MONTHYEARML20135F6941996-11-27027 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 ML20128L7761996-10-10010 October 1996 Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant ML20058C2811990-10-26026 October 1990 Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 ML20151T9551988-08-0808 August 1988 Notification of 880915 Meeting W/Util in Rockville,Md to Review 880630 Submittal to Resolve Open Issues Re Ground Motion Attenuation ML20155E8511988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by ML20196J9081988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by .Meeting Room Changed ML20150C4201988-03-10010 March 1988 Forwards BNL Re Ssi/Deconvolution Issue.Ltr Received for Distribution to Applicant,Util & Lpdrs ML20149K1061988-02-18018 February 1988 Notification of 880301-02 Meetings W/Util in New York,Ny to Discuss Soil Structure Interaction/Deconvolution Issue ML20236W0451987-12-0101 December 1987 Notification of 871215 Meeting W/Util in Bethesda,Md to Discuss soil-structure Interaction/Deconvolution Analysis Used in Facility Seismic Evaluation ML20236N1221987-11-0909 November 1987 Forwards Structural & Geosciences Branch Observation & Findings Re Concrete Module on (C3-02) - Const Assurance Program.Observation & Findings Should Be Identified to Region V Lead Reviewer ML20236A7421987-10-14014 October 1987 Forwards Draft Status of Plant Seismic Review to Be Filed ML20214P5991987-05-21021 May 1987 Notification of Significant Meeting on 870529 W/Util in Walnut Creek,Ca to Discuss Licensee Overview Presentation of Completed Activities of Readiness Review Const Assurance Module C3-02 Re Concrete ML20215F9171986-12-11011 December 1986 Notification of Significant Meeting on 870107 W/Util at Region V Ofc to Review Commitments & Schedules for Readiness Review Program ML20207E5431986-07-18018 July 1986 Notification of 860801 Meeting W/Util in Walnut Creek,Ca to Discuss Const Assurance Program Earthwork Module ML20211G7741986-06-16016 June 1986 Advises That G Dick Assigned as Licensing Project Manager for Facility.Dick Will Be point-of-contact for All NRR Activities,Including Readiness Review ML20141D3631986-03-25025 March 1986 Suggests That Response to Util Re Delay Should Be Sent by NRR Rather than EDO ML20153F1681986-02-21021 February 1986 Requests Approval/Disapproval of Encl DOE Proposal, Readiness Review,Const Assurance Program Insp of Washington Nuclear Plant,Unit 3 ML20210B9881986-02-0505 February 1986 Forwards Util 850731 Request for Review of Itt Grinnell Stiff Clamps.Util Prepared to Make Presentation of Rept & Respond to Questions.Complete Review Requested by 860430 ML20137R8821986-02-0404 February 1986 Notification of 860213 Meeting W/Util in Bethesda,Md to Discuss Recent Developments Re Engineering Assurance Program of Readiness Review Program ML20210A9471986-01-15015 January 1986 Responds to 851219 Request for Info Re S&W Engineering Assurance Program.Principal Differences Between Engineering Assurance Program & Idvp Is Review Timing & Who Performs Review ML20210A6731985-12-0606 December 1985 Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.W/o Supporting Documentation from Program Ofcs ML20209H0891985-10-0707 October 1985 Concurs w/marked-up Environ & Hydrologic Enginering Branch Review of Section 2.4 of Draft SER Re PMF on Streams & Rivers & Potential Dam Failures ML20132F2071985-09-27027 September 1985 Notification of Significant Licensee Meeting on 851029 W/Util in Elma,Wa to Examine Readiness Review Const Appraisal Program ML20209H0691985-09-19019 September 1985 Forwards marked-up Section 2.4 of Draft SER for Use in Responding to T Novak Undtd Memo.Figures 2.4.1 & 2.4.2 Missing from Draft ML20209H0811985-09-19019 September 1985 Recommends Concurrence W/Draft SER.Marked-up Page 6-19 of Draft SER Re Combustible Gas Control