|
---|
Category:Report
MONTHYEARML24122C6372024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report November 24, 2022 to May 1 2024 ML24115A0992024-04-0101 April 2024 EIP-ZZ-A0066, Rev 30, RERP Training Program ML24086A5142024-03-26026 March 2024 Changes to the Westinghouse and Framatome ECCS Evaluation Models and PCT Penalty Assessments ULNRC-06861, Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments2024-03-26026 March 2024 Westinghouse and Framatome, ECCS Evaluation Model Margin Assessments ML24065A2992024-03-0505 March 2024 Enclosure - Callaway Nuclear Plant: Form Oar-1 Owners Activity Report ULNRC-06849, Cracking Assessment for Framatome RSG Channel Head Assembly2023-12-20020 December 2023 Cracking Assessment for Framatome RSG Channel Head Assembly ML23215A1992023-08-31031 August 2023 ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 ML23299A1982023-06-16016 June 2023 Enclosure 2: Callaway RR Tech Report Containment Post-Tensioning System Inservice Inspection Technical Report Basis for Proposed Extension of Examination Interval, Revision 0 ML23156A6712023-06-0505 June 2023 Description and Justification for Changes ML23150A1832023-05-30030 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist Administrative Correction ML23150A1842023-05-18018 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist ML23150A1892023-05-18018 May 2023 EIP-ZZ-00245 Addendum H, Revision 004, Security Coordinator Checklist for the Alternate Tsc/Osa Assembly Area ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23110A0712023-04-0606 April 2023 Procedure Review Form (PRF) for EIP-ZZ-A0066, Revision 28, RERP Training Program ML24115A1002023-03-26026 March 2023 EIP-ZZ-PRO2O, Rev. 55, Activation and Operation of the Joint Information Center ML23068A0992023-03-0909 March 2023 Special Report 2023-01 PAM Report ML23052A0492023-02-14014 February 2023 Enclosure 7 - Holtec International Report HI-2230125, Revision 0, Supplemental Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station, Revision 0, Dated February 14, 2023 ML22349A6272022-12-15015 December 2022 Enclosure 3 - 2022 Proxy Statement of Ameren Corporation ML22349A6322022-12-15015 December 2022 Enclosure 8 - 10-K Filed 02/23/2022 ML22349A6342022-12-15015 December 2022 Enclosure 9 - 10-Q Filed 03/31/2022 ML22349A6352022-12-15015 December 2022 Enclosure 10 - 10-Q Filed 06/30/2022 ML22349A6362022-12-15015 December 2022 Enclosure 11 - 10-Q Filed 09/30/2022 ML22349A6402022-12-15015 December 2022 Enclosure 14 - Schedule 14C Information for Union Electric Company March 2022 ML22327A2242022-11-23023 November 2022 Enclosure 1: Callaway Plant - Report Period: 10 CFR 50.59 and 10 CFR 72.48 Summary Report June 16, 2021 to November 23, 2022 ML22335A5012022-11-16016 November 2022 Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis ML22318A1902022-11-14014 November 2022 Enclosure 2 - Pressurized Water Reactor Owners Group Letter, OG-22-187, Subject: PWR Owners Group Mode 4 LOCA Analysis for Westinghouse NSSS Plants ML22299A2352022-10-21021 October 2022 HI-2220020, Revision 2, Non Proprietary Version of Criticality Safety Analysis of SFP for Callaway Nuclear Generating Station ML22285A1252022-10-12012 October 2022 Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 ML22181B1362022-06-30030 June 2022 Attachment 6 - Replacement for Attachment 6, Description and Assessment Specific to TSTF-439, of ULNRC-06688 ML22181B1402022-06-30030 June 2022 Enclosure 1 - Replacement for Enclosure 1, List of Revised Required Actions to Corresponding PRA Functions, of ULNRC-06688 ML22181B1412022-06-30030 June 2022 Enclosure 4 - Replacement for Enclosure 4, Information Supporting Justification of Excluding Sources of Risk Not Addressed by the PRA Models, of ULNRC-06688 ML22153A1822022-06-0202 June 2022 Attachment 6 - Non-Proprietary Version of Rlbloca Summary Report ML22153A1832022-06-0202 June 2022 Attachment 7 - Non-Proprietary Version of SBLOCA Summary Report ML22153A1852022-06-0202 June 2022 Attachment 8 - Non-Proprietary Version of Non-LOCA Summary Report ULNRC-06715, Enclosure 3: Attachment a to the NPDES Permit Modification Application2022-03-0101 March 2022 Enclosure 3: Attachment a to the NPDES Permit Modification Application ML22027A8082022-01-27027 January 2022 Enclosure 3: Callaway, Unit 1, Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02 ML22027A8092022-01-27027 January 2022 Enclosure 4: Callaway, Unit 1, Acronyms and Definitions ML22027A8062022-01-27027 January 2022 Enclosure 1: Request for Exemptions for Risk-Informed Approach to Resolution for Generic Letter 2004-02 ML21356B5072021-12-22022 December 2021 Enclosure 1: Mark-up of Operating License (OL) ML21356B5082021-12-22022 December 2021 Enclosure 2: Clean Copy of Affected OL Pages (Reflecting Proposed Change) ML21343A0952021-12-0909 December 2021 Attachment 1: Description and Assessment ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days ML21280A3802021-10-0707 October 2021 Cumulative Summary of Changes to Enclosure 2, License Amendment Request, and Enclosure 3, Callaway Methodology for a Risk-Informed Approach to Address Generic Letter 2004-02, of ULNRC-06526 ML21280A3812021-10-0707 October 2021 License Amendment Request for Risk-Informed Approach to Resolution of Generic Letter 2004-02 ML21272A1702021-09-28028 September 2021 Enclosure 2 - Full Scope Implementation of Alternative Source Term Evaluation of Proposed Changes (Redacted) ULNRC-06683, Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks)2021-08-23023 August 2021 Enclosure 3: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - CAL Roverd Results Baseline (Non-Isolable Breaks) ML21237A1372021-08-23023 August 2021 Enclosure 1: Callaway, Unit 1, Amendment Request Regarding Risk-Informed Approach to Closure of Generic Safety Issue 191 - Baseline Weld Input 2024-05-01
[Table view] Category:Administrative
MONTHYEARML23150A1832023-05-30030 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist Administrative Correction ML23150A1842023-05-18018 May 2023 EIP-ZZ-00240 Addendum E, Revision 027, Health Physics Coordinator (Hpc) Checklist ML0631703352006-11-0707 November 2006 Draft Input - Effect of Inoperable Actuator Trains on MSIV Operability, Callaway Plant, Unit 1 2023-05-30
[Table view] |
Text
PROCEDUREREVIEW FORM (PRY) 1.0 Initiation Initiator: Joseph Fortman Date: 0511 8/2023 Procedure Dcpt: EP Document #: EIP-ZZ-00240 ADDENDUM E New Rev. # 027 (3 ij !c]?Iire
Title:
Health Physics Coordinator (HPC) Checkflst Level of Use: UContinuous Refercncc Information EjMultiple EIN/A 2.0 Reason for ChangefDcscription of Change (List commitments, CRs, eB Change Requests, OERs, Plant Mods etc and record numbers here.)
CR 202207821 Corrected Attachment references that were not updated following a previous attachment deletion.
RERP Training Requirements was removed during Revision 025 of the document. However, several attachment references were not updated. Admin correction to address the oversight in the prior revision.
Continued: fl 3.0. Document Disposition LI Temp Change New I)ocurncL ,.Q?Mjor Revision üMinor Revision flCancellation Ad;nrnistratwe Cornction .4) L j i Dept Head or Dsignated Approver rLguired for Administrative Corrections ($ina1urdPIN/D L)nov ilurc rujwrul 4O Interim Approval (Temp. Change Only) Temp. Change #: Expiration Date:
Cognizant Supervisor (Signature/PIN/Date) SRO(Signature/PIN/Date)
Continued: 0 6.0 1;cvicws a;id Signatnres (NOT recjuiredfor Administrative Corrections)
Revichw !kijnireil ] i)epi PIN f Sigizature Date C40139 Attached Preparer N/A Tcchnia1 Review J LI Yes El No Yes El No Tethrncal Review J AddlReview i üYcs jNo Addl Review Yes El No LiAdditional Reviews (See Attached CAOI39forrns). Nunther of additionalCAOl39s:
Type Coordinator PL1 Signature Date C40139 Attached LiValidation Yes EIN0 50.59 Review DCA251O DCA25I1 CA2512 / uN/A (perAPA-ZZ-00143)
Scteen i tinna1íPI1 Rit Imticit II (Dept. Head or Designated Approver) Is a Change Management Plan required? ElYcs [No (IF YES, attach CA2773 or CA2774)
Is a (toss-i)iseipIinary review required? 1Yes JNo 7.0 Approval (Either approval must be qzcci4fled as PAT/APVR or PAT/CMPR in Qua/Master)
El Senior Director Nuclear Operations Approval (per APA-ZZ-OOlO1) E1 ORC is required in accordance with APA-ZZ-00091 0 Department Head Final Review and Approval ORC Meeting:
Dept. Head or Designated Approver Senior I)irector Nuclear Operations (Signature/PIN/Date) (Signature/PIN/I)ate)
Nüte. Pige 2 provides inslrztctions it) coniplete tIlISJO!tfl 011(1 niu be distcirded A1900001 2 5 35 A2100t)62 M69 M19000t)1 Page 1 of 2 CA0033 APA-ZZt)O I 01 Rev. 002