Category:Letter type:ULNRC
MONTHYEARULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06807, Submittal of Single Positive Test Forms2023-04-0303 April 2023 Submittal of Single Positive Test Forms ULNRC-06801, CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions2023-03-30030 March 2023 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06798, Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan2023-03-30030 March 2023 Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan ULNRC-06803, Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection2023-03-29029 March 2023 Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ULNRC-06805, Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days2023-03-21021 March 2023 Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days ULNRC-06802, Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument2023-03-0909 March 2023 Special Report 2023-01 (PAM Report); Non-Functionality of a Post-Accident Monitoring Instrument ULNRC-06795, Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms2023-01-24024 January 2023 Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms ULNRC-06794, Submittal of Fitness for Duty Program Data for 20222023-01-24024 January 2023 Submittal of Fitness for Duty Program Data for 2022 ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ULNRC-06772, 10 CFR 50.59 and 10 CFR 72.48 Summary Report2022-11-23023 November 2022 10 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06779, ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves2022-11-14014 November 2022 ULNRC-06779: Contesting of Green NCV 05000483/2022010-03, Failure to Perform Required Inservice Testing of Residual Heat Removal Heat Exchanger Pneumatically (Air) Operated Outlet and Bypass Valves ULNRC-06773, Results of Steam Generator Tube In-Service Inspection2022-11-0101 November 2022 Results of Steam Generator Tube In-Service Inspection ULNRC-06775, Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days2022-10-27027 October 2022 Submittal of Non-Functionality of Loose-Part Detection System Channel for Greater than 30 Days ULNRC-06771, Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013)2022-10-25025 October 2022 Correction to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections (LDCN 21-0013) ULNRC-06770, Cycle 25 Commitment Change Summary Report2022-10-19019 October 2022 Cycle 25 Commitment Change Summary Report ULNRC-06763, Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013)2022-09-0101 September 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspection (LDCN 21-0013) ULNRC-06758, Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002)2022-08-0404 August 2022 Union Electric Co. - Renewed Facility Operating License NPF-30, Withdrawal of License Amendment Request and Exemption Request Regarding Transition to Framatome Fuel (LDCN 22-0002) ULNRC-06755, Enclosure 2: Ameren Missouri Verification Ofagreement Letters with State and EPZ Counties for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals2022-07-13013 July 2022 Enclosure 2: Ameren Missouri Verification Ofagreement Letters with State and EPZ Counties for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals ULNRC-06754, Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications2022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications ULNRC-06739, Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007)2022-06-30030 June 2022 Post-Audit Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505 (LDCN 20-0007) ULNRC-06735, Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014).2022-05-27027 May 2022 Response to Request for Additional Information Regarding Request for License Amendment and Regulatory Exemptions for Risk-Informed Approach to Address GSI-191 and Respond to Generic Letter 2004-02 (LDCN 19-0014). 2024-06-26
[Table view] Category:Report
