. I~
I ~1!¥'~0ISTRIBUTION:
(J *
- Docket
\\
Docket No. 50-255 Mr. David P.* Hoffman*_
Nuclea~ Licensing Administrator Consumers Power Corrq>any 212 West Michigan Avenue Jackson, Michigan *49201
Dear Mr. Hoffman:
. NRG PDR Local PDR TERA NSIC.
NRR Reading ORB #5 Reading DEi senhut
- *Jolshi-nski GLai nas*
TNovak '
-~. '
DCrutchfield TWambach
- HSrriith OELD
, Ol&E (3)
ACRS *(16)
Gray File.
Xtra Cy..(6) *
- JHe ltemes.
. RPurple
- RTedesco We are ~ontinuing our review of the adequacy of S~at1'on Electdc.
Oistri but ion System voltages *for the Palisades* Plant ~n<t have found
'~
- I c
that additional information described in the enclosure to this letter is needed."
vJe request your "response wit~in.45 days of yout" receipt of this.letter.
Enclosure:
,Request for Additional Information cc w/enclosure:
See next-page Sincerely.
- ,,<8~ ~~. 6tj
.
- Dennis M. Crutchfield, Chief
- Operating Reactors Bran~h #5
- oiv1s.ion of Licensing
. *SEE ATTACHED YELLOW H)R PREVIOUS CONCURRENCE OPl"ICB...DL:.ORB.. #.5/.LJ.I. OL:.ORB.. #.5/yM.., DL~*
.,.5/.C.... DL:.J.l.D/,SJ.\\............................ :..........................
9URNAIH...HS01Hh;.cc....... T..W.am.b:a.ch........... r.lltchf.i.e.J.d.... G.L.ain.as............... :..........................................
DATB~
6/9/80*
. 6/9180*
- ~;I /BO 6/10/80*
Mac PORN ~18 (9-76) :NllCM 0240..
U.G, OOVBRNMBNT PRINTING OP'P'l(:B: 1~71... Ill... 711
Docket No. 50-255 Mr. David. P. Hb.ffman Nuclear Licensing Administrato~
Consumers Power Company 212 West Michigan Avenue Jackson, Michigari 49201
Dear Mr. Hoffman:
DI STR I sut ION Docket NRC PDR Local PDR ORB Reading
- N'RR.Reading DEisenhdlt
, Glainas
-* OELD OI&E (3)
- DCrutchfield HSmith TWambach NSIC TEAA.*
ACRS (l6 )*
DCrutchfield CHofmayer.
HShap{lker
. We are continuing our,review of the apequacy of*§tation electric
~
distribution* system voltages* for the Palisades P-1ant and have 'found that additional information describ.ed 1n the enclosure to this letter is needed *.,* We request your r.:esponse within 45 days of you~ receipt of*
this letter.
Enclosure:
Request for Additional Information cc w/enclosure:
Se~ next page "
N1lC FORM 318 (9*76') NRCM *0240 Sincerely, Gus C. Lainas,'Assistant Director Division of Licensing
.. 1:
- u.s. a.Ova:RNME 0
NT PRINTING ~P'~ICE: 1171 - ZG~ - 718
Mr~*oavid P. Hoffman cc
-- -- -M* h-M-Hler, [squire--- - --- - -
Isham, Lincoln & Beale Suite 4200 One First National Plaza Chicago, Illinois 60670
~Mr. Paul A. Perry, Secretary Consumers Power Compar\\Y 212 West Michigan Avenue Jackson, Michigan 49201
~Judd L. Bacon, Esquire C'Onsumers Pm*1er Corrq:>any 212 West Michigan Avenue Jackson, Michigan 49201 Myron M. Cherry, Esquire
, Suite 4501 One IBM Plaza Chicago, Illinois 60611-Ms. Mary P. Sinclair Great Lakes Energy Alliance
'5711 Summerset Drive Midland, Michigan 48640 Kalamazoo Public Library 315 South Rose$;5treet Kalamazoo, Michigan 49006
\\ Township Supervisor Covert Township Route 1, Box 10 Van Buren County, Michigan 49043
~Office of the Governor (2)
Room 1 - Capitol Building.
