum core differential pressure model. The error was estimated to increase the GNF2 PCT by +20 F.
Error 2014-04 Rev 0 described an error in the bundle / lower plenum counter-current flow-limited head model. The error was estimated to increase the GNF2 PCT by +5 F.
[
Reference:
Letter from Chris M. Adner (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-14-0094, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models, dated August 1, 2014.]
Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Attachment 2 Assessment Notes for JAF Page 3 of 4
- 8) Prior LOCA Model Assessment One error was reported against GNF2 fuel during this reporting period.
Error 2014-04 Rev 1 was issued as a revision to error notification 2014-04 Rev 0 (Note 7). The revision identified a change to the hot bundle pressure head used as input to the counter-current flow-limited head model that resulted in a benefit (PCT reduction). With this revised notice, the prior PCT change of +5 F was replaced by a PCT change of -20 F. Consequently, the error was estimated to have a net change upon GNF2 PCT of -25 F.
[
Reference:
Letter from Chris M. Adner (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-15-0092, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models, dated August 3, 2015.]
- 9) Prior LOCA Model Assessment No changes or errors were reported against GNF2 during this reporting period.
[
Reference:
Letter from William C. Drews (Entergy Nuclear Operations) to the U.S. Nuclear Regulatory Commission, JAFP-16-0121, 10 CFR 50.46 Annual Report - Changes and Errors in Emergency Core Cooling System Evaluation Models, dated August 1, 2016.]
- 10) Prior LOCA Model Assessment One error was reported against GNF2 during this reporting period.
Error 2017-01 identifies that the GNF2 leakage paths between the bundle and the bypass (lower tie plate flow hole and channel to lower tie plate interface) were incorrectly modeled. The error was estimated to have no impact upon the GNF2 PCT.
[
Reference:
Letter from James Barstow (Exelon Generation) to the U.S. Nuclear Regulatory Commission, JAFP-17-0076, 10 CFR 50.46 Annual Report, dated August 1, 2017.]
- 11) Prior LOCA Model Assessment One error was reported against GNF2 during this reporting period.
Change 2017-02 describes a change in the GNF2 upper plenum model. The generic upper plenum model was changed to more explicitly model the GNF2 fuel design. The change was estimated to have no impact upon the GNF2 PCT.
[
Reference:
Letter from James Barstow (Exelon Generation) to the U.S. Nuclear Regulatory Commission, JAFP-18-0069, 10 CFR 50.46 Annual Report, dated August 1, 2018.]
Annual Report of the Emergency Core Cooling System Evaluation Model Changes and Errors Assessments as of July 29, 2021 Attachment 2 Assessment Notes for JAF Page 4 of 4
- 12) Prior LOCA Model Assessment No changes or errors were reported against GNF2 during this reporting period.
[
Reference:
Letter from James Barstow (Exelon Generation) to the U.S. Nuclear Regulatory Commission, JAFP-19-0072, 10 CFR 50.46 Annual Report, dated August 1, 2019.]
- 13) Prior LOCA Model Assessment Notification 2019-05 identifies that the upper and lower limits for the SAFER code forward and backward bypass leakage were coded incorrectly for the control rod guide tube to control rod drive housing interface backward leakage path. The error was estimated to have zero degree upon the GNF2 PCT.
Notification 2020-01 identifies that the PRIME code contained errors in irradiation growth after a breakaway neutron fluence, thermal conductivity applied to the zirconium barrier for cladding temperature drop, and gap conductance during pellet-cladding gap closure. The errors were estimated to have zero degree impact upon the GNF2 PCT.
[
Reference:
Letter from David T. Gudger (Exelon Generation) to the U.S. Nuclear Regulatory Commission, JAFP-20-0063, 10 CFR 50.46 Annual Report, dated July 28, 2020.]
- 14) Current LOCA Model Assessment Notification 2021-01 identifies an error in the fuel rod stress and perforation model due to an incorrect value used for the fuel pellet to plenum spring conductance input. The error was a result of an incorrect conversion from SI units in preparing the input for SAFER analyses. The error was estimated to have a zero degree impact upon the GNF2 PCT.
Notification 2021-02 identifies an error in the inner cladding surface roughness value in the gap conductance model. An inconsistency was identified between the roughness value used in the fuel performance model PRIME and the input to the SAFER and TRACG calculations. The error was estimated to have a zero degree impact upon the GNF2 PCT.