Sys Encl ML20198A1571985-09-19019 September 1985 Comments on WPPSS Project 3 Draft Ser,Including Sections 13.2,14 & 18 Re Training,Initial Test Program & Human Factors Engineering,Respectively.Comments on Sections 13.1, 13.4 & 13.5 Not Provided ML20210A7421985-09-11011 September 1985 Advises That Input in Draft SER Contains Outstanding Issues, Including Responses to Concerns Received in June 1984.Issues Must Be Received & Resolved at Such Time as Licensing Process Reinstated for Unit ML20210A7451985-09-0404 September 1985 Forwards Draft SER for Comments & Concurrence by 850920. Identification of Change in Staff Positions from Feb 1984 - Aug 1985 Requested So That Applicant May Be Advised of Items Requiring Reconsideration.W/O Encl ML20209G1251985-08-29029 August 1985 Forwards Draft SER for Comments & Concurrence by 850920. Draft Originally to Be Issued in Feb 1984.Draft to Provide Baseline Record of Review in Case Const Reinstated. W/O Encl ML20209G1101985-08-23023 August 1985 Forwards Draft SER Input,Based on FSAR Submitted to Date. Unresolved Issues Requiring Addl Info Listed ML20197K2061985-08-21021 August 1985 Recommends That a Bournia & T Cox Be Made Available If Members of NRR Required to Provide Depositions in WPPSS Securities Litigation.Listing of NRR Personnel Involved in Review of CPs of Facilities Forthcoming ML20209E5861985-06-28028 June 1985 Forwards Comments on Design Review Program to Be Implemented by Util as Second Module of Readiness Review Program,Per 850607 Memo.Specific Input from NRR (Secondary Reviewer) Not Required ML20127G1161985-06-21021 June 1985 Responds to Jg Partlow 850508 Memo Requesting Comments on Eight Draft Emergency Preparedness Preoperational Procedures.Program Should Be Similar to Other IE Insp Programs.Inclusion of Procedure 82102 Not Supported ML20209E5021985-06-12012 June 1985 Forwards Meeting Notice on Readiness Review Program Scheduled by Region V for 850701-02.T Ankrum Comments on Meeting Submitted.Implementation of Design Review Ie/Region V Responsibility.W/O Encl ML20197J5561985-05-0202 May 1985 Forwards Fes for Final Concurrence to Permit Issuance. Responses Received Re 841123 Memo Resolved.W/O Encl ML20209E3071985-04-16016 April 1985 Describes Site Environ Status,As Determined by 850411 Telcons W/F Hahn,A Moore & a Christian.Stabilization & Revegetation Efforts Along Stein Creek & Elizabeth Creek Satisfactory.Site Visit Not Necessary for Environ Review ML20209E3681985-04-12012 April 1985 Informs That Development of Draft SER Not Worthwhile,Per 850129 Request That Draft SER Be Provided by 850301,since Most Responses to Questions Not Received.No Approved Schedule Exists for Facility ML20209E0271985-03-0404 March 1985 Advises That Branch Has No Further Input to 831013 Draft SER & Section 3.11,per 850129 Request.Addl Input for Section 3.10 Will Be Provided at Later Time ML20209E0761985-03-0101 March 1985 Forwards Draft SER Re FSAR Chapter 14 Concerning Initial Plant Test Program.Test Program Acceptable & Meets Requirements of 10CFR50 ML20209D9871985-02-26026 February 1985 Forwards Draft SER Input on FSAR Section 4.2, Fuel Sys Design. License Condition 4.2.3.1(g) Re Maintaining Shoulder Gap Clearance During First Two Refueling Outages Should Be Relaxed ML20209E0061985-02-25025 February 1985 Confirms 850208 Notes That No Revs or Additions to 831213 Draft SER Input Provided,Per 850129 Request ML20209D9541985-02-19019 February 1985 Forwards Proposed License Condition & Safeguards SER Input, Based on Review of Facility Security Plan.Protected SER App Containing Safeguards Info Available from E Mcpeek. SALP Input Also Encl ML20209D9711985-02-19019 February 1985 Advises That Meteorology Sections in Draft SER Require No Changes & Should Be Used,Per G Knighton 850129 Request ML20209D9771985-02-15015 February 1985 Advises of