MONTHYEARML24122C6372024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report November 24, 2022 to May 1 2024 ML24115A0992024-04-0101 April 2024 EIP-ZZ-A0066, Rev 30, RERP Training Program ML24086A5142024-03-26026 March 2024 Changes to the Westinghouse and Framatome ECCS Evaluation Models and PCT Penalty Assessments ULNRC-06861, Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments2024-03-26026 March 2024 Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments ML24065A2992024-03-0505 March 2024 Enclosure - Callaway Nuclear Plant: Form Oar-1 Owners Activity Report ULNRC-06849, Cracking Assessment for Framatome RSG Channel Head Assembly2023-12-20020 December 2023 Cracking Assessment for Framatome RSG Channel Head Assembly ML23215A1992023-08-31031 August 2023 ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 ML23299A1982023-06-16016 June 2023 Enclosure 2: Callaway RR Tech Report Containment Post-Tensioning System Inservice Inspection Technical Report Basis for Proposed Extension of Examination Interval, Revision 0 ML23156A6712023-06-0505 June 2023 Description and Justification for Changes ML23150A1832023-05-30030 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist Administrative Correction ML23150A1842023-05-18018 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist ML23150A1892023-05-18018 May 2023 EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23110A0712023-04-0606 April 2023 Procedure Review Form (PRF) for EIP-ZZ-A0066, Revision 28, RERP Training Program ML24115A1002023-03-26026 March 2023 EIP-ZZ-PRO2O, Rev. 55, Activation and Operation of the Joint Information Center ML23068A0992023-03-0909 March 2023 Special Report 2023-01 PAM Report ULNRC-06796, Enclosure 7 - Holtec International Report HI-2230125, Revision 0, Supplemental Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station, Revision 0, Dated February 14, 20232023-02-14014 February 2023 Enclosure 7 - Holtec International Report HI-2230125, Revision 0, Supplemental Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station, Revision 0, Dated February 14, 2023 ML22349A6272022-12-15015 December 2022 Enclosure 3 - 2022 Proxy Statement of Ameren Corporation ML22349A6322022-12-15015 December 2022 Enclosure 8 - 10-K Filed 02/23/2022 ML22349A6342022-12-15015 December 2022 Enclosure 9 - 10-Q Filed 03/31/2022 ML22349A6352022-12-15015 December 2022 Enclosure 10 - 10-Q Filed 06/30/2022 ML22349A6362022-12-15015 December 2022 Enclosure 11 - 10-Q Filed 09/30/2022 ML22349A6402022-12-15015 December 2022 Enclosure 14 - Schedule 14C Information for Union Electric Company March 2022 ML22327A2242022-11-23023 November 2022 Enclosure 1: Callaway Plant - Report Period: 10 CFR 50.59 and 10 CFR 72.48 Summary Report June 16, 2021 to November 23, 2022 ML22335A5012022-11-16016 November 2022 Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis ML22318A1902022-11-14014 November 2022 Enclosure 2 - Pressurized Water Reactor Owners Group Letter, OG-22-187, Subject: PWR Owners Group Mode 4 LOCA Analysis for Westinghouse NSSS Plants ULNRC-06774, HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station2022-10-21021 October 2022 HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station ULNRC-06768, Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 20222022-10-12012 October 2022 Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22181B1362022-06-30030 June 2022 Attachment 6 - Replacement for Attachment 6, Description and Assessment Specific to TSTF-439, of ULNRC-06688 ML22181B1402022-06-30030 June 2022 Enclosure 1 - Replacement for Enclosure 1, List of Revised Required Actions to Corresponding PRA Functions, of ULNRC-06688 ML22181B1412022-06-30030 June 2022 Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688 ULNRC-06729, Attachment 8 - Non-Proprietary Version of Non-LOCA Summary Report2022-06-0202 June 2022 Attachment 8 - Non-Proprietary Version of Non-LOCA Summary Report ML22153A1822022-06-0202 June 2022 Attachment 6 - Non-Proprietary Version of Rlbloca Summary Report ML22153A1832022-06-0202 June 2022 Attachment 7 - Non-Proprietary Version of SBLOCA Summary Report ML22027A8082022-01-27027 January 2022 Enclosure 3: Callaway, Unit 1, Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 ML22027A8092022-01-27027 January 2022 Enclosure 4: Callaway, Unit 1, Acronyms and Definitions ML22027A8062022-01-27027 January 2022 Enclosure 1: Request for Exemptions for Risk-Informed Approach to Resolution for Generic Letter 2004-02 ML21356B5072021-12-22022 December 2021 Enclosure 1: Mark-up of Operating License (OL) ML21356B5082021-12-22022 December 2021 Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change) ML21343A0952021-12-0909 December 2021 Attachment 1: Description and Assessment ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days