List of results

  • ML20059L865  + (Informs of Staff Plan & Schedule for Developing Program to Evaluate Agreement States & Regional Matls Programs Using Common Performance Indicators)
  • ML20141J679  + (Informs of Staff Plans for Resolution of Generic Safety Issue 15, Radiation Effects on Reactor Vessel Support)
  • ML17158A373  + (Informs of Staff Plans of Presentation to ACRS Full Committee Meeting in Aug 1994 in Response to Addressee 921127 Addressee Rept & That Draft SE to Be Completed for Presentation Re Issues Raised at Plant)
  • ML20210U813  + (Informs of Staff Plans on How External Initiators of Accidents Will Be Handled in Context of Severe Accident Policy.Tentative Schedule for Completion of First Phase Approx 1 Yr)
  • ML20209D717  + (Informs of Staff Position Re Notice of Matls Licensing Activities.Current Practice Meets Statutory Requirements)
  • U-602834, Informs of Stand Down of Work Activities as Result of Personnel Errors That Occurred or Were Discovered in Last Several Days,Including Work on Wrong Components,Tagout Errors & Other Problems  + (Informs of Stand Down of Work Activities as Result of Personnel Errors That Occurred or Were Discovered in Last Several Days,Including Work on Wrong Components,Tagout Errors & Other Problems)
  • ML20206C657  + (Informs of Standard Nuclear Consultants Use of Radioactive Matl at Westside VA Medical Ctr,Chicago,Il & Lakeside VA Medical Ctr,Chicago,Il on 990428-29 Under State of Il License IL-01300-01)
  • ML20087K373  + (Informs of Start Failure Delay Relay SFD-2 Failure to Operate within Required Time Period on 750409,during Annual 3D Emergency Diesel Insp.Schedule Being Developed to Exercise & Check Relays for Reliable Operation)
  • ML20198G701  + (Informs of State U Licensing Authority Transfer to Nrc.State Will Continue to Take Active Interest in U Issues in New Mexico & Will Review Major Licensing Actions of NRC)
  • ML20147D741  + (Informs of State of AL Program for Reciprocal Recognition of Byproduct Matl Licensed Activities & Returns Matls Submitted to NRC)
  • ML20148D488  + (Informs of State of Ma Atty General Request to Reopen Recore on Onsite Safety Issues & Emergency Planning.Matter Should Be Deferred Pending Submission of Applicants Alternativenotification Plan in Event of Plant Emergency)
  • ML20128M266  + (Informs of State of Ny Supreme Court 850719 Rejection of Suffolk County Legislature 850715 Motion to Reinstate Kirkpatrick & Lockhart as County Atty in Shoreham Proceeding.Certificate of Svc Encl)
  • ML20084C671  + (Informs of State of Tn Emergency Mgt Agency Decision Not to Participate in 1984 full-scale Emergency Preparedness Exercise.Exemption from 10CFR50,App E Requirements Requested)
  • ML20141A470  + (Informs of State of Tn First Impep Review in Dec 1996,which Included Personnel from Agreement State.Review Consisted of Accomplishments of Several Inspectors by NRC Personnel in Months Prior to Actual Visit to Central Ofc of Nashville)
  • ML20153E296  + (Informs of State of or Dept of Energy Recommendation to Proceed W/Sheer Quarry to Obtain Remainder of Erosion Protection Matl Required for Lakeview Disposal Site.Quality Data Encl)
  • ML20115F191  + (Informs of Status & Completion Dates for Resolution of 1/8-inch Positive Pressure Concern & Chlorine Detection Sys Mods.Chlorine Detection Sys Mods Will Be Completed by End of Current Refueling Outage)
  • ML20128F810  + (Informs of Status & Future Plans Addressing NRC Concerns Over Beta Radiation in Radioactive Liquid Effluents.All Releases to Be Performed in Batch Mode.Investigation Into Installing in-line beta-sensitive Monitors Continuing)
  • ML19253A826  + (Informs of Status Re Installation of Security Sys Hardware. Testing of Vikonics Equipment Continues at Slower Pace than Expected.Compensatory Measures Will Be Extended Approx One Month)
  • ML19309F977  + (Informs of Status Re Preliminary Analysis of First Nuclear loss-of-coolant experiment,L2-2,performed at Loft.Final Results Delayed by High Priority Given to Work on TMI-2 Calculations)
  • ML20125A401  + (Informs of Status of Actions Taken & Progress in Response to Re Facility)
  • ML19352A084  + (Informs of Status of Activities Initiated in Response to IE Bulletins 75-04 & 75-04A.Engineering Evaluation of Halon 1301 Suppression Sys Will Be Approved in 30 Days.Plant Fire Protection Sys & SRP 9.5.1 Guidelines Being Compared)
  • ML19352A082  + (Informs of Status of Activities Initiated in Response to IE Bulletins 74-04 & 75-04A.Procurement Spec for Halon 1301 Sys Design Requirements Will Be Prepared in 30 Days)
  • ML19343C290  + (Informs of Status of Activities Initiated in Response to IE Bulletins 75-04 & 75-04A Re Cable Fire at Browns Ferry.Util Scheduling Implementation of Commitments & Developing Specs for Halon 1301 Suppression Sys for Cable Spreading Room)
  • ML19261B154  + (Informs of Status of Application by Transnuclear,Inc to Export 2.597 Kg Highly Enriched U to Canada,Amended in July to 5.297 Kg.License Should Be Granted)
  • ML20212H168  + (Informs of Status of Auxiliary & Fuel Handling Bldg Decontamination for Fourth Quarter 1986.Radiological Surveys Show 600 to 3,000 Mrem/H W/Contact Readings as High as 5.5 Rem/H in make-up Filter Cubicle)