Dr Muller 840511 Memo to Tm Novak That Provided Final SER Input Identifying One Open Item Re Control Room Habitability from Section 6.4.Item Remains Open Due to Lack of Info from Util ML20209D9371985-02-0808 February 1985 Forwards 831031 Draft SER Re Radiation Exposure in Response to 850129 Memo.Fsar Review Status Continuing Since Response to Eight Open Items Not Yet Received.W/O Encl ML20209D8971985-02-0606 February 1985 Discusses Review of Section 4.0, Identification of Vital Areas & App of Safeguards SER for Facility.No Concerns Re 10CFR73.55 Found ML20209D8481985-01-29029 January 1985 Informs That Draft SER Issuance Rescheduled for Mar 1985. Draft SER Input Indicating Appropriate Findings Re Topic Review or Inadequate Applicant Response Requested by 850301 ML20209D7321985-01-0303 January 1985 Forwards Summary of Review Costs Incurred by Various Program Ofcs Directly Involved in Processing of Ol.W/O Encl ML20209D6671984-12-0505 December 1984 Informs That Listed Items Should Be Corrected in Draft Fes. Corrections Needed Include Encl Table 4.7 Changes Re Population Distribution within 0-10 Miles in 1980 & Changes to Sections 4.2.2 & 5.9.4.4(2) Per Encl 840927 Memo ML20209D6331984-11-30030 November 1984 Forwards Comments on Portions of Fes,Per T Novak 841123 Request 1996-11-27
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20135F6941996-11-27027 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Atomic Safety & Licensing Board Terminating Proceedings in Docket Has Expired.W/Certificate of Svc.Served on 961127 ML20128L7761996-10-10010 October 1996 Notification of 961023 Meeting W/Wppss,Energy Facility Site Evaluation Council & State & Local Govt Agencies in Elma,Wa to Discuss Proposed Termination of CP & OL Application for Plant ML20058C2811990-10-26026 October 1990 Summary of 901018 Meeting W/Util Re Potential Restart of Units 1 &/Or 3 ML20151T9551988-08-0808 August 1988 Notification of 880915 Meeting W/Util in Rockville,Md to Review 880630 Submittal to Resolve Open Issues Re Ground Motion Attenuation ML20155E8511988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by ML20196J9081988-06-0909 June 1988 Notification of 880707 Meeting W/Util in Rockville,Md to Discuss Probabilistic Seismic Hazard Analysis Submitted by .Meeting Room Changed ML20150C4201988-03-10010 March 1988 Forwards BNL Re Ssi/Deconvolution Issue.Ltr Received for Distribution to Applicant,Util & Lpdrs ML20149K1061988-02-18018 February 1988 Notification of 880301-02 Meetings W/Util in New York,Ny to Discuss Soil Structure Interaction/Deconvolution Issue ML20236W0451987-12-0101 December 1987 Notification of 871215 Meeting W/Util in Bethesda,Md to Discuss soil-structure Interaction/Deconvolution Analysis Used in Facility Seismic Evaluation ML20236N1221987-11-0909 November 1987 Forwards Structural & Geosciences Branch Observation & Findings Re Concrete Module on (C3-02) - Const Assurance Program.Observation & Findings Should Be Identified to Region V Lead Reviewer ML20236A7421987-10-14014 October 1987 Forwards Draft Status of Plant Seismic Review to Be Filed ML20214P5991987-05-21021 May 1987 Notification of Significant Meeting on 870529 W/Util in Walnut Creek,Ca to Discuss Licensee Overview Presentation of Completed Activities of Readiness Review Const Assurance Module C3-02 Re Concrete ML20215F9171986-12-11011 December 1986 Notification of Significant Meeting on 870107 W/Util at Region V Ofc to Review Commitments & Schedules for Readiness Review Program ML20207E5431986-07-18018 July 1986 Notification of 860801 Meeting W/Util in Walnut Creek,Ca to Discuss Const Assurance Program Earthwork Module ML20211G7741986-06-16016 June 1986 Advises That G Dick Assigned as Licensing Project Manager for Facility.Dick Will Be point-of-contact for All NRR Activities,Including Readiness Review