ML21280A3802021-10-0707 October 2021 Cumulative Summary of Changes to Enclosure 2, License Amendment Request, and Enclosure 3, Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02, of ULNRC-06526 ML21280A3812021-10-0707 October 2021 License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 ML21272A1702021-09-28028 September 2021 Enclosure 2 - Full Scope Implementation of Alternative Source Term Evaluation of Proposed Changes (Redacted) ML21237A1372021-08-23023 August 2021 Enclosure 1: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - Baseline Weld Input ML21237A1382021-08-23023 August 2021 Enclosure 2: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Critical Breaks) ULNRC-06683, Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks)2021-08-23023 August 2021 Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks) 2024-05-01
[Table view] Category:Miscellaneous
MONTHYEARML24115A0992024-04-0101 April 2024 EIP-ZZ-A0066, Rev 30, RERP Training Program ULNRC-06861, Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments2024-03-26026 March 2024 Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments ML24086A5142024-03-26026 March 2024 Changes to the Westinghouse and Framatome ECCS Evaluation Models and PCT Penalty Assessments ML23156A6712023-06-0505 June 2023 Description and Justification for Changes ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML24115A1002023-03-26026 March 2023 EIP-ZZ-PRO2O, Rev. 55, Activation and Operation of the Joint Information Center ML23068A0992023-03-0909 March 2023 Special Report 2023-01 PAM Report ML22027A8092022-01-27027 January 2022 Enclosure 4: Callaway, Unit 1, Acronyms and Definitions ML22027A8062022-01-27027 January 2022 Enclosure 1: Request for Exemptions for Risk-Informed Approach to Resolution for Generic Letter 2004-02 ML21356B5082021-12-22022 December 2021 Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change) ML21356B5072021-12-22022 December 2021 Enclosure 1: Mark-up of Operating License (OL) ML21343A0952021-12-0909 December 2021 Attachment 1: Description and Assessment ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days ML21280A3802021-10-0707 October 2021 Cumulative Summary of Changes to Enclosure 2, License Amendment Request, and Enclosure 3, Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02, of ULNRC-06526 ML21280A3812021-10-0707 October 2021 License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 ML21173A3412021-06-22022 June 2021 CFR 50.59 and 10 CFR 72.48 Summary Report - May 16, 2019 to June 15, 2021 ULNRC-06437, Cycle 22 Commitment Change Summary Report2018-06-0707 June 2018 Cycle 22 Commitment Change Summary Report ML17097A5582017-03-30030 March 2017 Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process ULNRC-06349, Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process2017-03-30030 March 2017 Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process ML16160A0952016-06-0808 June 2016 ASP ANALYSIS-REJECT- Callaway Unit 1 Auxiliary Feedwater Control Valves in Motor Driven Pump Train Inoperable due to Faulty Electric positioner Cards (LER 483-2015-003 and 483-2015-004) ULNRC-06292, Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions2016-03-30030 March 2016 Transmittal of 10 CFR50.46 Annual Report ECCS Evaluation Model Revisions ULNRC-06199, Nuclear Property Insurance Reporting2015-03-18018 March 2015 Nuclear Property Insurance Reporting ULNRC-06173, Submits Owner'S Activity Reports (OAR-1 Forms) for Cycle 20 and Refuel 202015-02-19019 February 2015 Submits Owner'S Activity Reports (OAR-1 Forms) for Cycle 20 and Refuel 20 ML14310A8362015-02-0909 February 2015 NRC Staff Evaluation of Final Rule for Continued Storage of Spent Nuclear Fuel for the License Renewal Environmental Review for Callaway, Unit 1 ULNRC-06168, Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren2014-12-18018 December 2014 Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren ULNRC-06168, Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren2014-12-18018 December 2014 Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren ULNRC-06168, Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/19952014-12-18018 December 2014 Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/1995 ULNRC-06168, Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren2014-12-18018 