Enclosure 1 ULNRC-06705 Page 1 of 3 ENCLOSURE 1 Mark-up of Operating License (OL)

Two (2) Pages Follow

1. In order to ensure that the threads for RPV closure stud hole No. 18 can perform their intended function throughout the period of extended operation, UE shall remove stuck stud No. 18. If repair of stud hole No. 18 is required following removal of the stud, the repair plan shall include inspection of the stud hole prior to and after the completion of the repair.
2. In order to ensure that RPV stud holes with damaged threads can continue to perform their intended function throughout the period of extended operation, UE shall perform a laser inspection for the threads of repaired RPV stud hole location Nos. 2, 4, 5, 7, 9, and 53. If inspection of these RPV stud holes reveals that there is additional degradation in any of these stud holes, the condition will be entered in the Corrective Action Program for evaluation and corrective action, and UE shall also inspect the remaining repaired RPV stud hole locations (Nos. 13, 25, 39 and 54).

(18) Implementation Actions for New Technical Specification 3.7.20 The planned plant modifications and emergency operating procedure changes described as commitments in Attachment 5 of Ameren Missouri letter ULNRC-06477, Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013), dated January 23, 2019, shall be completed prior to implementation of the license amendment requested per Ameren Missouri letter ULNRC-06401, License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013), dated March 9, 2018, as supplemented by the noted January 23, 2019 letter (ULNRC-06477) and Ameren Missouri letter ULNRC-06491, Additional Supplement to License Amendment Request See insert A for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013), dated March 7, 2019. Completion of the planned plant modifications means physical completion, including completion of the post-modification testing.

D. An Exemption from certain requirements of Appendix J to 10 CFR Part 50, are described in the October 9, 1984 staff letter. This exemption is authorized by law and will not endanger life or property or the common defense and security and are otherwise in the public interest. Therefore, this exemption is hereby granted pursuant to 10 CFR 50.12. With the granting of this exemption the facility will operate, to the extent authorized herein, in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission.

E. UE shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements Renewed License No. NPF-30 Amendment No. 219

(19) Implementation of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Ameren Missouri is approved to implement 10 CFR 50.69 using the processes for categorization of Risk Informed Safety Class (RISC)-1, RISC-2, RISC3, and RISC-4 systems, structures and components (SSCs) using: Probabilistic Risk Assessment (PRA) models to evaluate risk associated with internal events, including internal flooding, internal fire, high winds, and seismic risk; the shutdown safety assessment process to assess shutdown risk; the Arkansas Nuclear One, Unit 2 (ANO-2) passive categorization method to assess passive component risk for Class 2 and Class 3 SSCs and their associated supports; and the results of non-PRA evaluations that are based on a screening of other external hazards updated using the external hazard screening significance process identified in American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) PRA Standard RA-Sa-2009; as specified in License Amendment No. ___

dated _________. Prior NRC approval, under 10 CFR 50.90, is required for a change to the categorization process specified above (e.g., change from a seismic margins approach to a seismic probabilistic risk assessment approach).