ML20141D3631986-03-25025 March 1986 Suggests That Response to Util Re Delay Should Be Sent by NRR Rather than EDO ML20153F1681986-02-21021 February 1986 Requests Approval/Disapproval of Encl DOE Proposal, Readiness Review,Const Assurance Program Insp of Washington Nuclear Plant,Unit 3 ML20210B9881986-02-0505 February 1986 Forwards Util 850731 Request for Review of Itt Grinnell Stiff Clamps.Util Prepared to Make Presentation of Rept & Respond to Questions.Complete Review Requested by 860430 ML20137R8821986-02-0404 February 1986 Notification of 860213 Meeting W/Util in Bethesda,Md to Discuss Recent Developments Re Engineering Assurance Program of Readiness Review Program ML20210A9471986-01-15015 January 1986 Responds to 851219 Request for Info Re S&W Engineering Assurance Program.Principal Differences Between Engineering Assurance Program & Idvp Is Review Timing & Who Performs Review ML20210A6731985-12-0606 December 1985 Forwards Summary of OL Review Costs & Supporting Documentation for 840624-1222.W/o Supporting Documentation from Program Ofcs ML20209H0891985-10-0707 October 1985 Concurs w/marked-up Environ & Hydrologic Enginering Branch Review of Section 2.4 of Draft SER Re PMF on Streams & Rivers & Potential Dam Failures ML20132F2071985-09-27027 September 1985 Notification of Significant Licensee Meeting on 851029 W/Util in Elma,Wa to Examine Readiness Review Const Appraisal Program ML20209H0691985-09-19019 September 1985 Forwards marked-up Section 2.4 of Draft SER for Use in Responding to T Novak Undtd Memo.Figures 2.4.1 & 2.4.2 Missing from Draft ML20209H0811985-09-19019 September 1985 Recommends Concurrence W/Draft SER.Marked-up Page 6-19 of Draft SER Re Combustible Gas Control Sys Encl ML20198A1571985-09-19019 September 1985 Comments on WPPSS Project 3 Draft Ser,Including Sections 13.2,14 & 18 Re Training,Initial Test Program & Human Factors Engineering,Respectively.Comments on Sections 13.1, 13.4 & 13.5 Not Provided ML20210A7421985-09-11011 September 1985 Advises That Input in Draft SER Contains Outstanding Issues, Including Responses to Concerns Received in June 1984.Issues Must Be Received & Resolved at Such Time as Licensing Process Reinstated for Unit ML20210A7451985-09-0404 September 1985 Forwards Draft SER for Comments & Concurrence by 850920. Identification of Change in Staff Positions from Feb 1984 - Aug 1985 Requested So That Applicant May Be Advised of Items Requiring Reconsideration.W/O Encl ML20209G1251985-08-29029 August 1985 Forwards Draft SER for Comments & Concurrence by 850920. Draft Originally to Be Issued in Feb 1984.Draft to Provide Baseline Record of Review in Case Const Reinstated. W/O Encl ML20209G1101985-08-23023 August 1985 Forwards Draft SER Input,Based on FSAR Submitted to Date. Unresolved Issues Requiring Addl Info Listed ML20197K2061985-08-21021 August 1985 Recommends That a Bournia & T Cox Be Made Available If Members of NRR Required to Provide Depositions in WPPSS Securities Litigation.Listing of NRR Personnel Involved in Review of CPs of Facilities Forthcoming ML20209E5861985-06-28028 June 1985 Forwards Comments on Design Review Program to Be Implemented by Util as Second Module of Readiness Review Program,Per 850607 Memo.Specific Input from NRR (Secondary Reviewer) Not Required ML20127G1161985-06-21021 June 1985 Responds to Jg Partlow 850508 Memo Requesting Comments on Eight Draft Emergency Preparedness Preoperational Procedures.Program Should Be Similar to Other IE Insp Programs.Inclusion of Procedure 82102 Not Supported ML20209E5021985-06-12012 June 1985 Forwards Meeting Notice on Readiness Review Program Scheduled by Region V for 850701-02.T Ankrum Comments on Meeting Submitted.Implementation of Design Review Ie/Region V Responsibility.W/O Encl ML20197J5561985-05-0202 May 1985 Forwards Fes for Final Concurrence to Permit