| #REDIRECT [[L-2016-138, Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval]]
| | {{Adams |
| | | number = ML16202A150 |
| | | issue date = 07/12/2016 |
| | | title = Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval |
| | | author name = Summers T |
| | | author affiliation = Florida Power & Light Co |
| | | addressee name = |
| | | addressee affiliation = NRC/Document Control Desk, NRC/NRR |
| | | docket = 05000251 |
| | | license number = |
| | | contact person = |
| | | case reference number = ISI-PTN-4-2016, L-2016-138 |
| | | document type = Inservice/Preservice Inspection and Test Report, Letter |
| | | page count = 6 |
| | | project = |
| | | stage = Other |
| | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 lnservice Inspection Program Owner's Activity Report (OAR-1) JUL 1 2 2016 L-2016-138 10 CFR 50.55a Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 4 Fifth lnservice Inspection Interval, First Period, Second Outage (PTN 4-29). The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4. Should there be any questions concerning this report, please contact Mr. Mitch Guth, Licensing Manag_er, at 305-246-6698. |
| | Sincerely, Vice President Turkey Point Nuclear Plant |
| | * SM Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9760 S.W. 344 111 Street Homestead, FL 33035 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISl.,.PTN-4-2016 ) Plant: Turkey Point Nuclear Power Plant Unit 4 9760 SW-344th street Homestead, Florida 33035 EC-286459 Rev. O PTN-ENG-SESJ-16-009 Page 1 of5 Commercial Service Date: September |
| | : 7. 1973 Refueling Outage No.: PTN 4-29 Current lnspectionlnterval: |
| | ISi-Fifth IWE*Second Current Inspection Period: ISi Fifth Interval-First and IWE-Third Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition with Addenda through 2008 and IWE .. 2001 with Addenda through 2o03. * -* -* --Date and Revision of inspection plans: ISi Fifth Interval Effective-January |
| | : 21. 2015 Rev.a and !WE-April 5, 2016. Rev.1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: ASME Section XI 2007 Edition through 2008 Addenda |
| | * Code Cases Used: Approved Code Cases listed in lnspedion Plan CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) tne examinations and tests meet the Inspection plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluation.s supporting the completion of PTN4-29 conform to the requirements of Section XI. Signed |
| | /d,,,r:.u;, £dt;f'Re'&uP( rr<"' Date --..... |
| | ..... rZ_z_c---+- |
| | __ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National B.oard of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the reqt:Jirements of Section XI. By signing this certificate neither the Inspector nor his employer mfilkes any warranty, expressed |
| | *or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with Commissions N_B 1¢2'1.2 .4,,,J, 1 &eol<l c,,4 98.:3 National Board, State, Province and |
| | * I, ' : . : : : '. '' I' : I ; : ' 1 : I . |
| | FORM OAR-1 OWNER'S ACTIVITY REPORT r i. TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None |
| | *-3 --FORM OAR-1 OWNER'S ACTIVITY .REPORT TABLE2 ABSTRACT OF REPAIR/Rl;PLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number Steam 1 Generator Replace Bolt 04/25/2016 RR40350540-01 4E210A .. ** Steam 1 Generator Install Tube Plug 04/25/2016 RR40350547-01 4E210B 1 Snubber Replace bolting 04/08/2016 RR40364134-36 4-1053 on support 1 Safety Valve Replace one 04/25/2016 RR40365695-01 RV-4,.5518 stud aild nut -1 Piping at Pen-11 Prep for NOE 04/14/2016 RR40459962-01 . Piping Modify piping for 2 RCP 04/25/2016 RR40273327-18 4P200A modification Piping Modify piping for 2 RCP 04/25/2016 RR40361761-18. |
| | 4P200B modification Piping Modify piping for I 2 4P200C RCP 04/25/2016 RR40361762-21 modification |
| | .. 2 Control Valve Replace Bolting 04/25/2016 RR40273327-26 CV-4-303A |
| | -*'. ! FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2-ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement |
| | * pescription Of Work Completed Plan.Number |
