.e, Entergy opereuone,Inc.
h.
- 1448 SA 333
" " J--
Rosse!Aa, AR 72801
-,r
~ Td 501 BSB-5n00 December 18,1997 -
2CAN129704 U. S. Nuclear Regulatory Conunission Document ControlDent
. Mail Station OPI-17 Washirigton, DC 20555
Subject:
Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Cci..,0;.im Extension Regarding Risk-Informed Inservice Icpection Pilot Plant Submittal For ANO-2 l
Gentlemen:
^
The results of the risk-ir. formed inservice insWJon (ISI) pilot plant application study for Arkansas. Nuclear One,- Unit 2- (ANO-2) were submitted to - the Nuclear Regulatory Commission by letter dated; September 30,1997 '(2CAN099706).
Eight system risk evaluations were included with the submittal: _1)_high pressure safety injection, 2) reactor
. coolant,' 3) chemical and _ volume control, 4) containment spray, 5) low pressure safety
- irioction and shutdown cooling,.6) emergency feedwater, 7) main feedwater, and 8) main -
steam. The lettet included a commitment to submit the fmal system risk evaluation for the service water system in December 1997.~
The December submittal date was contingent upon the availability of contract support to-perforra th? consequence evaluation of the service water system. The original schedule called for the vendor to begin work in early October 1997.< Due to delays in securing a contract, the vendor was not authorized to begir. work until November 25,1997. Based on this delay, and
- allowing for review by the plant project team and incorporation of resultant comrrats, we believe a submittal date of March 31,1998, is achievable.
g\\[
L y
4 ll lllll11 I lllll ll
,, _,,,,,m,
7 d
PDR ADOCK 05000368 w
- PDR P
w 2
_i_'__i____._.___i____.___m.l______
..______.Z_______
m-
~
~~
~
l=
l
[U. S.' NRC '
l
." December 18,1997 -
.,J.
2CAN129704 Page 2 Very truly ycurs,-
YCWN Dwight C. Mims Director, Nuclear Safety DCM/dwb cc:
Mr. Ellis W. Merschoff Regional Administrator.
U. S. Nuclear Regulatory Commission RegionIV 611 Ayan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior ResidentInspector Arkansas Nuclear One P.O. Box 310 London, AR72847 Mr. George Kalnun NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North -