There is currently no text in this page. You can search for this page title in other pages, or search the related logs, but you do not have permission to create this page.
Category:Letter type:W
Jump to navigation
Jump to search
(previous page) (next page)
Pages in category "Letter type:W"
The following 200 pages are in this category, out of 785 total.
(previous page) (next page)W
- W3F1-2002-0005, Ses, Technical Specification Bases Update to NRC for Period September 1, 2002 Through January 15, 2002
- W3F1-2002-0006, Response to Requests for Additional Information on Technical Specification Change Request, NPF-38-238 Regarding Appendix K Margin Recovery, Power Uprate Request
- W3F1-2002-0009, Technical Specification Change Request - Power Uprate Request Response to Request for Additional Information
- W3F1-2002-0010, Submittal of Fitness-for-Duty Performance Data for 07/01/2001 - 12/31/2001 for Waterford 3 Ses
- W3F1-2002-0012, Revision to Peak Linear Heat Rate Safety Limit Technical Specification 2.1.1.2
- W3F1-2002-0013, Supplement to Amendment Request NPF-38-234 Replacement of Part-Length Control Element Assemblies
- W3F1-2002-0014, WAT3 - Init Exam - 01/2002 - Licensee Post Exam Recommendations
- W3F1-2002-0015, Physical Security Plan, Revision 20, Change 1
- W3F1-2002-0017, January 2002 Monthly Operating Report for Waterford 3 Ses
- W3F1-2002-0018, Entergy Operations, Inc.'S Response to Request for Additional Information Regarding Realignment of Refueling Water Storage Pool (Rwsp) Boundary Isolation Valves to Rwsp Purification System
- W3F1-2002-0029, February 2002 Monthly Operating Report for Waterford 3 Ses
- W3F1-2002-0032, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity
- W3F1-2002-0034, Ses Core Operating Limits Report for Cycle 12
- W3F1-2002-0037, 30 Day Response to NRC Bulletins 2001-01 and 2002-01 for Vessel Head Inspection Findings
- W3F1-2002-0040, Ses - 15 - Day Special Report SR-02-001-00 on the 11th Refueling Outage Steam Generator Tube Inservice Inspection
- W3F1-2002-0044, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models
- W3F1-2002-0046, Ses, Annual Radiological Environmental Operating Report
- W3F1-2002-0048, Ses - Annual Environmental Operating Report - 2001
- W3F1-2002-0053, Clarification of Response to Order for Interim Safeguards and Security Compensatory Measures
- W3F1-2002-0054, April 2002 Monthly Operating Report for Waterford 3
- W3F1-2002-0058, Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
- W3F1-2002-0064, Ses Startup and Power Escalation Report for Cycle 12
- W3F1-2002-0065, Emergency Plan Training Procedure
- W3F1-2002-0068, Ses NRC RIS 2002-09, Preparation and Scheduling of Operator Licensing Examinations.
- W3F1-2002-0071, Supplement to Amendment Request Realignment of Refueling Water Storage Pool (Rwsp) Boundary Isolation Valves to Rwsp Purification System
- W3F1-2002-0072, Supplement to Amendment Request NPF-38-239 Revision of Letdown Line Break Dose Consequences
- W3F1-2002-0073, Application for Technical Specification Change Regarding Missed Surveillances Using the Consolidated Line Item Improvement Process
- W3F1-2002-0074, Changes to Waterford 3 Emergency Plan & Implementing Procedures, Including Rev. 27, Change 4 to Emergency Plan, Rev. 26 to EP-001-020, Rev. 20, Change 1 to EP-001-001 & Rev. 22, Change 1 to EP-003-040
- W3F1-2002-0075, Wat 3 - Retake Exam - 07/2002 - Post Examination Comments
- W3F1-2002-0077, July 2002 Monthly Operating Report for Waterford 3 Ses
- W3F1-2002-0080, Day Response to Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzle Inspection Programs
- W3F1-2002-0084, Final Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures
