ML20112E541
| ML20112E541 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/18/1985 |
| From: | Carey J DUQUESNE LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20112E545 | List: |
| References | |
| GL-83-28, NUDOCS 8503270020 | |
| Download: ML20112E541 (4) | |
Text
i s
g
'A@
.OM Telephone (412) 393-6000 N :le r Malon SHpping Mn, PA 150770004 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Atin: Mr. D. G. Eisenhut,. Director Divisic.n of Licensing Washington, DC 20555 Reierence: Beaver Valley Pcwer Station, Unit No.1 Docket No.60-334, License No. DPR-66 Response to Generic Letter 83-28, Item 2.2.2 Geritlemen:
In our May 10, 1984 response to Generic Letter 83-28, Item 2.2.2, Veridor Interface, it was stated that administrative procedures would be developed or revised to control vendor technical information and the internal handling cf vendor services at Beaver Valley Power Station Unit No. 1 (BVPS-1). This letter forwards the Nuclear Group Directive (NGD) and Site Administrative Procedures (SAPS) developed or revised to address these concerns. As indicated in our prior response, approval of these procedures was delayed due to the Duquesne Light Company manage-ment reorganization.
Specifically, NGD No. 23 and SAP Chapter 24 provide administrative controls for the evaluation, tracking, and disposition of vendor techni-cal information and other safetv-related equirment technical infonnation commonly received or initiated
.y BVPS-1 perscnnel.
SAP Chapter 1 Section VI.L, provides administrative controls on vendor services per-fonned at BVPS-1.
If you have any questions regarding these procedures, please contact our Nuclear Services Unit directly.
l Very truly yours, J J a
ce President l
Nuclear Group B503270020 850318 PDR ADOCK 05000334 h
P PDR 0
'\\
.'i :
March 18, 1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Response to Generic' Letter 83-28, Item 2.2.2 Page 2 cc:
U.S. Nuclear Regulatory Commission Director of Nuclear Reactor Regulation Attn:
Steven A. Varga, Chief Operating Reactors Branch No.1 Division of Licensing Washington, DC 20555 Mr. W. M. Troskoski, Resident Inspector U.S. Nuclear Regulatory Canmission Beaver Valley Power Station Shippingport,-PA 15077 U. S. Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 2666 One James River Plaza Richmond, VA 23261 L
['.
l-i i
f
,, -,. - -, + -, -,
,n
,.e.
-n--,-.
~----n.,.n..,---~
--n.
. -, ~.---,. -,
{?
NUCLEAR GROUP DIRECTIVE NO. 23 Evaluation, Tracking, and Disposition of Correspondence PURPOSE To identify administrative responsibility for establishment of controls on the evaluation, tracking, and disposition of correspondence and other documents routinely received by or circulated through the Nuclear Group.
APPLICABILITY This Directive applies to all Nuclear Group personnel involved with Beaver Valley Power Station Unit 1.
This Directive does not lessen or diminish the responsibility of all Nuclear Group personnel to support the organization defined as the lead in resolving issues identified by the evaluation.
RESPONSIBILITY The Nuclear Group tfanagers and their section heads are responsible to assure that procedures within their respective scope of functional responsibility adhere to Site Administrative Procedure Chapter 24 on Correspondence Control and include the requirements given below.
REQUIREMENTS Procedures shall be developed to require receipt tracking and dispositioning of each document identified in the Site Administrative Procedure on Correspondence Control.
Procedures shall be developed by each group identified to control this incoming information so that it receives the appropriate engineering / technical review, evaluation and distribution for the following:
prompt warnings to key personnel (i.e., notification to olerators of vendor technical information which may affect plant operation).
updating of procedures.
notification to the Nuclear Engineering and Construction Unit for revision of equipment technical manuals.
notification to Training for possible changes to the training program.
notification to the appropriate section head of recommendations to improve the safety or efficiency of plant operations. ISSUE 1 7/17/84
1 NUCLEAR GROUP DIRECTIVE NO. 23 (continued)
Evaluation, Tracking, and Dispositien of Correspondence References Generic Letter 83-28, Section 2.2.2 Salem AWS NDISLC:0813 NDISLC:0894 NUTAC Report on Generic Letter E3-28, Section 2.2.2 Nuclear Group Review:
b 1flW hh
?$h$$
/
4/)'Y Nuclear Operations Quality Assu ce gNuclearServices, Nuclear 7[l7 $
' Engineering and Construction Approval:
717 BY Vice p jident - Nu61 ear Date I
1 I
l ISSUE 1 7/17/84
.-