December 2014 Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren ULNRC-06168, Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/19952014-12-18018 December 2014 Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/1995 ULNRC-06168, Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric2014-12-18018 December 2014 Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric ULNRC-06168, Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren2014-12-18018 December 2014 Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren ULNRC-06168, Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/20122014-12-18018 December 2014 Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/2012 ULNRC-06168, Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren2014-12-18018 December 2014 Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren ULNRC-06168, Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/19942014-12-18018 December 2014 Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/1994 ULNRC-06168, Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/20102014-12-18018 December 2014 Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/2010 ML14352A4472014-12-18018 December 2014 Enclosure 3 - 2014 Proxy Statement of Ameren Corporation - Ameren ML14352A4432014-12-18018 December 2014 Enclosure 10 - Articles of Incorporation Ameren Corporation Restated 10/17/1995 ML14352A4412014-12-18018 December 2014 Enclosure 7 - 10-Q Filed Period 6/30/2014 Ameren ML14352A4402014-12-18018 December 2014 Enclosure 5 - 10-K Filed Period 12/31/2013 - Ameren ML14352A4392014-12-18018 December 2014 Enclosure 8 - 10-Q Filed Period 9/30/2014 Ameren ML14352A4382014-12-18018 December 2014 Enclosure 9 - Articles of Incorporation Ameren Corporation Dated 08/07/1995 ML14352A4362014-12-18018 December 2014 Enclosure 14 - Defc 14c Filed Period 3/11/2014 - Union Electric ML14352A4352014-12-18018 December 2014 Enclosure 6 - 10-Q Filed Period 3/31/2014 - Ameren ML14352A4342014-12-18018 December 2014 Enclosure 11 - Ameren Corporation By-Laws Effective 12/14/2012 ML14352A4332014-12-18018 December 2014 Enclosure 4 - 2013 Annual Report (Includes 2013 Form 10-K) - Ameren ML14352A4322014-12-18018 December 2014 Enclosure 16 - Articles of Incorporation - Union Electric Company Restated 04/12/1994 ML14352A4302014-12-18018 December 2014 Enclosure 17 - By-Laws of Union Electric Company as Amended to 12/10/2010 ML14352A4292014-12-18018 December 2014 Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/1922 ULNRC-06168, Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/19222014-12-18018 December 2014 Enclosure 15 - Articles of Incorporation - Missouri Electric Light and Power Company Dated 11/20/1922 ULNRC-06157, Special Report 2014-04: Inoperability of a Seismic Instrument for Greater than 30 Days2014-11-14014 November 2014 Special Report 2014-04: Inoperability of a Seismic Instrument for Greater than 30 Days 2024-04-01
[Table view] |
Text
~~
WAmeren MISSOURI Callaway Plant February 23, 20 I2 ULNRC-05838 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000I Ladies and Gentlemen:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 OWNER'S ACTIVITY REPORTS (OAR-1 FORMS) FOR REFUEL 18 Please find enclosed the Owner's Activity Reports (OAR-I forms) for Refueli8 activities at Callaway Plant. The reports are submitted pursuant to the provisions of ASME Boiler and Pressure Vessel Code Case N-532-4, "Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission."
The OAR-I forms enclosed are associated with the following Refuel I8 activities at Callaway Plant:
I. lnservice Inspection and Repair/Replacement activities, and
- 2. Containment Inservice Inspection pursuant to ASME Section XI, subsections IWE and IWL.
In accordance with Code Case N-532-4, each attached OAR-I form includes a listing of items with flaws or relevant conditions that required evaluation for continued service (Table I) and an abstract of repair/replacement activities required for continued service (Table 2).
This letter does not contain new commitments. For any questions regarding the attached information, please contact me at (573) 676-87I9.
Sincerely, A)t-or-\ A.
Scott A. Maglio
~>.2 Regulatory Affai s Manager ACS/nls Enclosed: OAR-I Forms (2)
PO Box 620 Fulton, MD 65251 AmerenMissouri.com ...............
