MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] |
Text
- -- .
l
= j Log # TXX-93413
.._ C File # 10010 clo r C 848 7UELECTRIC Ref. # 10CFR50.48 eceh U, N w imam J. cahm. Jr.
U'*WYIrr l'!ru*le't!
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 TRANSMITTAL OF FIRE Pr 'ECTION REPORT. REVISION 8 .;
Gentlemen:
i TU Electric, the owner of CPSES Units 1 and 2, herewith submits Revision 8 of the CPSES Fire Protection Report (FPR). j Enclosed are the following documents: ;
Fire Protection Report -
1 signed (and sworn)
Revision 8 original and 10 copies f
A page-by-page description of the changes is attached. The group number f assigns a level of significance for each change made to the Fire Protection Report consistent with TV Electric's letter TXX-88467 of June 1,1988. In j addition, all changes have been reviewed under the TV Electric 50.59 process ;
and found not to include any "unreviewed safety questions *. .
i Pages which do not have technical changes but are included in the revision f (because a change shifted the existing material to another page or because 'i only editorial changes were made to the Fire Protection Report) are not discussed in the enclosure "CPSES FPR Revision 8 Detailed Description".
These changes will not adversely affect the ability to achieve and maintain l
safe shutdown in the event of a fire. .;
FPR Revision 8 is being issued on December 13. 1993 and will be executed at j 12:01 a.m. on December 21. 1993.
l l
l N
210042 'O O t(
r;
~
9312270060 931213-PDR ADOCK 05000445 F PDR u 400 x cmve street LB. si natias. Texas 7520
)
I a
TXX-93413 i Page 2 cf 2 l J
l If you should have any questions, please contact Mr. Jacob Kulangara at (214) 812-8818.
Sincerely,
' l
/
/ dW1 t .
William J. Cahill, Jr.
JMK/
Attachments i Enclosures c - Mr. J. L. Milhoan, Region IV Resident Inspectors, CPSES (2)
Mr. T. A. Bergman, NRR (3 Copies) 1 I
f b
5 I
e
Attachment 1 to TXX-93413 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION l
In the Matter of )
)
Docket Nos. 50-445 and 50-446 Texas Utilities Electric Company )
) License Nos. NPF-87 and NPF-89 (Comanche Peak Steam Electric ) ,
Station Units 1 and 2) )
AFFIDAVIT ,
William J. Cahill, Jr. being duly sworn, hereby deposes and says that he is Group Vice President, Nuclear Production of TV Electric, the licensee herein; that he is duly authorized to sign and file with the Nuclear Regulatory Commission this transmittal of the Fire Protection Report Revision 8; for the captioned facilities; that he is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge, information and belief.
f 1 +
., i ' ,
'~
n.
w:
/ y /g .
)
William J. Cahill, Jr. jff
~' '
,s Group Vit, President, Nuclear Production STATE OF TEXAS )
) i COUNTY OF DALLAS }
Subscribed and sworn to before me, on this 13tn day of December ,
1993.
L -
}
Notary (f Jblic 9
. . - - . _ . . . . - _ . - - .~. - .., .-
)
' i 4 *
.- i ;
i I
Attachment 2 to TXX-93413 December 13, 1993 Page 1 of 6 I CPSES - FIRE PROTECTION REPORT ( FP )
AMENDMENT / REVISION 8 DETAILED DESCRIPTION Prefix Page ,
(as amended) Group Description l i
I II-138 3 Revises the following combustible loading data for.
Fire Area WA/ Fire Zone WA103: i Actual Fire Load - changed from 328,800 to 5300 BTU /sq. ft.
Fire Duration - changed from 246 to 4 minutes.
Type (of combustible) - deletes the 504 gallons of .
Diesel Fuel ,
Revision :
The Emergency Diesel Fire pump originally intended to provide lake water as a source of water for the i Fire Protection-system was abandoned in place as ;
identified in the Fire Protection Report. To comply k with Texas Water Commission requirements for ,
underground storage tanks,.the diesel fuel oil i storage tank for this abandoned pump has been removed. Thus, the combustible loading data is being revised to reflect this change.
