W3F1-2002-0065, Emergency Plan Training Procedure

From kanterella
Jump to navigation Jump to search
Emergency Plan Training Procedure
ML022190636
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/31/2002
From: Peters K
Entergy Nuclear South, Entergy Operations
To:
Document Control Desk, Office of Nuclear Security and Incident Response
References
A4.05, W3F1-2002-0065
Download: ML022190636 (41)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road "Killona, LA 70066 Entergy Tel 504 739 6440 "Fax 504 739 6698 kpetersaýfentergy com Ken Peters Directo, NL,clea, Safe',, Asstrri-e WMaterford 3 W3F1-2002-0065 A4.05 PR July 31, 2002 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Emergency Plan Training Procedure Gentlemen:

In accordance with Appendix E of 10CFR50 and 10CFR50.4(b)(5), Entergy is submitting Revision 1 of Corporate Emergency Planning Training Procedure TQ-1 10, "Emergency Preparedness Training Program." This procedure replaces Waterford 3 Procedure NTP-203, "Emergency Plan Training." The revision was reviewed per 1 OCFR50.54(q) requirements and was determined not to decrease the effectiveness of the emergency plan.

The procedure incorporates emergency planning training requirements from Waterford 3, Arkansas Nuclear One and Grand Gulf Nuclear Station into a single corporate procedure.

We request that this procedure be filed with Waterford 3's Emergency Planning Implementing Procedures.

Emergency Plan Training Procedure W3F1-2002-0065 Page 2 July 31, 2002 This letter does not contain -any commitments.

Should you have any questions concerning this procedure, please contact J.J. Lewis, Emergency Planning Manager, at (504) 739-6624.

Very truly yours, K.J. Peters

Director, Nuclear Safety Assurance KJP/GCS/cbh

Attachment:

TQ-1 10, Revision 1 cc: (w/Attachment)

Emergency Response Coordinator, NRC Region IV (2 copies)

(w/o Attachment)

N. Kalyanam (NRC-NRR)

W.A. Maier (NRC Region IV)

J. Smith N.S. Reynolds NRC Resident Inspectors Office

ATTACHMENT TO W3FI -2002-0065 TQ-110, REVISION 1 Emergency Preparedness Training Program

NUCLEAR NoNnQuAuTr RELATED TQ-110 REV.No.1 a E tMANAGEMENT er MANUAL NoN.A4uIsnTlATrn PROCM IREPage 1 of 38 INFORMATIONAL USE "Title: Ememrency PmM dness Tmlknm Prgram Reviews Required Cross Discipline Review ........................................

Code Reviews:

10CFR50.59 Review ...................................... yes 10CFR50.54 Review ...................................... yes Environmental Qualification ........................... No On-Site Safety Review Committee Reviews ........ No Procedure Owner: Tom Tankersley I Menaer, Training and Development (Procedure Owner Signature) /

Effective Dates: 07101102 7131102 7M102 7101102 NA ANO GONS RBS W3 Echelon New Procedure/Revision/Csncellition Beels: Revision one Numbering correction on page 7 Incorporation of TCN at ANO, GGNS and WF3 Added Matrices from desk guide to procedure Added Course summaries into the attachment Added One ANO commitment Changed ANO Lesson Plan Codes Changed one RB position title Deleted some WF3 commlin~wts Deleted reference 2.9 DGTQ110

NUCLEAR NON-QUALrnY RELATED TQ-110 REV. No. 1 A n MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 2 of 38 INFORMATIONAL USE TABLE OF CONTENTS Sectio n Title Paqe 1.0 - Purpose 3 2.0 - References 3 3.0 - Definitions 4 4.0 - Responsibility 5 5.0 - Details 5 5.1 - Emergency Plan Training for All Personnel 5 5.2 - Prerequisites for Emergency Response Organization 6 Personnel 5.3 - Initial Training for ERO Personnel 6 5.4 Re-qualification Training for ERO Personnel 7 5.5 Exemptions/Waivers 8 6.0 - Interfaces 8 7.0 - Records 8 8.0 - Requirements and Commitment Cross Reference 9 11 9.0 - Attachments 11 9.1 Course Summaries 9.2 ANO Training Matrix 18 9.3 GGNS Training Matrix 23 9.4 RB Training Matrix 27 9.5 WF3 Training Matrix 35

NUCLEAR NON-QUALrTY RELATED TQ-110 REV. No. 1 Enteg MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 3 of 38 INFORMATIONAL USE 1.0 PURPOSE 1.1 This procedure establishes the appropriate training and qualification requirements for Emergency Response Organization (ERO) personnel in accordance with the site Emergency Plans.

2.0 REFERENCES

2.1 ANO, GGNS, RBS, WF3 Emergency Plans 2.2 NUREG-0654 "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 2.3 Title 10, Code of Federal Regulations, Part 50(10CFR50) 2.3.1 Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" 2.3.2 50.47, "Emergency Plans" 2.4 INPO 96-009, "Maintaining Emergency Preparedness Manual" 2.5 Title 10, Code of Federal Regulations, Part 20, "Standards for Protection Against Radiation" 2.6 Entergy Nuclear Management Manual (NMM) Company Procedures 2.6.1 No. PL-140, "Emergency Response Organization Respiratory Protection Guidelines" 2.6.2 No. PL-147, "Personnel Expectations Related to Emergency Response at Entergy Nuclear Sites" 2.6.9 No. TQ-201, "Systematic Approach to Training Process" 2.6.4 No. TQ-1 06, "Instructor Training and Qualification Process" 2.6.5 No. TQ-205, 'Training Exemptions" 2.7 Entergy Emergency Preparedness Position Papers 2.7.1 Position Paper No. 9, "Management and Tracking of Emergency Response Organization (ERO) Qualifications" 2.8 Station Procedures 2.8.1 ANO - 1000.015, "Station Training Program" 2.8.2 GGNS S-04-36, Handling of Training Documents 2.8.3 WF3 - NTP-003, "Training Records"

a :7Enter NUCLEAR MANAGEMENT NoN-QuAUTY RELATED TQ-110 REV. No. 1 MANUAL NON-ADMINISTRATIVE PROCEDURE Page 4 of 38 INFORMATIONAL USE 3.0 DEFINITIONS 3.1 Annual - For the purposes of this procedure, annual is defined as that period between January 1 and December 31st of each year.

