MONTHYEARML21271A6112021-09-28028 September 2021 Presentation Information for Second Pre-Application Meeting Regarding Use of Framatome Fuel at Callaway Plant Project stage: Meeting ML21272A1672021-09-28028 September 2021 License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Request ML21272A1682021-09-28028 September 2021 License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Request ML21308A0692021-11-0404 November 2021 NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Unit 1 - License Amendment Request - Adoption of Alternate Source Term and Revision of TSs - Project stage: Acceptance Review ML21319A0062021-11-30030 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Actions License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Acceptance Review ML21335A4512021-12-0101 December 2021 Supplement to License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications Project stage: Request ML21335A1602021-12-0101 December 2021 Special Report 2021-02: Accident Monitoring Instrumentation Non-Functional for Greater than 7 Days Project stage: Request ML21335A4522021-12-0101 December 2021 Supplement to License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications Project stage: Supplement ML21342A3332021-12-10010 December 2021 Acceptance of Requested Licensing Actions License Amendment for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Acceptance Review ML22137A0292022-05-16016 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 Project stage: Draft RAI ML22154A0122022-06-0202 June 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 Project stage: RAI ML22186A1052022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Response to RAI ML22186A1032022-07-0505 July 2022 Response to Request for Additional Information Regarding Licensee Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications Project stage: Request ML22244A1672022-09-0101 September 2022 Revised Response to Request for Additional Information Regarding License Amendment Request for Adoption Off Alternate Source Term and Revision of Technical Specifications (LDCN 2 1-00 15) Project stage: Request ML22287A0952022-10-14014 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 Project stage: RAI ML22342B2642022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) Project stage: Request ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) Project stage: Response to RAI ML22342B2662022-12-0808 December 2022 Enclosure - Ameren Missouri Response to NRC RAIs Project stage: Request ML23037A0022023-02-0303 February 2023 NRR E-mail Capture - Callaway - LAR to Adopt AST - EPID L-2021-LLA-0177 - Revised Schedule for Completion of the Project Project stage: Approval ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) Project stage: Withdrawal ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications Project stage: Approval 2022-12-08
[Table View] |
Text
Enclosure to ULNRC-06703 Page 1 of 1 Special Report 2021-02 Requirement Chapter 16 of Callaway Plants Final Safety Analysis Report (FSAR) contains requirements relocated from the Technical Specifications. In particular, FSAR Section 16.3.3.4 specifies requirements for accident monitoring instrumentation, which includes the unit vent - high range noble gas radiation monitor (GTRE0021B). The Limiting Condition for Operation (LCO) specified per FSAR 16.3.3.4 requires the accident monitoring instrumentation to be Functional in MODES 1, 2, and 3. With GTRE0021B non-functional, Action "c" applies. It states, With the number of FUNCTIONAL channels for the unit vent-high range noble gas monitor less than the Minimum Channels FUNCTIONAL requirement of Table 16.3-7, initiate the preplanned alternate method of monitoring the appropriate parameter(s) within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and either restore the non-functional channel to FUNCTIONAL status within 7 days, or prepare and submit a Special Report to the Commission within the following 14 days outlining the preplanned alternate method of monitoring, the cause of the non-functionality, and the plans and schedule for restoring the channel to FUNCTIONAL status."
Preplanned Alternate Method of Monitoring There are two preplanned alternate methods: obtaining grab samples of the unit vent activity and/or gathering data from field monitoring. The alternate method of monitoring currently in place is the first one, i.e., utilizing manual grab samples from the unit vent per procedure HSP-ZZ-00014, "Rad Monitor Non-functionality." If an emergency were to occur, the second method would be applied and accomplished by the field monitoring team in accordance with the Emergency Plan implementing procedures.
Cause of the Non-functional Unit Vent - High Range Noble Gas Monitor During the performance of Job 20503223.500 to perform a channel calibration for the unit vent thermal mass flow transmitter associated with GTRE0021B (i.e., GTFT0021BA), the display screen was found to be non-functional and indicative of a failure of the transmitter function. The cause of the non-functional transmitter was identified to be a failed power supply. As a result, GTRE0021B has been non-functional since 0900 on 11/10/2021. Job 21004207 was generated to initiate repairs.
Plans and Schedule for Restoring the Instrument to FUNCTIONAL status The delay in the return to service for this radiation monitor is due to unavailability of a replacement power supply. The faulty power supply has been sent to a vendor for repair. GTRE0021B will be returned to FUNCTIONAL status when the repaired power supply has been received and installed.
The estimated restoration date for the monitor is 1/7/2022. In parallel, approval of an alternate part for the power supply is being pursued.