Change Request Number : FP-93-4.1 ,
Commitment Register Number :
Related SER : 9.5.1.1 SSER :26 9.5.1 SER/SSER Impact : No IV-3 3 In Section 2.0, Tests / Inspections, the following statement is deleted from the last paragraph on the page: "Furthermore, the combined time interval for_ ,
any three consecutive test / inspections will not i exceed 3.25 times the specified test / inspection ;
interval." The following statement is added to that l same paragraph on this page: "It is not' intended ,
that this provision be used repeatedly as a ;
convenience to extend test / inspection intervals--
i beyond that specified for tests / inspections that are not performed during refueling outages". ;
Revision : ~l The limit on consecutive' extensions was left over from the time when it existed in the' Standard
, Technical Specifications. The wording was carried ov9r into.the Fire Protection. Report when the fire protection requirements were relocated from the- i Technical Specifications under Generic Letters 86-10 and 88-12 Generic Letter 89-14 recommends that '
affected licensees submit a Technical Specification change to delete the consecutive interval limit in Section 4.0.2 of the Specifications and to add a '
statement to the related Bases Section to note that it is not intended for the (existing) 25% extension allowance to be used repeatedly. Based on those justifications presented in Generic Letter 89-14, it t
,, , l l
-Attachment 2 to TXX-93413 i December 13, 1993 -)
.Page 2 of 6 Prefix Page (as amended) Group Description is concluded that it is acceptable to also remove this same requirement from the Fire Protection Report, and to add a statement (to this section of the Report) that informs.the user that the 25% j extension allowance is not intended to be used !
repeatedly. 3 Change Request Number : FP-93-2.1 Cormitment Register Number :
Related SER : SSER :12 9.5.1.2 :
SER/SSER Impact : No f IV-6 3 In Section 2.1.b.3.a., the frequency of the surveillance check for confirming that the diesel ;
fire pump battery voltage and electrolyte levels are !
acceptable, is changed from 7 to 92 days.
Revision :
Section IV-2.1.b.2.a.2 of the Fire Protection Report is revised to require for the diesel fire pumps (DFPs) to be started and operated-for at least-30 ndnute s, every 14 days in lieu of the present interval of 31 days, as a partial justification for relaxing this battery surveillance. .;
Additionally, a malfunction of the battery or ,
charger would be annunciated in the control room. A )
loss of AC power or charger malfunction would result !
in an automatic start of the diesel _ fire pump. I The surveillance practices, combined with the existing design features, provide for a timely and !
meaningful indication of DFP battery operability f status compared to the indication provided by the l weekly check of, battery electrolyte levels and l voltage. Also, the surveillance to check overall i battery voltage of each DTP battery is enhanced to [
require the chargers to be OFF for at.least.15 !
minutes before performing the battery surveillance. l This change places the surveillance in line with the l frequency for the closely related requirement for ;
confirming acceptability of battery _ specific 'l gravity, i Change Request Number .: FP-93-2.2 .l Ccmmitment Register Number : [
Relatsd SER : SSER *12 9.5.1.2 '(
SER/SSER Impact : No .
IV-6 3 In Section 2.1.b.2.a., the surveillance frequency is l increased by reducing the interval from 31 days to i 14 days, for verifying diesel fire pump fuel tank !
level and start and run for-30 minutes. In Section- l 2.1.b.2.a.1, the bracket for the fuel storage tank l volume of 100. gallons is deleted. ,
i Revision :
This increase in the surveillance testing for diesel ,
fire pump is used as one of the justifications for .l t
t
(
i Attachment 2 to-TXX-93413 December ~13, 1993 Page 3 of 6 Prefix Page [
(as amended) Group Description s
relaxing the battery surveillance test frequency. $
The bracket for the fuel storage tank volume was f intended to identify that the value was yet to be .
confirmed. This value was.. verified prior to Unit 1 license and was found accurate by Engineering and l also independently by contractor; however the
. 3 bracket was inadvertently left in place and is being !
deleted to correct thzs administrative error. ,
Change Request Number : FP-93-2.4 -I Commitment Register Number : !