3.2 Credit by Examination (CBE) - Training credit given to ERO personnel for successfully completing Emergency Plan training courses by passing the examination only. CBE is only allowed under certain circumstances for experienced ERO members in accordance with station training procedures.

3.3 Computer Based Training (CBT) - Training provided to ERO personnel through the use of computer interaction. CBT courses may be provided to students either remotely or in a classroom setting.

3.4 Drill - Performance enhancing experiences that reasonably simulate the interactions between appropriate centers and/or individuals that would be expected to occur during emergencies. Drills are an ERO training activity and may be used for initial and/or re qualification training purposes.

3.5 Emergency Response Organization (ERO) - Personnel who are assigned and trained to respond to emergency events and perform duties as outlined in site emergency plans.

3.6 Exemptions/Waivers - Emergency Preparedness Training/Qualification credit given to students/instructors implemented in accordance with NMM TQ-205, "Training Exemptions".

3.7 Exercise - An activity aimed at testing the integrated capability and a major portion of the basic elements of the Emergency Planning and Response Organizations. An exercise involves a major portion of the Emergency Response Organization and is evaluated by the NRC.

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1

ýEntery MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 5 of 38 INFORMATIONAL USE 3.8 Tabletop - A specialized training session conducted for an emergency response facility or group. Tabletops are seminar style meetings in a facility to discuss objectives and expectations of ERO personnel. These sessions are designed to emphasize team building and correct previously identified weaknesses.

3.9 Walkthrough - A training activity designed to develop and maintain an individual's knowledge of their assigned ERO duties. The walkthrough is normally conducted in an emergency response facility and includes discussion or demonstration of the appropriate facility activation, staffing, and organizational responsibilities for the individual's assigned ERO position.

4.0 RESPONSIBILITIES 4.1 Manager, Training and Development - Is responsible for providing and implementing an Emergency Preparedness Training Program and for overall performance of this program.

4.2 Manager, Emergency Preparedness - Is responsible for ensuring a comprehensive Emergency Preparedness Training Program is maintained for all offsite and onsite response personnel.

4.3 Supervisor, Technical Training - or designee is responsible for the administration of the day-to-day performance of the EP Training Program.

4.4 EP Training Instructor - Responsible for the development, scheduling, administering, and documenting of EP Training.

4.5 Emergency Response Personnel in accordance with NMM, Company Procedure, No. PL 147 will:

4.5.1 Maintain emergency response qualifications for their position including EP Training and additional specific training such as licenses, respirator qualifications, PAT, RWT, and FFD training.

4.5.2 Attend scheduled training and if unable to attend, provide prior notification to their supervisor and to the instructor.

5.0 DETAILS 5.1 Emergency Plan Training for ALL Personnel Information on the Emergency Plan is administered as part of Plant Access Training (PAT) to all personnel (excluding visitors) coming onsite for the first time and to all personnel participating in the annual PAT retraining program. This portion of PAT meets the following objectives:

5.1.1 Trains personnel with respect to their responsibilities during an emergency situation.

5.1.2 Keeps personnel informed of any applicable changes to the Emergency Plan

a NUCLEAR NoN-QuALIy RELATED TQ-110 REV. No. 1 Entewrg MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 6 of 38 INFORMATIONAL USE 5.1.3 Instructions concerning the following will be given to all personnel participating in Plant Access Training:

5.1.3.1 Signals and alarms 5.1.3.2 Evacuation routes and procedures 5.1.3.3 Response during an emergency 5.1.3.4 Response on observing an unusual occurrence 5.1.3.5 Emergency classifications 5.1.3.6 Public relations 5.2 Prerequisites for Emergency Response Organization Personnel 5.2.1 Plant Access Training including Fitness for Duty is required for all ERO personnel.

5.2.2 Radiation Worker Training is required for all ERO personnel, excluding News Center personnel.

5.2.3 Respiratory Protection Training, physical and fit test as required per NMM, Company Procedure, No.PL-140.

5.3 Initial Training for Emergency Response Organization Personnel 5.3.1 Individuals designated as Emergency Response Organization (ERO) personnel must be qualified in accordance with this procedure.

5.3.2 Requirements for each position are found in the site training matrices, Attachment 9.0.

5.3.3 Initial Emergency Response Organization (ERO)Training Requirements-Initial ERO training is designed to provide the necessary instruction to personnel that are assigned to the ERO, as it relates to their designated ERO position, and may include all or portions of the following course areas:

"* Essential Training (Basics of Emergency Response Organization and Facilities)

"* Facility Training

"* Position Specific Training

"* Drill, Tabletop, or Walkthrough

"* Operations Event Training These course areas should be taught in accordance with the applicable matrix in 9.0.

5.3.4 Scheduling for initial training is normally coordinated between the individual and the EP Training instructor and/or through the use of "OnTrack for Training".

5.3.5 Evaluations are normally given to ensure adequate understanding and retention of material covered in the classroom, and/or other specific qualifying activities.

Written exams require a passing score of 80% or greater. Evaluations are administered in accordance with reference 2.6.3.

NUCLEAR NON-QUALrrY RELATED TQ-110 REV. No. 1 Entergy MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 7 of 38 INFORMATIONAL USE 5.3.5.1 Individuals who fail to pass Initial Training must be remediated which may include remedial training and/or re-examination.

5.3.6 Initial ERO training supplements the training received by personnel through their departmental training.

5.4 Re-qualification Training for ERO Personnel 5.4.1 ERO Re-qualification Training is given to reinforce Initial Training in accordance with the applicable matrix in 9.0.

5.4.2 You must attend training annually (or as indicated in the applicable matrix in 9.0) to remain qualified in your assigned position.

5.4.3 Prior to taking ERO Re-qualification Training, you must be current in Initial Training.

5.4.4 ERO Re-qualification Training Requirements - Course material provided during re qualification training is determined from previous drill/training evaluations and ERO personnel needs. Re-qualification training course material may include information from all or portions of the following :

"* Essential Training (Basics of Emergency Response Organization and Facilities)

"* Facility Training

"* Position Specific Training

"* Drill, Exercise, or Tabletop

"* Operations Event Training These courses should be taught in accordance with the matrices in 9.0.

