ULNRC-05838, Owner'S Activity Reports (OAR-1 Forms) for Refuel 18

From kanterella
(Redirected from ULNRC-05838)
Jump to navigation Jump to search
Owner'S Activity Reports (OAR-1 Forms) for Refuel 18
ML12055A059
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/23/2012
From: Maglio S
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-05838
Download: ML12055A059 (8)


Text

~~

WAmeren MISSOURI Callaway Plant February 23, 20 I2 ULNRC-05838 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000I Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 OWNER'S ACTIVITY REPORTS (OAR-1 FORMS) FOR REFUEL 18 Please find enclosed the Owner's Activity Reports (OAR-I forms) for Refueli8 activities at Callaway Plant. The reports are submitted pursuant to the provisions of ASME Boiler and Pressure Vessel Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission."

The OAR-I forms enclosed are associated with the following Refuel I8 activities at Callaway Plant:

I. lnservice Inspection and Repair/Replacement activities, and

2. Containment Inservice Inspection pursuant to ASME Section XI, subsections IWE and IWL.

In accordance with Code Case N-532-4, each attached OAR-I form includes a listing of items with flaws or relevant conditions that required evaluation for continued service (Table I) and an abstract of repair/replacement activities required for continued service (Table 2).

This letter does not contain new commitments. For any questions regarding the attached information, please contact me at (573) 676-87I9.

Sincerely, A)t-or-\ A.

Scott A. Maglio

~>.2 Regulatory Affai s Manager ACS/nls Enclosed: OAR-I Forms (2)

PO Box 620 Fulton, MD 65251 AmerenMissouri.com ...............

ULNRC-05838 February 23, 2012 Page2 cc: Mr. Elmo E. Collins, Jr.

Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)

Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738

ULNRC-05838 February 23, 2012 Page3 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood R. Holmes-Bobo J. A. Doughty C. J. Stundebeck NSRB Secretary Mr. Paul Parmenter, Director (SEMA)

Mr. Thomas Mohr, Senior REP Planner (SEMA)

Mr. Tom Masso, REP Planner (SEMA)

. Ms. Diane M. Hooper (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr. Wayne Harrison (STPNOC)

Ms. Linda Conklin (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Mr. Dru Buntin (DNR)

Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 18 Plant Callaway Plant Unit No. Commercial service date 12/19/1984 Refueling outage no. 18 (if applicable)

Current inspection interval 2"d (IWE Program)

(1st, 2nd, 3rd, 4th, other)

Current inspection period 1st (IWE Program)

(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition with 2003 Addenda (IWE Program)

Date and revision of inspection plans IWE Program: 10/06/2009, Rev. 3, Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used N-532-4, N-685 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 18 (refueling outage number) conform to the requirements of Section XI.

ltvE Signed Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by _ __:H....:..:S=B=C=-T'------ of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions nspeor's Signature National Board, State, Province, and Endorsements Date 111/- F£8 -12 Page 1 of2

Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number E-A, E1.11 Containment Liner CAR 201108817 identified areas on the containment Plate Barrel liner plate barrel having blistered paint. The evaluation determined that the blistered paint was not a result of corrosion or other distress to the liner base metal and the condition was therefore acceptable.

E-A, E1.11 Containment Normal CAR 201109796 identified corrosion on the 'A' Sump Liner containment sump liner plate that did not meet acceptance criteria. The evaluation determined that there was no structural degradation due to the corrosion and the condition was acceptable.

TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number None None None None None Page 2 of2

Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 18 Plant Callaway Energy Center, P. 0. Box 620, Fulton, MO 65251 Unit No. Commercial service date 12/19/1984 Refueling outage no. 18 (if applicable)

Current inspection interval 3rd (1st, 2nd. 3rd. 4th, other)

Current inspection period 2nd (1st. 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition with 2000 Addenda Date and revision of inspection plans 10/24/2012, Revision 5 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Edition and Addenda as inspection plan.

Code Cases used N-460, N-532-4, N-533-1, N-566-2, N-616, N-623, N-652, N-706, N-722-1, N-729-1 (if applicable)

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 18 (refueling outage number) conform to the requirements of Section XI.

Signed ec ~--c.r=it-,- l:- - - <-t;.J_'- ~ Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by HSB--=C_T_ _ of _ _ _ _ _H_a_rtford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/

replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

~~'~ til'l'tDS" _______ Commissions ~rc.(o;s-A-_~--- Mo .t4~2. ______________

~lns~or's Signature National Board, State, Province, and Endorsements Date Z3 -Fee Page 1 of3

Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number None None None Page 2 of3

Enclosure to ULNRC-05838 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number BGV0002, Chemical and Volume Control Perform Section XI Repair to correct leakage at 2" 2 System Letdown 11/15/2010 10008582 BGV0002 fillet weld.

Orifice B Outlet Throttle Valve Page 3 of3