| | ',--2 Control Valve Replace Bolting 04/25/2016 RR40361761-26 cv4..:303s 2 Control Valve Replace Bolting 04/25/2016 RR40361762-26 CV-4-303C 2 Support Cut and weld 04/09/2016 RR40365364-06 4P214B support 2 Relief Valve Replace Bolting 04/25/2016 RR40303578-01 RV-4-1403 2 Snubber Support Modify Support 04/21/2016 RR40343601-01 4-1105, 4-1106 2 Snubber Support Replace 04/21/2016 RR4Q459254-01 4-1106 Sn_uobers 2 Relief Valve Replace Bolting 04/25/2016 RR40350593-01 RV-4-1407 |
| | *. 2 Flange Replace Bolting 04/25/2016 RR40368049-01 FE-4-127 2 Valve Replace Bolting 04/25/2016 RR40366792-01 CV-4-2902 Containment Cut and Reroute 2 Spray Full-Flow piping during 03/24/2016 RR40369651-54 Recirculation ccw Piping modification I i FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT 0.F REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date ' Repair/Replacement Description Of Work Completed Plan Number Heat Exchanger Retube and 3 bolting 03/12/2015 RR40088999-01 4E207A replacement 3 Heat Exchanger Replace Bolting 12/24/2015 RR40397 457-02 4E207C 3 Heat Exchanger Replace Bolting 01/15/2016 RR40434157-01 4E207B Heat Exchanger Retube and 3 bolting ' 04/10/2015 RR40089001-01 4E207C replacement Fukushima 3 Tank Modification, 11/25/2014 RR40318922-05 4T8 Add Emergency Connection Piping Flange 3 ICW Crawl-thru Replace Bolting 04/21/.2016 RR40350677-01 Flanges Piping Flange 3 ICW Crawl-thru Replace Bolting . 04/21/2016 RR40350677-1 O Flanges}} |
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARL-2024-044, Revised Steam Generator Tube Inspection Reports2024-03-19019 March 2024 Revised Steam Generator Tube Inspection Reports L-2024-007, Inservice Inspection Program Owners Activity Report (OAR-1)2024-01-18018 January 2024 Inservice Inspection Program Owners Activity Report (OAR-1) L-2023-115, Inservice Inspection Program Owner'S Activity Report (OAR-1)2023-08-21021 August 2023 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2022-149, U4R33 Steam Generator Tube Inspection Report2022-10-0404 October 2022 U4R33 Steam Generator Tube Inspection Report L-2022-109, Inservice Inspection Program - Owner'S Activity Report (OAR-1)2022-06-27027 June 2022 Inservice Inspection Program - Owner'S Activity Report (OAR-1) L-2022-035, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II2022-03-10010 March 2022 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 Part-II L-2022-027, Inservice Inspection Program Owner'S Activity Report (OAR-1)2022-02-17017 February 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2021-183, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 102021-09-30030 September 2021 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 10 L-2021-042, Inservice Inspection Program Owner'S Activity Report (OAR-1)2021-02-15015 February 2021 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2020-126, ln-Service Inspection Program Owner'S Activity Report (OAR-1)2020-07-24024 July 2020 ln-Service Inspection Program Owner'S Activity Report (OAR-1) L-2020-074, Response to Request for Additional Information for Relief Request No. 62020-04-15015 April 2020 Response to Request for Additional Information for Relief Request No. 6 L-2020-056, Fifth Ten-Year Inservice Inspection Interval Relief Request No. 62020-03-30030 March 2020 Fifth Ten-Year Inservice Inspection Interval Relief Request No. 6 L-2019-175, Steam Generator Tube Inspection Report2019-09-25025 September 2019 Steam Generator Tube Inspection Report ML19189A3532019-07-0808 July 2019 Inservice Inspection Program: Owner'S Activity Report (OAR-1) L-2019-018, Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-1)2019-02-0707 February 2019 Submittal of Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2018-232, Metamic Inservice Surveillance Campaign Summary Report2018-12-13013 December 2018 Metamic Inservice Surveillance Campaign Summary Report L-2017-132, Inservice Inspection Program Owner'S Activity Reports2017-07-20020 July 2017 Inservice Inspection Program Owner'S Activity Reports L-2016-138, Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval2016-07-12012 July 2016 Inservice Inspection Program Owner'S Activity Report for Fifth Inservice Inspection Interval L-2016-139, Fifth 10-Year Interval Inservice Testing Program Plan2016-07-0606 July 2016 Fifth 10-Year Interval Inservice Testing Program Plan L-2016-044, Inservice Inspection Program Owner'S Activity