- W3F1-2002-0090, Technical Specification Bases Update to the NRC for the Period January 16, 2002 Through September 30, 2002
- W3F1-2002-0099, Ses, Report of Facility Changes, Tests & Experiments for Period from June 1, 2001 Through May 31. 2002
- W3F1-2002-0101, License Amendment Request NPF-38-246 Main Steam Line Isolation Valves
- W3F1-2002-0104, Unit 3, License Amendment Request NPF-38-245 Use of CEN-372-P-A
- W3F1-2002-0105, November 2002 Monthly Operating Report for Waterford 3
- W3F1-2002-0106, Extended Power Uprate Methodologies
- W3F1-2003-0001, December 2002 Monthly Operating Report for Waterford 3
- W3F1-2003-0005, Day Response to NRC Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity
- W3F1-2003-0006, Personnel Monitoring Reports
- W3F1-2003-0007, Appendix R Deviation Request, Supplemental Information
- W3F1-2003-0010, Supplement to Amendment Request NPF-38-243 Reactivity/Boron Concentration Changes
- W3F1-2003-0014, Entergy Nuclear Operation'S, Inc., - Answer to Issuance of Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- W3F1-2003-0015, License Amendment Request NPF-38-247 Relocation & Modification of Technical Specifications 4.0.5 & 3/4.4.9 & Extension of Reactor Coolant Pump Flywheel Volumetric Examination Interval
- W3F1-2003-0016, Steam Generator Tubesheet Inspection Information
- W3F1-2003-0020, Submittal of Second Reactor Vessel Surveillance Capsule Report
- W3F1-2003-0021, 12-Month Special Report SR-03-001-00 on the 11th Refueling Steam Generator Tube Inservice Inspection
- W3F1-2003-0023, March 2003 Monthly Operating Report for Waterford 3
- W3F1-2003-0024, TS Bases Update to NRC for Period January 8, 2003 Through April 7, 2003
- W3F1-2003-0027, Annual Radiological Environmental Operating Report
- W3F1-2003-0030, Annual Environmental Operating Report - 2002
- W3F1-2003-0037, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models
- W3F1-2003-0040, April 2003 Monthly Operating Report for Waterford 3 Ses
- W3F1-2003-0042, Emergency Plan Implementing Procedures
- W3F1-2003-0043, Ses, Notification of Disturbances to Waterford Plantation Workers' Quarters Site, Area 4
- W3F1-2003-0044, License Amendment Request NPF-38-248 Relaxation of Ventilation System Heater Surveillance Acceptance Criteria
- W3F1-2003-0045, Emergency Plan Implementing Procedures
- W3F1-2003-0048, Revision to Steam Generator Tubesheet Inspection Information
- W3F1-2003-0050, 60-Day Response to NRC Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
- W3F1-2003-0051, June 2003 Monthly Operating Report for Waterford 3 Ses
- W3F1-2003-0053, Follow-up Response to NRC Generic Letter (GL) 2003-01, Control Room Habitability
- W3F1-2003-0055, TS Bases Update to NRC for Period April 8, 2003 Through July 23, 2003
- W3F1-2003-0057, Withdrawal of Appendix R Deviation Request, Waterford Steam Electric Station, Unit 3
- W3F1-2003-0059, Ses, Emergency Plan Implementing Procedure, EP-002-052, Rev. 18
- W3F1-2003-0064, July 2003 Monthly Operating Report for Waterford 3 Ses
- W3F1-2003-0067, Supplement to Amendment Request Main Steam Line Isolation Valves
- W3F1-2003-0072, August 2003 Monthly Operating Report for Waterford Steam Electric Station Unit 3
- W3F1-2003-0074, Request for Amendment, Increase Unit'S Rated Thermal Power Level from 3441 Megawatts Thermal (Mwt) to 3716 Mwt. Without Enclosures
- W3F1-2003-0075, Ses, Unit 3, License Amendment Request NPF-38-250, Revision to Pressure/Temperature and Low Temperature Overpressure Protection Limits for 32 Effective Full Power Years
- W3F1-2003-0077, Supplemental Information Regarding Amendment Request for Addition of CEN-372 to Technical Specification 6.9.1.11.1
- W3F1-2003-0079, Revision 16 to EP-002-050, Offsite Dose Assessment (Manual).
