Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134K206 + (Informs of Review of Pse&G Response to Escalated EA .Licensee Response Acceptable)
- ML20132C095 + (Informs of Review of Radiological Tech Specs Per 840425 Memo.All Category 1 Items Should Be Corrected by 840801. Category 2 Items Could Be Handled on Licensee Priority Schedule)
- ML20084M243 + (Informs of Review of Re IE Bulletin 73-01. Westinghouse DB-50 Breakers Modified)
- ML17258A840 + (Informs of Review of Re Inadvertent Safety Injection During Surveillance Testing.Response Acceptable. Requests Notification When Administrative & Calibr Procedures Re Supervisor Notification Have Been Modified)
- ML18092A521 + (Informs of Review of Re QA Program Description. Responses Adequate to Resolve NRC Concerns Noted in .Effectiveness of QA Program Implementation Will Continue to Be Subj of Routine Regional Insps)
- ML20013F807 + (Informs of Review of Region II Nuclear Matls Program as Part of Impep,As Described in USNRC Mgt Directive 5.6.Forwards for Comment Draft Impep Rept Which Documents Results of Review Conducted on 980209-13)
- ML18095A927 + (Informs of Review of Request for Clarification of Reporting Requirements Re Svc Water Piping Leaks & Determines Formal Reporting to NRC EOC Per 10CFR50.72 & 50.73 Not Necessary)
- ML20210T194 + (Informs of Review of Rev 1 to SER Re PSAR Through Amend 23. CESSAR Outstanding Items,Including Atws,Design Changes to Shutdown Cooling Sys & Boron Dilution Analysis,Remain.Upon Resolution of Items,Psar Will Be Acceptable for CPs)
- ML19343B634 + (Informs of Review of SEP Topic VI-4 Re Containment Isolation Sys.Addl Info Described in Encl Requested)
- ML20094Q317 + (Informs of Review of Schedule for Sprinkler Design & Installation in Conjunction W/Possible Temporary Protective Measures.Installation of Permanent Sprinkler Sys Should Be Expedited)
- ML20071M181 + (Informs of Review of Secy 91-294, Draft SER on GE BWR Design Covering Chapter 7 of Std Sar)
- ML20132C383 + (Informs of Review of Ser,Section 4.0 Re Vital Area Identification.No Concerns Identified Re Meeting 10CFR73.55 Requirements,Assuming Refueling Water Storage Tank Included in Vital Area)
- RBG-20350, Informs of Review of Shift Staffing in Light of Operating Experience on Shift,In Response to a Schwencer to Wj Cahill.Current Training & Exam Plans Continue Toward Fully Qualified six-shaft Rotation + (Informs of Review of Shift Staffing in Light of Operating Experience on Shift,In Response to a Schwencer to Wj Cahill.Current Training & Exam Plans Continue Toward Fully Qualified six-shaft Rotation)
- ML20203D662 + (Informs of Review of Staff Response to Applicant Motion for Summary Disposition of Joint Intervenors Contention EP-2/EP-2(h) & Affidavit of Cl Stovall.State & Local Emergency Plans Will Be Revised.Related Correspondence)
- ML20140G734 + (Informs of Review of State of Il 850812 Draft Proposal for Agreement State Status,Per F Brenneman Request.Section 6 of Vol III Re Regulations for Stds for Protection Against Radiation in Accordance w/10CFR20 Stds)
- ML20140C970 + (Informs of Review of State of Il Laws Re Power of Dept of Nuclear Safety to Determine If Laws Provide Adequate Legal Authority for State of Il to Become Agreement State.State Statutes Provide Sufficient Legal Authority)
- ML19220B312 + (Informs of Review of Steam Line Break Analysis Submitted by Applicant on 771118.Forwards Info Requests Resulting from 771208-09 Meeting Between Applicant & NSSS Supplier)
- ML20209D465 + (Informs of Review of Tech Specs 3/4.7.12, UHS & 3/4.7.13, Flood Protection. Limiting Conditions for Operation, Surveillance Requirements & Bases of Tech Specs Acceptable)
- ML17321A992 + (Informs of Review of Tech Specs for post-maint Testing of Diesel Generators,Identifying Specs That May Contribute to Reduced Diesel Generator Reliability,Per Generic Ltr 83-28. Internal Efforts Underway to Modify Tech Specs)