Report2016-02-26026 February 2016 Inservice Inspection Program Owner'S Activity Report L-2015-223, Fifth Ten-Year Interval Inservice Testing (IST) Program Relief Request No. PR-01-Resubmittal2015-09-25025 September 2015 Fifth Ten-Year Interval Inservice Testing (IST) Program Relief Request No. PR-01-Resubmittal L-2015-101, Submittal of Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 32015-06-0808 June 2015 Submittal of Fifth Ten-Year Inservice Inspection (ISI) Interval Relief Request No. 3 L-2015-098, Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-012015-05-12012 May 2015 Fifth Ten-Year Interval Inservice Testing (IST) Program, Relief Request No. PR-01 L-2015-040, Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan2015-03-11011 March 2015 Submittal of Fifth 10 Year Interval Inservice Inspection (ISI) Program Plan ML15077A2142015-03-0202 March 2015 Inservice Inspection Plan - Fifth Inspection Interval, Relief Request No. 1, Revision 1 L-2015-020, Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 172015-02-13013 February 2015 Closeout of the Fourth Ten-Year Inservice Inspection (ISI) Interval Relief Requests Nos. 15, 16, 17 L-2015-012, Inservice Inspection Program Owner'S Activity Report (OAR-1)2015-01-16016 January 2015 Inservice Inspection Program Owner'S Activity Report (OAR-1) L-2014-105, Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information2014-04-14014 April 2014 Inservice Inspection Plan - Fifth Inspection Interval, Unit 3 Relief Request No. 1 - Response to Follow-up Request for Additional Information L-2014-096, Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 12014-04-0404 April 2014 Inservice Inspection Plan - Fifth Inspection Interval Unit 3 Relief Request No. 1 L-2014-040, Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 42014-02-13013 February 2014 Letter Regarding Inservice Testing Program-Extension of Interval for Turkey Point, Units 3 and 4 L-2013-113, Inservice Inspection Plan Submittal of Relief Request No. 122013-05-24024 May 2013 Inservice Inspection Plan Submittal of Relief Request No. 12 L-2012-435, Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1)2012-12-0303 December 2012 Inservice Inspection Program Fourth Interval-Third Period-First Refueling Outage Owner'S Activity Report (OAR-1) L-2012-214, License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program2012-05-16016 May 2012 License Renewal Commitment, Submittal of Pressurizer Surge Line Welds Inspection Program ML11361A3812012-01-27027 January 2012 Summary of the Staff'S Review of the Steam Generator Tube Inservice Inspection Refueling Outage 25 L-2011-254, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)2011-08-0505 August 2011 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) L-2011-119, Submittal of Steam Generator Tube Inspection Report2011-04-19019 April 2011 Submittal of Steam Generator Tube Inspection Report L-2011-042, Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1)2011-02-0707 February 2011 Inservice Inspection Program Fourth Interval-Second Period-Third Refueling Outage Owner'S Activity Report (OAR-1) L-2010-250, Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair2010-10-27027 October 2010 Fourth Inservice Inspection Interval, Relief Request No. 9, Visual Examination of Containment Liner Repair L-2010-042, Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1)2010-02-26026 February 2010 Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1) L-2009-167, Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1)2009-08-0606 August 2009 Inservice Inspection Program Fourth Interval-Second Period-Second Refueling Outage Owner'S Activity Report (OAR-1) L-2008-003, Inservice Inspection Report2008-01-10010 January 2008 Inservice Inspection Report L-2007-036, Inservice Inspection Report2007-03-0808 March 2007 Inservice Inspection Report L-2006-158, Inservice Inspection Record2006-06-28028 June 2006 Inservice Inspection Record L-2006-062, Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice Inspection Report2006-02-27027 February 2006 Response to Request for Additional Information Regarding Steam Generator Tube Plugging Inservice Inspection Report L-2005-190, 2005 Inservice Inspection Report2005-09-0808 September 