e nas,jo, UNITED STATES y
e o
NUCLEAR REGULATORY COMMISSION 4
h WASHINGTON, D. C. 20555
/
BALTIMORE GAS AND ELECTRIC COMPANY DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAP, POWER PLANT UNIT N0. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 101 License No. DPR-53 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment by Baltimore Gas & Electric Company (the licensee) dated June 29, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
8503270099 850307 fDR ADOCK 05000317 PDR
I
!4 2-2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, g
and paragraph 2.C.(2) of Facility Operating License No. DPR-53 is hereby
\\
amended to read as follows:
(2) Technical Specifications l
l The Technical Specifications contained in Appendices A and B, as revised through Amendment No.101, are hereby incorporated in the license. The licensee shall operate the facility in accordance with
{
the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION t
[g James R. Miller, Chief y
Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: March 7, 1985 s
4
r 4
ATTACHMENT TO LICENSE AMENDMENT N0.101 FACILTIY OPERATING LICENSE NO. DPR-53 DOCKET NO. 50-317 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change. The corresponding overleaf page is provided to maintain document completeness.
Page 3/4 7-72
w TABLE 3.7-5 FIRE PROTECTION SPRINKLERS UNIT 1 SPRINKLER LOCATION CONTROL VALVE ELEVATION 11 Diesel Generator 45'-0" 12 Diesel Generator 45'-0" Unit 1 East Pipe Pen Room 227/316*
5'-0" Unit 1 Aux Feed Pump Room 603*
12'-0" Unit 1 East Piping Area Room 428*
45'-0" Unit 1 East Electrical Penetration Room 429*
4 5 ' -0" Unit 1 West Electrical Penetration Room 423*
45'-0" Unit 1 Main Steam Piping Room 315*
45'-0" Unit 1 Component Cooling Pump Room 228*
5'-0" Unit 1 East Piping Area 224*
5'-0" Unit 1 Radiation Exhaust Vent Equipment Room 225*
5'-0" Unit 1 Service Water Pump Room 226*
5'-0" Unit' 1 Boric Acid Tank and Pump Room 217*
5'-0" Unit 1 Reactor Coolant Makeup Pump Room 216*
5'-0" Unit 1 Charging Pump Room 115*
(-)l0'-0" Unit 1 Misc Waste Mon Room 113*
(-)10'-0" Cask and Eqpt Loading Area Rooms 419, 420, 425 & 426*
45'-0" Solid Waste Processing
- 45'-0" Corridors 200, 202, 212 and 219*
5'-0" Corridors 100,103 and 116*
(-)10'-0" Cable Chase 1 A*
45'-0" Cable Chase 1B*
45'-0" Unit 1 ECCS Pump Room 119*
(-)l5'-0" Hot Instrument Shop Room 222*
5'-0" Hot Machine Shop Room 223*
5'-0"
- Sprinklers required to ensure the OPERABILITY of redundant safe shutdown equi pment.
CALVERT CLIFFS - UNIT 1 3/4 7-71 Amendment No. 26, 61
PLANT SYSTEMS HALON SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.11.3.
The following Halon systems shall be OPERABLE with the storage tanks having at least 95% of full charge weight (or level) and 901' of full charge pressure.
a.
Cable spreading rooms total flood system, and associated vertical cable chase 1C, Unit 1.
b.
460 volt switchgear rooms 27 & 45' elevation Unit 1.
APPLICABILITY: Whenever equipment protected by the Halon system is required to be OPERABLE.
ACTION:
a.
With both the primary and backup Halon systems protecting the areas inoperable, within one hour establish an hourly fire watch with backup fire suppression equipment for those areas protected by the inoperable Halon system. Restore.the system to OPERABLE status within 14 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperabil-ity and the plans and schedule for restoring the system to OPERABLE status, b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
SURVEILLANCE REQUIREMENTS 4.7.11.3 Each of the above required Halon systems shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.
b.
At least once per 6 months by verifying Halon storage tank weight (level) and pressure.
c.
At least once per 12 months by performing a visual inspection of the nozzle (s) and visible flow paths for obstructions.
d.
At least once per 18 months by verifying the system, including associated ventilation dampers and fire door release mechanisms, actuates manually and automatically, upon receipt of a simulated actuation signal, and Following completion of n$ajor maintenance or modifications on e.
the system (s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> by performance of a flow test through headers and nozzles to assure no blockage.
