Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20112E482 + (ML20112E482)
- ML20112E485 + (ML20112E485)
- ML20112E487 + (ML20112E487)
- ML20112E488 + (ML20112E488)
- ML20112E492 + (ML20112E492)
- ML20112E493 + (ML20112E493)
- ML20112E499 + (ML20112E499)
- ML20112E500 + (ML20112E500)
- ML20112E505 + (ML20112E505)
- ML20112E506 + (ML20112E506)
- ML20112E507 + (ML20112E507)
- ML20112E511 + (ML20112E511)
- ML20112E531 + (ML20112E531)
- ML20112E535 + (ML20112E535)
- ML20112E540 + (ML20112E540)
- ML20112E541 + (ML20112E541)
- ML20112E544 + (ML20112E544)
- ML20112E546 + (ML20112E546)
- 3F0596-27, Informs That Senior Operators GP Hebb & Rl Pate,Reassigned & No Longer Require License,Effective 960513 + (ML20112E550)
- ML20112E557 + (ML20112E557)
- ML20112E562 + (ML20112E562)
- ML20112E566 + (ML20112E566)
- ML20112E582 + (ML20112E582)
- ML20112E591 + (ML20112E591)
- ML20112E601 + (ML20112E601)
- ML20112E606 + (ML20112E606)
- ML20112E610 + (ML20112E610)
- ML20112E612 + (ML20112E612)
- ML20112E613 + (ML20112E613)
- ML20112E616 + (ML20112E616)
- 05000413/LER-1996-002-04, :on 960503,TS 3.0.3 Entered Due to Inconclusive Surveillance Testing.Caused by Ommission of Relevant Info & Inadequate Training.Reviewed Test Procedures & Trained Personnel Re Multimeter Use + (ML20112E617)
- ML20112E626 + (ML20112E626)
- 05000354/LER-1996-017, :on 960505,failed to Perform Electrical Distribution Sys line-up.Caused by Personnel Error.Personnel Issues Addressed & Repaired Temp Control Valves for a and D Emergency Diesel Generator + (ML20112E627)
- NSD-NRC-96-4734, Informs Review of Final Design & Seismic Analyses for Nuclear Island Structures & Foundation Basemat Will Be Discussed at 960617-21 Meeting + (ML20112E628)
- ML20112E633 + (ML20112E633)
- ML20112E634 + (ML20112E634)
- ML20112E639 + (ML20112E639)
- RBG-19764, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-29.Corrective Actions:Procedure ADM-0003, Development,Control & Use of Procedures, Revised to Clarify Need for Incorporating Missing Info (Laters) + (ML20112E646)
- ML20112E649 + (ML20112E649)
- 05000334/LER-1996-007, :on 960506,inadvertent Autostart of Motor Driven Auxillary Feed Pumps Occurred.Caused by Inadequate Test Procedure.Revised Maintenance Procedures for Testing Main Feed Pumps + (ML20112E650)
- ML20112E651 + (ML20112E651)
- 05000387/LER-1985-007-02, :on 850216,breaker Supplying Instrument Bus Opened,Causing Isolation of Reactor Water Cleanup Sys on False Signal.Caused by Loss of Power to Temp Sensor Trip Circuitry.Addl Training for Operators Provided + (ML20112E652)
- 05000321/LER-1985-013, :on 850216,drywell Floor Drain Total Leakage Exceeded Max Limit.Caused by Shaft Seal 1 on Reactor Recirculation Pump B Leaking Excessively.Shaft Seal Cartridge Replaced + (ML20112E655)
- W3P85-0749, Informs of Status of License Condition.Summary Document of Operational QA Program,Defining Responsibilities & Interfaces & Providing Guidance on Location of QA Matter Info,Developed & Approved by Util Nuclear Operations Mgt + (ML20112E660)
- ML20112E663 + (ML20112E663)
- ML20112E672 + (ML20112E672)
- ML20112E673 + (ML20112E673)
- W3P85-0753, Forwards Executed Amend 3 to Indemnity Agreement B-92 + (ML20112E675)
- ML20112E679 + (ML20112E679)
- ML20112E682 + (ML20112E682)
- ULNRC-03384, Forwards Revised Schedule & Plans for Resolution of Ampacity Derating Issues Along W/Addl Info Re GL 92-08, Thermo-Lag 330-1 Fire Barriers + (ML20112E686)