2005 2005 Inservice Inspection Report L-2005-137, Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report2005-06-17017 June 2005 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report L-2005-046, Refueling Outage Summary of Inservice Inspection Examinations.2005-02-15015 February 2005 Refueling Outage Summary of Inservice Inspection Examinations. L-2004-217, Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report2004-10-12012 October 2004 Steam Generator Tube Plugging Inservice Inspection 12-Month Special Report L-2004-046, Inservice Inspection (ISI) Program Missing Pages from Fpl'S Letter L-2004-046, Dated March 11, 20042004-04-29029 April 2004 Inservice Inspection (ISI) Program Missing Pages from Fpl'S Letter L-2004-046, Dated March 11, 2004 L-2004-043, Submittal of Fourth 10-year Testing Interval IST Program, Revision 0, Beginning February 22, 2004 for Turkey Point Unit 3 and April 15, 2004 for Turkey Point Unit 42004-03-11011 March 2004 Submittal of Fourth 10-year Testing Interval IST Program, Revision 0, Beginning February 22, 2004 for Turkey Point Unit 3 and April 15, 2004 for Turkey Point Unit 4 2024-03-19
[Table view] Category:Letter
MONTHYEARML24276A2302024-10-16016 October 2024 Westinghouse Topical Report – Request for Withholding Information from Public Disclosure ML24289A2372024-10-15015 October 2024 Transmittal of Revision 1 Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) L-2024-157, Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles2024-10-0303 October 2024 Response to Requests for Additional Information Regarding License Amendment Request (278) to Facilitate a Transition to 24-Month Fuel Cycles IR 05000250/20243012024-10-0303 October 2024 NRC Operator License Examination Report 05000250/2024301 and 05000251/2024301 L-2024-147, Submission of Periodic Reports2024-10-0101 October 2024 Submission of Periodic Reports L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24262A2272024-09-18018 September 2024 Transmittal of Additional Errata Pages for WCAP-18830-P (Proprietary) and WCAP-18830-NP (Non-Proprietary), Turkey Point Fuel Storage Criticality Analysis for 24 Month Cycles ML24260A2262024-09-18018 September 2024 NRC Examination Results Summary - Examination Reports: 05000250/2024301 and 05000251/2024301 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24207A0342024-09-13013 September 2024 – Exemption from Certain Requirements of 10 CFR 50.46 for Use of Axiom Fuel Rod Cladding – Letter ML24256A1132024-09-13013 September 2024 Regulatory Audit Summary Related to the Review of Regarding the Updated Spent Fuel Pool Criticality Safety Analysis License Amendment Request IR 05000250/20240052024-08-23023 August 2024 Updated Inspection Plan for Turkey Point Units 3 & 4 - Report 05000250/2024005 and 05000251/2024005 ML24234A0062024-08-22022 August 2024 Project Manager Assignment L-2024-106, Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-022024-08-12012 August 2024 Fifth and Sixth 10-Year Inservice Testing Interval Relief Request No. VR-02 L-2024-122, Core Operating Limits Report2024-08-12012 August 2024 Core Operating Limits Report IR 05000250/20240112024-08-0606 August 2024 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000250/2024011 and 05000251/2024011 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-089, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2024-07-25025 July 2024 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP- 17 451-P. Revision 1. Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-112, Condition Prohibited by Technical Specifications2024-07-10010 July 2024 Condition Prohibited by Technical Specifications ML24173A1902024-06-28028 June 2024 Withdrawal of an Amendment Request ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project L-2024-100, Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project2024-06-19019 June 2024 Withdrawal of License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter IR 05000250/20244012024-06-0505 June 2024 – Security Baseline Inspection Report 05000250-2024401, 05000251-2024401 and 07200062-2024401 L-2024-076, Reply to Notice of Violation; NOV 05000250, 05000251/2024010-052024-05-29029 May 2024 Reply to Notice of Violation; NOV 05000250, 