Lansing, Michigan 48913
\\Director, Technical Assessment Division Office of Radiation Programs
{AW-459)
- u. S. En'li ronmenta 1 Protect ion Agency Crysta 1 Ma 11 #2 Arlington, Virginia 20460 e June 19, 1980
"\\ -u.- S-.- Environment-a-1-Protection ---
Agency..
Federal Activities Branch.
Region V Office ATTN:
EIS COORDINATOR 230 South Dearborn Street Chicago, Illinois 60604
'"Charles Bechhoef er, Esq., Chairman Atomic Safety and Licensing Board Panel
- u. S. Nuclear Regulatory Comnission Washington, D. c.
20555
\\.Dr. George c. Anderson Department of Oceanography*
University of Washington Seattle, Washington 98195_
- or. M. Stanley Livingston 1005 Calle Largo Santa Fe, New Mexico 87501 Resident Inspector c/o U. S. NRC P. O. Box 87 South Haven, Michigan 49090 Palisades Plant ATTN:
Mr. J. G. Lewis
)
Plant Manager Covert, Michigan 49043 "William J. Scanlon, Esquire 2034 Pauline Boulevard Ann Arbor, Michigan 48103
PALISADES _
DOCKET NO. 50-255 REQUEST FOR ADDITIONAL INFORMATION
___ QtLAPEQUAC_'f _QF_ ST.A.TIOJLEJ..ECTRJC __ _
DISTRIBUTION SYSTEM VOLTAGES ENCLOSURE References
- a.
CP letter, David P. Hoffman, to Director, Nuclear Reactor Regulation, NRC, "Response to Emergency Supply Generic
- Issues, 11 October 2, 1978.
- b.
NRC generic letter to all Power Reactor Licensees, "Adequacy of Sta ti on Electric Distribution System Voltages, 11 August 8, 1979.
- c.
CP letter, David P. Hoffman, to Director, Nuclear Reactor Regulation, NRC, "Adequacy of Station Electric Distribution Systems Voltages, 11 January 9, 1980.
- d.
CP letter, Rogert W. Huston, to Director, Nuclear Reactor Regulation, NRc,* "Response to Adequacy of Station Electric Distribution Systems Voltages," March 7, 1980.
- e.
NRC letter (Ziemann) to CP (Bixel), dated November 16, 1979.
Questions
- 1.
Does t*e 86.25% of 2400 V setpoint of your second level of voltage protection (attachment 2a) adequately pro~ect 480 V and 120 V class lE equipment? Response to item l indicates this setpoint is 0.913 PU.
Resolve the discrepancy.
- 2.
Per NRC guidelines 3 and gb, compare the effect of starting and running the largest non~class lE load on all class lE equipment with the required voltage range for nonnal operation of these loads (starters, contactors, motors, etc.). What is the duration of identified transient undervoltage conditions?
- 3.
As required by NRC guideline 9, CP should provide analysis and comparison of terminal voltages on all class TE loads (2300 V, 480 V, and lower voltage loads) for the worst case starting voltage and steady state running voltages.
The CP submittalsa,c,d do not include all of these values.
- 4.
Plant FSAR, Section 8.3.2.2 and single line diagram indicate
\\
three alternate sources of offsite power to class lE buses.
Reference 2 includes analysis only for one offsite source (startup transformer).
Separate analysis for the other two offsite sources (service transformer and station power transformer) is required.
~--
---~ __________________ -
- 5.
As per reference e, *the generi~ fssue in reference b, is part of SEP topic VIII-1-A.
CP should, therefore, review the station power system for possible violation of GDC-17 as requested in reference b.