Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Informs of Revised Amend Implementation Date for TS Change 93-09". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20134K206  + (Informs of Review of Pse&G Response to Escalated EA .Licensee Response Acceptable)
  • ML20132C095  + (Informs of Review of Radiological Tech Specs Per 840425 Memo.All Category 1 Items Should Be Corrected by 840801. Category 2 Items Could Be Handled on Licensee Priority Schedule)
  • ML20084M243  + (Informs of Review of Re IE Bulletin 73-01. Westinghouse DB-50 Breakers Modified)
  • ML17258A840  + (Informs of Review of Re Inadvertent Safety Injection During Surveillance Testing.Response Acceptable. Requests Notification When Administrative & Calibr Procedures Re Supervisor Notification Have Been Modified)
  • ML18092A521  + (Informs of Review of Re QA Program Description. Responses Adequate to Resolve NRC Concerns Noted in .Effectiveness of QA Program Implementation Will Continue to Be Subj of Routine Regional Insps)
  • ML20013F807  + (Informs of Review of Region II Nuclear Matls Program as Part of Impep,As Described in USNRC Mgt Directive 5.6.Forwards for Comment Draft Impep Rept Which Documents Results of Review Conducted on 980209-13)
  • ML18095A927  + (Informs of Review of Request for Clarification of Reporting Requirements Re Svc Water Piping Leaks & Determines Formal Reporting to NRC EOC Per 10CFR50.72 & 50.73 Not Necessary)
  • ML20210T194  + (Informs of Review of Rev 1 to SER Re PSAR Through Amend 23. CESSAR Outstanding Items,Including Atws,Design Changes to Shutdown Cooling Sys & Boron Dilution Analysis,Remain.Upon Resolution of Items,Psar Will Be Acceptable for CPs)
  • ML19343B634  + (Informs of Review of SEP Topic VI-4 Re Containment Isolation Sys.Addl Info Described in Encl Requested)
  • ML20094Q317  + (Informs of Review of Schedule for Sprinkler Design & Installation in Conjunction W/Possible Temporary Protective Measures.Installation of Permanent Sprinkler Sys Should Be Expedited)
  • ML20071M181  + (Informs of Review of Secy 91-294, Draft SER on GE BWR Design Covering Chapter 7 of Std Sar)
  • ML20132C383  + (Informs of Review of Ser,Section 4.0 Re Vital Area Identification.No Concerns Identified Re Meeting 10CFR73.55 Requirements,Assuming Refueling Water Storage Tank Included in Vital Area)
  • RBG-20350, Informs of Review of Shift Staffing in Light of Operating Experience on Shift,In Response to a Schwencer to Wj Cahill.Current Training & Exam Plans Continue Toward Fully Qualified six-shaft Rotation  + (Informs of Review of Shift Staffing in Light of Operating Experience on Shift,In Response to a Schwencer to Wj Cahill.Current Training & Exam Plans Continue Toward Fully Qualified six-shaft Rotation)
  • ML20203D662  + (Informs of Review of Staff Response to Applicant Motion for Summary Disposition of Joint Intervenors Contention EP-2/EP-2(h) & Affidavit of Cl Stovall.State & Local Emergency Plans Will Be Revised.Related Correspondence)
  • ML20140G734  + (Informs of Review of State of Il 850812 Draft Proposal for Agreement State Status,Per F Brenneman Request.Section 6 of Vol III Re Regulations for Stds for Protection Against Radiation in Accordance w/10CFR20 Stds)
  • ML20140C970  + (Informs of Review of State of Il Laws Re Power of Dept of Nuclear Safety to Determine If Laws Provide Adequate Legal Authority for State of Il to Become Agreement State.State Statutes Provide Sufficient Legal Authority)
  • ML19220B312  + (Informs of Review of Steam Line Break Analysis Submitted by Applicant on 771118.Forwards Info Requests Resulting from 771208-09 Meeting Between Applicant & NSSS Supplier)
  • ML20209D465  + (Informs of Review of Tech Specs 3/4.7.12, UHS & 3/4.7.13, Flood Protection. Limiting Conditions for Operation, Surveillance Requirements & Bases of Tech Specs Acceptable)
  • ML17321A992  + (Informs of Review of Tech Specs for post-maint Testing of Diesel Generators,Identifying Specs That May Contribute to Reduced Diesel Generator Reliability,Per Generic Ltr 83-28. Internal Efforts Underway to Modify Tech Specs)
  • ML20128M337  + (Informs of Review of Ucs Re TMI-1 & Oeld 850517 Memo Discussing Ucs Ltr.Ucs Ltr Does Not Warrant Further Commission Review)
  • ML20198A166  + (Informs of Review of Unresolved Item Identified in Insp Rept 50-461/85-60 Re Acceptability of Preoperational Type a Test Conducted at Plant.Justification for Not Performing Another Type a Test Requested)
  • ML20206L794  + (Informs of Review of Util 800716,841011 & 850315 Responses to IE Bulletin 80-11, Masonry Wall Design. Failure of Any Masonry Wall Will Not Affect Ability of Plant to Safely Shut Down.Action on Bulletin Closed)
  • ML20210P148  + (Informs of Review of Util 860318 Sediment Transfer & Processing Operations Ser.Proposed Operation of Collection, Transfer & Sediment Treatment Equipment in Facility Auxiliary,Fuel Handling & Reactor Bldgs Approved)
  • ML20247E370  + (Informs of Review of Util 890224 Response to Generic Ltr 88-14 Re Instrument Air Supply Problems.Nrc Understands That Util Program Will Be Completely Implemented by Completion of 9R Refueling Outage Estimated to Be 911231)
  • ML14138A194  + (Informs of Review of on Operating Experience, Insp & Analysis Results Re Reliability of Tdi V-20 Diesels. Lead Engine Testing,Disassembly & Insp Not Required Before Restart)
  • ML20083B874  + (Informs of Revised Amend Implementation Date for TS Change 93-09)