05000251/2024010-05 L-2024-082, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000250/20240012024-05-10010 May 2024 Integrated Inspection Report 05000250/2024001 and 05000251/2024001 ML24135A0942024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report L-2024-060, 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report2024-05-0909 May 2024 10 CFR 50.59(d)(2) Evaluation and 10 CFR 50.71(e)(2) Technical Specification Bases Summaries Report ML24127A1862024-05-0909 May 2024 Request for Withholding Information from Public Disclosure ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-073, Cycle 34 Core Operating Limits Report2024-05-0101 May 2024 Cycle 34 Core Operating Limits Report L-2024-072, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report IR 05000250/20240102024-05-0101 May 2024 Design Basis Assurance Inspection Programs Inspection Report 05000250/2024010 and 05000251/2024010 and Notice of Violation L-2024-048, Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision2024-04-30030 April 2024 Divider Plate Assemblies Bounding Analysis Evaluation for Subsequent License Renewal Commitment Revision L-2024-069, Radiological Emergency Plan Revision 762024-04-22022 April 2024 Radiological Emergency Plan Revision 76 L-2024-066, Sixth 10-Year Inservice Testing Interval Relief Request No. PR-022024-04-17017 April 2024 Sixth 10-Year Inservice Testing Interval Relief Request No. PR-02 L-2024-057, 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications2024-04-11011 April 2024 0 for Turkey Point, Unit 3 - Condition Prohibited by Technical Specifications ML24096A2152024-04-0505 April 2024 Ltr. to Lewis Johnson, Principal Chief, Seminole Nation of Oklahoma, Re., Section 106 Letters for Turkey Point ML24096A2162024-04-0505 April 2024 Ltr. to Marcellus Osceola, Chairman, Seminole Tribe of Florida, Re., Section 106 Letters for Turkey Point ML24087A1982024-04-0505 April 2024 Notice of Availability of the Final Environmental Impact Statement for the Turkey Point Nuclear Generating Unit Numbers 3 and 4 Subsequent License Renewal Application ML24096A2182024-04-0505 April 2024 Ltr. to Stephanie Bryan, Tribal Chair, Poarch Band of Creek Indians, Re., Section 106 Letters for Turkey Point 2024-09-25
[Table view] |
Text
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-00001 Re: Turkey Point Unit 4 Docket No. 50-251 lnservice Inspection Program Owner's Activity Report (OAR-1) JUL 1 2 2016 L-2016-138 10 CFR 50.55a Attached find the Owner's Activity Report (Form OAR-1), for Turkey Point Unit 4 Fifth lnservice Inspection Interval, First Period, Second Outage (PTN 4-29). The Form OAR-1, Owner's Activity Report, implements Code Case N-532-4. Should there be any questions concerning this report, please contact Mr. Mitch Guth, Licensing Manag_er, at 305-246-6698.
Sincerely, Vice President Turkey Point Nuclear Plant
- SM Attachment cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9760 S.W. 344 111 Street Homestead, FL 33035 FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number: ISl.,.PTN-4-2016 ) Plant: Turkey Point Nuclear Power Plant Unit 4 9760 SW-344th street Homestead, Florida 33035 EC-286459 Rev. O PTN-ENG-SESJ-16-009 Page 1 of5 Commercial Service Date: September
- 7. 1973 Refueling Outage No.: PTN 4-29 Current lnspectionlnterval:
ISi-Fifth IWE*Second Current Inspection Period: ISi Fifth Interval-First and IWE-Third Edition and Addenda of Section XI applicable to the inspection plans: ISi Fifth lnterval-2007 Edition with Addenda through 2008 and IWE .. 2001 with Addenda through 2o03. * -* -* --Date and Revision of inspection plans: ISi Fifth Interval Effective-January
- 21. 2015 Rev.a and !WE-April 5, 2016. Rev.1 Edition and Addenda of Section XI applicable to repairs and replacements, if different than the inspection plan: ASME Section XI 2007 Edition through 2008 Addenda
- Code Cases Used: Approved Code Cases listed in lnspedion Plan CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) tne examinations and tests meet the Inspection plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluation.s supporting the completion of PTN4-29 conform to the requirements of Section XI. Signed
/d,,,r:.u;, £dt;f'Re'&uP( rr<"' Date --.....
