Informs of Status of Fire Protection Program Review.Requests Addl Info Re Incomplete Items within 20 Days
ML19296B175
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/21/1980
From: Lainas G
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
Shared Package
ML19296B176 List:
References
NUDOCS 8002200212
Download: ML19296B175 (1)


Text

/[{'0 hl.W n maag'o

.o UNITED STATES g

8 NUCLEAR REGULATORY COMMISSION o

h WASHINGTON, D. C. 20555 o

%*.../

JAN 211980 MEMORANDUM FOR: Dennis L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors FROM:

G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

SUBJECT:

SAFETY EVALUATION REPORT, FIRE PROTECTION PROGRAM REVIEW - HADDAM NECK (TAC 11113)

Plant Name: Haddam Neck Licensee: Northeast Utilities Docket No.: 50-213 Responsible Branch: ORB #2 Project Manager:

R. Silver Review Branch: PSB Requested Completion Date: December 31, 1979 Status: See Enclosure 1 Our initial Safety' Evaluation Report dealing with fire protection at Haddam Neck, was issued on October 3,1978.

In Section 3 of the SER certain items were identified as incomplete and requiring further information from the licensee and evaluation by the staff. We have completed our review of information <4ealing with these incomplete items as provided in licensee responses of July 31, 1979 and October 9,1979.

The results of our review are enclosed. Enclosure 1 is the status of each of the incomplete items; Enclosure 2 is our evaluation. We find that additional information is required from the licensee to resolve two items. This request for information should be transmitted to the licensee requesting a response within 20 days, h4W G. Lainas, Chief Plant Systems Branch Division of Operating Reactors

Contact:

L. Derderian, X27690 8002200

RESOLUTION OF INCOMPLETE ITEMS - STATUS HADDAM NECK Licensee Response Staff Evaluation Due 3.1.1 Fire Detection System Complete 3.1. 2 Fire Water Supply Complete 3.1.3 Yard Hydrants Complete 3.1.5 Water Suppression Systems Complete 3.1.6 Gas Suppression System Complete 3.1.7 Portable Extinguishers Complete 3.1.11 Ventilation Equipment Complete 3.1.18 Reactor Coolant. Pump Complete 3.2.1 Alternate Shutdow'n Capability Deferred to SEP Not scheduled 3.2.2 Smoke Detection System Tests (a)

In-situ tests Acceptance Criteria 2/1/80IBNL)

(b) Bench tests Information 20 days 3.2.3 Cable Fire Barrier Penetration Test Date Information 20 days QBonon-m