- W3F1-2003-0080, Preparation and Scheduling of Operator Licensing Examinations
- W3F1-2003-0081, September 2003 Monthly Operating Report for Waterford Unit 3
- W3F1-2003-0085, Report of Facility Changes, Tests, and Experiments and Commitment Changes
- W3F1-2003-0086, Core Operating Limits Report - Cycle 13, Revision 0
- W3F1-2003-0088, October 2003 Monthly Operating Report for Waterford Steam Electric Station, Unit 3
- W3F1-2003-0089, Combined Category C-3 and 15-Day Special Report SR-03-002-00 on the 12th Refueling Outage Steam Generator Tube Inservice Inspection
- W3F1-2003-0090, Response to Request for Information Related to Review of Refuel 11 Steam Generator Tube Inspection Report SR-03-001-00
- W3F1-2003-0094, Core Operating Limits Report, Cycle 13, Revision 1
- W3F1-2003-0097, Core Operating Limits Report, Cycle 13, Revision 1, Change 1
- W3F1-2003-0101, November 2003 Monthly Operating Report for Waterford Unit 3
- W3F1-2004-0001, December 2003 Monthly Operating Report for Waterford Unit 3
- W3F1-2004-0002, Transmittal of Emergency Plan, Revision 30
- W3F1-2004-0003, Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01, Revision 4 Methodology
- W3F1-2004-0004, Supplemental Information Extended Power Uprate - Power Ascension Testing
- W3F1-2004-0010, Submittal of Owners Activity Report Forms for Inservice Inspection Performed During Refueling Outages 11 and 12
- W3F1-2004-0011, January 2004 Monthly Operating Report for Waterford, Unit 3
- W3F1-2004-0013, License Amendment Request NPF-38-255, Removal of Requirements Associated with the Ultimate Heat Sink Dry Cooling Tower Fans (TS 3.7.4)
- W3F1-2004-0014, License Amendment Request, Deletion of Pressurizer Heatup and Cooldown Limits
- W3F1-2004-0015, Fitness-for-Duty Performance Data, Six-Month Report for Period Ending December 31, 2003
- W3F1-2004-0016, Technical Specificaiton Bases Update to the NRC for Period July 24, 2003 Through February 25, 2004
- W3F1-2004-0017, Supplement to Amendment Request NPF-38-249 Regarding Extended Power Uprate
- W3F1-2004-0019, Answer to Issuance of First Revised NRC Order (EA-03-009) Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors
- W3F1-2004-0020, February 2004 Monthly Operating Report for Waterford Unit 3
- W3F1-2004-0021, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models
- W3F1-2004-0022, Core Operating Limits Report - Cycle 13 Revision 1, Change 2
- W3F1-2004-0023, Ses - Personnel Monitoring Reports for 2003
- W3F1-2004-0025, Request for Exemption to the Cladding Material Specified in 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow Use of Optimized Zirlo Lead Test Assemblies
- W3F1-2004-0026, Annual Radiological Environmental Operating Report - 2003
- W3F1-2004-0027, Supplemental to Amendment Request Regarding the Relaxation of Ventilation System Heater Surveillance Acceptance Criteria
- W3F1-2004-0028, License Amendment Request NPF-38-254, Reactor Coolant System Leakage Detection
- W3F1-2004-0029, Extended Power Uprate, Waterford, Unit 3 Supplement to Amendment Request
- W3F1-2004-0031, Reporting of Information Under 10 CFR 50.46, Newly Identified Single Failure for Small Break LOCA Analysis of Record
- W3F1-2004-0032, February 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3
- W3F1-2004-0033, Annual Radioactive Effluent Release Report - 2003
- W3F1-2004-0034, Supplemental Response to the April 29, 2003
- W3F1-2004-0037, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0038, Ses Annual Report of Individual Monitoring - NRC Form 5 for 2003 Per 10CFR20.2206
- W3F1-2004-0039, April 2004 Monthly Operating Report for Waterford, Unit 3
- W3F1-2004-0043, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0044, Small Break Loss-of-Coolant Accident Emergency Core Cooling System Performance Analysis
- W3F1-2004-0047, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0048, Supplement to Request for Exemption to the Cladding Material Specified in 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow Use of Optimized Zirlo Lead Test Assemblies