Issuance. Responses Received Re 841123 Memo Resolved.W/O Encl ML20209E3071985-04-16016 April 1985 Describes Site Environ Status,As Determined by 850411 Telcons W/F Hahn,A Moore & a Christian.Stabilization & Revegetation Efforts Along Stein Creek & Elizabeth Creek Satisfactory.Site Visit Not Necessary for Environ Review ML20209E3681985-04-12012 April 1985 Informs That Development of Draft SER Not Worthwhile,Per 850129 Request That Draft SER Be Provided by 850301,since Most Responses to Questions Not Received.No Approved Schedule Exists for Facility ML20209E0271985-03-0404 March 1985 Advises That Branch Has No Further Input to 831013 Draft SER & Section 3.11,per 850129 Request.Addl Input for Section 3.10 Will Be Provided at Later Time ML20209E0761985-03-0101 March 1985 Forwards Draft SER Re FSAR Chapter 14 Concerning Initial Plant Test Program.Test Program Acceptable & Meets Requirements of 10CFR50 ML20209D9871985-02-26026 February 1985 Forwards Draft SER Input on FSAR Section 4.2, Fuel Sys Design. License Condition 4.2.3.1(g) Re Maintaining Shoulder Gap Clearance During First Two Refueling Outages Should Be Relaxed ML20209E0061985-02-25025 February 1985 Confirms 850208 Notes That No Revs or Additions to 831213 Draft SER Input Provided,Per 850129 Request ML20209D9541985-02-19019 February 1985 Forwards Proposed License Condition & Safeguards SER Input, Based on Review of Facility Security Plan.Protected SER App Containing Safeguards Info Available from E Mcpeek. SALP Input Also Encl ML20209D9711985-02-19019 February 1985 Advises That Meteorology Sections in Draft SER Require No Changes & Should Be Used,Per G Knighton 850129 Request ML20209D9771985-02-15015 February 1985 Advises of Dr Muller 840511 Memo to Tm Novak That Provided Final SER Input Identifying One Open Item Re Control Room Habitability from Section 6.4.Item Remains Open Due to Lack of Info from Util ML20209D9371985-02-0808 February 1985 Forwards 831031 Draft SER Re Radiation Exposure in Response to 850129 Memo.Fsar Review Status Continuing Since Response to Eight Open Items Not Yet Received.W/O Encl ML20209D8971985-02-0606 February 1985 Discusses Review of Section 4.0, Identification of Vital Areas & App of Safeguards SER for Facility.No Concerns Re 10CFR73.55 Found ML20209D8481985-01-29029 January 1985 Informs That Draft SER Issuance Rescheduled for Mar 1985. Draft SER Input Indicating Appropriate Findings Re Topic Review or Inadequate Applicant Response Requested by 850301 ML20209D7321985-01-0303 January 1985 Forwards Summary of Review Costs Incurred by Various Program Ofcs Directly Involved in Processing of Ol.W/O Encl ML20209D6671984-12-0505 December 1984 Informs That Listed Items Should Be Corrected in Draft Fes. Corrections Needed Include Encl Table 4.7 Changes Re Population Distribution within 0-10 Miles in 1980 & Changes to Sections 4.2.2 & 5.9.4.4(2) Per Encl 840927 Memo ML20209D6331984-11-30030 November 1984 Forwards Comments on Portions of Fes,Per T Novak 841123 Request 1996-11-27
[Table view] |
Text
- - -
7 4
_h L. . l V -
. ) yelloa)
UNITED STATES NUCLEAR REGULATORY COMMISSION W ASHINGTON. D. C. 20555 OCT 1IIIE ;
1 Richard C. DeYoung, Jr., Assistant Director for LWR's, Group 1 RL f REVISION 1 TO SER - WASHINGTON PUBLIC POWER SUPPLY SYST 8 UNITS 3 & 5 Plant Name: WPPSS 3 & 5 l Licensing Stage: C Docket Nos.: S 50-508 509 Milestone No.: 21-Responsible Branc and Project Leader: LWR l-3, P. O'Reilly Requested Completion Date: August 29, 1975 (Reference, Ltr. to R. E. Heineman and D. Skovholt from R. C. DeYoung, Jr., ,
i Schedule for WPPSS 3 & 5 et.al., dated July 25, 1975)
Technical Review Branch Involved: Reactor Systems Description of Review: Revision to Update SER - Washington Public Power Supply System Units 3 & 5, letter to R. C. DeYoung, Jr.,
from Victor Stello, Jr., dated July 10, 1975.