5.4.5 Scheduling for re-qualification training is normally coordinated between the individual and the EP Training instructor and/or through the use of "OnTrack for Training".

5.4.6 Evaluations are normally given to ensure adequate understanding and retention of material covered in the classroom, and/or other specific qualifying activities.

Written exams require a passing score of 80% or greater. Evaluations are administered in accordance with reference 2.6.3.

Credit by Exam (CBE) may be given in lieu of classroom, CBT, etc. at the discretion of the instructor. Failure of CBE requires completing an initial class.

5.4.6.1 Individuals who fail to pass Re-qualification Training should be remediated the same working day. Remediation may include remedial training and/or re-examination. If remediation is not accomplished within the same working day, the failure must be reported to Emergency Preparedness as soon as possible.

5.4.6.2 All failures after attempting 5.4.6.1, must complete Initial Training Requirements.

SNUCLEAR NON-QUALuY RELATED TQ-110 REV. No. I

zý-

ntew MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 8 of 38 INFORMATIONAL USE 5.4.7 ERO Re-qualification Training supplements the training received by personnel through their continuing departmental training.

5.4.8 Consequences - If an individual fails to remain qualified in accordance with this procedure, the individual shall be disqualified from participating in the ERO.

5.4.9 Conditions of Disqualification - Individuals that are removed from the ERO shall not perform during emergencies and exercises in assigned ERO positions until the required qualifications are completed. They may perform in assigned ERO positions during drills or other practical training activities.

5.4.10 Reinstatement of disqualified ERO Members - When deficient course work/qualifications are completed lAW this procedure the member will be reinstated in their former ERO position.

5.5 Exemptions/Waivers may be granted per reference 2.6.5.

6.0 INTERFACES None 7.0 RECORDS 7.1 All records shall be documented and recorded in accordance with applicable site procedures.

SNUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 SEnterg MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 9 of 38 INFORMATIONAL USE 8.0 QUIREMENTS AND COMMITMENT CROSS REFERENCE Plant Commitment Requirement Name Paragraph Number Corp. Proc explanation Number GGNS P-22986-88 UFSAR 18.1.22.$3-5 5.3.1, 5.3.2, 5.4.8 Tmg. for Mitigating Core Damage G-GN P-22989 UFSAR 18.1.22.S7 5.3.1, 5.3.2, 5.4.8 Tmg. for Mitigating Core Damage GGNS P-24468 AECM- 5.4.6.1, 5.5 Escalation of Deviations 89/0202.AT.1 ,IV.S7 from Emer. Training GGNS P-26675 ANSI N2.3.4.5.1.S 5.1.3.1 Evacuation Signal Testing GGNS P-26676 ANSI N2.3.4.5.2.S1 5.1.3.1 Evacuation Signal Testing GGNS P-26677 ANSI N2.3.4.5.3.S2 5.1.3.1 Evacuation Signal Testing GGNS P-28891 E-PLAN 6.5.1.A.5 5.1 Decdared Emergency Situations GGNS P-28945 E-PLAN 8.2.$1 Whole procedure Emergency Plan Training Program GG-NS9 P-28946 _E_-PLAN 8.2.S2 Whole procedure Emergency Plan Training Proram GGNS P-28948 E-PLAN 8.2.1.S1 5.1 GET GGNS P-28949 E-PLAN 8.2.1.S2 5.1 GET GGNS P-28950 E-PLAN 8.2.1.S3 5.1 GET GGNS P-28951- E-PLAN 8.2.2.$1 5.3.1, 5.3.2, 5.4.8 Emergency Plan Training GGNS P-28952 E-PLAN 8.2.2.$2 Whole procedure Emergency Response Training S 9 E-PLAN 8.2.2.$3 Whole procedure Emergency Preparedness Specialized Training GGNS P-29532 TRM 7.6.3.1.A 5.3.1, 5.3.2, 5.4.8 Emergency Preparedness TmO. Program GGNS P-32776 FSAR 18.1.22.S6 5.3.1, 5.3.2, 5.4.8 Training for Operations Mgmt. personnel GGNS P-31141 Tech Spec 5.5.3a 5.3.1, 5.3.2, 5.4.8 Chemistry Training Program GGNS P-32820 FSAR 7.7.1.11.4.3.$3 5.3.1, 5.3.2, 5.4.8 Classroom Training will be provided on PASS system operation and proper handling of highly radioactive samples GGNS P-33053 GNRO-97/00080.97- 5.3.1, 5.3.2, 5.4.8 Ensure persons that perform OGNRI 9/01/1997 on-shift radiological assessment will periodically train with operations personnel in a Control Room/Simulator setting ANO P-4175 0CAN128305 5.2.1,5.3.3,5.4.2 GET, ERO Assignment, ERO Requal Training ANO P-10866 0CAN058203 5.2.1,5.4.2 GET, ERO Requal Training ANO P-4822 0CAN098106 5.3.3 & 5.4.4 ERO Requal Training RBS 1-15735 RBFI-98-0070 5.2.1, 5.2.2, 5.4.2 PAT, RWT W3 P-5074 E-PLAN 3.4.4 5.3 Ensure Comprehensive Training Program is maintained for all on-site and off-site response personnel.

W3 P-12775 IR 85-25 5.4 NRC Notification W3 P-5121 E-PLAN 5.1.2 5.3 Training and Qual. Of members of On-shift Emerg.

Organization W3 P-1 3297 FSAR 5.1.3.C 5.3 Training for Rad. Emerg.