- W3F1-2004-0052, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0057, June 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3
- W3F1-2004-0058, Response to NRC Bulletin 2004-01 Regarding Inspection of Alloy 82/182/600 Materials Used in Pressurizer Penetrations and Steam Space Piping Connections
- W3F1-2004-0059, Reactor Coolant System Leakage Detection
- W3F1-2004-0061, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0067, July 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3 (Waterford 3)
- W3F1-2004-0068, Supplement to Amendment Request NPF-38-249 Extended Power Uprate
- W3F1-2004-0071, Supplement to Alternate Source Term Submittal
- W3F1-2004-0073, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0074, Cultural Resources Damage Assessment Report Area 4
- W3F1-2004-0075, Reissue of Report BAW-2177, Analysis of Capsule W-97 Entergy Operations, Inc. Waterford Generating Station Unit 3 - Reactor Vessel Material Surveillance Program
- W3F1-2004-0076, Supplement 2 to Amendment Request NPF-38-256, Alternate Source Term
- W3F1-2004-0078, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0081, Revision to Security Plan, T&Q Plan and Safeguards Contingency Plan Incorporating RAI Responses
- W3F1-2004-0082, Resubmittal of Waterford 3 Security Plan
- W3F1-2004-0083, August 2004 Monthly Operating Report for Waterford Unit 3
- W3F1-2004-0085, Schedule Clarification for Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0086, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0088, Updated Entergy Nuclear-South Submittal of Security Plan, T&Q Plan and Safeguards Contingency Plans Incorporating RAI Responses
- W3F1-2004-0089, Supplement to Amendment Request NPF-38-249
- W3F1-2004-0090, Ses, Technical Specification Bases Update to the NRC for the Period of 10/26/04 - 09/30/04
- W3F1-2004-0091, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections
- W3F1-2004-0094, Revised Response to Waterford 3's Response Letter to Generic Letter 2003-01, Control Room Habitability
- W3F1-2004-0095, Supplement 3 to Amendment Request NPF-38-256 Alternate Source Term
- W3F1-2004-0096, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0099, Supplement to Amendment Request NPF-38-258 to Modify Technical Specification (TS) 5.3.1, Fuel Assemblies and TS 6.9.1.11.1, Core Operating Limits
- W3F1-2004-0100, Response to Request for Additional Information Regarding Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors.
- W3F1-2004-0101, to Amendment Request NPF-38-256, Alternate Source Term, Waterford Steam Electric Station, Unit 3
- W3F1-2004-0103, Disposition of Requested Information Regarding Significance Determination Process Risk-Informed Inspection Notebook
- W3F1-2004-0105, Extended Power Uprate
- W3F1-2004-0107, Supplement to Amendment Request NPF-38-249
- W3F1-2004-0110, Report of Facility Changes, Tests and Experiments and Commitment Changes
- W3F1-2004-0111, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2004-0112, October 2004 Monthly Operating Report for Waterford Steam Electric Station Unit 3 (Waterford 3)
- W3F1-2004-0117, Supplement to Amendment Request NPF-38-249 Extended Power Uprate
- W3F1-2004-0118, Correction to Annual Radiological Environmental Operating Report - 2003 Originally Submitted Via Letter WF3-2004-0026
- W3F1-2004-0120, (Waterford 3), Response to Request for Additional Information for Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology
- W3F1-2004-0124, November 2004 Monthly Operating Report for Waterford Steam Electric Station, Unit 3
- W3F1-2005-0001, Review of Draft Safety Evaluation for the Extended Power Uprate
- W3F1-2005-0004, Supplement to Amendment Request NPF-38-249 Extended Power Uprate Waterford Steam Electric Station, Unit 3
- W3F1-2005-0005, 90 Day Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.