Review Status: Complete thru WPPSS Amendment 23. .
The referenced letter SER from Reactor Systems Branch identified several
- unresolved items and problem areas with respect to the construci. ion appli-cation for WPPSS 3 & 5. The identified items represented the RSB evaluation of the project PSAR through Amendment 18, which incorporated CESSAR Amendments up to and including 21. On September 12, 1975, the applicant submitted Amendment 23, which included response to interface items in CESSAR Amendeents 36 and 37. Reactor Systems Branch has now reviewed the submittal through Amendment 23 and finds that the status of unresolved items has changed. A listing of unresolved CESSAR items identified in the referenced SER together with comments on the current status of these items follows:
CESSAR Outstanding Items (1) Anticipated Transients Without Scram must be reviewed and any required changes must be incorporated into the CESSAR design.
No change; the CE model is under review by the staff.
(2) Design changes to the shutdown cooling system to satisfy CDC 34 must be accomplished. Tliis item has been resolved pending documentation of design changes which have been agreed upon between EICSB and Combustion Engineering. However, WPPSS has taken exception to interface requirements which are necessary to the resolution of this problem, and it will become a WPPSS open item after resolution of CESSAR.
D
} .
J
- t 8605290794 751001 PDR ADOCK 05000508 E PDR L
7f, 1 .
)
OCT 11975 Richard C. DeYoung, Jr. (3) Pressurizer relief tank design - The CESSAR review of this item has been completed and we find the design acceptable; this item
. is resolved.
'(4) The ECCS performance evaluation must comply to the requirements of 10 CFR 50.46 and Appendix K (presently under review) - No change; additional information has been requested from Combustion Engineering.
(5) Flow restrictors are to be incorporated in the main steam lines -
CESSAR hss specified this as an interface item and the applicant has agreed to provide them unless Combustion Engineering can demonstrate that they are unaccessary for System 80. We find that the conuitment provided in Section 5.1.4 interface item I-2 of Amendment 23 of the applicant's PSAR is acceptable and consider this item to be reselved. Evaluation of the methods for the main steam line break analysis is scheduled for Beneric review. .
(6) Baron dilution analysis - Additional documentation is required from Combustion Engineering before the staff review of this item
~
can be completed.
(7) Repressurization of Safety Injection Tanks - An additional unresolved item, repressurization of the safety injection tanks was identified as item 12(a) in Section 1.9 of the CESSAR SER. The design of the safety injection tanks provides for the manual depressurization of the tanks to 400 psig during plant cooldown and the manual pres-surization of the tanks to 600 psig during plant start-up. Additional e documentation is being' required to describe the proposed procedures, indications, and alarms to accomplish the repressurization function.
- The outcome of the Reactor Systems Branch review of this item will I be applicable to WPPSS 3 & 5.
The status of WPPSS items addressed in the previous SER and new problem areas identified in subsequent WPPSS submittals follows:
i r
i
1 . )
001 1 I* '
Richard C. DeYoung, Jr. .
WPPSS Outstanding Items (1) Overpressure Protection Design - In Amendment 23 to the WPPSS PSAR, the applicant 1ndicates that twelve safety valves are to be provided; four valves are to have set pressure equal to the main steam system design pressure (1255 psig) and the highest set pressure (four valves) will not exceed 1318 psig, with the middle set pressure at an intermediate value to be finalized during valve procurement. We have evaluated the design commitments with respect to the preliminary overpressure pro-tection analysis and assumptions used in the accident analyses and find the design acceptable for a construction permit. -
(2) NPSH Requirements for LPSI Pumps - Post-LOCA procedures described by the applicant include restart of the low pressure safety injection (LPSI) pumps during recirculation from the sump. The Amendment 22 response to our question 214.2 regarding monitoring and flow throttling control for this operation is acceptable.
However, a design evaluation of available NPSH for the LPSI pumps operating in the recirculation mode has not been provided. The applicant has provided such an evaluation for all other pumps taking suction from the sump in Section 6.3.2.14 of the PSAR. We will require this evaluation for the LPSI pumps before the design can be accepted for a construction permit.
