Informs of Revised Date Re Commitment to Submit Final Sys Risk Evaluation for Svc Water Sys.Evaluation Will Be Submitted 980331 Due to Delay of Availability of Contract Support to Perform Consequence Evaluation of Svc Water Sys
ML20197F322
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 12/18/1997
From: Mims D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
2CAN129704, NUDOCS 9712300185
Download: ML20197F322 (2)


Text

.,

.e, Entergy opereuone,Inc.

h.

- 1448 SA 333

" " J--

Rosse!Aa, AR 72801

-,r

~ Td 501 BSB-5n00 December 18,1997 -

2CAN129704 U. S. Nuclear Regulatory Conunission Document ControlDent

. Mail Station OPI-17 Washirigton, DC 20555

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Cci..,0;.im Extension Regarding Risk-Informed Inservice Icpection Pilot Plant Submittal For ANO-2 l

Gentlemen:

^

The results of the risk-ir. formed inservice insWJon (ISI) pilot plant application study for Arkansas. Nuclear One,- Unit 2- (ANO-2) were submitted to - the Nuclear Regulatory Commission by letter dated; September 30,1997 '(2CAN099706).

Eight system risk evaluations were included with the submittal: _1)_high pressure safety injection, 2) reactor

. coolant,' 3) chemical and _ volume control, 4) containment spray, 5) low pressure safety

irioction and shutdown cooling,.6) emergency feedwater, 7) main feedwater, and 8) main -

steam. The lettet included a commitment to submit the fmal system risk evaluation for the service water system in December 1997.~

The December submittal date was contingent upon the availability of contract support to-perforra th? consequence evaluation of the service water system. The original schedule called for the vendor to begin work in early October 1997.< Due to delays in securing a contract, the vendor was not authorized to begir. work until November 25,1997. Based on this delay, and

- allowing for review by the plant project team and incorporation of resultant comrrats, we believe a submittal date of March 31,1998, is achievable.

g\\[

L y

4 ll lllll11 I lllll ll

,, _,,,,,m,

7 d

PDR ADOCK 05000368 w

- PDR P

w 2

_i_'__i____._.___i____.___m.l______

..______.Z_______

m-

~

~~

~

l=

l

[U. S.' NRC '

l

." December 18,1997 -

.,J.

2CAN129704 Page 2 Very truly ycurs,-

YCWN Dwight C. Mims Director, Nuclear Safety DCM/dwb cc:

Mr. Ellis W. Merschoff Regional Administrator.

U. S. Nuclear Regulatory Commission RegionIV 611 Ayan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior ResidentInspector Arkansas Nuclear One P.O. Box 310 London, AR72847 Mr. George Kalnun NRR Project Manager Region IV/ANO-1 & 2 U. S. Nuclear Regulatory Commission NRR Mail Stop 13-H-3 One White Flint North -

11555 Rockville Pike Rockville, MD 20852 l

>