Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133M528 + (Requests Addl Info Re 961031 Application for Amend to Coc for Paducah Gaseous Diffusion Plant)
- ML20135B703 + (Requests Addl Info Re 961108 Certificate Amend Requesting Rev to Definition of Withdrawal Stations Standby Operations Mode for Ports)
- ML20140H545 + (Requests Addl Info Re 961204 TS Change Request to Convert to Improved TS for Calvert Cliffs Nuclear Power Plant,Units 1 & 2)
- ML20203C123 + (Requests Addl Info Re 970113 & 0415 Applications Requesting Revision of Part II of License SNM-1227 to Include Criticality Safety Analysis Summaries for Several Processes. Provide Missing Pages 15-35 Through 15-37d within 30 Days)
- ML20135D834 + (Requests Addl Info Re 970116 Submittal to Change Minimum Boron Concentration Required by Refueling Water Storage Tanks,Boric Acid Storage Tanks & Safety Injections Accumulators,During Normal Operation)
- ML18102B587 + (Requests Addl Info Re 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis-Accident Conditions)
- ML20154N444 + (Requests Addl Info Re 970221 & 1219 Request for Registration of Model SH-300 Seried & Model LS-101 Level/Density Gauges. Addl Info Re Sample Label for General License.Response Requested within 30 Days)
- ML20248J537 + (Requests Addl Info Re 970225 Application for Amend to Coc for Portsmouth Gaseous Diffusion Plant.Responses Requested to Listed Comments within 30 Days of Ltr)
- ML20153F943 + (Requests Addl Info Re 970430 Proposed License Amend for Plant,Unit 2 That Would Relocate Meteorological Monitoring Instrumentation Requirements in TSs to USAR)
- ML20148P186 + (Requests Addl Info Re 970506 Submittal of Proposed Changes to TS 3/4.7.5, Ultimate Heat Sink, to Support SG Replacement at Plant)
- ML20141C945 + (Requests Addl Info Re 970516 Application Requesting Amend to Coc for Portsmouth Gaseous Diffusion Plant to Reduce Technical Safety Requirment 2.5.4.4 Raschig Ring Minimum Depth Requirement from 12 Inches to 6 Inches in Erp Scale)
- ML20203C390 + (Requests Addl Info Re 970614 License Amend,Suplemented on 970925,1119,1121 & 1203,re FPC Approach for Addressing Certain SBLOCA Scenarios)
- ML20217C260 + (Requests Addl Info Re 970801 Application Request for Consent to Indirect Transfer of Dlc Interests in Plant,Units 1 & 2 That Will Occur Under Proposed Merger)
- ML20248F422 + (Requests Addl Info Re 970818 & 971031 Applications to Amend Coc GDP-1 & GDP-2,updating Application Sars.Provide Info within 30 Days Requested)
- ML20153C465 + (Requests Addl Info Re 970909 Amend Request Which Addressed Analysis Rev for Makeup Sys Letdown Line Failure Analysis at Crystal River Unit 3,by 981030)
- ML20203A230 + (Requests Addl Info Re 970915 Application for Amend to Certificate of Compliance Revising Technical Safety Requirement 2.3.4.7, Criticality Accident Alarm Sys, Required Action A.1.5)
- ML20247N228 + (Requests Addl Info Re 970930 Application for Renewal of License SNM-1373.Info Should Be Provided within 30 Days)
- ML16342E101 + (Requests Addl Info Re 971212 Relief Request P-RR5 for Diablo Canyon Power Plant,Units 1 & 2,second 10-yr Interval Program for Inservice Testing of Pumps)
- ML20154M016 + (Requests Addl Info Re 971223,30 & s Requesting Amend of Device Registry NR-587-D-104-S.Response Requested within 30 Days of Date of Ltr)
- ML20154C593 + (Requests Addl Info Re 980605 & 0706 Ltrs Which Requested Reactivation of Registration for Model 1001,smoke Detectors. Info Requested within 30 Days or Application Will Be Considered Abandoned by Licensee)
- ML20206A066 + (Requests Addl Info Re 980702 Application Request for Registration of Berthold Sys Photon Gauges,Per 980812 Meeting)
- ML20155A538 + (Requests Addl Info Re 980709 Application for Amend to License SNM-960,revising Apps a & B.Addl Info,Specified in Encl,Should Be Provided within Thirty Days of Ltr)
- ML17059C204 + (Requests Addl Info Re 980716 Revised Application for License Amend to Change TS 3/4.2.3, Coolant Chemistry, for Plant Unit 1)
- ML20217H923 + (Requests Addl Info Re 990716 Request for Amend to Registration NR-186-117-G Related to Models NW-201 Series, NW-301 Series & NW-401 Series Photon Gauges.Response Requested with 30 Days of Date of Ltr)