ULNRC-05838 February 23, 2012 Page2 cc: Mr. Elmo E. Collins, Jr.
Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Mohan C. Thadani (2 copies)
Senior Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738
ULNRC-05838 February 23, 2012 Page3 Index and send hardcopy to QA File A160.0761 Hardcopy:
Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood R. Holmes-Bobo J. A. Doughty C. J. Stundebeck NSRB Secretary Mr. Paul Parmenter, Director (SEMA)
Mr. Thomas Mohr, Senior REP Planner (SEMA)
Mr. Tom Masso, REP Planner (SEMA)
. Ms. Diane M. Hooper (WCNOC)
Mr. Tim Hope (Luminant Power)
Mr. Ron Barnes (APS)
Mr. Tom Baldwin (PG&E)
Mr. Wayne Harrison (STPNOC)
Ms. Linda Conklin (SCE)
Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)
Mr. Dru Buntin (DNR)
Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 18 Plant Callaway Plant Unit No. Commercial service date 12/19/1984 Refueling outage no. 18 (if applicable)
Current inspection interval 2"d (IWE Program)
(1st, 2nd, 3rd, 4th, other)
Current inspection period 1st (IWE Program)
(1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 2001 Edition with 2003 Addenda (IWE Program)
Date and revision of inspection plans IWE Program: 10/06/2009, Rev. 3, Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans N/A Code Cases used N-532-4, N-685 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 18 (refueling outage number) conform to the requirements of Section XI.
ltvE Signed Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by _ __:H....:..:S=B=C=-T'------ of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions nspeor's Signature National Board, State, Province, and Endorsements Date 111/- F£8 -12 Page 1 of2
Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number E-A, E1.11 Containment Liner CAR 201108817 identified areas on the containment Plate Barrel liner plate barrel having blistered paint. The evaluation determined that the blistered paint was not a result of corrosion or other distress to the liner base metal and the condition was therefore acceptable.
E-A, E1.11 Containment Normal CAR 201109796 identified corrosion on the 'A' Sump Liner containment sump liner plate that did not meet acceptance criteria. The evaluation determined that there was no structural degradation due to the corrosion and the condition was acceptable.
TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number None None None None None Page 2 of2
Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 18 Plant Callaway Energy Center, P. 0. Box 620, Fulton, MO 65251 Unit No. Commercial service date 12/19/1984 Refueling outage no. 18 (if applicable)
Current inspection interval 3rd (1st, 2nd. 3rd. 4th, other)
Current inspection period 2nd (1st. 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans 1998 Edition with 2000 Addenda Date and revision of inspection plans 10/24/2012, Revision 5 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Edition and Addenda as inspection plan.
Code Cases used N-460, N-532-4, N-533-1, N-566-2, N-616, N-623, N-652, N-706, N-722-1, N-729-1 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of 18 (refueling outage number) conform to the requirements of Section XI.
Signed ec ~--c.r=it-,- l:- - - <-t;.J_'- ~ Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Missouri and employed by HSB--=C_T_ _ of _ _ _ _ _H_a_rtford, CT have inspected the items described in this Owner's Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/
replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
~~'~ til'l'tDS" _______ Commissions ~rc.(o;s-A-_~--- Mo .t4~2. ______________
~lns~or's Signature National Board, State, Province, and Endorsements Date Z3 -Fee Page 1 of3
Enclosure to ULNRC-05838 CALLAWAY NUCLEAR PLANT TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category Item Description Evaluation Description and Item Number None None None Page 2 of3
Enclosure to ULNRC-05838 TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Class Item Description Description of Work Date Completed Repair/Replacement Plan Number BGV0002, Chemical and Volume Control Perform Section XI Repair to correct leakage at 2" 2 System Letdown 11/15/2010 10008582 BGV0002 fillet weld.
Orifice B Outlet Throttle Valve Page 3 of3