- W3F1-2005-0008, January 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3
- W3F1-2005-0013, . Modify Technical Specification (TS) 5.3.1, Fuel Assemblies and TS 6.9.1.11.1, Core Operating Limits
- W3F1-2005-0016, February 2005 Monthly Operating Report for Waterford Unit 3
- W3F1-2005-0017, Supplement to Amendment Request NPF-38-258 to Modify Technical Specification (TS) 5.3.1, Fuel Assemblies and TS 6.9.1.11.1, Core Operating Limits Report Waterford Steam Electric Station, Unit 3
- W3F1-2005-0019, Supplement to Amendment Request NPF-38-249, Extended Power Uprate
- W3F1-2005-0020, 2004 Personnel Monitoring Reports
- W3F1-2005-0023, March 2005 Monthly Operating Report for Waterford Steam Electric Station Unit 3
- W3F1-2005-0024, Supplement to Amendment Request NPF-38-258 to Modify Technical Specification (TS) 5.3.1, Fuel Assemblies and TS 6.9.1.11.1, Core Operating Limits Report
- W3F1-2005-0025, Holtec Licensing Report Errors
- W3F1-2005-0027, Ses Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models
- W3F1-2005-0030, Annual Report of Individual Monitoring - NRC Form 5 for 2004 Per 10CFR20.2206
- W3F1-2005-0032, License Amendment Request NPF-38-249-1 Extended Power Uprate (Amendment 199) License Condition Regarding Instrument Uncertainty
- W3F1-2005-0035, April 2005 Monthly Operating Report for Waterford, Unit 3
- W3F1-2005-0036, Supplement to Amendment Request NPF-38-249-1 Extended Power Uprate (Amendment 199) License Condition Regarding Instrument Uncertainty
- W3F1-2005-0038, Response to NRC Guidance Regarding Mitigation Strategies
- W3F1-2005-0040, License Amendment Request NPF-38-262 Proposed Technical Specification Change to Steam Generator Tube Inservice Inspection Program Using Consolidated Line Item Improvement Process
- W3F1-2005-0044, Response to Request for Additional Information Related to Review of Refuel 12 Steam Generator Tube Inservice Inspection Reports
- W3F1-2005-0045, 60-Day Report for Waterford Steam Electric Station, Unit 3 Reactor Pressure Vessel Head and Pressurizer Inspection for the Spring 2005 Refueling Outage
- W3F1-2005-0051, Status of the Real Time Contingency Monitoring Program
- W3F1-2005-0052, Response to Request for Additional Information for Generic Letter 2004-02
- W3F1-2005-0058, NRC Bulletin 2003-01 Additional Information
- W3F1-2005-0059, June 2005 Monthly Operating Report for Water Ford Steam Electric Station Unit 3 Revised
- W3F1-2005-0060, Submittal of Owner'S Activity Report Form for Inservice Inspection Performed During Refueling Outage 13 Waterford Steam Electric Station, Unit 3
- W3F1-2005-0062, Technical Specification Bases Update to the NRC for the Period October 1, 2004 Through October 31, 2005
- W3F1-2005-0063, Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- W3F1-2005-0066, Use of Temporary Alternate Emergency Operations Facility
- W3F1-2005-0067, Supplemental Startup and Power Report for Cycle 14 Waterford, Unit 3
- W3F1-2005-0071, Response to NRC Request for Additional Information Regarding the February 2002, Order Section B.5.b
- W3F1-2005-0072, License Amendment Request NPF-38-264 to Modify Technical Specification 3.1.1.4, Minimum Temperature for Criticality
- W3F1-2005-0073, License Amendment Request NPF-38-263 to Modify Technical Specification 3.1.1.3 Surveillance Requirements as Allowed by WCAP-16011-P-A, Startup Test Activity Reduction Program
- W3F1-2005-0074, License Amendment Request NPF-38-265 to Allow the Use of Zirconium Diboride and Modify Technical Specification 6.9.1.11, Core Operating Limits Report
- W3F1-2005-0075, License Amendment Request NPF-38-266, Remove Limitation to Perform Various Surveillance Only During Shutdown
- W3F1-2005-0076, Preparation and Scheduling of Operator Licensing Examinations
- W3F1-2005-0080, NRC Bulletin 2003-01 Response to Request for Additional Information Waterford Steam Electric Station, Unit 3
- W3F1-2005-0084, Additional Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors
- W3F1-2006-0005, License Amendment Request NPF-38-267, Reactor Coolant System Leakage Detection Instrumentation
- W3F1-2006-0007, Supplement to Amendment Request NPF-38-262, Steam Generator Tube Inservice Inspection Program
- W3F1-2006-0008, Supplement to Amendment Request NPF-38-260 Tubesheet Inspection Depth for Steam Generator Tube Inspections for Waterford, Unit 3
- W3F1-2006-0012, Report of Facility Changes, Tests and Experiments and Commitment Changes
- W3F1-2006-0014, Response to Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power
- W3F1-2006-0016, Supplement 2 to Amendment Request NPF-38-262, Steam Generator Tube Inservice Inspection Program
- W3F1-2006-0017, 2005 Annual Radiological Environmental Operating Report - Waterford
- W3F1-2006-0019, 2005 Annual Report of Individual Monitoring - NRC Form 5, Waterford 3
- W3F1-2006-0024, 12-Month Special Report SR-06-001-00 on the 13th Refueling Steam Generator Tube Inservice Inspection, Waterford Unit 3
- W3F1-2006-0025, Ses, Annual Report on Westinghouse Electric Company LLC Combustion Engineering Emergency Core Cooling System Performance Evaluation Models