| title = Turkey Point, Units 3 and 4, RAI, Regarding Alternative Source Term (TAC Nos. ME1624 and ME1625)
| title = RAI, Regarding Alternative Source Term (TAC Nos. ME1624 and ME1625)
| author name = Paige J C
| author name = Paige J C
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2

Revision as of 12:51, 9 February 2019

RAI, Regarding Alternative Source Term (TAC Nos. ME1624 and ME1625)
ML093500665
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/17/2009
From: Paige J C
Plant Licensing Branch II
To: Nazar M
Florida Power & Light Co
Paige, Jason C, NRR/DORL,301-415-5888
References
TAC ME1624, TAC ME1625
Download: ML093500665 (3)


Text

UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 December 17, 2009 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 TURKEY POINT NUCLEAR PLANT, UNITS 3 AND 4 -REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE SOURCE TERM (TAC NOS. ME1624 AND ME1625)

Dear Mr. Nazar:

By letter dated June 25, 2009, Florida Power & Light requested an amendment to the facility operating licenses of Turkey Point Units 3 and 4, to adopt the alternative source term as allowed by Title 10, Code of Feral Regulations, Section 50.67. The Nuclear Regulatory Commission staff has reviewed the Turkey Point Unit 3 and 4 application and has determined that additional information is required to complete the review. This request was discussed with Ms. Olga Hanek of your staff on November 23, 2009, and it was agreed that a final response would be provided by February 12, 2010. If you have any questions, please feel free to contact me at 301-415-5888.

Sin rely, J son C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

Request for Additional Information cc: Distribution via ListServ REQUEST FOR ADDITIONAL INFORMATION ALTERNATIVE SOURCE TERM TURKEY POINT NUCLEAR PLANT UNITS 3 AND 4 DOCKET NUMBERS 50-250 AND 50-251 Florida Power & Light Company (FPL) stated on page 33 of 40 of Enclosure 1 to the June 25, 2009, letter that the Control Room Emergency Ventilation System new air duct intakes will be relocated to different parts of the auxiliary building.

The relocated intakes and associated duct work will be designed to current licensing design basis seismic and tornado criteria for this plant, as defined in Updated Final Safety Analysis Report Chapter 5, Appendix 5A, "Seismic Classification and Design Basis for Structures, Systems and Equipment." Provide a sketch showing the relocated air intakes and ductwork. Provide the results of the structural analysis of the relocated intake ducts and associated duct work, showing that the maximum stresses meet the design basis acceptance criteria under safe shut-down earthquake and tornado loading. Provide the results of the evaluation of the intake ducts and associated duct work for external missile protection. FPL stated on p. 14 of 20 of Attachment 2 to the Enclosure that it intends to install 10 stainless steel wire mesh baskets (two large and eight small) containing sodium tetraborate decahydrate (NaTB) in the containment basement, as a means of controlling the containment sump pH. These baskets contain a combined mass of 11,061 Ibm of NaTB. Provide a detailed description of the structural design and analysis of these baskets, including the location, geometry, anchoring, the design loads and load combinations, design acceptance criteria and margins under normal and accident conditions. FPL stated on p. 30 of 40 of Enclosure 1 that it will replace the aluminum fins on the normal containment coolers with copper fins to generate less chemical debris. Provide a description and results of the evaluation of potential structural effects on the coolers as a result of the fin replacement.

Enclosure December 17,2009 Mr. Mano Nazar Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420 SUB..TURKEY POINT NUCLEAR PLANT, UNITS 3 AND 4 -REQUEST FOR ADDITIONAL INFORMATION REGARDING ALTERNATIVE SOURCE TERM (TAC NOS. ME1624 AND ME1625)

Dear Mr. Nazar:

By letter dated June 25, 2009, Florida Power & Light requested an amendment to the facility operating licenses of Turkey Point Units 3 and 4, to adopt the alternative source term as allowed by Title 10, Code of Feral Regulations, Section 50.67. The Nuclear Regulatory Commission staff has reviewed the Turkey Point Unit 3 and 4 application and has determined that additional information is required to complete the review. This request was discussed with Ms. Olga Hanek of your staff on November 23, 2009, and it was agreed that a final response would be provided by February 12, 2010. If you have any questions, please feel free to contact me at 301-415-5888.

Sincerely, IRA! Jason C. Paige, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250 and 50-251

Enclosure:

Request for Additional Information cc: Distribution via ListServ Distribution:

PUBLIC LPL2-2 R/F RidsNrrPMTurkey Point RidsNrrLABClayton RidsNrrDorlLpl2-2 RidsOgcRp RidsAcrsAcnw

_MailCenter RidsRgn2MailCenter RidsNrrDorl RidsNrrDe RidsOEMailCenter RidsEdoMailCenter RidsNrrDciEmcb BJessup, NRR Accession Number* ML093500665 NRR088 OFFICE LPL2-2/PM LPL2-2/LA EMCB/BC LPL2-2/BC NAME JPaige BClayton MKhanna memo dated TBoyce DATE 12/17/09 12/17/09 10/28/09 12/17/09 OFFICIAL RECORD COpy