_ I_ Teams

p p NUCLEAR NON-QUALITY RELATED TQ-1 10 REV. No. I a z-Enterg MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 10 of 38 INFORMATIONAL USE m

NON-QUALITY RELATED TQ-110 REV. No. 1 ftEntfrv NUCLEAR MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 11 of 38 INFORMATIONAL USE 9.0 ATTACHMENTS 9.1 Course Summaries Arkansas Nuclear One (ANO)

TUOI # TUOI Title ASLP-EP-AO01 1 Emergency Response/Support Organization ASLP-EP-AO012 Emergency Response Facilities ASLP-EP-AO013 Overview Emergency Plan and EPIP's ASLP-EP-AO014 Role of the NRC ASLP-EP-AO015 Emergency Interface Agreement ASLP-EP-AO01 6 Scenario/Exercise Rules and Guidelines ASLP-EP-AO017 Turnover of Responsibilities ASLP-EP-A0021 Medical Emergencies ASLP-EP-A0022 Dealing with the Media - offered upon recommendation by EP Manager; Provided by Entergy Corporate Communications ASLP-EP-A0024 Evacuation ASLP-EP-A0025 Reentry for Recovery ASLP-EP-A0026 EP Training for Engineers ASLP-EP-A0031 Communications ASLP-EP-A0032 Emergency Systems Review - offered upon recommendation; Operations Training ASLP-EP-A0041 Controller/Evaluator Training

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 12 of 38 INFORMATIONAL USE ASDRL-EP-A0044 ERO Drill ASLP-EP-A0045 ERF Walkthrough ASLP-EP-A0060 Duty Emergency Planner ASLP-EP-A0062 Offsite Dose Consequences ASLP-EP-A0063 Dose As sessment Training ASLP-EP-A0071 Onsite Radiation Monitoring Team ASLP-EP-A0072 Non-routine Equipment ASLP-EP-A0073 Radiological Field Monitoring ASLP-EP-A0081 EAL Class - Operations Training ASLP-EP-A0082 Emergency Response/Notification ASCBT-EP-A0083 Severe Accident Management (Overview)

ANO-1/2-SAMG (OPS) Severe Accident Management (In-Depth) - Operations SAMG Course ASLP-EP-A0091 Update Training ASRR-EP-A0093 Emergency Plan Required Reading ASOTH-EP-A0094 Misc. Emergency Plan Training ASWBK-EP-ERORQ ERO Requalification Training (Workbook)

ASLEC-EP-ERORQ ERO Requalification Training (Lecture)

ASCBT-EP-ERORQ ERO Requalification Training (Computer Based Training)

ASDRL-EP-SIMPI Simulator PI Drill ASLP-EP-A0064 ENC Staff Training ASLP-EP-OPSRQ Emergency Plan SRO/SE Requal Training

NUCLEAR TQ-110 REV. No. I ft Ente'r MANAGEMENT NON-QUALITY RELATED MANUAL NON-ADMINISTRATIVE PROCEDURE Page 13 of 38 INFORMATIONAL USE Grand Gulf Nuclear Station (GGNS)

Essential Training Facility Training Position Specific EPTS I - Security Training EPTS 2 - Mitigation and/or Recognition of Core Damage EPTS 3 - Radiological Assessment EPTS 5 - Radiological Monitoring EPTS 6- Emergency Assessment EPTS 7 - Post-Accident Sampling EPTS 9 - Standard First Aid (American Red Cross lAW their policies and procedures)

EPTS 11 - Response Teams CPR/CPRP - Adult CPR/CPR Professional (lAmerican Red Cross lAW their policies and procedures)

EPTS 14 - EIC Staff Specific Training EPTS 16 - OSC Coordinator and OSC HP Coordinator Training EPTS 17 - Security Coordinator Training EPTS 19 - Severe Accident Procedures Training EPTS 23 - ENMCIEIC Specific Training EPTS 24 - EOF Specific Training EPTS 25 - Communicator Training

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1

-Enter, MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 14 of 38 INFORMATIONAL USE Facility Walkthrough (FW) - Discussion and/or demonstration of Individual's assigned ERO position.

Drill Participation - Participate In a qualifying EP Activity in the ERO position assigned.

Riverbend Station (RBS)

Essential Training LEC-EP-100 Emergency Preparedness; Organization and Facilities Facility Training LEC-EP-101 Facility Training Position Specific LEC-EP-022 Notifications (NEOs)

LEC-EP-023 Notifications (SROs)

LEC-EP-024 Notifications (TSC/EOF Comm)

LEC-EP-031 Emergency Identification and Classifications (Ops Coord/Adv)

LEC-EP-032 Emergency Identification and Classifications (SROs)

LEC-EP-041 Radiological Assessment and Protective Action Recommendations (RPA/RPC)

LEC-EP-042 Radiological Assessment and Protective Action Recommendations (SROs)

LEC-EP-051 Offsite Dose Calculation Methodology (Chem Techs)

LEC-EP-052 Offsite Dose Assessment (OSS, CRS, CCDAC)

LEC-EP-053 Offsite Dose Calculations and Protective Action Recommendations (RAC, ARAC, CCDAC)

LEC-EP-061 Radiological Monitoring LEC-EP-071 NCO/NEO Emergency Response Duties LEC-EP-083 Management Control of Emergencies (RM/ED/Mgrs)

LEC-EP-091 Emergency Response Training for Security Personnel

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 0 ýnf MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 15 of 38 INFORMATIONAL USE LEC-EP-1 15 ERO Tabletop Training LEC-EP-1 18 First Responders-Emergency Organization and Facilities LEC-EP-1 22 Overview of Severe Accident Guidelines LEC-EP-124 Severe Accident Phenomena/Technical Support Guideline Training Waterford 3 (WF3)

PAT Plant Access Training RWT Radworker Training Essential Personnel (1)

WLP-EP-ESS Essential Personnel Facility Training (2)

WLP-EP-TSC Technical Support Center WLP-EP-OSC Operational Support Center WLP-EP-EOF Emergency Operations Facility Position Specific (3)

WLP-EP-EC Emergency Coordinator WLP-EP-TSPV TSC SupervisorlTSC Supervisor Communicator WLP-EP-SS SM/CRS/NPO/Operations Coordinator/Operations Communicator/STA WLP-NAO-EP01 Nuclear Auxiliary Operator WLP-EP-THPC TSC Health Physics/HPC/HPC Assistant/DAC/DAC Assistant WLP-EP-DACM Dose Assessment Communicator

