Requests Schedular Extension Until 851031 to Submit Test Results of Surveillance Capsule 2 Removed from Facility on 840328.Extension Necessitated by Delayed Shipment of Capsule to Testing Lab Due to Scheduling Conflicts
ML20112E633
Person / Time
Site: Oyster Creek
Issue date: 03/21/1985
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
NUDOCS 8503270059
Download: ML20112E633 (2)


Text

T E

GPU Nuclear Corporation ggg7 Post Office Box 388 Route 9 South Forked River,New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

March 21, 1985 Mr. John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Zwolinski:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Schedular Extension Request for Submittal of Surveillance Capsule Analyses Results In accordance with the provisions of Appendix H (Section III.A) of 10CFR50, GPUN hereby requests a schedular extension for submitting the test results of the No. 2 surveillance capsule which was removed from the Oyster Creek reactor vessel on March 28, 1984. Appendix H of 10CFR50 requires submittal of the test results within one year after capsule withdrawal, unless an extension is granted by the Director, Office of Nuclear Reactor Regulation.

The schedular extension request is necessitated by a delayed shipment of the capsule to a testing laboratory due to scheduling conflicts mainly with receipt of spent fuel shipments at Oyster Creek from West Valley, New York.

The delay will have no technical effect on the operation of Oyster Creek Nuclear Generating Station during the current fuel cycle. Oyster Creek Technical Specification (Section 3.3.A(iv)) requires GPU4 to generate new P-T curves for operation beyond 10 effective full power years (EFPY). Oyster Creek will reach 10 CFPY during Cycle XI operation.

It is expected at this time that Cycle XI operation will start in the last quarter of calender year 1986.

8503270059 850321 PDR ADOCK 05000219 P

PDR GPU Nuclear Corporation is a subsidiary of the General Public Unlities Corporation

[,

.Mr. John A. Zwolinski, Chief Divisien cf Lic:nsing U.S. Nuclear Regulatory Commission Page 2 The results of the test will be submitted by October 31, 1985.

Very truly yours, h

f A

te edler Vice President and Di rector Oyster Creek PBF/ dam:0883A cc: Dr. Thomas E. Murley, Administrator-Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 l