Requests Addl Info Re 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis-Accident Conditions
ML18102B587
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/19/1997
From: Olshan L
NRC (Affiliation Not Assigned)
To: Eliason L
Public Service Enterprise Group
References
GL-96-06, GL-96-6, TAC-M96860, TAC-M96861, NUDOCS 9710010298
Download: ML18102B587 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 Mr. Leon R. Eliason Chief Nuclear Officer & President-Nuclear Business Unit Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, NJ 08038 September 19, 1997

~D~w~(l~

..£1}---27;z/31/

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING RESPONSE TO GENERIC LETTER (GL) 96-06 FOR SALEM NUCLEAR GENERATING STATION, UNITS I AND 2 (TAC NOS. M96860 AND M96861)

Dear Mr. Eliason:

  • The NRC staff has reviewed your January 28, 1997, submittal regarding GL 96-06, "Assurance of Equipment Operability and Containment Integrity During Design Basis-Accident Conditions." Your submittal addresses the issues of water hammer, two-phase flow and thermally-induced pressurization of piping runs penetrating the containment for Salem Units I and 2. A preliminary review of the issues of water hammer and two-phase flow was performed during the staff review of your request to amend the Salem, Units I and 2, Technical Specification requirements relating to the Containment Fan Coil Unit response time.

In the January 28, !997, response, you indicated that a list of pipe lines penetrating the containment and susceptible to thermally-induced pressurization was compiled.

You further indicated that the pipe lines that are susceptible to thermally-induced pressurization would be resolved prior to the restart of each affected unit through one of the following approaches:

Document piping system operability against the appropriate Code requirements; Analytically demonstrate that the isolation valve will act as a controlled leakage point; Where practible, affected sections of piping will be drained by procedure during system alignment; or Install relief valves.

In order to complete the review of your response to the generic letter, the staff needs additional information regarding your evaluation of these pipe lines. The staff requests that you provide a list of the pipe lines penetrating containment that are susceptible to thermally-induced pressurization. For each susceptible pipe line, please identify which of the above listed approaches was selected in the resolution of the issue. Also, 9710010298 970919 POR ADOCK 05000272 P

PDR (I ! :-. :**'. /l 1

\\..

.... JL


~---~---- --~-,

I 1111111111111111111111111111111111111111 1

5 E

L: Eliason p 1 ease provide summaries of your eva 1 uat ions of thos.e pipe lines where one of the first two approaches was used for resolution of the issue. These summaries should describe the method of analysis, including the assumptions used in the analysis, and the results.

You should provide fabrication drawings of the piping sections evaluated.

For those systems evaluated using the second approach, include a drawing of the applicable valve.

Please discuss how the criteria used for the evaluations meet the licensing basis criteria for the Salem facility.

Please provide a response within 30 days.

If you need any cl~rification of this request, I can be reached on (301) 415-1419.

Docket Nos. 50-272/311 cc:

See next page DISTRIBUTION Docket File KManoly PUBLIC JFair PDI-2 Reading BBoger JStolz LOlshan MO' Brien OGC ACRS JLinville, RGN-I PDI-2/PM DATE 9 /I S/97 OFFICIAL RECORD COPY DOCUMENT NAME:

SA96860.RAI Sincerely,

/SI Leonard N. Olshan, Senior Project Manager Project Directorate 1~2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation I~

L: Eli a"son please provide summaries of your evaluations of those pipe lines where one of the first two approaches was used for resolution of the issue. These summaries should describe the method of analysis, including the assumptions used in the analysis, and the results.

You should provide fabrication drawings of the piping sections evaluated.

For those systems evaluated using the second approach, include a drawing of.the applicable valve.

Please discuss how the criteria used for the evaluations meet the licensing basis criteria for the Salem facility.

Please provide a response within 30 days.

If you need any clarification of this request, I can be reached on (301) 415-1419.

Docket Nos. 50-272/311 cc:

See next page Leonard N. Olshan, Senior Project Manager Project Directorate I-2 Division of Reactor Projects - I/II.

Office of Nuclear Reactor Regulation

Mr. Leon R. Eliason r

Public Service Electric & Gas Comp2.ny

  • r cc:

Mr. Jeffrie J. Keenan, Esquire Nuclear Business Unit - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 I

General Manager - Salem Operations Salem Nuclear Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. Louis Storz Sr. Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Senior Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer. 0509 Hancocks Bridge, NJ 08038 Dr. Jill Lipoti, Asst. Director Radiation Protection Programs

  • NJ Department of Environmental Protecti-0n and Energy CN 415 Trenton, NJ 08625-0415 Maryland Office of People's Counsel 6 St. Paul Street, 21st Floor Suite 2102 B~ltimore, MD 21202 Ms. R. A. Kankus Joint Owner Affairs

. PECO Energy Company 965 Chesterbrook Blvd., 63C-5 Wayne, PA 19087 Mr. Elbert Simpson Senior Vice President-Nuclear Engineering Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 e

Salem Nuclear Generating Station, Units 1 and 2 Richard.Hartung Electric Service Evaluation Board of Regulatory Commissioners 2 Gateway Center, Tenth Floor Newark, NJ 07102 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road.

King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Manager-Licensing and Regulation Nuclear Busienss Unit - N21 P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Manager - Joint Generatio~

Atlantic Energy 6801 Black Horse Pike Egg Harbor Twp., NJ 08234-4130 Carl D. Schaefer

  • External Operations - Nuclear Delmarva Power & Light Company.

P.O. Box 231 Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Centre Baltimore, MD 21202-6806