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No.1 EnfreW MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 16 of 3 INFORMATIONAL USE WLP-EP-TCOM TSC Communicator #land#2/TSC Lead Communicator WLP-EP-TENS ENS Communicator WLP-EP-SECS Security Superintendent WLP-EP-SEC E-Plan Security WLP-EP-TENG TSC Engineer/TSC Lead Engineer/TSC Electrical Engineer/TSC Mechanical Engineer WLP-EP-TNUC TSC Nuclear Engineer WLP-EP-TCHM TSC Chemistry Engineer WLP-EP-CHEM Emergency Chemistry WLP-EP-OSPV OSC SupervisorlOSC Supervisor AssistantlOSC Electrical Lead/OSC I&C Lead/OSC Mechanical Lead WLP-EP-OCOM OSC Supervisor Communicator WLP-EP-EMHP Emergency HP Monitoring Team/RCC WLP-EP-RDW Emergency Radwaste WLP-EP-OAAS Assembly Area Supervisor WLP-EP-TSBK TSC Status Board Keeper WLP-EP-TLOG TSC Logkeeper WLP-EP-OITR OSC IT Representative WLP-EP-OMAN OSC Manpower/Electrical Maintenance/l&C Maintenance/ Mechanical Maintenance/ OSC Miscellaneous Support WLP-EP-EDIR EOF Director/Deputy EOF Director WLP-EP-EENG EOF Engineer/EOF Electrical Engineer/EOF I&C Engineer/EOF Mechanical Engineer/Operations Engineering Coordinator/Operations Engineering Coordinator Assistant WLP-EP-ENUC EOF Nuclear Engineer

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I Eltpr- MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 17 of 38 INFORMATIONAL USE WLP-EP-ESBK EOF Status Board Keeper WLP-EP-ERAC EOF Health Physics/RAC/RAC Assistant/Field Team Controller/Dose Projection Coordinator WLP-EP-FTCM EOF Field Team Communicator WLP-EP-EOTA Offsite Technical Advisor WLP-EP-TSPK Technical Spokesperson WLP-EP-TREP Technical Representative/St. Charles Parish Technical Representative/St. John Parish Technical Representative/State Technical Representative WLP-EP-OTAT Offsite Technical Advisor Assistant WLP-EP-ECOM EOF Communicator #1, #2, #3/Communications Coordinator WLP-EP-EENT Entergy System Liaison WLP-EP-ELIC Licensing Coordinator WLP-EP-EADM Administration/Logistics Coordinator WLP-EP-ELOG EOF Logkeeper/Administrative Assistant - Training/Administrative Assistant General/ EOF Procurement Representative Severe Accident Management Overview (4)

1---El NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I

.eW MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 18 of 38 INFORMATIONAL USE 9.2 - ANO Training Matrix Emergency Response Organization (ERO)

Position/TUOI Training Matrix ANO ERO Position/TUOI Training Matrix - Initial Training EP-AOO (See TUOI Listing)

Emergency OperationsFac F)__ __

"11 12 13 14 15 16 17 21 22 24 25 26 31 32 44 45 60 62 63 71 72 73 81 82 83 SAM

  • G*

Acc. Assmt. X X XX X XX X X - -- X Manager Comm. Manager X X X X X X X X X

_X Comm. Liaison X X X X X X X X X X Dose Assessment X X X X X X X X X Tm.

Dose Assmt. XX X X- -X x X X X X X Supv.

Engineering X X X X X X X EOF Director X X XX X X X X X X X X X X X X X_ X EOF HP Supv. X X X X X X X X EOF Maint. X X X X X X X X X Coord.

EOF Support X X X X X X X X X X Supt.

Emerg. Rad. X X X X X X X X X X X Team EP Duty X X X Notif. X X X X X X X X X X X Communicator Offsite Monit. XX X XXX X X X X X - X - X Supv.

REAM X X XX X X X X X X X - X - X Status Board X X X X X X X X Comm. xII _

Support Manager X X X X X X X X X -

NON-QUALITY RELATED TQ-110 REV. No. I

  • Entpra NUCLEAR MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 19 of 38 INFORMATIONAL USE Operational Support Center (OSC) 11 12 13 14 15 16 17 21 22 24 25 26 31 32 44 45 60 62 63 71 721 73 81 82 83 SAM
  • G*

Elect. Maint. X X X X X X X X X Supv.

Emerg. Medical X X X X X X X TeamIII I&C Supv. X X X X X X X X X Maint. Supt. X X X X X X X X X Mech. Maint. X X X X X X X X X Supv.

NCHEM Manager X X X X X I X X X X X OSC Director X X X X X X X X X X X X-X OSC HIP Supv. XF x x I i x x I iX I x X X Status Board X X - X X X X X Comm.

Technical Support Center (TSC) 11 12 13 14 15 16 17 21 22 24 25 26 31 32 4445 60 62 63 71 72 73 81 82 83 SAM

  • G*

Engineering XX X X X -X X X X X-X Manager X X IX Eng. Support TSC X X X X Maint. Manager X X X X X X X X X X X Notif. X X X X X X X X X X X Communicator I I I I Operations Mgr. X X X - X X-X - XX - X RP&RW Manager X XX X X X X X X X XX _ X X TSC Director XXX X X X I_X XX X X X X X XX xX X X TSC Support X X X X X X X X X X Supt. I Status Board X X X X X X Comm. III

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 Entpmv MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 20 of 38 INFORMATIONAL USE Control Room 11 12 13 14 15 16 17 21 22 24 25 26 31 32 SIMPI 45 60 62 63 71 72 73 81 82 83 SAM

  • G*

Shift Manager X X X X X X X X X X X X X X X X X X Shift Engineer X X X X X X X X X X X X SRO XX X X X X X X X xX X X XX X RO X X X X X X X X Status Board X X X X - X - - X X X Comm.

  • Courses provided by Operations Training ANO ERO Position/TUOI Training Matrix - Annual Requalification Training (See TUOI Listing)

Emergency Operations Facility (EOF)

ASCBTILEC-EP-ERORQ ASDRL-EP-A0044 ASCBT-EP-A0083*

Acc. Assmt. Manager X X X Comm. Manager X X X Comm. Liaison X X X Dose Assessment Tm. X X Dose Assmt. Supv. X X X Engineering X X EOF Director X X X EOF HP Supv. X X X EOF Maint. Coord. X X X EOF Support Supt. X X X Emerg. Rad. Team X X EP Duty X X Notif. Communicator X X X Offsite Monit. Supv. X X X REAM X X X Status Board Comm. X X X Support Manager X X X

  • Required every three years

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1

-- E tpw MANAGEMENT_

MANUAL NON-ADMINISTRATIVE PROCEDURE Page 21 of 38 INFORMATIONAL USE Operational Support Center (OSC)

ASCBT/LEC-EP-ERORQ ASDRL-EP-A0044 ASLP-EP-A0025 ASCBT-EP-A0083*

Elect. Maint. X X X Supv.