  • ML20215J057  + (Informs of Status of Cable Routing Criteria,Fire Protection Sys Description & Matl & Installation Specs for Paint. Significant Amount of Manpower Required to Develop Cable Routing Criteria Into Form Usable by Design Staff)
  • ML19261B620  + (Informs of Status of Class IE Equipment Per IE Bulletin 79-01, Environ Qualification of Class IE Equipment. Problem Switches Will Be Changed During Next Refueling Outage in Apr 1979)
  • ML20137S587  + (Informs of Status of Commitments Re Generic Ltr 83-28 Included in License Condition 21 for Unit 1.Items 1.1 & 1.2 Re post-trip Review Program & Capabilities Implemented Upon Unit 1 Initial Criticality)
  • A04547, Informs of Status of Commitments in Response to Facility Proposed Design Change Task Group Final Rept,Per . All Commitments Fulfilled.Original Intent of Improvement Plans Unaltered  + (Informs of Status of Commitments in Response to Facility Proposed Design Change Task Group Final Rept,Per . All Commitments Fulfilled.Original Intent of Improvement Plans Unaltered)
  • ML19283B712  + (Informs of Status of Data Requested in IE Bulletin 78-12. Reactor Vendor Requires More than 60 Days for Data Collection.Notes Delay Until Generic Approach to Identifying Atypical Weld Matl Is Resolved)
  • ML20238A647  + (Informs of Status of Dept of Labor Position Re Util Subpoena for Desposition of D Feinberg,Per Enforcement Action EA 84-137.Dept Concerned That Feinberg Not Be Required to Testify Both at Desposition & at Hearing.Served on 870817)
  • ML20099L177  + (Informs of Status of Development of Inservice Insp Organization Manual,In Response to Insp Rept 50-335/83-08. Manual Expected to Be Finalized by 840701 & Necessary Implementing Procedures Completed by 841001)
  • ML19282B769  + (Informs of Status of Discovery:Nrc Has Received Answers & Objections from Houston Lighting & Power Co & Tx Util Co,Was Served W/Second Set of Interrogatories from Former & Plans to Continue Reviewing Documents)
  • ML20209C467  + (Informs of Status of Discussions W/Doj Re Allegations of Anonymous Informant Concerning OL Application.Doj No Longer Objects to Disclosure of Technical Info Sought by NRC & Applicant That Would Reveal Informant Identity)
  • ML20004D119  + (Informs of Status of Early Warning Sys Installation as Required by NUREG-0654.Delay Could Be Experienced in Completing Installation of single-phase Electric Motor Powered Sirens in 0 to 5-mile Emergency Zones by 810701)
  • ML18139B371  + (Informs of Status of Early Warning Sys Installations Per NUREG-0654 App 3.Util Requested State for Special Interim Procedure to Facilitate Alerting Residents in 5-10 Mile Emergency Planning Zone Due to Delays in Siren Installation)
  • ML18094B215  + (Informs of Status of Efforts to Establish Revised Schedule for Mods to Main Steam Line Radiation Monitors,Per Reg Guide 1.97.Review of Less Expensive Alternatives Re Mods to Monitors Expected to Be Completed by 900131)
  • ML20207S747  + (Informs of Status of Facility Component Cooling Water Sys. Issue of Appropriate Intake Temp to Be Used in post-accident Heat Removal Analysis for Assuring Equipment Operation Unresolved)
  • ML19339A834  + (Informs of Status of Facility Degraded Voltage (Part a) Ter.Part a TER Is in Hold Status Awaiting Further Info from Facility)
  • ML20212L025  + (Informs of Status of Facility Interrogatory Responses & Extent to Which USGS Involved in Preparation of Responses)
  • ML20209D163  + (Informs of Status of Facility Shift Advisor Program & Performance of Operating Crews)
  • ML19296B175  + (Informs of Status of Fire Protection Program Review.Requests Addl Info Re Incomplete Items within 20 Days)
  • ML19296B181  + (Informs of Status of Fire Protection.Requests Addl Info within 20 Days.Suggests Meeting within 20 Days If Requirements Not Met)
  • ML19261C588  + (Informs of Status of Geology Review:Licensee Final Documentation of Geology Investigations Expected by 790228. NRC Review Will Take Several Months)
  • ML20211C091  + (Informs of Status of IE Bulletins 83-01 & 83-04 for Listed Plants.Based on Verbal Confirmation That Insp Repts Final, Closeouts for Cook,Kewaunee & Point Beach May Be Closed)
  • ML20057C024  + (Informs of Status of Implementation of Mark 1 Containment Performance Improvement Program)
  • ML20058P227  + (Informs of Status of Implementation of Nuclear Plant Reliability Data Sys (Nprds).Advises of Staff Actions/Plans for Obtaining Risk & Reliability Data to Meet Changing NRC Needs)
  • ML20211P822  + (Informs of Status of Implementation of SPDS & Specifies New Completion Date.Spds Cannot Be Declared Fully Operational at Present Time Due to Listed Reasons.Technical Deficiencies Identified W/Spds.Spds Will Be Fully Operational by 870501)
  • ML20031E423  + (Informs of Status of Installation of 5 to 10 Mile Emergency Planning Zone Phase of Early Warning Sys.W/Current Matl Delivery Schedules,Early Warning Sys Will Be Completed & in Svc by 811130)
  • NRC-85-3034, Informs of Status of Investigations Into Repts by Two Plants of Resistance Temp Detector Calibr Anomalies in Detectors Manufactured by Rdf Co  + (Informs of Status of Investigations Into Repts by Two Plants of Resistance Temp Detector Calibr Anomalies in Detectors Manufactured by Rdf Co)