Fitness-for-Duty Performance Data, Six-Month Report for Period Ending December 31, 2003
ML040540579
Person / Time
Site: Waterford Entergy icon.png
Issue date: 02/18/2004
From: Sen G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2004-0015
Download: ML040540579 (7)


Text

1OCFR26.71 (d)

Entergy Entergy Operations, Inc.

17265 River Road Killona, LA 70066 Tel 504 739 6650 W3Fl -2004-0015 February 18, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Fitness for Duty Performance Data-Six Month Report Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

In accordance with 10CFR26.71 (d), Entergy Operations, Inc. hereby submits the fitness for Duty Performance Data for the six month period from July 1, 2003 through December 31, 2003.

There are no new commitments contained in this submittal. Should you have any questions concerning this submittal, please contact Oscar Pipkins at (504) 739-6707 or Dee Childress at (504) 739-6974.

Sincerely, G. Sen Licensing Manager GS/OPP/cbh Attachment(s)

-1

-OL

W3F1 -2004-0015 Page 2 cc: Mr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford Steam Electric Station Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-07 D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502

Attachment to W3F1-2004-0015 Page 1 ATTACHMENT FITNESS FOR DUTY - SIX MONTH REPORT FOR THE PERIOD JULY 1, 2003 THROUGH DECEMBER 31, 2003

Attachment to

'.43F1 -2004-0015 Page 2 Fitness for Duty Program Six Month Performance Report July - December 2003 PROGRAM

SUMMARY

The Waterford 3 annual random testing rate is 50 percent. During this reporting period, approximately 25.1 percent of the population has been randomly tested. The rate of positive tests from random testing is 0.37 percent. The total random percentage for the year is 51.7percent.

POSITIVE RESULTS:

As shown on the attached sheets, there were a total of seven confirmed positive test results during this reporting period. Of the two samples that confirmed positive for marijuana, one confirmed due to the lower cut-off established by Entergy. Cocaine accounted for 71.4 percent of the positive test results.

MANAGEMENT ACTIONS:

During Pre-Access testing, one contractor sample was classifed as 'suspect' because of a low termperature reading on the sample. An additional specimen was collected under direct observation and classified as

'Other'. Both samples were sent to the confirmatory laboratory and both samples returned negative results.

One sample was collected due to request by management after an accident and classified as a 'for-cause' test. After further review, management decided the test was not warranted and changed the reason for the test to 'Other'. This sample returned negative results.

Access was denied to the five short-term contractors and one licensee employee that tested positive during Pre-Access testing. Management was notified and the individual's files were annotated to reflect the positive result and management's actions.

One licensee employee tested positive during random testing. This individual was a licensed nuclear operator. Management and the NRC were notified. The individual's file was annotated to reflect the positive result and management's actions.

During this reporting period, eight 'for-cause' collections were requested. Four collections were requested because of accidents. The other collections were requested due to behavioral observations. All 'for-cause' samples were returned with negative results.

There was one licensee employee and three contractors that participated in follow-up testing during this reporting period in accordance with other licensees' follow-up testing programs. Five tests were administered collectively and all test results were favorable.

EVENTS REPORTED TO THE NRC:

During this reporting period, there was one violation of the fitness for duty program that was reportable. A Licensced Operator tested positive for marijuana during random testing.

PROGRAM EVALUATION:

No programmatic problems were identified during this reporting period.

Attachment to W3F1 -2004-0015 Page 3 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO IOCFR26 Entergy Operations, Inc. December 31, 2003 Company 6 Months Ending Waterford 3 SES, 17265 River Road, Killona, LA 70057 Location Dee R. Childress, Supervisor, Security/Fitness for Duty (504) 739-6974 Contact Name Phone (Include Area Code)

Cutoffs: Screen / Confirmation I Appendix A to 10CFR26 Marijuana 50 / 15 Amphetamines 1000 / 500 N/A l

Cocaine 300 / 150 Phencyclidine 25 1 25 N/A Opiates 300 / 300 A,Icohol (%BAC 0.04% N/A Licensee Long-Term Short-Term Testing Results Employees Contractor Contractor Personnel Personnel Average Number with Unescorted Access 749 N/ A 331 Categories Tested Positive Tested Positive Tested Positive Pre-Access 23 1 N/A N/A 416 5 For-Cause (Post accident) 0 0 N/A N/A 4 0 For-Cause (Behavior) 2 0 N/ A N/ A 2 0 Random 186 1 N/A N/A 85 0 Follow-Up 2 0 N/A N/A 3

Attachment to W3Fl -2004-0015 Page 4

Attachment to W3F1 -2004-0015 Page 5 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES JULY - DECEMBER 2003 Marijuana Cocaine Opiates Amphetamines Phencyclidine Alcohol Refusal 1 2 3 4 5

_________ ~~to Test _ _ _ _ _ _ _ _

Licensee Employees 1/1 0 0 0 0 0 0 N/A N/A N/A N/A N/A Long-Term Contractor N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Short-Term Contractor 0 5 0 0 0 0 0 N/A N/A N/A N/A N/A Total 11 5 0 10 1 0 01 0 1 N/AI N/AI N/A N/A N/A 7