Emerg. Medical X X X Team I&C Supv, X X X Maint. Supt. X X X Mech. Maint. X X X Supv.

NCHEM Manager X X X OSC Director X X X OSC HP Supv. X X X Status Board X X x Comm. I

ASCBT/LEC-EP-ERORQ ASDRL-EP-A0044 ASCBT-EP-AO083*

Engineering X X X Manager Eng. Support TSC X X X Maint. Manager X X X Notif. X X X Communicator Operations Mgr. X X X RP&RW Manager X X X TSC Director X X X TSC Support X X X Supt.

Status Board X X X Comm. I I I

  • Required every three years

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I e Wt - MANAGEMENT "MANUAL NON-ADMINISTRATIVE PROCEDURE Page 22 of 38 INFORMATIONAL USE Control Room ASLP-EP-OPSRQ ASDRL-EP-SIMPI ASLP-EP-A0025 ASDRL-EP-A0044 Shift Manager X X Shift Engineer X X SRO X RO X Status Board X Comm. I

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 EntjWv MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 23 of 38 INFORMATIONAL USE 9.3 - GGNS Training Matrix CONTROL ROOM Emergency PAT RWT* RRT ESSENTIAL EP EPTS EPTS EPTS EPTS EPTS 7 EPTS OTHER Positions FFD FIT TRNG** DRILL 2 3 25 6 19 FFDS PHYS* OPS **

Fire Brigade X X X X Fire Brigade Tmg*

Operations X X X X X X X Coordinator 1 _ 1 1 NLO/RWO X X X X X RO X X X X X X X Onshift X X X X X X X Chemists SRO/STA X X X X X X X Shift X X X X X X X Manager I _ I I_ I_ I_ _ _ I _ _ _ix ENMC/EIC Emergency PATIFFD/FFDS* ESSENTIAL TRNG** FACILITY TRNG EPDRILL EPTS 23 EPTS 14 OTHER Positions Company X X X X X Spokesperson EIC Coordinator X X X X X EIC Staff X X X X X ENMC Clerical X X X X FW*

Coordinator ENMC Clerical X X X X FW**

Staff ENMC Manager X X X X X ENMC Support X X X X FW**

Staff Media Monitor X X X X FW Technical X X X X X Spokesperson

SEnf NUCLEAR NON-QUALITY RELATED TO-110 REV. No. I

.Enrwv MANAGEMENT Page 24 of 38 MANUAL NON-ADMINISTRATIVE PROCEDURE INFORMATIONAL USE EMERGENCY OPERATIONS FACILITY Emergency Positions PAT RWT* ESSENTIAL FACILITY EP EPTS ? see EPTS 6 EPTS 19 OTHER FFD TRNG** TRAINING DRILL below FFDS*

Accident Assessment x X X X X X Engineer Emergency Support X X X X X EPTS Manager 24 EOF Engineer Mechanical X X X X X EOF Engineer Support X x X X X EOF Engineer Electrical X X X X X EOF Engineer Civil x X X X X EOF Admin Director X X X X X EPTS 24 EPTS 25 EOF Communicator x x X X X EPTS 25 EOF Facility Coordinator X X X X X EPTS 24 X X X X X EPTS 5 Rad Monitor/

EOF Habitability Specialist CAA Qualified or HP Qualified Food & Lodging x x x x X EPTS 24 Background check and MMPI**, and Coordinator Coordinator____Breatholizer Training

  • Licensing Coordinator X X Offsite Emergency X X X X X X X Coordinator OEC Technical Assistant X x X X X X X Offsite Monitoring Team X x X X X RRT, FIT, PHYS*

Driver FW**

Offslte Monitoring Team X X X X X EPTS 5 RRT, FIT, PHYS*

Monitor Offsite Technical Advisors X X Plume Tracking Specialist X X X X X EPTS 5 Radiation Emergency X X X X X EPTS 3 X Manager Radiological Assessment X X X X X EPTS 3 Coordinator Tech/Eng. Support X X X X X EPTS 24 X Manager I_ I Radiological Assessment X X X X X EPTS 3 Dose Calculator I_ _ 1

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I MEnterv MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 25 of 38 INFORMATIONAL USE OPERATIONS SUPPORT CENTER Emergency PAT RWT* RRT ESSENTIAL FACILITY EP EPTS ? EPTS EPTS 11 CPR* OTHER Positions FFD FIT TRNG** TRAINING DRILL See Below 9**

FFDS* PHYS*

Chemistry Teams/On- X x X X X On-call EPTS 7 call Chemist chemist only First Aid Team X X X X X X X (Elec., I&C)

First Aid Team X x X X X X or X or (HP) EMT CPRP Health Physics x x X X X X EPTS 16 EPTS 2*

Coordinator Search and Rescue X X X X X X EPTS 2*

Team (Mech, Elec, FOR I&C l&C)

Damage Control, x X X X X X Repair, Re-entry and Recovery (Mech, Elec, I&C)

On-call Health X X X X X X EPTS 5 EPTS 2**

Physicist On-shift HPs X X X X X EPTS 5 EPTS 2**

On-site Monitor X X X X X X EPTS 5 OSC Communicator x x X X FW*

OSC Coordinator X X X X X X EPTS 16 OSC Planner x x X X FW**

SECURITY Emergency Positions PATIFFDIFFDS* RWT* RRTIFIT/PHYS* EPTS ? See Below Security Contract Personnel X x EPTS 1 or 17 Security Coordinator X X EPTS 17

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I A Enfte v MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 26 of 38 INFORMATIONAL USE TECHNICAL SUPPORT CENTER Emergency PAT RWT* RRT ESSENTIAL FACILITY EP EPTS 2 EPTS ? EPTS 6 EPTS 19 OTHER Positions FFD FIT TRNG** TRAINING DRILL '*OPS See FFDS* PHYS* Below Computer Engineer X X X X X Emergency Director X X X X X X X X Information x x X X X X X Specialist Radiation Protection X X X X X EPTS 3 X EPTS 2**

