W3F1-2004-0022, Core Operating Limits Report - Cycle 13 Revision 1, Change 2

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report - Cycle 13 Revision 1, Change 2
ML041130290
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/19/2004
From: Sen G
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2004-0022
Download: ML041130290 (9)


Text

'Entergy Entergy Operations, Inc.

17265 River Road Killona. LA 70066 Tel 504 739 6650 W3Fl-2004-0022 April 19, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

Subject:

Core Operating Limits Report - Cycle 13 Revision 1, Change 2 Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

Waterford 3 Technical Specification 6.9.1.11.3 requires submittal of the Core Operating Limits Report (COLR) for each reload cycle. Revision 1, Change 1 of the COLR for Waterford 3 Cycle 13 was submitted on November 19, 2003 by letter W3F1 -2003-0097.

COLR Cycle 13, Revision 1 Change 1 revised Section 3.2.7, Axial Shape Index (ASI), to implement a 0.03 positive adjustment to the lower limit of the allowed ASI range (changed from -0.22 to -0.19) for 2 70% power. The change was necessary due to the upward shift of incore instrumentation due to a modification performed in Refueling Outage 12 and was based on a conservative preliminary assessment of the impact of changes in incore instrumentation (ICI) position on the operation of the Core Operating Limit Supervisory and CPCs.

Final detailed analysis on the impact of changes in ICI position have been completed and the attached COLR Cycle 13 Revision 1, Change 2 revises Section 3.2.7, Axial Shape Index (ASI), to reduce the adjustment to the lower limit of the allowed ASI range for 2 70%

power. The allowed ASI lower limit is changed from -0.19 to -0.21.

If you have any questions concerning this submittal please contact D.L. Bentzinger at (504) 739-6368.

4CoDI

W3FI-2004-0022 Page 2 There are no new commitments contained in this submittal.

incerely, G. Sen Licensing Manager GS/TMM/cbh Attachment(s)

W3Fl-2004-0022 Page 3 cc: Mr. Bruce S. Mallett Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Waterford NPS P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. N. Kalyanam Mail Stop 0-07D1 Washington, DC 20555-0001 Wise, Carter, Child & Caraway ATTN: J. Smith P.O. Box 651 Jackson, MS 39205 Winston & Strawn ATTN: N.S. Reynolds 1400 L Street, NW Washington, DC 20005-3502 Platts Energy ATTN: B. Lewis 1200 G. St., N.W. Suite 1000 Washington, DC 20005

W3FI-2004-0022 Waterford 3 Core Operating Limits Report Cycle 13, Revision 1, Change 2

ENTERGY OPERATIONS WATERFORD 3 CORE OPERATING LIMITS REPORT FOR CYCLE 13 REVISION 1, CHG. 2 Prepared by: D. L. Bentzinger /,~t/ /g + /t1 Nuclear Engineering Reviewed by: J.M. Manzella Ls$c t( A1 I//Y'-

Lic nsing Approved by: J. B. Holman 9J Nbclear Engineering Approved by: G. Sen "X hi4 /ng ° LicvnK i (

WATERFORD 3 Page 1 CYCLE 13 REVISION 1, CHG. 2 l

WATERFORD 3 CORE OPERATING LIMITS REPORT CYCLE 13, REVISION 1, CHG. 2 INDEX PAGE I. INTRODUCTION 5

11. AFFECTED TECHNICAL SPECIFICATIONS 6 3.1.1.1 Shutdown Margin - Any CEA Withdrawn COLR 3/4 1-1 3.1.1.2 Shutdown Margin -All CEAs Fully Inserted COLR 3/4 1-3 3.1.1.3 Moderator Temperature Coefficient COLR 3/4 1-4 3.1.2.9 Boron Dilution COLR 3/4 1-15 3.1.3.1 Movable Control Assemblies - CEA Position COLR 3/4 1-18 3.1.3.6 Regulating and Group P CEA Insertion Limits COLR 3/4 1-25 3.2.1 Linear Heat Rate COLR 3/4 2-1 3.2.3 Azimuthal Power Tilt - Tq COLR 3/4 2-4 3.2.4 DNBR Margin COLR 3/4 2-6 3.2.7 Axial Shape Index COLR 3/4 2-12 3.9.1 Boron Concentration COLR 3/4 9-1 1II. METHODOLOGIES 33 LIST OF EFFECTIVE PAGES Revision 0 Pages 1-6, COLR 3/4 1-1 through COLR 3/4 9-1 and Page 33 Revision 1 Pages 1-6, COLR 3/4 1-1 through COLR 3/4 9-1 and Page 33 Revision 1 Pages 1, 2, 5, and COLR 3 /4 2-12 R ng. 1 Revision 1 Pages 1, 2, 5, 5a and COLR 3 /4 2-12 Chg. 2 WATERFORD 3 Page 2 CYCLE 13 REVISION 1, CHG. 2 l

WATERFORD 3 CORE OPERATING LIMITS REPORT CYCLE 13, REVISION 1, CHG. 2 I. INTRODUCTION This CORE OPERATING LIMITS REPORT (COLR) has been prepared in accordance with the requirements of Waterford 3 Technical Specification 6.9.1.1 1 for Waterford 3 Cycle 13. The core operating limits have been developed using the NRC approved methodologies specified in Section 1II. This is Revision I of the Cycle 13 COLR.