- ML20128M337 + (Informs of Review of Ucs Re TMI-1 & Oeld 850517 Memo Discussing Ucs Ltr.Ucs Ltr Does Not Warrant Further Commission Review)
- ML20198A166 + (Informs of Review of Unresolved Item Identified in Insp Rept 50-461/85-60 Re Acceptability of Preoperational Type a Test Conducted at Plant.Justification for Not Performing Another Type a Test Requested)
- ML20206L794 + (Informs of Review of Util 800716,841011 & 850315 Responses to IE Bulletin 80-11, Masonry Wall Design. Failure of Any Masonry Wall Will Not Affect Ability of Plant to Safely Shut Down.Action on Bulletin Closed)
- ML20210P148 + (Informs of Review of Util 860318 Sediment Transfer & Processing Operations Ser.Proposed Operation of Collection, Transfer & Sediment Treatment Equipment in Facility Auxiliary,Fuel Handling & Reactor Bldgs Approved)
- ML20247E370 + (Informs of Review of Util 890224 Response to Generic Ltr 88-14 Re Instrument Air Supply Problems.Nrc Understands That Util Program Will Be Completely Implemented by Completion of 9R Refueling Outage Estimated to Be 911231)
- ML14138A194 + (Informs of Review of on Operating Experience, Insp & Analysis Results Re Reliability of Tdi V-20 Diesels. Lead Engine Testing,Disassembly & Insp Not Required Before Restart)
- ML20083B874 + (Informs of Revised Amend Implementation Date for TS Change 93-09)
- PY-CEI-NRR-2293, Informs of Revised Commitment Originally Submitted in Response to Violations Noted in Insp Rept 50-440/97-08.Table 8.3-1 of USAR Will Now Be Revised by 981010 Subsequent to Completion of Electrical Calculation self-assessment + (Informs of Revised Commitment Originally Submitted in Response to Violations Noted in Insp Rept 50-440/97-08.Table 8.3-1 of USAR Will Now Be Revised by 981010 Subsequent to Completion of Electrical Calculation self-assessment)
- B17309, Informs of Revised Commitment Previously Submitted in Response to NRC Re 10CFR50.54(f) Info on Utils Efforts to Plant to Full Compliance W/Ol,Nrcs Regulations & Design & Licensing Basis + (Informs of Revised Commitment Previously Submitted in Response to NRC Re 10CFR50.54(f) Info on Utils Efforts to Plant to Full Compliance W/Ol,Nrcs Regulations & Design & Licensing Basis)
- 0CAN029802, Informs of Revised Commitment Re GL 87-02,Suppl 1.Util Will Complete Relay Resolution by 1R15 Which Is Currently Scheduled to Begin on 990925 + (Informs of Revised Commitment Re GL 87-02,Suppl 1.Util Will Complete Relay Resolution by 1R15 Which Is Currently Scheduled to Begin on 990925)
- ML20059K367 + (Informs of Revised Commitments Re Crud Induced Localized Corrosion Related to Fuel Cladding Failures.Deep Bed Demineralizers Installation Activities Will Be Performed in Unit 1 Subsequent to Third Refueling Outage)
- ML20202F357 + (Informs of Revised Completion Date for Actions Requested by GL 96-01, Testing of Safety-Related Logic Circuits. Date Revised Due to Expanded Work Scope)
- ML17306A765 + (Informs of Revised Completion Date for Corrective Action Per Violations Described in EA-91-182.Evaluation of Maint Dept Expected to Be Completed by 920731 & Evaluation of Technical Support Dept Expected to Be Completed by 920831)
- 05000423/LER-1998-002, Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl + (Informs of Revised Completion Date to Complete Commitment Contained in LER 98-002-00, Verification of ECCS Piping Full of Water Per TS 4.5.2.b.1 Not Being Met. New Commitment Made by Util,Encl)
- ML20217M958 + (Informs of Revised Completion Dates for Actions Associated W/Gl 96-01, Testing of Safety-Related Logic Circuits. Actions Will Be Completed by 980315 Due to Expanded Work Scope)