Related SER : SSER :12 9.5.1.2 l SER/SSER Impact : No IV-7 3 For section 2.1.b.3. (covering operability checks of l the diesel fire pump battery banks and chargers); In part a.2., the requirement-is added to have the ;
battery chargers off for at least 15 minutes when ;
checking the battery voltages; in part b., the word i
" barrier" is corrected to be " battery"; in part- ;
c.l., the words " cell plates" are deleted from the requirement involving visual inspection of the batteries, j Revision
- Adding the requirement to have the battery chargers off for at least 15 minutes when performing the ,
surveillance check of diesel fire pump battery -
voltages will yield results which are more !
indicative of actual battery conditions (unsupported s by the battery chargers). Changing the word '
" barrier" to " battery" corrects a typographical '
error. The cell plates are deleted from the visual check of the batteries since the plates of these batteries are not visible. The cases of these j batteries are of a black plastic construction, which' j is typical of this type of application. l Change Request Number : FP-93-2.3 ,
Commitment Register Number : l Related SER : SSER :12 9.5.1.2 i SER/SSER Impact : No )
1 Table IV-1 4 See Sheet No(s) :19 Corrects number of smoke detectors for room 1-085D from 18 to 11 "X"-type (early warning) detectors.
Correction :
Corrects word processing error made when the Table was changed during Revision 6 of the Fire Protection Report.
Change Request Number : FP-93-3.1 Commitment Register Number :
Related SER : SSER :
SER/SSER Impact : No Table IV-1 4 See Sheet No(s) :20 I
I a
i .
I
? .' . -j t
Attachment 2 to TXX-93413 l December 13, 1993 ,
Page 4 of 6 i
Prefix Page '
(as amended) Group Description !
r Corrects the room numbers shown as 1-084 and 1-080 i to be 1-080 and 1-084 respectively. .
Correction : '
l See justification given in Change Request Number FP-93-3.1. I Change Request Number : FP-93-3.2 l Commitment Register Number : i Related SER : 9.5.1.1 SSER :26 9.5.1 i SER/SSER Impact : No
{
Table IV-1 4 See Sheet No(s) :21 Corrects the number of detectors shown for room ;
1-090 from 5 to 2 "X"-type (early warning)-
detectors.
Correction :
See justification given for Change Request Number i FP-93-3.1. '
Change Request Number : FP-93-3.3 :
Commitment Register Number :
Related SER : 9.5.1.1 SSER :26 9.5.1 SER/SSER Impact : No Table IV-1 4 See Sheet No (s) :23 Adds one "X"-type (early warning) detector to the ;
list of those found in the Auxiliary Building. The l change shows it is located in fire zone 21a, l detection zone 21a, room X-163, designated as a zone ,
. - 5 radiation area outside containment, at elevation !
790'6". f Correction This change corrects discrepancies found DJkveen the -l number, description and location of fire M o o t. ion equipment shown in the. Table and the as-b ;;. I configuration. This change was inadvertently excluded from previous" Revisions to the Fire ,
Protection Report and is not due to a plant -?
modification. l Change Request Number :'FP-93-3.4 .j Commitment Register Number :
Related SER : 9.5.1.1 SSER :26 9.5.1 ,
SER/SSER Dmpact : No 5 Table IV-1 4 See Sheet No(s) . :23 -
Removes the designation of Zone V radiation area outside containment-shown for Auxiliary Building room X-190 in the Table.
Correction :
See justification for Change Request Number
, TP-93-3.4.
Change Request Nwmber : FP-93-3.5 Commitment Register Nurrber :
Related SER : 9.5.1.1 SSER :26 9.5.1 SER/SSER Impact : No
.)
l
- 's. l 2
. i j
l Attachment 2 to TXX-93413 '
December-13, 1993
~Page 5 of 6 I
Prefix Page' l
-(as amended) Group Description ,
Table IV-1 4 See Sheet No (s) :24 Corrects Auxiliary Building room number shown as X-210# to be X-210A#. l Correction : !
See justification given for Change. Request Number FP-93-3.1.
Change Request Number : FP-93-3.6 ,
Commitment Register Number :
Related SER : 9.5.1.1 SSER :26 9.5.1 l SER/SSER Impact : No Table IV-1 4 See Sheet No(s) :28 Corrects the last line on the page for the Electrical & Control Building room number.from ,
X-150 to be X-136.
Correction :
See justification given-for Change Request Number !
FP-93-3.1.
Change Request Number : FF-93-3.7 ,
Commitment Register Number -
Related SER : 9.5.1.1 SSF% :26 9.5.1 SER/SSER Impact : No Table IV-1 4 See Sheet No (s) :29 !