The major changes between the Cycle 13 Revision 0 COLR and the Cycle 12 COLR are listed below:

  • The Table of Contents List of Effective Pages was updated.
  • The List of Figures were revised to add COLR Figure 8A and to update the List of Effective Figure Pages
  • This Introduction section was revised to reflect the changes for Cycle 13.
  • The surveillance requirements for Section 3.1.2.9 were changed based on results of a corrective action of Condition Report CR-WF3-2003-02844.
  • Clarifying notes were added below Sections 3.1.3.1.a and 3.1.3.1.b regarding the correspondence of these sections to Technical Specifications.

.* The title for Section 3.1.3.6 was revised to match references in Section III and the Table of Contents

  • Figures 6 & 7 were revised to provide vertical lines from the endpoints of the plotted line to the temperature axis. Also, the equation for the plotted line was added.
  • Section 3.2.4.b was revised to allow use of Figure 8A
  • Notes below the text of Section 3.2.4 for use with Figures 8, 8A & 9 were updated and new notes were added.
  • Figure 8,was revised to incorporate cycle-specific limits for Cycle 13.
  • Figure 8A, was added to provide better resolution for the three power ranges in the lower portion of Figure 8.
  • Figure 9,was revised to incorporate cycle-specific limits for Cycle 13.
  • Section 111.7 was revised to add the document date.
  • Section 111.8 was added in accordance with License Amendment 191.

The changes between the Cycle 13 Revision I COLR and the Cycle 13 Revision 0 COLR are listed below:

  • Figures 6 & 7 were revised to implement a 0.1 KW/FT reduction for the specified temperature range to account for greater than 500 but less than 600 plugged tubes in Steam Generator #1 (Ref. ER-WF3-2003-0117-000)

The change between the Cycle 13 Revision 1 COLR and the Cycle 13 Revision 1Chg. 1 COLR is listed below:

Section 3.2.7, Axial Shape Index, was revised to implement a 0.03 positive bias to the lower limit of the allowed ASI range (changed from -0.22 to -0.19) for 2 70% power. This change was necessary due to the upward shift of incore instrumentation due to a modification performed in Refueling Outage 12 (Ref. Westinghouse Letter CWTR-03-190, dated 11/17/03).

WATERFORD 3 Page 5 CYCLE 13 REVISION 1, CHG. 2

The change between the Cycle 13 Revision 1 Chg. 1 COLR and the Cycle 13 Revision 1 Chg. 2 COLR is listed below:

Cycle 13 Revision 1 Chg. 1 was based on a conservative preliminary assessment of the impact of changes in ICI position on the operation of the COLSS and CPCS. The necessary detailed study has since been completed and the results were transmitted via Westinghouse Letter CWTR-03-197, dated 1/8104. The maximum required margin penalty was reduced from those installed in COLSS at the beginning of Cycle 13. The suggested change to COLSS constant ASINBP(3) is still conservative to that originally suggested in the Waterford 3, Cycle 13 Startup Test and Setpoints Transmittal, (Ref.

NF-03-W-WrFD-40, dated 10/2/03) which assumed no changes in ICI position. Section 3.2.7, Axial Shape Index, was revised to implement a 0.02 negative bias to the lower limit of the allowed ASI range (changed from -0.19 to -0.21) for 2 70% power.

WATERFORD 3 Page 5A CYCLE 13 REVISION 1, CHG. 2 l

- Z o CORE OPERATING LIMITS REPORT AXIAL SHAPE INDEX 3.2.7 The AXIAL SHAPE INDEX (ASI) shall be maintained within the following limits

COLSS Operable

-0.21 < ASI * +0.26 for THERMAL POWERS > 70% of RATED THERMAL POWER

-0.26 < ASI * +0.26 for THERMAL POWERS from 20% to 70% of RATED THERMAL POWER COLSS Out of Service

-0.17 < ASI * +0.22 for THERMAL POWERS from 20% to 100% of RATED THERMAL POWER WATERFORD3

... .. _ _ _ _ COLR3/42-12 CYCLE 13 REVISION 1. CHG 2