Manager Records Document x x X X X FW**

Manager I Technical Manager X X X X X X X X TSC Communicator X x X X X EPTS 25 TSC Coordinator X X X X X X X X TSC Coordinator X X X X X X X X Assistant Engineer (Elec, X X X X X Mech)

Radiological X X X X X EPTS 3 Assessment Dose Calculator ENS Communicator x X X X X EPTS 25**

KEY

  • Required every 13 months Required one time only
      • Required every 3 years

SEnterg NUCLEAR MANAGt=MENT NON-QUALrTY RELATED TQ-1 10 REV. No. I gy MANUAL NON-ADMINISTRATIVE PROCEDURE Page 27 of 38 INFORMATIONAL USE 9.4- RBS Training Matrix RBS Course Listing

  • PAT Plant Access Training
  • RWT Radworker Training (1) Essential Training (2) Facility Training (3) Notifications (4) Emergency Identifications and Classifications (5) Radiological Assessment and Protective Action Recommendations (6) Offsite Dose Calculations and Protective Action Recommendations (7) Radiological Monitoring (8) NEO/NCO Emergency Response Training (9) Management Control of Emergencies (10) Security
  • (11) Severe Accident Management Overview Training
  • (12) Severe Accident PhenomenalTSG Training (13) First Responders Tabletop Tabletop Training Drill Drill Participation
  • Governed by site procedures

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I Entpr MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 28 of 38 INFORMATIONAL USE RBS ERO TRAINING MATRIX - INITIAL TRAINING CONTROL ROOM

  • See Course Listinc r-T'-'I
  • 1 7 V T PAT RWT (1) 1 (2) 1 (3) 1 (4) 1 (5) 1(6) 1(7) 1(8) 1 (9) 1 (10) 1 (11) I (12) 1 (13) 1 Drill OSS / CRS * **
  • NCO __ _ __ _ _

NEO _ _ _ ___ _

TECHNICAL SUPPORT CENTER SC) See Course Listing.

PAT RWT (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) Drill Emergency Director I TSC 0 0. 0

  • 0 0 Manager Engineering . . ___ _ ___

Ops. Support Coordinator 0. 0 *

  • Maint. Support Coordinator . . ___

Rad. Protection Coordinator *0 0*

Chem/Core Damage Coord *0

  • _ _

Data Facility Coord. / Status 0 0 0 0 Comm.

Admin. Coord. I Admin.Support 0 0 0 _

Communicator 0 0 .0 _

ENS Comm. / TSC/CR Comm. _ . 0 .

Security Coordinator . . _ _

OPERATIONS SUPPORT CENTER (OSC See Course Listing.

PAT RWT (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) Drill OSC Director / OSC Manager 0 0 a 0 _

Status Comm. / Admin. Support 0 a

  • _

SRPT / RP Technicians 0

  • 0 0
  • _

Mech., Elect., & I&C Maintenance 0 * . _ _

Chemistry Technicians 0 0 0 *

  • _

First Responders 0

  • a Security 0 0 0

TQ-110 REV. No. I MEnterav NUCLEAR MANAGEMENT NON-QUALITY RELATED MANUAL NON-ADMINISTRATIVE PROCEDURE Page 29 of 38 INFORMATIONAL USE RBS ERO TRAINING MATRIX - INITIAL TRAINING EMERGENCY OPERATIONS FACILITY (EQF[ See Course Listing_

PAT RWT (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) Drill Recovery Manager/ EOF . .

Manager Rad. Prot. Advisor . . . ___

Rad. Assess. Coordinator / Asst. . .

  • RAC Offsite Team Coordinator . . .

Operations Advisor . . .

Admin. Advisor / Admin. Support . . .

Communicator * . . .

Status Communicators . .

Technical Advisor . . _

HPN Communicator . . _

Eng. Support Advisor/ . .

Engineering Telecommunications _ . .

  • EOF Registration _ . . -

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I Entefro MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 30 of 38 INFORMATIONAL USE JOINT INFORMATION CENTER (JIC) See Course Listing.

PAT RWT (1) (2) (3) (4) 1 (5) (6) 1 (7) (8) (9) (10) (11) (12 (13) 1 Drill

)

JIC Director _ . .

Media Liaison *

  • Events Information Team . . .

Media Registration / Breezeway . .

Reg.

AudioNisual _____

EOI Spokesperson ------

Rumor Control Coordinator *

  • _

Offsite Coordinator Team * .

News Release Team _ .

Logistics Team _ _

Phone Team * . _

Parish/State Liaison

  • _ _

a NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I z=ý-E jfry MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 31 of 38 INFORMATIONAL USE RBS ERO TRAINING MATRIX - REQUALIFICATION TRAINING CONTROL ROOM PAT RWT CLASSROOM TABLETOP DRILL OSS / CRSI*

NCO **

NEO*

  • OPERATIONS SUPPORT CENTER (OSC)

PAT RWT CLASSROOM TABLETOP DRILL OSC Director / OSC Manager * *__

Status Comm. / Admin. Support *

Mech., Elect. & I&C Maintenance *__

Chemistry Technicians

  • _ _

First Responders / Security _

  • _

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. 1 MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 32 of 38 INFORMATIONAL USE TECHNICAL SUPPORT CENTER (TSC)

F 1 T I PAT RWT CLASSROOM I TABLETOP DRILL Emergency Director / TSC Manager Reactor Engineer _ ___

Mech & Elect. Eng. _ ___

Eng. Coord _ ___ __

Ops. Support Coordinator _ _____

Maintenance Support Coord. _ __ __ _

Radiation Protection Coord. _ __ _ __ _ _

Chem/Core Damage Coord. _ __ __ __ _

Data Facility Coord. / Status a Comm.

Admin. Coord. / Admin. Support _ ___

Communicator ______ _

ENS Communicator _ _ ___

Security Coordinator _ _ _

TSC/CR Communicator _ _

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I

"-ftEfero MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 33 of 38 INFORMATIONAL USE RBS ERO TRAINING MATRIX - REQUALIFICATION TRAINING EMERGENCY OPERATIONS FACILITY (EOF)

PAT RWT CLASSROOM TABLETOP DRILL Recovery Manager / EOF Manager Rad. Prot. Advisor _ _ _ __ _ _

Rad. Assess. Coordinator I Asst.