..... rZ_z_c---+-
__ Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National B.oard of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by the Hartford Steam Boiler Inspection and Insurance Company of Connecticut have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the reqt:Jirements of Section XI. By signing this certificate neither the Inspector nor his employer mfilkes any warranty, expressed
- or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with Commissions N_B 1¢2'1.2 .4,,,J, 1 &eol<l c,,4 98.:3 National Board, State, Province and
- I, ' : . : : : '. I' : I ; : ' 1 : I .
FORM OAR-1 OWNER'S ACTIVITY REPORT r i. TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None
- -3 --FORM OAR-1 OWNER'S ACTIVITY .REPORT TABLE2 ABSTRACT OF REPAIR/Rl;PLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement Description Of Work Completed Plan Number Steam 1 Generator Replace Bolt 04/25/2016 RR40350540-01 4E210A .. ** Steam 1 Generator Install Tube Plug 04/25/2016 RR40350547-01 4E210B 1 Snubber Replace bolting 04/08/2016 RR40364134-36 4-1053 on support 1 Safety Valve Replace one 04/25/2016 RR40365695-01 RV-4,.5518 stud aild nut -1 Piping at Pen-11 Prep for NOE 04/14/2016 RR40459962-01 . Piping Modify piping for 2 RCP 04/25/2016 RR40273327-18 4P200A modification Piping Modify piping for 2 RCP 04/25/2016 RR40361761-18.
4P200B modification Piping Modify piping for I 2 4P200C RCP 04/25/2016 RR40361762-21 modification
.. 2 Control Valve Replace Bolting 04/25/2016 RR40273327-26 CV-4-303A
-*'. ! FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE 2-ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date Repair/Replacement
- pescription Of Work Completed Plan.Number
',--2 Control Valve Replace Bolting 04/25/2016 RR40361761-26 cv4..:303s 2 Control Valve Replace Bolting 04/25/2016 RR40361762-26 CV-4-303C 2 Support Cut and weld 04/09/2016 RR40365364-06 4P214B support 2 Relief Valve Replace Bolting 04/25/2016 RR40303578-01 RV-4-1403 2 Snubber Support Modify Support 04/21/2016 RR40343601-01 4-1105, 4-1106 2 Snubber Support Replace 04/21/2016 RR4Q459254-01 4-1106 Sn_uobers 2 Relief Valve Replace Bolting 04/25/2016 RR40350593-01 RV-4-1407
- . 2 Flange Replace Bolting 04/25/2016 RR40368049-01 FE-4-127 2 Valve Replace Bolting 04/25/2016 RR40366792-01 CV-4-2902 Containment Cut and Reroute 2 Spray Full-Flow piping during 03/24/2016 RR40369651-54 Recirculation ccw Piping modification I i FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE2 ABSTRACT 0.F REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Date ' Repair/Replacement Description Of Work Completed Plan Number Heat Exchanger Retube and 3 bolting 03/12/2015 RR40088999-01 4E207A replacement 3 Heat Exchanger Replace Bolting 12/24/2015 RR40397 457-02 4E207C 3 Heat Exchanger Replace Bolting 01/15/2016 RR40434157-01 4E207B Heat Exchanger Retube and 3 bolting ' 04/10/2015 RR40089001-01 4E207C replacement Fukushima 3 Tank Modification, 11/25/2014 RR40318922-05 4T8 Add Emergency Connection Piping Flange 3 ICW Crawl-thru Replace Bolting 04/21/.2016 RR40350677-01 Flanges Piping Flange 3 ICW Crawl-thru Replace Bolting . 04/21/2016 RR40350677-1 O Flanges