ML17306A765
| ML17306A765 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/29/1992 |
| From: | Conway W ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 102-02161-WFC-T, 102-2161-WFC-T, EA-91-182, NUDOCS 9206050218 | |
| Download: ML17306A765 (6) | |
Text
ACCELERATED D TRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9206050218 DOC.DATE: 92/05/29 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STN-50-529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
I
SUBJECT:
Informs of revised completion date for corrective action in ref to violations issued in EA-91-182.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR g ENCL ~
SIZE:
TITLE: OR Submittal:
General Distribution NOTES:STANDARDIZED PLANT Standardized plant.
Standardized plant.
D
/
05000528 05000529 A
05000530 D
RECIPXENT ID CODE/NAME PD5 LA TRAMMELL,C INTERNAL: ACRS NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD5 PD THOMPSON,M NRR/DET/ECMB 7D NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E OCJ EMB
~G FI 01 NSIC COPIES LTTR ENCL D
D NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WARM CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED! P 7 TOTAL NUMBER OF COPIES REQUIRED:
LTTR ~
ENCL
Arizona Public Service Company P.O. BOX 53999
~
PHOENIX. ARIZONA85072<999 WILLIAMF. CONWAY EXECUTIVEVICEPRESIDENT NUCLEAR 102-02161-WFC/TRB/JRB May 29, 1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Reference:
Letter from W. F. Conway, Executive Vice President, Nuclear, APS, to James Lieberman,
- Director, Office of Enforcement,
- NRC, dated March 2, 1992
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. 50-528/529/530 Revised Completion Date For Corrective Action File: 92-070-026 Arizona Public Service Company (APS) responded, in the referenced letter, to the notice of violations issued in EA 91-182.
Attachment 1 to the referenced letter described the immediate and longer term actions that are being taken on a site wide basis to eliminate the root causes which led to the violations.
APS committed, in Attachment 1 to the referenced letter, to complete an organizational and programmatic evaluation of personnel performance at PVNGS by May 1992. Due to APS'nvestigation activities associated with the water hammer related to the March 23, 1992, Unit 2 reactor trip, the March 31, 1992, surveillance test failure of a Unit 3 reactor trip breaker, and the Unit 3 ALERT emergency classification from May 4, 1992, through May 6, 1992, this date will not be met.
The first phase of the organizational and pro'grammatic assessment, which was completed in March 1992, concluded that detailed organizational and programmatic assessments of the Operations, Maintenance and Technical Support Departments and their key work processes be conducted.
To date, the evaluation of the Operations Department has been completed, the evaluation of the Maintenance Department is expected to be completed by July 31, 1992, and the evaluation of the Technical Support Department is expected to be completed by August 31, 1992.
92060502i8 920529 PDR ADOCK '05000528
..8..
'DR
4) f a
eg I'+(
gpgu
~
L I
,NRC Document Control Page 2 102-02161-WFC/TRB/JRB May 29, 1992 Should you have any questions regarding this letter, please contact Thomas R. Bradish of my staff at (602) 393-5421.
Sincerely, WFC/TRB/JRB/dmn cc:
J. B. Martin D. H. Coe
~ g IJ