- ML20197F322 + (Informs of Revised Date Re Commitment to Submit Final Sys Risk Evaluation for Svc Water Sys.Evaluation Will Be Submitted 980331 Due to Delay of Availability of Contract Support to Perform Consequence Evaluation of Svc Water Sys)
- ML20196F621 + (Informs of Revised Date for Submittal of Addl Info Re NRC GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. Util Will Provide Info Requested by RAI Ltr on or Before 990115)
- ML20151S474 + (Informs of Revised Date of Compliance for Violations Noted in Insp Repts 50-447/87-18 & 50-446/87-14,per 880219 Commitment.Date of Closure for CAR 87-78 Revised from 880422 to 880722)
- ML19210B783 + (Informs of Revised Estimate for Projected Completion Date of Unit 2.Delay May Affect Issuance of Des)
- ML20207C207 + (Informs of Revised Expected Submittal Date of Proposed License Amend Presented at 990127 Meeting Re Soluble Boron & Boraflex.Util Plans to Submit Proposed License Amend in First Quarter of 1999)
- ML19332A644 + (Informs of Revised Facility Position on NUREG-0694,Task II.D.3.3 Re Portable Iodine Instrumentation.One SAM & Five Ping-Eberline Iodine Monitor Sys Will Be Available at Site. Equipment Meets NRC Requirements)
- ML20198E206 + (Informs of Revised Health Risk Assessment for Application of Supplemental Stds for Bldg Located at 531 South Grand Ave, Grand Junction,Co.Encl Table Indicates Assumption Used to Build Model)
- ML19343B810 + (Informs of Revised Implementation Dates for post-accident Sampling Capacity & Onsite Technical Support Ctr.Changes Necessary Due to Delays in Matl Shipments from Vendors. Lab & Technical Support Ctr Will Be Ready by 810301)
- ML18093A950 + (Informs of Revised Implementation Schedule for App R Mod. Mod to CO2 Sys Redesign Due to Identified Seismic Concerns & Desire to Eliminate Need for Local Operator Response.Mods Will Be Completed by 880930)
- ML17325B709 + (Informs of Revised Input Methodology in Interface Between Two Computer Codes Used in ECCS Evaluation Model to Demonstrate Compliance W/App K to 10CFR50.46.Rev Will Not Result in Analyses Exceeding 2,200 F Regulatory Limit)
- ML20137Y064 + (Informs of Revised NRC Program for Managing plant-specific Backfitting of Nuclear Power Plants.Nrc Manual Chapter 0514, NRC Program for Mgt of Plant-Specific Backfitting of Nuclear Power Plants, Encl)
- U-601161, Informs of Revised Position Re Sser 6 Commitment Concerning Condition Discovered in Which Annunciator Features of self-test Sys Not Functioning as Described in Sser 2. Justification for Changed Position Discussed + (Informs of Revised Position Re Sser 6 Commitment Concerning Condition Discovered in Which Annunciator Features of self-test Sys Not Functioning as Described in Sser 2. Justification for Changed Position Discussed)
- ST-HL-AE-1381, Informs of Revised Program to Assure That Design Info Input for Seismic Analyses Kept Consistent w/as-built Configuration Per IE Bulletin 79-14.Revised Program Requires safety-related Piping Sys Walkdown by Dedicated Group + (Informs of Revised Program to Assure That Design Info Input for Seismic Analyses Kept Consistent w/as-built Configuration Per IE Bulletin 79-14.Revised Program Requires safety-related Piping Sys Walkdown by Dedicated Group)
- ML18100A521 + (Informs of Revised Request for Amend for Licenses DPR-70 & DPR-75 Re Deletion of Line Item 9 of TS 3.3.3.7,PAMS, Table 3.3-11 & 4.3-11 W/Associated Action 3 on Both Units)
- ML20211E373 + (Informs of Revised Schedule for Commission Consideration of Idvp Final Rept & NRC 830805 Sser Re Fuel Loading at Plant. Written Comments Will Be Submitted by 830823,Public Meetings Scheduled for 830913 & 21)
- ML20082P196 + (Informs of Revised Schedule for Installation of Drains & Vents in AFW Sys Per Insp Repts 50-445/90-03 & 50-446/90-03)
- ML20235D695 + (Informs of Revised Schedule for Remaining Milestones in Environ Review of Application for CPs for Plant.Revised Schedule Encl)