CALVERT CLIFFS - UNIT 1 3/4 7-72 Amendment No. 26, 67, H,101
p rah o
UNITED STATES E"
[,%
NUCLEAR REGULATORY COMMISSION
/E WASHINGTON, D. C. 20555 I,4....../
BALTIM0RE GAS AND ELECTRIC COMPANY DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 83 License No. DPR-69 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Baltimore Gas & Electric Company (thelicensee)'datedJune 29, 1984 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and reaulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There 'is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l L
l f
4 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2 of Facility Operating License No. DPR-69 is heret'y amended to read as follows:
2.
Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 83, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specti ations.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Ch m. / rd 7 ames R. Miller, Chief J
Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: March 7, 1985
ATTACHMENT TO LICENSE AMENDMENT NO. 83 FACILTIY OPERATING LICENSE NO. DPR-69 DOCKET N0. 50-318 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change. The corresponding
- overleaf page is provided to maintain document completeness.
.Page 3/4 7-64 4
h '
TABLE 3.7-5 FIRE PROTECTION SPRINKLERS UNIT 2 SPRINKLER LOCATION CONTROL VALVE ELEVATION Unit 2 Aux Feed Pump Room 605*
12'-0" Unit 2 East Piping Area Room 408*
45'-0" Unit 2 East Elec Pen Room 409*
45'-0" Unit 2 West Elec Pen Room 414*
45'-0" Cable Chase 2A*
45'-0" Cable Chase 2B*
45'-0" Unit 2 Main Steam Piping Room 309*
45'-0" V' nit 2 Component Cooling Pp Room 201 5'-0" Unit 2 East Piping Area 203*
5'-0" Unit 2 Rad Exh Vent Equip Room 204*
5'-0" Unit 2 Service Water Pp Room 205*
5'-0" Unit 2 Boric Acid TK and Pp Room 215*
5'-0" Unit 2 Reactor Coolant flakeup Pump Room 216A*
5'-0" Unit 2 Charging Pump Room 105*
(-)l0'-0" Unit 2 Misc Waste Monitor TK Room 106*
(-)l0'-0" Unit 2 ECCS Pump Room 10l*
(-)l5'-0" 21 Diesel Generator 45'-0" Unit 2 East Pipe Pen Room 206/310*
5'-0" NOTE:
Sprinkle.s protecting all rooms listed under heading " Unit 2" will be made operational later in 1981 except for "21 Diesel Generator" which is now operational.
- Sprinklers required to ensure the OPERABILITY of redundant safe shutdown equipment.
CALVERT CLIFFS - UNIT 2 3/4 7-63 Amer.dment No. JJ, 43
PLANT SYSTEMS HALON SYSTEMS LIMITING CONDITION FOR OPERATION 3.7.11.3 The following Halon systems shall be OPERABLE with the storage tanks having at least 95% of full charge weight (or level) and 90% of full charge pressure.
a.
Cable spreading rooms total flood system, and associated vertical cable chase 1C, Unit 2.
b.
460 volt switchgear rooms 27 & 45' elevation Unit 2.
APPLICABILITj[: Whenever equipment protected by the Halon system is required to be OPERABLE.
ACTION:
a.
With both the primary and backup Halon systems protecting the areas inoperable, within one hour establish an hourly fire watch with backup fire suppression equipment for those areas protected by the inoperable Halon system.
Restore the system to OPERABLE status within 14 days or prepare and submit a Special Report to the Comission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
b.
The provisions of Specifications 3.0.3 and 3.0.4 are not applicable.
(
SURVEILLANCE REQUIREMENTS 4.7.11.3 Each of the above required Halon systems shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying that each valve (manual, power operated or automatic) in the flow path is in its correct position.
b.
At least once per 6 months by verifying Halon storage tank weight (level)andpressure.
c.
At least once per 12 months by performing a visual inspection of the nozzle (s) and visible flow paths for obstructions.
d.
At least once per 18 months by verifying the system, including associated ventilation dampers and fire door release mechanisms, actuates manually and automatically, upon receipt of a simulated actuation signal, and e.
Following completion of major maintenance or modifications on the system (s), within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> by performance of a flow test through headers and nozzles to assure no blockage.
CALVERT CLIFFS - UNIT 2 3/4 7-64 Amendment No. JJ, M, 75,83