Informs of Review of Secy 91-294, Draft SER on GE BWR Design Covering Chapter 7 of Std Sar
ML20071M181
Person / Time
Issue date: 09/24/1991
From: Curtiss J
NRC COMMISSION (OCM)
To: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20024G666 List: ... further results
References
NUDOCS 9408040097
Download: ML20071M181 (2)


Text

l C.-

sME2v9'o 1

l UNITED STATES l

8 NUCLEAR REGULATORY COMMISSION o

h WASHINGTON, D.C. 20555

(,*****,o[

September 24, 1991 OFFICE OF THE COMMISSIONER l

MEMORANDUM FOR:

Samuel J.

Chilk Secretary hb

  • FROM:

James R.

Curtis l

SUBJECT:

SECY-91-294 (INFORMATION) -

" DRAFT SAFETY l

EVALUATION REPORT ON THE GENERAL ELECTRIC l

BOILING WATER REACTOR DESIGN COVERING CHAPTER 7 OF THE STANDARD SAFETY ANALYSIS REPORT" l

I have reviewed the subject SECY paper and have no objection to the staff forwarding the -report to General Electric (GE) to inform GE of the staff's current findings regarding instrumentation and control issues for GE's Advanced Boiling t

Water Reactor (ABWR).

Indeed, in view of the significant number of safety issues where the staff apparently lacks sufficient information to make its safety findings, I believe that these matters should be raised forthwith with GE.

l As a general observation, I would like to commend the staff for the high caliber of the review that it has undertaken, as reflected in this document.

The staff has done an outstanding job of identifying those issues requiring resolution in order for l

the staff to make its safety findings.

This effort represents precisely the kind of rigorous evaluation envisioned by Part 52 and, in my judgment, will serve to ensure that safety issues are resolved early and with finality in the design certification process.

I cc:

The Chairman Commissioner Rogers Commissioner Remick OGC EDO 9400040097 940629 PDR COMMS NRCC CORRESPONDENCE PDR

9%4 l