- ML20135C085 + (Requests Addl Info Re ABB Combustion Engineering Ltr LD-93-142,dtd 930930,submitted CENPD-289-P, Use of Inert Replacement Rods in ABB Cenf Fuel Assemblies for Staff Review)
- ML20054D284 + (Requests Addl Info Re ACRS 800311 Comments on Draft 3,TMI Action Plan)
- ML19284C379 + (Requests Addl Info Re ALARA Design Features & Sys Operation for Completion of Radiological Assessment Branch Review of AECC-2-P, Radwaste Vol Reduction Sys)
- ML20035G589 + (Requests Addl Info Re AP600 in Areas of Structural Engineering (Q220.21-Q220.23),containment Sys (Q280.4) & Radiation Protection (Q471.4-Q471.20))
- ML20005H158 + (Requests Addl Info Re ATWS Ari/Rpt Sys Power Supply,To Demonstrate That Qualified Isolators Properly Sized to Prevent Fault Propagation & That Common Mode Failure Cannot Compromise Both RTS & Ari/Rpt Functions)
- ML19326C181 + (Requests Addl Info Re Abnormalities Discussed in 760830 Semiannual Environ Monitoring Rept)
- ML20209A862 + (Requests Addl Info Re Acceptability of Containment Isolation Provisions for RHR & Reactor Containment Fan Cooler Return Lines.If Provisions Meet GDC 57,approval to Lock Open Valves on Fluid Lines for Fire Protection Unnecessary)
- ML20195J480 + (Requests Addl Info Re Acceptance Criteria for Eddy Current Measurement Scheduled to Be Performed After 12 Wks of Operation & Action Plan If Measurement Shows Excessive Wear, Per)
- ML19273E362 + (Requests Addl Info Re Acceptance Review of App I 10CFR50 Evaluation.Questions Encl)
- ML20029D890 + (Requests Addl Info Re Accident Resulting from Turbine Failure That Occurred on 931225)
- ML17261A603 + (Requests Addl Info Re Action Item E of Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. Response Due within 30 Days of Ltr Date)
- ML17053B725 + (Requests Addl Info Re Actions Taken to Preclude Occurrence of Cracking Described in IE Bulletin 80-07.Also Requests Commitment to Adopt Whatever long-term Solution Is Approved)
- ML19330C197 + (Requests Addl Info Re Actions Taken to Preclude Occurrence of Cracking as Described in IE Bulletin 80-7, BWR Jet Pump Assembly Failure. Plant Operation Must Be Justified Until long-term Solution Is Found)
- ML18142A045 + (Requests Addl Info Re Activities Around Spent Fuel Pool & Basis for Which Actions Satisfy Requirements of IE Bulletin 80-11, Masonry Wall Design. Response Requested within 45 Days of Ltr Receipt)
- ML19320C795 + (Requests Addl Info Re Addition of 15 Snubbers.Info Needed to Complete Review of FSAR)
- ML20134C966 + (Requests Addl Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f).Background Info on Recently Identified Problems & Ltr from J Colvin to Chairman Jackson, Encl)
- ML16342D447 + (Requests Addl Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f).Background Info on Recently Identified Problems & Ltr from J Colvin to Chairman Jackson, Encl)
- ML18152A361 + (Requests Addl Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f).Policy Statement on Availability & Adequacy of Design Bases Info at NPP & Ltr from J Colvin to Chairman Jackson, Encl)
- ML20134C939 + (Requests Addl Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f).Ltr from J Colvin to Chairman Jackson, & Ltr from Chairman Jackson to J Colvin, Encl)
- ML20134C959 + (Requests Addl Info Re Adequacy & Availability of Design Bases Info,Per 10CFR50.54(f).Policy Statement on Availability & Adequacy of Design Bases Info at NPP & Background Info on Recently Identified Problems Encl)
- ML14183A783 + (Requests Addl Info Re Adequacy of Delayed Offsite Power Circuit for Hb Robinson Steam Electric Plant,Unit 2)
- ML18045A385 + (Requests Addl Info Re Adequacy of Station Electric Distribution Sys Voltages.Requests Response within 45 Days of Ltr Receipt)
- ML19332A733 + (Requests Addl Info Re Adequacy of Station Electrical Distribution Sys Voltage)
- ML14190A754 + (Requests Addl Info Re Adequacy of Station Electric Distribution Sys Voltages.Draft Safety Evaluation Encl. Response Required within 45 Days of Ltr Date)
- ML20008F023 + (Requests Addl Info Re Adequacy of Station Electric Distribution Sys Voltages within 60 Days)
- ML20216C810 + (Requests Addl Info Re Adherence to QA Program Provisions)
- ML20235U452 + (Requests Addl Info Re Advanced LWR Requirements Document, Chapter 6.Provide Info on Level of Detail Consistent W/ Reg Guide 1.70 for SAR)