RAC Offsite Team Coordinator _ _ _ _ _ _

Operations Advisor _______

Admin. Advisor / Admin. Support _ _ _ _ _

Communicator _ __ _ _ _

Status Communicator _ ___

Technical Advisor _ _ _ _ _ _ _

HPN Communicator _ _ _ __ _

Eng. Support Advisor/

Engineering Telecommunications Spec. _ _

EOF Registration _ _ _

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I

"-Enfeu8 MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 34 of 38 INFORMATIONAL USE JOINT INFORMATION CENTER (JIC)

  • I.

PAT RWT CLASSROOM I TABLETOP DRILL JIC Director / Media Liaison _ ___

Events Information Team _ ___ _

Media Registration I Breezeway Reg.

AudioNisual _ ___

EOI Spokesperson _ ___

Rumor Control Coordinator _ ___

Offsite Coordinator Team _ _

News Release Team __ _

Logistics Team / Phone Team _ _

Parish/State Liaison _ _

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I Enfero MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 35 of 38 INFORMATIONAL USE 9.5 - WF3 Training Matrix CONTROL ROOM ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG Operations Coordinator/Shift Manager Control Room Supervisor

  • a a ° Nuclear Plant Operator _ __°___*

Operations Communicator

  • a ° Shift Technical Advisor a
  • Nuclear Auxiliary Operator a
  • a OPERATIONS SUPPORT CENTER (OSC)

ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG OSC Supervisor

  • __"_*__

OSC Supervisor Assistant *

OSC I & C Lead _

  • 0 0_ _

OSC Mechanical Lead *

  • __ _

Security Superintendent 0 0 0 _ _ _

OSC Supervisor Communicator _ ° _ 0_ _

OSC I.T. Representative

  • _ _ _ _ _

Radiological Controls Coordinator

  • _ _ _ _ _

H.P. Monitoring Team 0 ° 0 0 0 Radwaste 0 0 0 0 "

Assembly Area Supervisor *

  • __ _

Electrical Maintenance

  • 0 0 I & C Maintenance 0
  • 0 0 0 Mechanical Maintenance
  • 0 0 0 0 OSC Miscellaneous Support *
  • 0 _
  • Chemistry ___ _ _ °

TQ-110 REV. No. 1 M

E.fpr0 NUCLEAR MANAGEMENT NON-QUALITY RELATED MANUAL NON-ADMINISTRATIVE PROCEDURE Page 36 of 38 INFORMATIONAL USE TECHNICAL SUPPORT CENTER (TSC)

ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG Emergency Coordinator ,_°_*___° _*

TSC Logkeeper TSC Supervisor °________

TSC Supervisor Communicator Health Physics Coordinator Health Physics Coordinator Assistant Dose Assessment Coordinator Dose Assessment Coordinator Assistant Dose Assessment Communicator TSC Lead Communicator ° TSC Communicator (#1 & #2)

ENS Communicator ° * ° TSC Lead Engineer ° * ° TSC Electrical Engineer °

  • TSC Mechanical Engineer ° TSC Nuclear Engineer * * ° ° ° TSC Chemistry Engineer ° ° °_°_° TSC Status Board Keeper ° *
  • a ° Offsite Technical Advisor * ° * ° °

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I

"- e Wfp MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 37 of 38 INFORMATIONAL USE EMERGENCY OPERATIONS FACILITY (EOF)

ESSENTIAL FACILITY POSITION PERSONNEL TRAINING SPECIFIC SAMG PAT RWT EOF Director

  • Deputy EOF Director _ _ _ __°_ _ _ _

Operations/Engineering Coordinator ° °_ _ _ _ _ _

Operations/Engineering Coordinator ° Assistant EOF Electrical Engineer ° °__ _ _ _ _

EOF I & C Engineer

  • _ _ __°_ _

EOF Mechanical Engineer ° *___ __ _

EOF Nuclear Engineer

  • _ __ ____

EOF Status Board Keeper ° °_ __ _ __

Radiological Assessment Coordinator ° °__ __ __

Radiological Assessment Coordinator Assistant Field Team Controller _ °__ _ _ _ _

Dose Projection Coordinator * *__ _ __*

Field Team Communicator ° °__ _ _ _ _

Offsite Technical Advisor ° °_°_°__

Offsite Technical Advisor Assistant * *___ __° Communications Coordinator ° °

  • ____

EOF Communicator (#1,#2,#3) ° ° ___° Entergy System Liaison _

  • __ __

Licensing Coordinator * ° __ _*

Administrative/Logistics Coordinator ° ° ___° EOF Logkeeper *_ _ _ _ ___ _

Administrative Assistant - Training °

  • ___° Administrative Assistant - General ° °
  • ___*__

EOF Procurement Representative ° * ° ____

NUCLEAR NON-QUALITY RELATED TQ-110 REV. No. I

"-entpro MANAGEMENT MANUAL NON-ADMINISTRATIVE PROCEDURE Page 38 of 38 INFORMATIONAL USE OFFSITE REPS. ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG St. Charles Parish Technical Representative

  • St. John Parish Technical Representative State Technical Representative *
  • EMERGENCY NEWS CENTER (ENC)

ESSENTIAL FACILITY POSITION PAT RWT PERSONNEL TRAINING SPECIFIC SAMG ENC Director _ _

  • Office Manager _ _ _ _

Logistics & Production Coordinator _ _ _

Logistics & Production Assistant 0

  • Rumor Control Supervisor a ENC Technical Spokesperson _ _°_ _

ENC Technical Spokesperson Assistant 0 0

  • Media Monitoring/Response Supervisor _ _ a Media Monitoring Assistant 0 0 Media Response Assistant _ __

Government Affairs Coordinator 0 0 ENC Secretary 0 0 0 Audio Visual Operator _ _ _

Offsite Agency Coordinator 0 0 St. Charles PR Representative _ *_*

St. John PR Representative _ _ __ ° Corporate Emergency Center Manager _ _ __ _

Security I 0