Mr. John H. Mueller Chief Nuclear Officer Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Operations Building, Second Floor P.O. Box 63 Lycoming, NY 13093 August 17, 1998
SUBJECT:
REQUEST FOR ADDITIONALINFORMATION REGARDING COOLANT CHEMISTRY, NINE MILE POINT NUCLEAR STATION UNIT NO. 1 (TAC NO.
M99130)
Dear Mr. Mueller.
By letter dated July 16, 1998, you submitted a revised application for license amendment to change Technical Specification (TS) 3/4.2.3, "Coolant Chemistry," for Nine Mile Point Nuclear Station, Unit 1 (NMP1). The NRC staff is reviewing the revised application and finds that the following additional information is needed:
The proposed TS changes would add a new TS 3.2.3e requiring shutdown ifconductivity exceeds 0.19 micro mho/cm when chloride or sulfate ion concentrations cannot be determined.
Please provide and justify a database for the correlation between chloride and sulfate ion concentrations verses conductivity that supports this proposed change.
Identify and justifythe possible upper limits for sulfate and chloride coolant concentrations ifconductivity has not exceeded 0.19 micro mho/cm.
We also request that you edit proposed TS 3.2.3a and 3.2.3b by relocating the phrase "for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" to followthe word "limits"and provide revised TS replacement pages.
Your response to this letter is requested within 30 days of its receipt.
Ifyou should have any questions regarding this request or are unable to meet the requested response schedule, please contact me by phone on (301) 415-3049 or by electronic mail at dshOnrc.gov.
Sincerely, ORIGINAL SIGNED BY:
Darl S. Hood, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page Docket File SBajwa PUBLIC SLittle PDI-1 R/F DHood JZwolinski (A)
WKoo OGC ACRS LDoerflein, Rl ESullivan RHermann KWichman DOCUMENT NAME: G:)NMP1iNM199130.RA2 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N"= No co OFFICE PM:PDI-1 E
LA:PDI-1 D:PDI-BC:EMCB DATE 08/ I 3 /98 08/I
/98 9808190245 9808i7 PDR ADOCK 05000220 P
PDR NAME DNood/rl SLittlw SBai 08/
/98
.Official Record Copy ESu
>van 08/
/98
1 tl
.h I
J
gD,R AEONS
~o i~
O Ilh Cy
~O
++*++
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-0001 August 17, 1998 Mr. John H. Mueller Chief Nuclear Officer Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Operations Building, Second Floor P.O. Box 63 Lycoming, NY 13093
SUBJECT:
REQUEST FOR ADDITIONALINFORMATION REGARDING COOLANT CHEMISTRY, NINE MILEPOINT NUCLEARSTATION UNIT NO. 1 (TAC NO.
M99130)
Dear Mr. Mueller.
By letter dated July 16, 1998, you submitted a revised application for license amendment to change Technical Specification (TS) 3/4.2.3, "Coolant Chemistry," for Nine Mile Point Nuclear Station, Unit 1 (NMP1). The NRC staff is reviewing the revised application and finds that the following additional information is needed:
The proposed TS changes would add a new TS 3.2.3e requiring shutdown ifconductivity exceeds 0.19 micro mho/cm when chloride or sulfate ion concentrations cannot be determined.
Please provide and justify a database for the correlation between chloride and sulfate ion concentrations verses conductivity that supports this proposed change.
'Identify and justify the possible upper limits for sulfate and chloride coolant concentrations ifconductivity has not exceeded 0.19 micro mho/cm.
We also request that you edit proposed TS 3.2.3a and 3.2.3b by relocating the phrase "for > 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />" to followthe word "limits"and provide revised TS replacement pages.
Your response to this letter is requested within 30 days of its receipt.
Ifyou should have any questions regarding this request or are unable to meet the requested response schedule, please contact me by phone on (301) 415-3049 or by electronic mail at dshOnrc.gov.
Sincerely,4/~
Darl S. Hood, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-220 cc: See next page
0
'E
John H. Mueller Niagara Mohawk Power Corporation Nine Mile Point Nuclear Station Unit No. 1 CC:
Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy State of New York Department of Public Service Power Division, System Operations 3 Empire State Plaza Albany, NY 12223 Mr. F. William Valentino, President New York State Energy, Research, and Development Authority
" Corporate Plaza West 286 Washington Avenue Extehsion Albany, NY 12203-6399 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Gary D. Wilson, Esquire Niagara Mohawk Power Corporation 300 Erie Boulevard West
- Syracuse, NY 13202 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126
)
f