1.) Corrects. Electrical & Control Building room number X-148 at elevation 2'O' 6" to be room X-146 at i elevation 830'0".
2.) Corrects the number of detectors shown for robm l X-150 at elevation 854'4" from 13 to 14 "X"-type (early warning)- detectors. ;
Correction :
See Justification given for Change Request Number. !
FP-93-3.4.
Change' Request Number : FP-93-3.8 ;
Commitment Register Number :
Related SER : 9.5.1.1 SSER :26 9.5.1 l SER/SSER Impact : No Table IV-1 4 See Sheet No(s) :30 1.) Corrects the number of detectors shown in '
Electrical & Control Building room X-150A from 13 to 14-"X"-type .(early warning) detectors. ,
- 2. ) Splits up the 10 "X"-type detectors shown for !
Fuel Building room X-255 to show that 7 of the '
detectors'are located in fire zone 99a, detector _j zone 99a and the remaining 3 "X"-type-detectors in ;
the room are located fire zone 99a, detection zone 99b. i correction : .
See justification given for Change Request Number !
.FP-93-3.4. '
Change Request Number : FP-93-3.9 2
,. r , _ _ , , . - ._- .
4~. .
t Attachment 2 to Txx-93413 :
December 13, 1993 Page 6 of 6
' Prefix Page (as amended) Group Description Commitment Register Number :
Related SER : 9.5.1.1 SSER :26 9.5.1 ,
SER/SSER Impact : No ,
Table IV-1 4 See Sheet No(s) :31 l 1.) Corrects the Fuel Building room number shown as X-205A to be X-250A.
2.) Removes the zone 5 radiation area designation j from Fuel Building room X-252.
3.) Corrects the fire zone number for detectors in '
room:X-262 from 99c to be 99a.
Correction :
}
1.) - Se9 justification given for Change Request Number FP-93-3.1.
2.) and 3.) - See justification given for Change >
Request Number FP-93-3.4.
Change. Request Number : FP-93-3.10 ;
Commitment Register Number : 1 Related SER : 9.5.1.1 SSER :26 9.5.1 ,
SER/SSER Impact : No ;
Table IV-1 4 See Sheet No (s) :38 i Corrects the symbol given to designate Zone V {
radiation area outside containment from "=" to ;
< Correction : 1 See justification given for Change Request Number [
FP-93-3.1.
- Change Request Number : FP-93-3.11 .
Commitment Register Number : [
Related SER : 9.5.1.1 SSER :26 9.5.1 [
SER/SSER Impact : No i
.I
'i l
T I
,44 m . Ag m *,Jefme,b-p3gC -O M-b.- 41J8m ' *" M **"d4*'W?-"##'-** 4 "" **"O#-- "' 4#"4 *' b*
- M- ' * # * ' ' # ' - ' ' ' ' "'^-* "'" ' "'--" '
< . s ,
r EO f
y I
i
?
1 1
4 I
- i. i 6
1 4
,f "i
}
4 7
s I
h !
I ENCLOSURES 1
i
' l 3- .
g ?
?
I-
.9 I
i e
s i
t I
i 11 ;
f
+.. r
^$
1 5
}
I I
a 9
- t I
O l, b
- I t
i 1
7
-~-- -- __ . _ _ _
1
~
COMANCHE PEAK STEAM ELECTRIC STATION
- - . FIRE PROTECTION REPORT INSTRUCTION SHEET The following instructional information is being furnished to help insert Revision 8 into the Comanche Peak Steam Electric Station Fire Protection Report.
Discard the old sheets and insert the new sheets as indicated below.
Holders of the CPSES Fire Protection Report should keep these instruction sheets in the front of the Effective Page Listing as a record of the changes, '
until a new listing is issued.
Remove Insert !
i Title Page Title Page ;11-138 11-138 l IV-3 IV-3 IV-6 IV-6 IV-7 IV-7 ,
i IV-19 thru IV-21 IV-19 thru IV-21 .i IV-23 thru IV-31 IV-23 thru IV-31 O
IV-38 IV-38 >
EPL-4 EPL-4 EPL-7 EPL-7 j i
i f
i t
l A8-1 i
i