(3) Conformance to Regulatory Guide 1.79 - The applicant indicates in j
Amendment 22 (Section 6.3.4) of the PSAR that the ECCS pre-operctional testing will conform to Regulatory Guide 1.79 with exception of j positions that require the pumps to take suction from the contain-i ment sump. We find this exception unacceptable and will require such tests.
l I
1 4 ) !
Richard C. DeYoung, Jr. OCT 1 575 (4) Steam Line Break Analysis - The applicant must identify any valves in the Main Steam and Feedwater Systems which will remain open to contribute to blowdown of the intact steam generator under assumed conditions of a steam line break coincident with a single failure (e.g., main steam isolation valve fails to close). The applicant must justify the existing steam line break analysis or provide a new analysis including maximum blowdown conditions.
(5) Compliance to CESSAR Interface Requirements - The documentation of CESSAR interface requirements and the intentions of the applicant with respect to these requirements is incomplete for
'this review. The applicant has indicated non-compliance with '
many safety-related interfaces in Amendment 23 and these items remain under review by the staff. However, several problem
, areas related to the non-compliance with interfaces have been identified in the plant review and are addressed in the items which follow.
(6) Shutdown Cooling Requirements - The CESSAR interface for cooling water supply to the Shutdown Cooling Heat Exchangers requires a flow of 5.46 x 106 WPPSS is providinglb/hrwithmaximumgnlettemperatureof105F.
a flow of 1.75 x 10 lb/hr at 95 0F. It is not apparent that the reduced flow rate proposed for the shut-down cooling heat exchangers vill provide the performance capability of the RHR system as presented in the CESSAR application.
A satisfactory resolution for this problem would be for the applicant to commit to the same design requirements set forth in the interface requirements in CESSAR. An equally acceptable alternative procedure would be for the applicant to demonstrate L that all of the performance requirements for the RHR system are satisfied with the reduced flow capability, i.e., that the RRR system would cool the primary system from an initial temperature of 350 F to 212 F in about 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> assuming a single failure in the RHR system.
a f
I t
,. -~
4, _
t kh A
c4 )
b.
L OCT 1 IIN-Richard C. DeYoung, Jr. (7) Post-LOCA Cooling Requirements - CESSAR requires that 11,000 gpm of cooling water at 120'F be supplied to each shutdown
. cooling heat exchanger to' remove a heat load of 290 x 106 Btu /hr derint recirculation at 20 minutes after LOCA. The WPPSS PSAR (/.mendment 23) indicates that this interface is not applicatle; a component cooling water flow of 6000 gpm at 120'F will be provided as used in their containment transient analysis. The staff will require a breakdown of the duty requirements with comparisons to CESSAR in sufficient detail to explain and justify the reduced cooling water flow requirements, (8) Removal of Power from Atmospheric Dump Valves - The applicant has proposed that electric power be removed from the control circuit for atmospheric steam dump valves to preclude spurious opening during power operation. Power is to be restored to assist in removing decay heat after reactor shutdown. This propoBal is under review.
(9) Removal of Power from Main Steam Isolation Valve Bypass Valves -
The applicant has proposed to remove power.from control circuits
, for these valves instead of providing a single failure proof design. This proposal is under review.
(10) Protection of Safety Injection Tanks from Pipe Whip - The applicant has indicated, that safety injection tanks will not be protected from pipe ruptures that do not require operation of the safety injection system. The staff will require identification of those potential pipe ruptures for which safety injection tanks will be afforded no protection from consequential effects.
Reactor Systems Branch has reviewed the WPPSS 3 & 5 PSAR through Amendment 23 and concludes that upon satisfactory resolution of CESSAR items (1), (2). and g (4) from our original list plus CESSAR item (7) above and upon satisfactory
-1
.i-g].'i j '; s
- p. 3-
.t .
}
Richard C. DeYoung, Jr. 1ON g7 resolution of the WPPSS problems identified above including all inter-face requirmeents, the plant design as described through Amendment 23 of the applicant's PSAR will be acceptable for a construction permit.
~ ,?
f
[dTrSteilo,J(?,
/ll sistant Director for Reactor Safety Division of Technical Review Office of Nuclear Reactor Regulation cc: S. Hanauer -
-R. Heineman
'R. Boyd O. Parr P,- O'Reilly W. Mcdonald -